erve rva tio n d pco nse o se - villawood properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70...

12
0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28 . 5 7 Cut Prop/Ex Retaining Wall TW28.57 S S Conduits 50mm Conduits 100mm Property Inlet Street Sign PSM Ex Gas/Elect/Tel Fill Prop/Ex Ex/Natural/FS Level FS @ Building Line 28 . 5 7 N S 28 . 57 B L 2 8 . 57 100yr Flood Level FL28.57 Prop Exist Top Ret. Wall Level Drains Sewer <300 Sewer >300 Water House Drain T O P 28 . 5 7 Top/Toe of Batter T O E 28 . 5 7 G W W H H S S W100 E T W100 WARNING GIVEN THAT ALL EXISTING SERVICES ARE SHOWN. SHOULD BE PROVEN ON SITE. NO GUARANTEE IS APPROXIMATE ONLY AND THEIR EXACT POSITION THE LOCATIONS OF UNDERGROUND SERVICES ARE BEWARE OF UNDERGROUND SERVICES an expansion joint of approved material shall be provided between the two faces. 2. Where concrete works abut a sewer access chamber surround or similar structure, SHOWN. PLAN, PROVIDED FOR SETOUT PURPOSES, MATCHES THE TBM COORDINATES 1. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT THE DIGITAL ATTENTION TO CONTRACTOR 1 i n 4 ( M a x ) 1 i n 4 ( M a x ) E X I S T I NG S U R F A C E 150 M i n 3 00 M i n C U T - O FF D R A I N D E T A I L OUTLET AT 1:200 MIN TO I NV E R T T O B E G R AD E D ( D i m e n s i o n s i n m ill i m e t r e s ) 2.00 (N.T.S.) N ort h 1 SERVICES OFFSETS AND LOCATIONS Rd.RESERVE WATER GAS Bk. of KERB JOINT TRENCHING ELECTRICITY CABLES POLES DW NDW NBN NBN CABLES NBN PITS STREET/LOT NAME 19.00 1.00 BOK 16.00 3.20 W 2.70 W 2.25 W 2.50 E 1.00 BOK 1.85 E 1.85 W 4.35 W G DW NDW & E NBN 4.05 E REALM VISTA 3.20 N 2.70 N 2.25 N 5.35 S 4.70 S 1.85 N 4.35 N 7.05 S HEATHCOTE STREET G DW NDW & E NBN BRABOURNE STREET 16.00 3.20 W 2.70 W 2.25 W 2.50 E 1.00 BOK 1.85 E 1.85 W 4.35 W 4.05 E G DW NDW & E NBN 16.00 AMBERFIELD STREET 3.20 S 2.70 S 2.25 S 2.50 N 1.00 BOK 1.85 N 1.85 S 4.35 S 4.05 N G DW NDW & E NBN FOR CONTINUATION REFER LEFT FOR CONTINUATION REFER BOTTOM RIGHT No. DESCRIPTION SHT SHEET INDEX 1 2 VER 8 9 10 11 4 5 6 7 3 12 B DETAIL PLAN,SHEET INDEX,SERVICES SCHEDULE & LOCALITY PLAN CROSS SECTIONS - REALM VISTA DRAINAGE LONGITUDINAL SECTIONS-1 PARKING AND SIGNAGE & LINEMARKING PLAN CROSS SECTIONS - AMBERFIELD STREET CROSS SECTIONS - HEATHCOTE STREET DRAINAGE LONGITUDINAL SECTIONS-2 & PIT SCHEDULE LOCALITY PLAN WORKS AREA OF NTS SINGLE DOUBLE DRIVEWAY PLAN NOT TO SCALE LOT BOUNDARY LOT BOUNDARY FOOTPATH FOOTPATH B B 05-12-17 BOLLARD & CABLE DETAILS ADDED TYPICAL CROSS SECTIONS,PAVEMENT DETAILS & NOTES INTERSECTION DETAILS LONGITUDINAL SECTION - REALM VISTA & AMBERFIELD STREET LONGITUDINAL SECTION - BRABOURNE STREET & HEATHCOTE STREET CROSS SECTIONS - BRABOURNE STREET B A A A A A A A A A A E D C ON S E R VA T I ON R E S E R V E 2 5 2 . 33 252 . 30 B L 2 5 2 . 39 B L 252 . 37 3 . 0 0 m D & S E 3 . 00 m D & S E 3 . 00 m S E 252.65 252.65 253 . 72 T O P 25 2 . 82 252 . 68 B L 252 . 7 3 252 . 29 B L 25 2 . 37 252 . 3 2 2 5 2 . 34 B L 252 . 41 B L 252 . 7 2 2 5 2 . 63 2 5 3 . 3 5 253 . 57 T O P 253 . 95 B L 253 . 45 253 . 62 B L 253 . 36 T O P 253 . 86 252 . 68 B L 252 . 74 B L 2 5 3 . 37 2 53 . 34 252 . 52 B L 252 . 64 T O P 252 . 7 9 252 . 55 B L 252 . 5 8 T O P 252 . 8 2 25 2 . 60 B L 252 . 6 4 T O P 2 52 . 85 B L 252 . 49 2 5 2 . 34 T O P 252 . 69 B L 252 . 58 252 . 65 T O P 2 5 2 . 75 B L 2 5 2 . 6 5 252 . 62 T O P 2 52 . 82 B L 252 . 72 252 . 6 7 252 . 84 B L 253 . 09 B L 253 . 0 0 2 5 2 . 83 252 . 8 6 B L 252 . 9 1 252 . 84 B L 2 53 . 08 2 5 2 . 95 B L 2 5 3 . 1 5 252 . 94 B L 252 . 98 252 . 98 B L 253 . 04 25 2 . 98 B L 2 53 . 2 1 253 . 02 B L 253 . 26 253 . 04 B L 253 . 09 2 5 3 . 0 7 B L 2 5 3 . 3 3 253 . 0 7 B L 25 3 . 16 253 . 16 B L 253 . 40 2 53 . 1 6 B L 253 . 2 3 2 5 3 . 2 3 B L 253 . 50 253 . 29 B L 25 3 . 31 253 . 28 B L 253 . 51 2 5 3 . 38 B L 2 53 . 43 253 . 33 B L 253 . 