e:semester 2final sheets inal images for sheetslinked model 2 · bitumin bedding 150mm quinnlite...

1
GLASSFOAM BLOCK BELOW DOOR FRAME IN BITUMIN BEDDING 150MM QUINNLITE THERMAL CONCRETE BLOCK BELOW 215 SOLID CONCRETE BLOCK RISING WALL WITH 85MM KINGSPAN STYROZONE H350R EXTRUDED POLYSTYRENE INSULATION TO FACE OF WALL BELOW GROUND NEW EDGE SLAB: 75MM CONCRETE SCREED AT PERIMETER 250MM KOOLTHERM PHENOLIC INSULATION 150MM REINFORCED CONCRETE SLAB ON MONARFLEX RMB 350 RADON BARRIER/DPM 50MM SAND BLINDING ON HARDCOre EXISTING SLAB TREATMENT: 50MM CONCRETE SCREED OVER 50MM KOOLTHERM PHENOLIC INSULATION TO EXISTING SLAB WITH SCREED CUT BACK 10MM CEMENT PARTICLE BOARD FIXED TO METAL STUDS WITH ROCKSHIELD ADHESIVE MORTAR TO CEMENT PARTICLE BOARD 120MM ROCKWOOL FLEXI INSULATION BETWEEN METAL STUDS 18MM OSB BOARD INTERNALLY TO FORM AIRTIGHT LAYER, ALL JOINTS AND JUNCTIONS TAPED TO SEAL AIRTIGHT LAYER PLASTERBOARD AND SKIM FINISH INTERNALLY 10MM EXTERNAL RENDER COMPRISING OF 2MM ROCKSHIELD FINISH COAT, 5MM ROCKSHIELD TOP COAT AND 5MM ROCKSHIELD BASECOAT WITH MESH REINFORCING 180MM ROCKSHIELD SLAB SECURED WITH 5MM ROCKSHIELD ADHESIVE MORTAR & STAINLESS STEEL INSULATION ANCHOR FIXINGS MUNSTER JOINERY TRIPLE GLAZED PASSIV WINDOW SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON TIMBER BEARER FIXED WITH ANGLE SUPPORT. PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OF FRAME WITH EDGE EXPOSED WHICH IS OVERLAPPED WITH TAPE FIXED TO OSB BOARD TO FORM AIR TIGHT SEAL 10MM CEMENT PARTICLE BOARD FIXED TO METAL STUDS WITH ROCKSHIELD ADHESIVE MORTAR TO CEMENT PARTICLE BOARD 120MM ROCKWOOL FLEXI INSULATION BETWEEN METAL STUDS 18MM OSB BOARD INTERNALLY TO FORM AIRTIGHT LAYER, ALL JOINTS AND JUNCTIONS TAPED TO SEAL AIRTIGHT LAYER PLASTERBOARD AND SKIM FINISH INTERNALLY AIR TIGHT LAYER PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS KINGSPAN KOOLTHERM K18 INSULATED PLASTERBOARD PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS BAUDER XF350 SEDUM BLANKET ON BAUDER SDF DRAINAGE MAT BAUDER ROOT RESISTANT CAPPING SHEET. BAUDER UNDERLAYER 200MM KINGSPAN THERMAROOF TR26 INSULATION IN 2 LAYERS ON BAUDER VAPOUR BARRIER ON EXISTING ROOF KINGSPAN THERMAROOF INSULATION UNDER PRESSED METAL PARAPET CAPPING 145MM± ROCKSHIELD SLAB SECURED WITH 5MM ROCKSHIELD ADHESIVE MORTAR & STAINLESS STEEL INSULATION ANCHOR FIXINGS TO FACE OF EXISTING PARAPET 145MM± ROCKSHIELD SLAB SECURED WITH 5MM ROCKSHIELD ADHESIVE MORTAR & STAINLESS STEEL INSULATION ANCHOR FIXINGS TO INNER FACE OF EXISTING PARAPET DRIP FLASHING OVER ROOFING MEMBRANE UPSTAND 180MM ROCKSHIELD SLAB SECURED WITH 5MM ROCKSHIELD ADHESIVE MORTAR & STAINLESS STEEL INSULATION ANCHOR FIXINGS MUNSTER JOINERY TRIPLE GLAZED PASSIV WINDOW SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON TIMBER BEARER FIXED WITH ANGLE SUPPORT. PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OF FRAME WITH EDGE EXPOSED WHICH IS OVERLAPPED WITH TAPE FIXED TO OSB BOARD TO FORM AIR TIGHT SEAL 10MM CEMENT PARTICLE BOARD FIXED TO METAL STUDS WITH ROCKSHIELD ADHESIVE MORTAR TO CEMENT PARTICLE BOARD 120MM ROCKWOOL FLEXI INSULATION BETWEEN METAL STUDS 18MM OSB BOARD INTERNALLY TO FORM AIRTIGHT LAYER, ALL JOINTS AND JUNCTIONS TAPED TO SEAL AIRTIGHT LAYER PLASTERBOARD AND SKIM FINISH INTERNALLY AIR TIGHT LAYER KINGSPAN KOOLTHERM K18 INSULATED PLASTERBOARD STEEL BALCONY SUPPORTED AT BUILDING WITH SHOECK ISOKORB TYPE R THERMALLY BROKEN SUPPORT SYSTEM. HOLES ARE DRILLED INTO SLAB AND UNIT ANCHORED WITH PRE-INJECTED ADHESIVE. STRUCTURAL SCREED POURED BETWEEN SLAB AND UNIT TO ANCHOR. MUNSTER JOINERY TRIPLE GLAZED PASSIV DOOR SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS TO STEEL ANGLE SUPPORT PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OF