54 B L 253 . 73 253 . 4 0 253 . 40 B L 253 . 46 B L 253 . 60 253 . 45 B L 253 . 75 253 . 42 T O P 253 . 78 B L 253 . 27 253 . 60 253 . 65 B L 253 . 43 253 . 40 253 . 64 253 . 10 T O P 252 . 8 8 T O P 2 52 . 83 B L 253 . 39 B L 253 . 37 B L 2 5 2 . 38 1 . 20 1 . 0 0 2 . 40 2 . 40 1 . 20 0 . 59 4 . 68 2 . 40 2 . 40 2 . 40 2 . 40 4 . 16 7 . 2 4 2 . 4 0 0 . 3 5 1 . 20 1 . 20 7 . 24 0 . 1 6 1 . 60 0 . 16 8 . 60 5 . 8 1 5 . 50 5 . 5 0 5 . 5 0 5 . 50 1 . 0 0 6 . 0 0 1 . 30 1 . 30 1 . 3 0 1 . 30 1 . 3 0 1 . 3 0 1 . 30 1 . 30 70 . 9 3 R 115 A 72 . 16 52 . 78 5 . 49 4 . 08 4 . 24 4 . 24 29 14 28 28 1 4 14 14 14 13 16 1 6 32 14 1 4 1 6 14 16 16 1 6 16 35 . 67 1 6 . 05 18 3 2 16 16 1 5 . 3 5 18 . 30 32 32 14 32 12 . 50 14 14 12 . 50 14 32 14 16 13 14 14 14 16 14 14 32 16 32 14 16 32 14 18 . 30 13 . 05 34 . 55 16 32 32 . 79 16 . 03 33 . 31 16 12 . 50 16 32 . 04 16 32 . 05 32 . 05 14 14 32 14 936 2 . 50 m S E 2 . 5 0 m S E H H H H H H H H H H H H H H H H H H H C U T O FF D R A I N R 1 0 . 5 C I RC LE @ 1 : 20 0 G R AD E T U R N I N G P R OV I D E 20 0 mm C O M P A C TE D T U R N I N G A R E A D E P T H F CR TE M P O R A R Y R 10 . 5 " NO R O AD " S I G N A M B E R F I EL D S T R EET H E A T H C O TE S T R EET B R A B OU R N E S T R EET F I LLE X I S T I NGC U T O FFD R A I NW I T H C OUN C I L ' S A P P R OV E DM A TE R I A L STAGE 8 EXISTING STAGE 10 FUTURE 2 . 00 m S E 2 . 00 m S E 2 52 . 6 2 52 . 6 252 . 6 2 52 . 6 2 5 2 . 8 2 5 2 . 8 2 5 2 . 8 252 . 8 252. 8 252. 8 2 5 2 . 8 2 5 2 . 8 253. 0 253. 0 253. 0 253. 0 253. 0 253. 0 253. 0 253. 0 25 3 . 0 253.0 253. 0 253. 0 253. 0 2 5 3 . 2 2 5 3 . 2 253 . 2 253 . 2 253 . 2 253. 2 253. 2 253. 2 253. 2 253. 2 253. 2 253. 2 253. 2 253. 2 253. 2 25 3 . 4 253 . 4 253 . 4 253.4 253. 4 253. 4 253. 4 253. 4 253 . 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 253. 4 2 53 . 6 253 . 6 2 5 3 . 6 253.6 253 . 6 253 . 6 253. 6 253. 6 253. 6 253. 6 253. 6 253. 6 253. 6 253. 6 253. 6 253. 6 25 3 . 6 253. 6 253. 6 253. 6 253. 6 253. 8 253. 8 253. 8 253 . 8 253 . 8 2 5 3 . 8 2 5 3 . 8 2 5 3 . 8 25 3 . 8 253. 8 253. 8 253. 8 253. 8 253. 8 2 5 3 . 8 253. 8 2 53 . 8 253. 8 253.8 254 . 0 2 5 4 . 0 254. 0 254. 0 254. 0 254 . 0 2 5 4 . 0 254 . 0 254. 0 254 . 0 2 5 4 . 0 2 54 . 0 254. 0 254 . 2 254. 2 2 5 4 . 2 254 . 2 254. 4 253 . 01 253 . 0 7 2 5 3 . 18 2 53 . 25 253 . 34 2 5 3 . 45 253 . 4 8 253 . 98 253 . 77 2 5 4 . 2 1 B L 253 . 25 B L 2 53 . 16 B L 2 53 . 2 4 B L 253 . 3 1 B L 2 5 3 . 24 B L 253 . 32 B L 253 . 63 B L 2 53 . 29 T O P 2 5 3 . 56 T O P 2 53 . 64 T O P 253 . 71 T O P 253 . 6 4 T O P 253 . 72 F I LLE X I S T I NGC U T O FFD R A I NW I T H C OUN C I L ' S A PP R OV E DM A T E R I A L H T O P 254 . 43 B L 254 . 20 25 4 . 12 25 4 . 07 B L 2 53 . 9 9 T O P 25 4 . 29 B L 254 . 0 3 25 4 . 13 T O P 25 4 . 3 5 B L 2 5 4 . 12 254 . 1 1 T O P 2 5 4 . 1 0 B L 2 5 4 . 04 25 4 . 05 T O P 254 . 2 7 B L 253 . 9 2 254 . 06 4 . 40 T O P 2 54 . 2 0 2 54 . 1 1 B L 25 3 . 87 5 . 9 4 A 1 0 . 0 8 25 4 . 01 B L 2 53 . 7 8 T O P 254 . 1 1 35 . 69 34 . 98 921 922 920 R 9 6 A 24 . 78 2 5 4 . 1 5 B L 2 5 3 . 65 T O P 2 5 3 . 98 A 22 . 86 T O P 253 . 84 B L 253 . 51 253 . 70 2 5 3 . 7 1 B L 25 3 . 61 T O P 253 . 86 4 . 2 2 31 . 90 3 2 . 9 3 B L 25 3 . 78 2 5 3 . 7 9 1 6 . 0 9 B L 2 5 3 . 5 7 25 3 . 6 4 14 . 08 B L 2 53 . 4 7 253 . 62 B L 253 . 80 25 3 . 78 22 . 51 B L 253 . 4 0 253 . 54 32 B L 2 5 3 . 32 253 . 42 B L 253 . 6 8 2 5 3 . 55 253 . 7 0 B L 253 . 73 B L 253 . 32 25 3 . 29 253 . 3 9 B L 2 53 . 25 B L 2 5 3 . 58 2 53 . 38 253 . 50 B L 253 . 66 B L 253 . 39 253 . 23 252 . 75 B L 2 52 . 96 T O P 253 . 04 B L 2 5 2 . 96 252 . 7 9 25 2 . 86 B L 253 . 0 4 T O P 253 . 1 0 252 . 91 B L 2 53 . 11 2 5 2 . 99 B L 2 5 3 . 18 14 253 . 03 B L 2 53 . 17 931 253 . 15 B L 2 5 3 . 18 2 53 . 2 1 B L 25 3 . 25 925 924 926 928 927 929 930 932 933 934 935 911 912 913 914 915 916 917 918 919 910 909 908 907 906 905 904 903 901 902 945 946 947 948 949 950 951 952 954 953 9 2 3 30 . 56 T O P 2 54 . 1 0 B L 2 5 3 . 9 0 2 5 3 . 9 2 B L 253 . 98 2 5 3 . 88 B L 2 53 . 8 8 25 3 . 90 3 . 00 m D & S E 3 . 00 m D & S E B L 2 53 . 9 0 25 3 . 91 B L 2 53 . 8 5 253 . 77 B L 2 5 3 . 76 2 5 3 . 76 253 . 6 1 B L 2 5 3 . 70 B L 2 5 3 . 69 2 5 3 . 54 B L 253 . 64 253 . 5 0 3 . 00 m D & S E 14 B L 253 . 58 2 5 3 . 37 B L 253 . 50 2 53 . 3 3 B L 253 . 41 253 . 28 253 . 24 B L 253 . 39 T O P 253 . 61 B L 253 . 31 253 . 38 14 T O P 2 5 3 . 62 B L 253 . 4 2 2 5 3 . 43 T O P 2 5 3 . 74 B L 25 3 . 54 2 53 . 5 3 T O P 25 3 . 83 12 . 50 14 2 5 3 . 59 14 T O P 253 . 90 B L 253 . 7 0 25 3 . 62 T O P 253 . 95 B L 25 3 . 75 2 53 . 70 14 14 T O P 25 3 . 89 B L 253 . 69 253 . 80 T O P 253 . 95 B L 2 5 3 . 75 2 5 3 . 83 T O P 2 5 4 . 02 B L 253 . 82 253 . 87 15 . 51 254 . 0 9 B L 253 . 8 5 2 . 00 m D E 253 . 9 4 B L 25 4 . 00 254 . 15 16 . 54 16 . 54 H 32 . 01 B L 253 . 7 7 25 3 . 96 14 B L 253 . 70 253 . 86 B L 2 5 3 . 68 2 53 . 84 B L 2 5 3 . 71 2 5 3 . 69 16 32 . 03 16 2 53 . 96 12 . 50 2 5 4 . 02 32 . 02 32 . 02 25 4 . 00 14 2 53 . 9 1 12 . 50 253 . 85 25 3 . 81 14 253 . 76 B L 253 . 67 253 . 70 14 32 . 06 253 . 50 B L 2 5 3 . 33 B L 253 . 44 253 . 55 B L 25 3 . 55 2 53 . 5 9 B L 253 . 6 3 253 . 6 8 12 . 50 15 . 51 14 12 . 50 32 32 32 32 32 32 B L 253 . 11 252 . 9 0 B L 253 . 1 8 25 3 . 02 2 5 3 . 04 B L 253 . 2 5 B L 253 . 3 4 25 3 . 12 14 16 14 16 32 32 32 32 32 32 32 32 14 14 16 14 14 T O P 253 . 89 B L 253 . 50 253 . 67 1 . 90 17 . 30 B L 253 . 83 253 . 57 2 7 . 3 8 B L 253 . 58 T O P 254 . 02 253 . 69 4 . 24 T O P 254 . 07 253 . 68 B L 253 . 40 15 . 29 253 . 64 B L 253 . 47 T O P 254 . 06 T O P 253 . 95 B L 253 . 45 253 . 62 B L 253 . 75 253 . 42 18 37 . 54 2 5 3 . 4 0 B L 2 5 3 . 7 3 3 2 253 . 42 B L 253 . 5 9 32 32 32 B L 253 . 5 2 2 5 3 . 30 B L 2 5 3 . 46 2 53 . 2 3 14 B L 253 . 4 1 25 3 . 17 1 6 B L 2 5 3 . 32 253 . 0 5 32 32 B L 2 53 . 08 252 . 85 252 . 95 B L 253 . 1 7 14 32 T O P 253 . 56 B L 253 . 16 253 . 00 14 T O P 2 53 . 56 B L 2 5 3 . 17 252 . 92 B L 2 53 . 08 T O P 253 . 28 252 . 88 B L 2 53 . 19 252 . 80 2 . 50 m S E 16 25 944 H T O P 253 . 1 6 B L 252 . 94 252 . 79 252 . 74 B L 2 52 . 84 T O P 252 . 95 252 . 71 B L 252 . 79 T O P 2 5 2 . 89 252 . 6 7 B L 252 . 72 T O P 2 52 . 82 28 943 2 8 T O P 2 52 . 92 B L 252 . 7 9 252 . 59 T O P 2 52 . 96 B L 25 2 . 86 252 . 64 B L 252 . 93 252 . 65 B L 252 . 70 252 . 44 28 2 8 B L 252 . 63 2 52 . 46 1 4 252 . 42 B L 252 . 56 14 B L 252 . 9 9 2 5 2 . 66 B L 253 . 05 252 . 75 12 . 50 B L 2 53 . 1 1 252 . 82 28 28 937 938 12 . 50 1 2 . 50 B L 252 . 76 28 28 942 941 940 939 B L 2 53 . 1 8 2 5 2 . 88 CIRCLE @ 1:200 GRADE TURNING PROVIDE 200mm COMPACTED TURNING AREA DEPTH FCR TEMPORARY AND SILT FENCE PROVIDE ROCK BEACHING B L 253 . 2 0 25 2 . 98 TO BE REMOVED POST & WIRE FENCE CONSERVATION OPEN SPACE R E A L M V I S T A R 8 . 6 0 R 8 . 60 R 8 . 60 R 8 . 60 R 8 . 60 R 8 . 60 R107.35 R 100 . 95 R 18 . 2 0 R 11 . 80 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 K & C - H B 2 STAGE 14 ANNADALE PROPOSED " N O R O A D " S I G N R 1 0 . 5 R 10 . 5 10 . 86 SUBSTATION 6 . 20 6 . 20 3 . 00 m D & S E WITH EXISTING CONSTRUCTION STRIP AND MATCH NEW WORK NEATLY REMOVE EXISTING CONCRETE EDGE WITH EXISTING CONSTRUCTION STRIP AND MATCH NEW WORK NEATLY REMOVE EXISTING CONCRETE EDGE 9 31 5 8 4 3 7 6 2 1 15 14 17 16 13 12 11 10 18 26 19 20 21 22 23 24 25 27 30 32 29 Star Picket E 314831.04 N 5842936.06 RL252.50AHD Star Picket Star Picket Star Picket RL253.96AHD E 314846.71 N 5842681.72 E 314702.05 N 5842672.60 RL254.09AHD E 314733.15 RL253.24AHD N 5842869.44 5842865.184 N 314711.304 E End of pipe C H 24 . 16 C H 38 . 16 C H 52 . 16 C H 66 . 16 C H 82 . 16 C H 96 . 16 C H 110 . 16 C H 126 . 