FRAME WITH EDGE EXPOSED WHICH IS OVERLAPPED WITH TAPE FIXED TO SCREED TO FORM AIR TIGHT SEAL TILE FINISH OVER PRESSED METAL FLASHING MUNSTER JOINERY TRIPLE GLAZED PASSIV DOOR SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURERS PRO CLIMA AIR TIGHT TAPE FIXED TO US OF FRAME WITH EDGE EXPOSED WHICH IS OVERLAPPED WITH TAPE FIXED TO SCREED TO FORM AIR TIGHT SEAL TILE FINISH OVER PRESSED METAL FLASHING OVER FLUSH DOOR DRAIN IN TILED CONCRETE PATIO MUNSTER JOINERY TRIPLE GLAZED PASSIV WINDOW SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON TIMBER BEARER FIXED WITH ANGLE SUPPORT. PRO CLIMA AIR TIGHT TAPE FIXED TO US OF FRAME WITH EDGE EXPOSED TO WHICH IS OVERLAPPED WITH TAPE FIXED TO OSB BOARD TO FORM AIR TIGHT SEAL PRESSED METAL CILL. HARDWOOD CILL ON 25MM EXPANDED POLYSTYRENE INSULATION PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS AIR TIGHT LAYER 150MM RAIN WATER PIPES FROM HOPPER OUTLETS FROM ROOF 10MM EXTERNAL RENDER COMPRISING OF 2MM ROCKSHIELD FINISH COAT, 5MM ROCKSHIELD TOP COAT AND 5MM ROCKSHIELD BASECOAT COMPLETE WITH MESH REINFORCING 180MM ROCKSHIELD SLAB SECURED WITH 5MM ROCKSHIELD ADHESIVE MORTAR & STAINLESS STEEL INSULATION ANCHOR FIXINGS 10MM CEMENT PARTICLE BOARD FIXED TO METAL STUDS WITH ROCKSHIELD ADHESIVE MORTAR TO CEMENT PARTICLE BOARD 120MM ROCKWOOL FLEXI INSULATION BETWEEN METAL STUDS 18MM OSB BOARD INTERNALLY TO FORM AIRTIGHT LAYER, ALL JOINTS AND JUNCTIONS TAPED TO SEAL AIRTIGHT LAYER PLASTERBOARD AND SKIM FINISH INTERNALLY 10MM EXTERNAL RENDER COMPRISING OF 2MM ROCKSHIELD FINISH COAT, 5MM ROCKSHIELD TOPCOAT AND 5MM ROCKSHIELD BASECOAT COMPLETE WITH MESH REINFORCING EDGE TRIM RADON SUMP UNDER NEW SECTION OF FLOOR PIPED TO VENT OUTSIDE ACO DRAIN AT DOOR PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS PRO CLIMA AIR TIGHTNESS TAPE TO JOINTS North 11 m² Bedroom 2 5 m² Bathroom 14 m² Bedroom 1 17 m² Living Room 3 m² Utility 8 m² Kitchen 8 m² Hall 1 m² Store 255 3865 255 255 15 m² Bedroom 18 m² Living/kitchen 3 m² Store 7 m² Hall 7 m² Bathroom 1800 1210 8013 9140 3893 3010 19 m² Bedroom 7 m² Hall 3895 2700 2583 1200 1713 350 910 347 11 m² Bedroom 2 8 m² Hall 5 m² Bathroom 14 m² Bedroom 1 8 m² Kitchen 3 m² Utility 17 m² Living Room 1 m² Store 9139 8006 2988 125 1175 121 4731 255 1087 125 2680 3859 2977 125 2186 125 3727 FD30S FD30S FD30S FD30S FD30S FD30S 1 hour Protected Hallway Air Tightness Layer FD30S 30 minute self closing fire door For Floors above 2nd 8 m² Kitchen 3 m² Utility 21 m² Stairs 31 m² Living/kitchen 8 m² Bedroom 3 3 m² Utility 11 m² Bedroom 2 8 m² Hall 5 m² Bathroom 1 m² store 15 m² Bedroom 1 3881 255 1188 135 3173 125 1185 125 4532 2547 125 3850 3393 3874 FD30S FD30S FD30S FD30S FD30S FD30S Colette Harold D12124981 09/05/2013 21:11:00 F L A T T O P R E F U R B I S H M E N T Dublin City Council 10.05.13 G R O U N D F L O O R P L A N 1 : 2 0 0 F I R S T & T H I R D F L O O R P L A N 1 : 2 0 0 S E C O N D & F O U R T H F L O O R P L A N 1 : 2 0 0 R O O F P L A N 1 : 2 0 0 W E S T E L E V A T I O N 1 : 3 0 0 E A S T E L E V A T I O N 1 : 3 0 0 S O U T H E L E V A T I O N 1 : 3 0 0 N O R T H E L E V A T I O N 1 : 3 0 0 The brief given was to carry out a full energy saving retrofit of a Dublin City Council 1970’s built, social housing apartment complex with two separate blocks. There are considerable problems with condensation, in part due to thermal bridging at junctions, especially where the external envelope is above and below the living areas. The required outcome was that the building would achieve compliance with Irish Building Regulations Part L 2011 and part M 2012 and achieve an overall A2 BER rating. The approach taken to achieve this result includes the following: The existing front and back walls will be entirely removed, and the existing balconies and access walkways will be incorporated into the new layouts, which has the effect of giving a larger living area, and, eliminating a number of problematic thermal bridge junctions between floors and ceilings and external walkways. A new highly insulated steel framed front and back wall system will be added using Rockwool Rockshield system, with Munster Joinery Eco Clad triple glazed windows and doors. The existing gable walls will have blown mineral woll insulation pumped into the cavity, and an additional layer of Rockshield insulation added externally linked into front and back walls. New Steel Framed Balconies and access walkways will be added externally and fixed through to the existing structure with Schock Type R Isokorb thermally broken fixings. Heating and hot water is supplied by Ochsner Universal Combi individual heat pumps to each unit. These will be controlled by the Ochsner OTE 2 inhouse climate control manager system. Each unit will have either one or two PV panels on the roof to suplement teh electricity requirements. The existing site will be re-paved with porus pavers to reduce surface water runoff. A new play area will be added in a grssed and planted new garden area. Bike storeage is being provided in a secure lockable shed. Recycling bins are being provided adjacent to this shed. The site shall be fully enclosed with walls and railings and vehicle access will be restricted to one entrance only, with electric gates. Pedestrian access will be via gates with key pad, adjacent to teh vehicle entrance and at rear of site. There are 4 fully accessible one bed apartments on teh ground floor, and all other apartments comly with visitable requirements of TGD Part M. The provision of five, three bedroom apartments caters for larger families. PLAY AREA BIKE STORE RECYCLING BINS PEDESTRIAN ENTRANCE UNIT 1 UNIT 2 UNIT 3 UNIT 4 UNIT 5 UNIT 6 UNIT 7 UNIT 8 UNIT 9 VEHICLE ENTRANCE electric gates key pad gate DISABLED PARKING LIFT PERMEABLE PAVING TO PARKING AREAS B A U D E R E X T E N S I V E S E D U M B L A N K E T Environmental Credentials of Bauder Green Roofs Growing substrates – these products include a high proportion of recycled crushed brick and aggregate which is mixed with composted green waste to provide an ecological solution. Drainage Layers – Bauder PLT10, DSE20 and DSE40 are manufactured from recycled polyethylene, which is one of the most versatile and easily recycled plastics in the world. Protection, Filtration and Isolation Layers – These products have important roles within a green roof build-up and are manufactured from the following recycled materials: fabric fibres from old clothing; rubber from used car tyres; and plastics from drinks bottles and other everyday items Heating, cooling and hot water heating with one system The Combi Universal supplies heating, cooling and hot water heating in one single compact appliance. As the DHW storage tank is situated on top of the heat pump and only a hydraulic separator is needed, the amount of space required is extremely small. Due to the small space available in each apartment, the Combi Universal system has been chosen as it is suitable for heating system renovation in tight spaces and provides both heat and hot water: The Combi Universal can be used for low-temperature, large-surface heating systems (underfloor and wall-heating) as well as for radiator heaters with flow temperatures up to 65°C. The Eco Evaporators are placed at ground floor level to serve ground floor apartments and from 1st floor up on the roof. Schöck Isokorb® type R T Y P I C A L T W O B E D R O O M A P A R T M E N T 1 : 