16 C H 140 . 16 C H 156 . 16 C H 16 9 . 6 5 C H 183 . 65 C H 196 . 15 C H 208 . 65 C H 221 . 15 C H 235 . 15 C H 310 . 89 C H 324 . 89 C H 338 . 89 C H 351 . 39 C H 367 . 39 C H 383 . 39 C H 395 . 89 C H 409 . 89 R T P 11 . 80 LT P 11 . 8 1 C H 414 . 40 C H 400 . 40 C H 387 . 90 C H 373 . 90 C H 359 . 90 C H 345 . 90 C H 333 . 40 C H 319 . 40 C H 305 . 40 C H 142 . 16 C H 126 . 16 C H 110 . 16 C H 96 . 16 C H 80 . 1 6 C H 6 6 . 16 C H 52 . 1 6 C H 36 . 1 6 C H 15 4 . 09 C H 218 . 09 C H 155 . 65 C H 14 1 . 65 R T P 11 77 . 11 R T P 115 3 . 51 T P 1132 . 82 R T P 1071 . 04 T P 1067 . 47 R T P 10 4 7 . 04 C H 1 0 3 2 . 7 0 C H 10 1 4 . 7 0 T P 4 5 8 . 28 C H 426 . 43 C H 1 8 1 . 83 C H 429 . 91 T P 185 . 95 T P 177 . 70 C H 17 7 . 9 6 C H 170 . 16 C H 1205 . 24 C H 1189 . 21 C H 1138 . 77 C H 1121 . 88 C H 10 95 . 00 STAGE 8 EXISTING R T P 210 . 62 LT P 21 0 . 6 7 LT P 16 6 . 14 LT P 189 . 74 H 28 T O P 253 . 10 T O P 2 53 . 3 3 T O P 253 . 40 T O P 253 . 4 8 T O P 253 . 5 5 T O P 25 3 . 65 ROW OF AG's PROTECTION STRIP AND PROVIDE CONCRETE EDGE R O W O F A G ' s P R O TE C T I O N S T R I P A ND P R O V I D E C O N CR ETE E D G E T O P 25 2 . 82 B L 252 . 7 3 252 . 68 2 5 2 . 63 B L 252 . 7 2 T O P 252 . 8 8 2 5 2 . 34 B L 252 . 49 NEATLY WITH PROPOSED CONSTRUCTION 'NO RAD' SIGN AND MATCH NEW WORK REMOVE EXISTING CONCRETE EDGE STRIP, 252 . 84 B L 253 . 09 SPECIFIELD AS AS PER NOTE 55, SHEET 2 FILL TO PROPOSED FINISHED LEVELS AS REMOVE EXISTING DAM PROVIDE LEVEL 1 PROVIDE 4m WIDE HEAVY DUTY CROSSOVER PROVIDE ACCESS GATE AT PIPE END PROVIDE ROCK BEACHING GREATER THAN 1m DEEP WHERE OPEN DRAIN IS PROVIDE SAFETY FENCING EXISTING SURFACE. DRAIN GRADE 1 IN 500 TO CONSTRUCT TEMPORARY OPEN (SHEET 2) AS PER DETAIL BOLLARDS & CABLE E AHD - OF - BPD 05-Dec-17 Plotted: I:\H8711\ENG\ST09\E9_R01_DET.dgn 22/11/17 A WARATAH ESTATE 8711 STAGE 9 366-E-6 SBS TVT AS SHOWN 9 HUME AUG' 17 12 CONSTRUCTION ISSUE MUNICIPALITY REFERENCE SHEET DATE DATUM SCALE MELWAY REF. SURVEY DESIGN DRAWN CHECKED REMARKS DATE AMENDMENTS VER. 05-Dec-17 Plotted: I:\H8711\ENG\ST09\E9_R01_DET.dgn 1/19 cato street hawthorn east, 3123 telephone 8823 2300 fax no. 8823 2310 land surveyors civil engineers 252 . 6 4 252 . 32 2 5 2 . 4 8 2 52 . 50 25 2 . 4 2 B L 25 2 . 48 B L 2 5 2 . 5 6 B L 2 5 2 . 7 2 B L 2 5 2 . 7 9 B L 2 5 2 . 9 5 252 . 5 7 B L 2 52 . 86 252 . 46 B L 2 5 2 . 6 3 T O P 252 . 8 2 B L 2 52 . 72 252 . 63 B L 2 5 2 . 4 9 252 . 34 T O P 2 52 . 8 8 2 . 40 8 . 6 0 5 . 81 5 . 50 4 . 24 4 . 24 14 2 8 12 . 50 28 14 14 14 14 936 A M B E R F I EL D S T R EET 252 . 6 252 . 6 252 . 6 25 2 . 6 2 52 . 8 252 . 8 252 . 8 252 . 8 25 2 . 8 25 2 . 8 252. 8 253. 0 2 5 3 . 0 253.0 253. 0 252 . 50 252 . 75 T O P 252 . 92 B L 252 . 79 252 . 59 T O P 2 5 2 . 96 B L 252 . 86 252 . 64 B L 2 5 2 . 93 252 . 65 B L 252 . 70 2 5 2 . 44 28 28 B L 252 . 63 252 . 46 14 252 . 42 B L 2 5 2 . 56 14 B L 2 5 2 . 99 252 . 66 B L 2 5 3 . 05 252 . 7 5 12 . 50 B L 2 5 3 . 11 252 . 8 2 B L 252 . 8 9 252 . 6 0 28 28 937 938 12 . 50 12 . 50 12 . 50 B L 252 . 76 12 . 50 B L 2 5 2 . 82 2 5 2 . 5 3 14 28 2 8 942 941 940 939 B L 252 . 96 25 2 . 65 B L 253 . 18 25 2 . 88 CIRCLE @ 1:200 GRADE TURNING PROVIDE 200mm COMPACTED TURNING AREA DEPTH FCR TEMPORARY 252 . 98 STAGE 7 EXISTING R 8 . 6 0 R 8 . 6 0 K & C - H B 2 K & C - H B 2 " NO R O AD " S I G N R 10 . 5 R 10 . 5 10 . 86 6 . 20 WITH EXISTING CONSTRUCTION STRIP AND MATCH NEW WORK N REMOVE EXISTING CONCRETE ED 9 12 11 10 18 26 19 Star Picket E 314831.04 N 5842936.06 RL252.50AHD C H 169 . 6 5 C H 1 8 3 . 65 C H 196 . 15 C H 2 08 . 65 C H 2 21 . 15 C H 23 5 . 1 5 R T P 11 . 80 LT P 11 . 81 C H 1 5 5 . 65 C H 141 . 6 5 LT P 166 . 1 4 LT P 1 8 9 . 7 4 ROW OF AG's PROTECTION STRIP AND PROVIDE CONCRETE EDGE T O P 252 . 8 2 252 . 63 B L 2 52 . 72 T O P 2 52 . 8 8 252 . 34 B L 2 5 2 . 4 9

Upload: others

Post on 25-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

0.75 3.50 3.50 3.50

4.70 8.20

SCALE 1:500

PLAN

SYMBOL LEGEND

28.57

Cut Prop/Ex

Retaining Wall

TW28.57

S S

Conduits 50mm

Conduits 100mm

Property Inlet

Street Sign

PSM

Ex Gas/Elect/Tel

Fill Prop/Ex

Ex/Natural/FS Level

FS @ Building Line

28.57

NS28.5

7

BL28.57

100yr Flood Level FL28.57

Prop Exist

Top Ret. Wall Level

Drains

Sewer <300

Sewer >300

Water

House DrainTOP2

8.57

Top/Toe of Batter TOE28.57

G

WW

H H

SS

W100

E T

W100

WARNING

GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

APPROXIMATE ONLY AND THEIR EXACT POSITION

THE LOCATIONS OF UNDERGROUND SERVICES ARE

BEWARE OF UNDERGROUND SERVICES

an expansion joint of approved material shall be provided between the two faces.

2. Where concrete works abut a sewer access chamber surround or similar structure,

SHOWN.

PLAN, PROVIDED FOR SETOUT PURPOSES, MATCHES THE TBM COORDINATES

1. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT THE DIGITAL

ATTENTION TO CONTRACTOR

1 in 4 (Max) 1 in 4

(Max)

EXISTING SURFACE

150

Min

300

Min

CUT-OFF DRAIN DETAILOUTLET

AT 1:200 MIN TO

INVERT TO BE GRADED

(Dimensions in millimetres)

2.00

(N.T.S.)

North

1

SERVICES OFFSETS AND LOCATIONS

Rd.RESERVEWATER

GAS Bk. of KERB JOINT TRENCHINGELECTRICITY

CABLES POLESDW NDW

NBN

NBN CABLES NBN PITSSTREET/LOT NAME

19.00 1.00 BOK

16.00 3.20 W 2.70 W 2.25 W 2.50 E 1.00 BOK 1.85 E 1.85 W 4.35 W

G DW NDW & E NBN 4.05 E

REALM VISTA 3.20 N 2.70 N 2.25 N 5.35 S 4.70 S 1.85 N 4.35 N 7.05 S

HEATHCOTE STREET

G DW NDW & E NBN

BRABOURNE STREET 16.00 3.20 W 2.70 W 2.25 W 2.50 E 1.00 BOK 1.85 E 1.85 W 4.35 W 4.05 E

G DW NDW & E NBN

16.00 AMBERFIELD STREET 3.20 S 2.70 S 2.25 S 2.50 N 1.00 BOK 1.85 N 1.85 S 4.35 S 4.05 N

G DW NDW & E NBN

FOR CONTINUATION REFER LEFT

FOR CONTINUATION REFER BOTTOM RIGHT

No.DESCRIPTION

SHT

SHEET INDEX

1

2

VER

8

9

10

11

4

5

6

7

3

12

B DETAIL PLAN,SHEET INDEX,SERVICES SCHEDULE & LOCALITY PLAN

CROSS SECTIONS - REALM VISTA

DRAINAGE LONGITUDINAL SECTIONS-1

PARKING AND SIGNAGE & LINEMARKING PLAN

CROSS SECTIONS - AMBERFIELD STREET

CROSS SECTIONS - HEATHCOTE STREET

DRAINAGE LONGITUDINAL SECTIONS-2 & PIT SCHEDULE

LOCALITY PLAN

WORKSAREA OF

NTS

SINGLE DOUBLE

DRIVEWAY PLAN

NOT TO SCALE

LOT BOUNDARY LOT BOUNDARY

FOOTPATH FOOTPATH

B

B 05-12-17 BOLLARD & CABLE DETAILS ADDED

TYPICAL CROSS SECTIONS,PAVEMENT DETAILS & NOTES

INTERSECTION DETAILS

LONGITUDINAL SECTION - REALM VISTA & AMBERFIELD STREET

LONGITUDINAL SECTION - BRABOURNE STREET & HEATHCOTE STREET

CROSS SECTIONS - BRABOURNE STREET

B

A

A

A

A

A

A

A

A

A

A

50m

BUFFER

INTO

PROPOSED CONSERVATIO

N RES

ERVE

252.33

252.30

BL252.39

BL252.37

3.00 m D & S E

3.00

m D

& S E

3.00 m S E

252.65252.65

253.72

TOP2

52.8

2

252.

68

BL25

2.73

252.29

BL252.37

252.32

252.34

BL252.41

BL252.72

252.63

253.35

253.57

TOP253.95

BL253.45

253.62

BL253.36

TOP253.86

252.68

BL252.74

BL253.37

253.34

252.52

BL252.64

TOP252.79

252.55

BL252.58

TOP252.82

252.60

BL252.64

TOP252.85

BL252.49

252.34

TOP252.69BL252.58252.65

TOP252.75

BL252.65

252.62

TOP252.82

BL252.72

252.67

252.84

BL253.09

BL253.00

252.83

252.86

BL252.91

252.84BL253.08

252.95BL253.15

252.94BL252.98

252.98BL253.04

252.98BL253.21

253.02BL253.26

253.04BL253.09

253.07BL253.33

253.07BL253.16

253.16BL253.40

253.16BL253.23

253.23BL253.50

253.29BL253.31

253.28BL253.51

253.38BL253.43

253.33BL253.54

BL253.7

3

253.40

253.40

BL253.46

BL253.60

253.45

BL253.75

253.42

TOP253.

78

BL253.2

7

253.60

253.65

BL253.43

253.40

253.64

253.10

TOP252.88

TOP252.83

BL253.39

BL253.37

BL252.38

1.20

1.00

2.40

2.40

1.200.59

4.68

2.40

2.40

2.40

2.40

4.16

7.24

2.40

0.35

1.20

1.20

7.24

0.16

1.60

0.16

8.60

5.81

5.505.50

5.50

5.50

1.00

6.00

1.30

1.30

1.30

1.30

1.30

1.30

1.30

1.30

70.93

R115 A72.16

52.7

8

5.49

4.08

4.24

4.24

29

14

28

28

1414

14

14

13

16

16

32

14

14

16

14

16

16

16

16

35.67

16.05

18

32

16

16

15.35

18.30

32

32

14

32

12.50

14

14

12.50

14

32

14

16

13

14

14

14

16

14

14

32

16

32

14

16

32

14

18.30

13.05

34.55

16

32

32.79

16.03

33.31

16

12.50

16

32.04

16

32.05

32.05

14

14

32

14

936

2.50 m S E

2.50

m S E

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

CUT

OFF

DR

AI

N

R10.5

CIRCLE @ 1:200

GRADE TURNING

PROVIDE 200mm COMPACTED

TURNING AREA

DEPTH FCR TEMPORARY

R10.5

"NO ROAD" SIGN

AMBERFIELD STREET

HE

AT

HC

OT

E S

TR

EE

T

BR

AB

OU

RN

E S

TR

EE

T

FILL EXISTING CUTOFF DRAIN WITH COUNCIL'S APPROVED MATERIAL

STAGE 8EXISTING

STAGE 10FUTURE

2.00 m S E

2.00

m S E

252.6

252.6

252.6

252.6

252.8

252.8

252.8

252.8

252.8

252.8

252.8

252.8

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.0

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.2

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.4

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.6

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

253.8

254.0

254.0

254.0

254.0

254.0

254.0

254.0

254.0

254.0

254.0

254.0

254.0

25

4.0

254.2

254.2

254.2

254.2

254.4

253.01

253.07

253.18

253.25

253.34

253.45

253.48

253.98

253.77

254.