2 0 0 F U L L Y A C C E S S A B L E O N E B E D R O O M G R O U N D F L O O R A P A R T M E N T 1 : 2 0 0 heat pump heat pump heat pump heat pump HEAT PUMP CYCLE OCHSNER COMBI UNIVERSAL ECO SPLIT EVAPORATOR T Y P I C A L T H R E E B E D R O O M A P A R T M E N T 1 : 2 0 0 H E A T I N G A N D H O T W A T E R S Y S T E M DEMAND CONTROL VENTILATION SCHEMATIC Air renewal into the dwelling is provided by a centralised fan which. Air is extracted (green arrows) via the extract units located in “wet rooms” (kitchen, utility room, bathroom and toilet). Connected to the fan (via ducting), the extract units drive the renewal air volume for the whole dwelling. In Demand Controlled Ventilation, the humidity sensitive/presence detection extract units make it possible to distribute the available airflow generated by the fan according to the needs of each room. The role of humidity sensitive air inlets (blue arrows) is then to distribute fresh air according to the needs of each “dry room” (bedrooms, dining and living rooms). Thus, rooms with high requirements for new air promote greater airflow than the empty rooms, to help remove pollution and save energy. In this instance, the V2A is placed into the utility room in each apartment. This fan serves two demand controlled extract units located in ”wet rooms” kitchen, and bathroom. With a very low power consumption ECM motor (Electronic Commutation Motor), the V2A can provide highly efficient air renewal without being noticed. Wall mounted humidity sensitive air inlet shallow ductwork at ceiling Aereco V2A fan at ceiling level in utility Thermal Properties ROCKWOOL® ROCKSHIELD® dual density insulation slab has a thermal conductivity (K value) of 0.036W/mK Fire Properties When tested to the European Fire Classification, the ROCKSHIELD® system achieves a Euro Class A2 for reaction to fire. The core mineral wool of ROCKWOOL® insulation will achieve a rating of A1. Performance and Properties The ROCKWOOL® ROCKSHIELD® system is stable and will ensure continuing high performance. ROCKWOOL® slabs have been proved in service for over 50 years in all types of exposure. ROCKWOOL® ROCKSHIELD® has undergone successful accelerated ageing tests simulating 25 years of exposure. Compressive Strength The ROCKSHIELD® system will support ladder with a spreading board used for normal maintenance work, without being damaged. Water Repellency ROCKWOOL® mineral wool is water repellent, which means this the stone wool at the core of this product is rain resistant. Ozone Depleting Potential Relying on entrapped air for its thermal properties, ROCKWOOL® ROCKSHIELD® does not contain (and has never contained) gases that have an ozone depleting potential (ODP). Global Warming Potential Relying on entrapped air for its thermal properties, ROCKWOOL® ROCKSHIELD® does not contain gases that have a global warming potential (GWP). Therefore, they have a zero GWP for the purposes of rating schemes such as the Code for Sustainable Homes ROCKSHIELD® SOLAR PV Each apartment is provided with either one in the case of mid units or two for all gable, ground and fourth floor apartments. Ecologics SR-P660245 PV panel with 245W Max power output. Panel size 1637mm x 992mm x 50mm. 45 degree pitch facing due south with no overshading 2 x 0.245 = 0.49 0.49 x 0.8 x 1072 x 1 = 420kWh/y for two panels 0.245 x 0.8 x 1072 x 1 = 210kWh/y for single panel Each apartment achieved an A2 BER rating under DEAP assessment A design stage BREEAM Domestic Refurbishment assessment was carried out on the develpoment, and an 83.69% score was achieved under this assessment. This should be carried out again by a reggistered BREEAM assessor for accurate results D E S C R I P T I O N