21

BL253.25

BL253.16

BL253.24

BL253.31

BL253.24

BL253.32

BL253.63

BL253.29

TOP253.56

TOP253.64

TOP253.71

TOP253.64

TOP253.72

FILL EXISTING CUTOFF DRAIN WITH COUNCIL'S APPROVED MATERIAL

H

TOP254.43

BL254.20

254.12

254.07

BL253.99

TOP254.29BL254.03254.13

TOP254.35

BL254.12

254.11

TOP254.10

BL254.04

254.05

TOP254.27BL253.92254.06

4.40

TOP254.20

254.11

BL253.87

5.94 A10.08

254.01

BL253.78

TOP254.11

35.69

34.98

921922

920

R96

A24.78

254.15

BL253.65

TOP253.98 A22

.86

TOP253.

84

BL253.5

1

253.70

253.71

BL253.61

TOP253.86

4.22

31.90

32.93

BL253.78

253.79

16.0

9

BL253.57

253.64

14.08

BL253.47

253.62

BL253.80

253.78

22.51

BL253.40

253.5432

BL253.32

253.42

BL253.68

253.55

253.70BL253.73

BL253.32

253.29

253.39BL253.25

BL253.58

253.38

253.50BL253.66

BL253.39253.23

252.75BL252.96

TOP253.04

BL252.96

252.79

252.86BL253.04

TOP253.10

252.91BL253.11

252.99BL253.18

14

253.03BL253.17

931

253.15BL253.18

253.21BL253.25

925

924

926

928

927

929

930

932

933

934

935

911

912

913

914

915

916

917

918

919

910

909

908

907

906

905

904

903

901902

945

946

947

948

949

950

951

952

954

953

923

30.56

TOP254.10

BL253.90

253.92

BL253.98

253.88

BL253.88

253.90

3.00 m D & S E

3.00 m D & S E

BL253.90

253.91

BL253.85253.77

BL253.76253.76

253.61

BL253.70

BL253.69253.54

BL253.64253.50

3.00

m D

& S E

14

BL253.58253.37

BL253.50253.33

BL253.41253.28

253.24BL253.39

TOP253.61

BL253.31

253.3814

TOP253.62BL253.42253.43

TOP253.74BL253.54253.53

TOP253.83

12.50

14

253.59

14

TOP253.90BL253.70253.62

TOP253.95BL253.75253.70

14

14

TOP253.89BL253.69253.80

TOP253.95BL253.75253.83

TOP254.02BL253.82253.87

15.51

254.09

BL253.85

2.00 m D E

253.94

BL254.00

254.15

16.54

16.54

H

32.01

BL253.77253.96

14

BL253.70253.86

BL253.68253.84

BL253.71253.69

16

32.03

16

253.96

12.50

254.02

32.02

32.02

254.00

14

253.91

12.50

253.85

253.81

14

253.76

BL253.67

253.70

14

32.06 253.50BL253.33

BL253.44253.55

BL253.55253.59

BL253.63253.68

12.50

15.51

14

12.50

32

32

32

32

32

32

BL253.11

252.90

BL253.18253.02

253.04

BL253.25

BL253.34253.12

14

16

14

16

32

32

32

32

32

32

32

32

14

14

16

14

14

TOP253.89

BL253.50

253.67

1.90 17

.30

BL253.83

253.57

27.38

BL253.58

TOP254.02

253.69

4.24

TOP254.

07

253.68BL253.4

0 15.2

9

253.64

BL253.47

TOP254.06

TOP253.95

BL253.45

253.62

BL253.75

253.42

18

37.5

4

253.40

BL253.73

32

253.42BL253.59

32

32

32BL253.52

253.30

BL253.46

253.23

14

BL253.41

253.17

16

BL253.32

253.05

32

32

BL253.08

252.85

252.95BL253.17

14

32

TOP253.56BL253.16253.00

14

TOP253.56

BL253.17

252.92

BL253.08TOP253.28

252.88

BL253.19

252.80

2.50 m S E16

25

944

H

TOP253.16

BL252.94

252.79

252.74BL252.84TOP252.95

252.71

BL252.79

TOP252.89

252.67

BL252.72

TOP252.82

28

943

28

TOP252.92

BL252.79

252.59

TOP252.96

BL252.86

252.64

BL252.93

252.65

BL252.70

252.44

28

28

BL252.63

252.46

14

252.42

BL252.56

14

BL252.99

252.66

BL253.05

252.75

12.50

BL253.11

252.82

28

28

937 938

12.5012.50

BL252.76

282

8

942941

940939

BL253.18

252.88CIRCLE @ 1:200

GRADE TURNING

PROVIDE 200mm COMPACTED

TURNING AREA

DEPTH FCR TEMPORARY

AND SILT FENCE

PROVIDE ROCK BEACHING BL253.20

252.98

TO BE REMOVEDPOST & WIRE FENCE

CONSERVATION OPEN SPACE

REALM VISTA

R8.60

R8.6

0

R8.60

R8.60

R8.60

R8.60

R107.35

R100.95

R18.20

R11.80

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

K&C - HB2

STAGE 14ANNADALE PROPOSED

"NO

ROAD"