Upload: others

Post on 09-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E:SEMESTER 2FINAL SHEETS inal images for sheetsLinked Model 2 · bitumin bedding 150mm quinnlite thermal concrete block below ... at perimeter 250mm kooltherm phenolic insulation

GLASSFOAM BLOCK BELOW DOOR FRAME INBITUMIN BEDDING

150MM QUINNLITE THERMAL CONCRETEBLOCK BELOW

215 SOLID CONCRETE BLOCK RISING WALLWITH 85MM KINGSPAN STYROZONE H350REXTRUDED POLYSTYRENE INSULATION TOFACE OF WALL BELOW GROUND

NEW EDGE SLAB:75MM CONCRETE SCREED AT PERIMETER250MM KOOLTHERM PHENOLIC INSULATION

150MM REINFORCED CONCRETE SLAB ONMONARFLEX RMB 350 RADON BARRIER/DPM

50MM SAND BLINDING ON HARDCOre

EXISTING SLAB TREATMENT:50MM CONCRETE SCREED OVER50MM KOOLTHERM PHENOLIC INSULATIONTO EXISTING SLAB WITH SCREED CUT BACK

10MM CEMENT PARTICLE BOARD FIXED TOMETAL STUDS WITHROCKSHIELD ADHESIVE MORTAR TOCEMENT PARTICLE BOARD

120MM ROCKWOOL FLEXI INSULATIONBETWEEN METAL STUDS

18MM OSB BOARD INTERNALLY TO FORMAIRTIGHT LAYER, ALL JOINTS ANDJUNCTIONS TAPED TO SEAL AIRTIGHT LAYERPLASTERBOARD AND SKIM FINISHINTERNALLY

10MM EXTERNAL RENDER COMPRISING OF2MM ROCKSHIELD FINISH COAT,5MM ROCKSHIELD TOP COAT AND 5MMROCKSHIELD BASECOAT WITH MESHREINFORCING

180MM ROCKSHIELD SLAB SECURED WITH5MM ROCKSHIELD ADHESIVE MORTAR &STAINLESSSTEEL INSULATION ANCHOR FIXINGS

MUNSTER JOINERY TRIPLE GLAZED PASSIVWINDOW SYSTEM FIXED IN ACCORDANCEWITH MANUFACTURERS INSTRUCTIONSON TIMBER BEARER FIXED WITH ANGLESUPPORT.

PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OFFRAME WITH EDGE EXPOSED WHICH ISOVERLAPPED WITH TAPE FIXED TO OSBBOARD TO FORM AIR TIGHT SEAL

10MM CEMENT PARTICLE BOARD FIXED TOMETAL STUDS WITHROCKSHIELD ADHESIVE MORTAR TOCEMENT PARTICLE BOARD

120MM ROCKWOOL FLEXI INSULATIONBETWEEN METAL STUDS

18MM OSB BOARD INTERNALLY TO FORMAIRTIGHT LAYER, ALL JOINTS ANDJUNCTIONS TAPED TO SEAL AIRTIGHT LAYERPLASTERBOARD AND SKIM FINISHINTERNALLY

AIR TIGHT LAYER

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

KINGSPAN KOOLTHERM K18INSULATED PLASTERBOARD

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

BAUDER XF350 SEDUM BLANKET ON

BAUDER SDF DRAINAGE MATBAUDER ROOT RESISTANT CAPPING SHEET.BAUDER UNDERLAYER

200MM KINGSPAN THERMAROOF TR26INSULATION IN 2 LAYERS ONBAUDER VAPOUR BARRIER ON EXISTINGROOF

KINGSPAN THERMAROOF INSULATIONUNDER PRESSED METAL PARAPET CAPPING

145MM± ROCKSHIELD SLAB SECURED WITH5MM ROCKSHIELD ADHESIVE MORTAR &STAINLESSSTEEL INSULATION ANCHOR FIXINGS TOFACE OF EXISTING PARAPET

145MM± ROCKSHIELD SLAB SECURED WITH5MM ROCKSHIELD ADHESIVE MORTAR &STAINLESSSTEEL INSULATION ANCHOR FIXINGS TOINNER FACE OF EXISTING PARAPET

DRIP FLASHING OVER ROOFING MEMBRANEUPSTAND

180MM ROCKSHIELD SLAB SECURED WITH5MM ROCKSHIELD ADHESIVE MORTAR &STAINLESSSTEEL INSULATION ANCHOR FIXINGS

MUNSTER JOINERY TRIPLE GLAZED PASSIVWINDOW SYSTEM FIXED IN ACCORDANCEWITH MANUFACTURERS INSTRUCTIONSON TIMBER BEARER FIXED WITH ANGLESUPPORT.

PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OFFRAME WITH EDGE EXPOSED WHICH ISOVERLAPPED WITH TAPE FIXED TO OSBBOARD TO FORM AIR TIGHT SEAL

10MM CEMENT PARTICLE BOARD FIXED TOMETAL STUDS WITHROCKSHIELD ADHESIVE MORTAR TOCEMENT PARTICLE BOARD

120MM ROCKWOOL FLEXI INSULATIONBETWEEN METAL STUDS

18MM OSB BOARD INTERNALLY TO FORMAIRTIGHT LAYER, ALL JOINTS ANDJUNCTIONS TAPED TO SEAL AIRTIGHT LAYERPLASTERBOARD AND SKIM FINISHINTERNALLY

AIR TIGHT LAYER

KINGSPAN KOOLTHERM K18 INSULATED PLASTERBOARD

STEEL BALCONY SUPPORTED AT BUILDINGWITH SHOECK ISOKORB TYPE R THERMALLYBROKEN SUPPORT SYSTEM.HOLES ARE DRILLED INTO SLAB AND UNITANCHORED WITH PRE-INJECTED ADHESIVE.STRUCTURAL SCREED POURED BETWEENSLAB AND UNIT TO ANCHOR.

MUNSTER JOINERY TRIPLE GLAZED PASSIVDOOR SYSTEM FIXED IN ACCORDANCE WITHMANUFACTURERS INSTRUCTIONS TO STEELANGLE SUPPORT

PRO CLIMA AIR TIGHT TAPE FIXED TO TOP OFFRAME WITH EDGE EXPOSED WHICH ISOVERLAPPED WITH TAPE FIXED TO SCREEDTO FORM AIR TIGHT SEAL TILE FINISH OVER

PRESSED METAL FLASHING

MUNSTER JOINERY TRIPLE GLAZED PASSIVDOOR SYSTEM FIXED IN ACCORDANCE WITHMANUFACTURERS

PRO CLIMA AIR TIGHT TAPE FIXED TO US OFFRAME WITH EDGE EXPOSED WHICH ISOVERLAPPED WITH TAPE FIXED TO SCREEDTO FORM AIR TIGHT SEAL TILE FINISH OVER

PRESSED METAL FLASHING OVER FLUSHDOOR DRAIN IN TILED CONCRETE PATIO

MUNSTER JOINERY TRIPLE GLAZED PASSIVWINDOW SYSTEM FIXED IN ACCORDANCEWITH MANUFACTURERS INSTRUCTIONS ONTIMBER BEARER FIXED WITH ANGLESUPPORT.

PRO CLIMA AIR TIGHT TAPE FIXED TO US OFFRAME WITH EDGE EXPOSED TO WHICH ISOVERLAPPED WITH TAPE FIXED TO OSBBOARD TO FORM AIR TIGHT SEAL

PRESSED METAL CILL.

HARDWOOD CILL ON 25MM EXPANDEDPOLYSTYRENE INSULATION

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

AIR TIGHT LAYER

150MM� RAIN WATER PIPES FROM HOPPEROUTLETS FROM ROOF

10MM EXTERNAL RENDER COMPRISING OF2MM ROCKSHIELD FINISH COAT,5MM ROCKSHIELD TOPCOAT AND 5MM ROCKSHIELD BASECOATCOMPLETE WITH MESH REINFORCING

180MM ROCKSHIELD SLAB SECURED WITH5MM ROCKSHIELD ADHESIVE MORTAR &STAINLESSSTEEL INSULATION ANCHOR FIXINGS

10MM CEMENT PARTICLE BOARD FIXED TOMETAL STUDS WITHROCKSHIELD ADHESIVE MORTAR TOCEMENT PARTICLE BOARD

120MM ROCKWOOL FLEXI INSULATIONBETWEEN METAL STUDS

18MM OSB BOARD INTERNALLY TO FORMAIRTIGHT LAYER, ALL JOINTS ANDJUNCTIONS TAPED TO SEAL AIRTIGHT LAYERPLASTERBOARD AND SKIM FINISHINTERNALLY

10MM EXTERNAL RENDER COMPRISING OF2MM ROCKSHIELD FINISH COAT,5MM ROCKSHIELD TOPCOAT AND5MM ROCKSHIELD BASECOATCOMPLETE WITH MESH REINFORCING

EDGE TRIM

RADON SUMP UNDER NEW SECTION OFFLOORPIPED TO VENT OUTSIDE

ACO DRAIN AT DOOR

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

PRO CLIMA AIR TIGHTNESSTAPE TO JOINTS

North

11 m²

Bedroom 2

5 m²

Bathroom

14 m²

Bedroom 1

17 m²

Living Room3 m²

Utility

8 m²

Kitchen

8 m²

Hall

1 m²

Store

255 3865 255

255

15 m²

Bedroom18 m²

Living/kitchen

3 m²

Store

7 m²

Hall

7 m²

Bathroom

1800

1210

8013

9140

3893

3010

19 m²Bedroom

7 m²Hall

3895

2700

2583 1200

1713

350 910 347

11 m²

Bedroom 28 m²

Hall

5 m²

Bathroom

14 m²

Bedroom 1

8 m²

Kitchen3 m²

Utility

17 m²

LivingRoom

1 m²

Store

9139

8006

2988 125 1175 121 4731

255

1087

125

2680

3859

2977 125 2186 125 3727

FD30S FD30S

FD30S

FD30S FD30S

FD30S

1 hour ProtectedHallway

Air Tightness Layer

FD30S 30 minute selfclosing fire door

For Floors above 2nd

8 m²Kitchen

3 m²Utility

21 m²

Stairs

31 m²

Living/kitchen8 m²

Bedroom 3

3 m²

Utility

11 m²

Bedroom 2

8 m²

Hall

5 m²

Bathroom

1 m²

store15 m²

Bedroom 1

3881

255

1188

135

3173 125 1185 125 4532

2547

125 3850

3393

3874

FD30S FD30S

FD30S

FD30SFD30S

FD30S

Colette Harold D12124981

09/0

5/20

13 2

1:11

:00

F L A T T O P R E F U R B I S H M E N TDublin City Council

10.05.13

G R O U N D F L O O R P L A N 1 : 2 0 0

F I R S T & T H I R D F L O O R P L A N 1 : 2 0 0

S E C O N D & F O U R T H F L O O R P L A N 1 : 2 0 0

R O O F P L A N 1 : 2 0 0

W E S T E L E V A T I O N 1 : 3 0 0

E A S T E L E V A T I O N 1 : 3 0 0

S O U T H E L E V A T I O N 1 : 3 0 0

N O R T H E L E V A T I O N 1 : 3 0 0

The brief given was to carry out a full energy savingretrofit of a Dublin City Council 1970’s built, socialhousing apartment complex with two separate blocks.There are considerable problems with condensation, inpart due to thermal bridging at junctions, especiallywhere the external envelope is above and below the livingareas.

The required outcome was that the building wouldachieve compliance with Irish Building Regulations Part L2011 and part M 2012 and achieve an overall A2 BERrating.

The approach taken to achieve this result includes thefollowing:

The existing front and back walls will be entirelyremoved, and the existing balconies and accesswalkways will be incorporated into the new layouts,which has the effect of giving a larger living area, and,eliminating a number of problematic thermal bridgejunctions between floors and ceilings and externalwalkways.

A new highly insulated steel framed front and back wallsystem will be added using Rockwool Rockshieldsystem, with Munster Joinery Eco Clad triple glazedwindows and doors. The existing gable walls will haveblown mineral woll insulation pumped into the cavity, andan additional layer of Rockshield insulation addedexternally linked into front and back walls.

New Steel Framed Balconies and access walkways willbe added externally and fixed through to the existingstructure with Schock Type R Isokorb thermally brokenfixings.

Heating and hot water is supplied by Ochsner UniversalCombi individual heat pumps to each unit. These will becontrolled by the Ochsner OTE 2 inhouse climate controlmanager system.

Each unit will have either one or two PV panels on theroof to suplement teh electricity requirements.

The existing site will be re-paved with porus pavers toreduce surface water runoff.A new play area will be added in a grssed and plantednew garden area.Bike storeage is being provided in a secure lockableshed.Recycling bins are being provided adjacent to this shed.The site shall be fully enclosed with walls and railingsand vehicle access will be restricted to one entranceonly, with electric gates.Pedestrian access will be via gates with key pad,adjacent to teh vehicle entrance and at rear of site.

There are 4 fully accessible one bed apartments on tehground floor, and all other apartments comly withvisitable requirements of TGD Part M.

The provision of five, three bedroom apartments caters forlarger families.

PLAY AREA

BIKESTORE

RECYCLINGBINS

PEDESTRIANENTRANCE

UNIT 1

UNIT 2

UNIT 3

UNIT 4

UNIT 5UNIT 6UNIT 7UNIT 8UNIT 9

VEHICLEENTRANCE

electric gates

key padgate

DISABLED PARKING

LIFT

PERMEABLEPAVING TOPARKINGAREAS

B A U D E R E X T E N S I V E S E D U MB L A N K E TEnvironmental Credentials of

Bauder Green Roofs

Growing substrates – theseproducts include a high proportion ofrecycled crushed brick andaggregate which is mixed withcomposted green waste to providean ecological solution.Drainage Layers – Bauder PLT10,DSE20 and DSE40 aremanufactured from recycledpolyethylene, which is one of themost versatile and easily recycledplastics in the world.Protection, Filtration andIsolation Layers – These productshave important roles within a greenroof build-up and are manufacturedfrom the following recycled materials:fabric fibres from old clothing; rubberfrom used car tyres; and plasticsfrom drinks bottles and othereveryday items

Heating, cooling and hot water heating with one systemThe Combi Universal supplies heating, cooling and hot water heating inone single compact appliance. As the DHW storage tank is situatedon top of the heat pump and only a hydraulic separator is needed, theamount of space required is extremely small.