SIGN

R10.5

R10.5

10.86

SUBSTATION

6.20

6.20

3.00

m D

& S E

WITH EXISTING CONSTRUCTIONSTRIP AND MATCH NEW WORK NEATLYREMOVE EXISTING CONCRETE EDGE

WITH EXISTING CONSTRUCTIONSTRIP AND MATCH NEW WORK NEATLYREMOVE EXISTING CONCRETE EDGE

9

31

5

8

43

7

6

2

1

15

1417

16

13

1211

10

18

26

19

20

21

22

23

24

25

27

30

32

29

Star Picket

E 314831.04N 5842936.06RL252.50AHD

Star Picket

Star Picket

Star Picket

RL253.96AHD

E 314846.71N 5842681.72

E 314702.05N 5842672.60RL254.09AHD

E 314733.15

RL253.24AHDN 5842869.44

5842865.184 N314711.304 EEnd of pipe

CH24.16

CH38.16

CH52.16

CH66.16

CH82.16

CH96.16

CH110.16

CH126.16

CH140.16

CH156.16

CH16

9.65

CH18

3.65

CH19

6.15

CH208.65

CH221.15

CH235.15

CH310.89

CH324.89

CH338.89

CH351.39

CH367.39

CH383.39

CH395.89

CH409.89

RTP11.80LTP11.81

CH414.40

CH400.40

CH387.90

CH373.90

CH359.90

CH345.90

CH333.40

CH319.40

CH305.40

CH142.16

CH126.16

CH110.16

CH96.16

CH80.16

CH66.16

CH52.16

CH36.16

CH15

4.09

CH218.09

CH15

5.65

CH14

1.65

RTP1177.11

RTP1153.51

TP1132.82

RTP10

71.0

4TP10

67.47

RTP10

47.04

CH10

32.70

CH10

14.70

TP458.28

CH426.43

CH181.83

CH429.91

TP185.95

TP177.70

CH177.96

CH170.16

CH12

05.24

CH1189.21

CH1138.77

CH1121.88

CH10

95.00

STAGE 8EXISTING

RTP2

10.62

LTP2

10.67

LTP16

6.14

LTP18

9.74

H

28

TOP253.10

TOP253.33

TOP253.40

TOP253.48

TOP253.55

TOP253.65

ROW OF AG's PROTECTION STRIP ANDPROVIDE CONCRETE EDGE

ROW OF AG's

PROTECTION STRIP AND

PROVIDE CONCRETE EDGE

TOP2

52.8

2

BL25

2.73

252.

68

252.63

BL252.72

TOP252.88

252.34

BL252.49

NEATLY WITH PROPOSED CONSTRUCTION'NO RAD' SIGN AND MATCH NEW WORKREMOVE EXISTING CONCRETE EDGE STRIP,

252.84

BL253.09

SPECIFIELD AS AS PER NOTE 55, SHEET 2FILL TO PROPOSED FINISHED LEVELS ASREMOVE EXISTING DAM PROVIDE LEVEL 1

PROVIDE 4m WIDE HEAVY DUTY CROSSOVER

PROVIDE ACCESS GATE

AT PIPE ENDPROVIDE ROCK BEACHING

GREATER THAN 1m DEEPWHERE OPEN DRAIN IS PROVIDE SAFETY FENCING EXISTING SURFACE. DRAIN GRADE 1 IN 500 TOCONSTRUCT TEMPORARY OPEN

(SHEET 2)AS PER DETAIL BOLLARDS & CABLE

E

AHD

-

OF

-

BPD

05-

Dec-

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R01_DET.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

05-

Dec-

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R01_DET.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

252.64

252.32

252.48

252.50

252.42

BL252.48

BL252.56BL252.72

BL252.79BL252.95

252.57

BL252.86

252.46

BL252.63

TOP2

52.8

2

BL252.72

252.63

BL252.49

252.34

TOP252.88

2.40

8.60

5.81

5.50

4.24

4.24

14

28

12.50

28

1414

14

14

936

AMBERFIELD STREET

252.6

252.6

252.6

252.6

252.8

252.8

252.8

252.8

252.8

252.8

252.8

253.0

253.0

253.0

253.0

252.50

252.75

TOP252.92

BL252.79

252.59

TOP252.96

BL252.86

252.64

BL252.93

252.65

BL252.70

252.44

28

28

BL252.63

252.46

14

252.42

BL252.56

14

BL252.99

252.66

BL253.05

252.75

12.50

BL253.11

252.82

BL252.89

252.60

28

28

937 938

12.5012.50

12.50

BL252.7612.50

BL252.82

252.53

14

282

8

942941

940939

BL252.96

252.65

BL253.18

252.88CIRCLE @ 1:200

GRADE TURNING

PROVIDE 200mm COMPACTED

TURNING AREA

DEPTH FCR TEMPORARY

252.98

STAGE 7EXISTING

R8.60

R8.6

0

K&C - HB2

K&C - HB2

"NO

ROAD"

SIGN

R10.5

R10.5

10.866.20

WITH EXISTING CONSTRUCTIONSTRIP AND MATCH NEW WORK NEATLYREMOVE EXISTING CONCRETE EDGE9

1211

10

18

26

19

Star Picket

E 314831.04N 5842936.06RL252.50AHD

CH16

9.65

CH18

3.65

CH19

6.15

CH208.65

CH221.15

CH235.15

RTP11.80LTP11.81

CH15

5.65

CH14

1.65

LTP16

6.14

LTP18

9.74

ROW OF AG's PROTECTION STRIP ANDPROVIDE CONCRETE EDGE

TOP2

52.8

2

252.63

BL252.72

TOP252.88

252.34

BL252.49

Page 2: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

1.85 (NBN CONDUIT)1.85 NBN PIT

16.00

2.50 (ELECTRICAL)

2.70 RECYCLED WATER

3.20 POTABLE WATER

2.25 GAS

7.604.05 4.35

1.50 0.052.800.606.400.602.501.500.05

7.30

600

300

200

35

0

150

300

5.00 (NBN CONDUIT) 1.85 NBN PIT

5.65 (ELECTRICAL)

2.70 RECYCLED WATER

3.20 POTABLE WATER

2.25 GAS

19.00

2.553.001.50

1.50 3.00 3.00 1.50

2 B

B 5/12/17 BOLLARD & CABLE DETAIL ADDED

NOTES

1. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MPA AND HUME CITY COUNCIL STANDARD

DRAWINGS, SPECIFICATIONS, APPROVED PLANS AND TO THE SATISFACTION OF THE CHIEF

EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

2. COUNCIL TO BE NOTIFIED SEVEN (7) CLEAR WORKING DAYS PRIOR TO THE COMMENCEMENT OF

WORKS WITH A PRECOMMENCEMENT MEETING BEING HELD BETWEEN HUME CITY COUNCIL, THE

DEVELOPER'S CONSULTANT AND THE CONTRACTOR BEFORE WORKS COMMENCE. A SITE MANAGEMENT

PLAN IS TO BE SUBMITTED PRIOR TO COMMENCEMENT OF WORKS AND PRIOR TO AN ONSITE

PRECOMMENCEMENT MEETING.

3. PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING

INFORMATION:

a) SOURCE OF QUARRY MATERIAL

b) N.A.T.A. APPROVED TEST RESULTS FOR THE F.C.R. THAT IS TO BE USED

c) IF THE SOURCE OF THE QUARRY MATERIAL IS CHANGED DURING THE COURSE OF

THE WORKS, THEN NEW TEST RESULTS SHALL BE PROVIDED.

4. PRIOR TO COMMENCEMENT OF WORKS ON SITE, THE CONTRACTOR MUST ENSURE THAT

ALL MATTERS RELATING TO THE OCCUPATIONAL HEALTH AND SAFETY ACT 2004 AND

OHS REGULATIONS 2007 HAVE BEEN AND WILL BE COMPLIED WITH.