Due to the small space available in each apartment, the CombiUniversal system has been chosen as it is suitable for heating systemrenovation in tight spaces and provides both heat and hot water:

The Combi Universal can be used for low-temperature, large-surfaceheating systems (underfloor and wall-heating)as well as for radiator heaters with flow temperatures up to 65°C.The Eco Evaporators are placed at ground floor level to serve groundfloor apartments and from 1st floor up on the roof.

Schöck Isokorb® type R

T Y P I C A L T W O B E D R O O M A P A R T M E N T 1 : 2 0 0

F U L L Y A C C E S S A B L E O N E B E D R O O MG R O U N D F L O O R A P A R T M E N T 1 : 2 0 0

heat pumpheat pump

heat pump

heat pump

HEAT PUMP CYCLE

OCHSNERCOMBI UNIVERSAL

ECO SPLIT EVAPORATOR

T Y P I C A L T H R E E B E D R O O M A P A R T M E N T 1 : 2 0 0

H E A T I N G A N D H O T W A T E R S Y S T E M

DEMAND CONTROL VENTILATION SCHEMATIC

Air renewal into the dwelling is provided by a centralised fan which.Air is extracted (green arrows) via the extract units located in “wetrooms” (kitchen, utility room, bathroom and toilet). Connected to thefan (via ducting), the extract units drive the renewal air volume for thewhole dwelling.In Demand Controlled Ventilation, the humidity sensitive/presencedetection extract units make it possible to distribute the availableairflow generated by the fan according to the needs of each room.The role of humidity sensitive air inlets (blue arrows) is then todistribute fresh air according to the needs of each “dry room”(bedrooms, dining and living rooms). Thus, rooms with highrequirements for new air promote greater airflow than the emptyrooms, to help remove pollution and save energy.

In this instance, the V2A is placed into the utility room in eachapartment. This fan serves two demand controlled extract unitslocated in ”wet rooms” kitchen, and bathroom. With a very low powerconsumption ECM motor (Electronic Commutation Motor), the V2Acan provide highly efficient air renewal without being noticed.

Wall mountedhumidity sensitiveair inlet

shallow ductworkat ceilingAereco V2A fan at

ceiling level in utility

Thermal PropertiesROCKWOOL® ROCKSHIELD® dual density insulation slabhas a thermal conductivity (K value) of 0.036W/mK

Fire PropertiesWhen tested to the European Fire Classification, theROCKSHIELD® system achieves a Euro Class A2 forreaction to fire. The core mineral wool of ROCKWOOL®insulation will achieve a rating of A1.

Performance and PropertiesThe ROCKWOOL® ROCKSHIELD® system is stable andwill ensure continuing high performance. ROCKWOOL®slabs have been proved in service for over 50 years in alltypes of exposure. ROCKWOOL® ROCKSHIELD® hasundergone successful accelerated ageing tests simulating25 years of exposure.

Compressive StrengthThe ROCKSHIELD® system will support ladder with aspreading board used for normal maintenance work, withoutbeing damaged.

Water RepellencyROCKWOOL® mineral wool is water repellent, which meansthis the stone wool at the core of this product is rain resistant.

Ozone Depleting PotentialRelying on entrapped air for its thermal properties,ROCKWOOL® ROCKSHIELD® does not contain (and hasnever contained) gases that have an ozone depletingpotential (ODP).

Global Warming PotentialRelying on entrapped air for its thermal properties,ROCKWOOL® ROCKSHIELD® does not contain gases thathave a global warming potential (GWP). Therefore, they havea zero GWP for the purposes of rating schemes such as theCode for Sustainable Homes

ROCKSHIELD®

SOLAR PVEach apartment is provided with either one in thecase of mid units or two for all gable, ground andfourth floor apartments.

Ecologics SR-P660245 PV panel with 245W Maxpower output.Panel size 1637mm x 992mm x 50mm.45 degree pitch facing due south with no overshading

2 x 0.245 = 0.490.49 x 0.8 x 1072 x 1 = 420kWh/y for two panels

0.245 x 0.8 x 1072 x 1 = 210kWh/y for single panel

Each apartment achieved an A2 BER ratingunder DEAP assessment

A design stage BREEAM Domestic Refurbishmentassessment was carried out on the develpoment, and an83.69% score was achieved under this assessment.This should be carried out again by a reggistered BREEAMassessor for accurate results

D E S C R I P T I O N