5. PRIOR TO COMMENCEMENT OF WORKS, THE CONTRACTOR MUST SUBMIT A SMP TO THE

DEVELOPER'S CONSULTANT FOR APPROVAL. THE CONTRACTOR MUST COMPLY WITH THE

RECOMMENDATIONS OF THE ENVIRONMENT PROTECTION AUTHORITY PUBLICATION No.275

"CONSTRUCTION TECHNIQUES FOR SEDIMENT POLLUTION CONTROL" AND MW SITE

ENVIRONMENTAL MANAGEMENT POLICY 3.8.2. APPROPRIATE SILTATION CONTROL IS TO BE

MAINTAINED THROUGHOUT THE CONSTRUCTION AND MAINTENANCE PERIOD OF THE WORKS.

6. THE DISPOSAL SITE FOR SPOIL REMOVAL FROM SITE AND TRUCK ROUTE IS TO BE SUBMITTED

TO AND APPROVED BY THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE IN

WRITING PRIOR TO THE COMMENCEMENT OF ANY WORKS.

7. WHERE WORKS ARE IN THE VICINITY OF EXISTING SERVICES, THESE SERVICES ARE TO BE

LOCATED AND EXPOSED/PROVED PRIOR TO COMMENCEMENT OF WORKS, AND THE RELEVANT

AUTHORITIES NOTIFIED SEVEN (7) CLEAR DAYS PRIOR TO THE COMMENCEMENT OF THE WORKS.

8. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.

9. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).

10. ALL CO-ORDINATES ARE TO MAP GRID OF AUSTRALIA (MGA).

11. THE CONTRACTOR MUST ARRANGE THE REQUISITE INSPECTIONS OF THE WORKS WITH THE CHIEF

EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE AS PER THE HOLD POINTS IN THE MPA

MANUAL AND HUME CITY COUNCIL SPECIFICATIONS.

12. FILL AREAS TO BE STRIPPED OF TOPSOIL, FILLED AND TOPSOIL REPLACED TO OBTAIN FINAL

FILL LEVELS AS SHOWN ON PLAN. FILLING IS TO BE CLEAN CLAY COMPACTED TO A DENSITY

NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE STANDARD

COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.1.1-2003.

13. FILLING TO COMPLY WITH A.S.3798-2007, LEVEL 1 UNLESS SPECIFIED OTHERWISE.

14. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL IMPORTED FILL MATERIAL,

INCLUDING TOPSOIL, SATISFIES THE DESCRIPTION FOR CLEAN FILL MATERIAL IN EPA

BULLETIN PUBLICATION NO 448 (SEPT '95) AND SUBSEQUENT REVISIONS. THE CONTRACTOR

SHALL IF REQUIRED PROVIDE VERIFICATION INCLUDING TEST CERTIFICATES TO THE CHIEF

EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

15. WHERE, AS A CONDITION OF THE PLANNING PERMIT OR AS A RESULT OF THE PRE-CONSTRUCTION

MEETING, FENCING OF AREAS CONTAINING TREES, NATIVE GRASSES AND SHRUBS IS REQUIRED,

A THREE STRAND STAR PICKET AND WIRE FENCE SHALL BE CONSTRUCTED.

16. NO TREE OR NATIVE VEGETATION IS TO BE DISTURBED OR REMOVED WITHOUT PRIOR APPROVAL

FROM COUNCIL'S SUSTAINABLE ENVIRONMENT DEPARTMENT. ANY TREES REMOVED, VEGETATION

OR OTHER MATERIALS ARE NOT TO BE BURNT ON SITE.

17. BEFORE COMMENCING WORK ON TRENCHES IN EXCESS OF 1.5M DEEP, NOTICE OF SUCH PROPOSAL

IS TO BE FORWARDED BY THE CONTRACTOR TO WORKSAFE VICTORIA.

18. THE CONTRACTOR IS TO OBTAIN A BUILDING PERMIT FOR ANY STRUCTURES/FENCES AND FOR ANY

RETAINING WALLS OVER 1.0M IN HEIGHT.

19. ANY INFRASTRUCTURE DAMAGE DURING THE DEFECTS LIABILITY PERIOD IS THE RESPONSIBILITY

OF THE DEVELOPER OR HIS REPRESENTATIVE AND IS TO BE REINSTATED TO THE SATISFACTION

OF THE CHIEF EXECUTIVE OFFICER OR HIS REPRESENTATIVE.

21. FOOTPATHS ARE TO BE 50mm OFFSET FROM TITLE BOUNDARIES UNLESS NOTED OTHERWISE.

VEHICLE CROSSING ALIGNMENTS ARE GENERALLY TO BE PARALLEL TO THE SIDE BOUNDARY.

22. ALL NEW CONCRETE WORKS SHALL BE JOINED INTO ABUTTING EXISTING CONCRETE WITH 450mm

LONG Y20 DOWEL BARS @ 600 CENTRES, UNLESS OTHERWISE SPECIFIED.

23. ANY EXPOSED AGGREGATE CONCRETE WORKS TO BE ACHIEVED BY SAND-BLASTING ONLY. WASHING

AGGREGATE OFF WITH WATER IS NOT PERMITTED.

24. SERVICE CONDUITS TRENCHES UNDER DRIVEWAYS AND FOOTPATHS ARE TO BE 50MM P.V.C. LAYED

450mm DEEP AND EXTENDING 250mm EACH SIDE OF DRIVEWAYS/FOOTPATHS.

ALL SERVICE CONDUITS TRENCHES UNDER ROAD PAVEMENTS ARE TO BE BACKFILLED WITH

20mm 3% CEMENT TREATED CLASS 3 CRUSHED ROCK COMPACTED TO A DENSITY NOT LESS

THAN 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION

TEST IN ACCORDANCE WITH A.S.1289.5.2.1-2003. ALL SERVICE CONDUITS TRENCHES UNDER

FOOTPATH, VEHICULAR CROSSINGS, PARKING BAYS AND WITHIN 750MM OF PARKING BAYS TO

BE BACKFILLED WITH CLASS 3 CRUSHED ROCK.

25. ALL STORMWATER DRAINS TO BE CLASS 2 R.C. OR RIGID F.R.C. PIPES WITH ADCOL FLEXIBLE

COLLARS UNLESS NOTED OTHERWISE. ALL PIPES UP TO & INCLUDING 750mm DIA. ARE TO BE

RUBBER RING JOINTED. INTERLOCKING/FLUSH JOINTS WITH EXTERNAL BANDS CAN ONLY BE USED

ON PIPE SIZES OVER 750mm DIA.

26. WHERE NEW ASPHALT, CONCRETE K & C, PATHS AND DRIVEWAYS MATCH INTO EXISTING, THE

EXISTING SURFACE IS TO BE SAW CUT AND MATCHED NEATLY.

27. ALL REDUNDANT ASSETS ARE TO BE REMOVED AND DISPOSED OFF SITE.

28. ALL TREES AND SHRUBS ARE TO BE RETAINED UNLESS OTHERWISE SHOWN OR DIRECTED BY THE

CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

29. AT THE COMPLETION OF ALL WORKS, ALL RUBBISH, DEBRIS AND SURPLUS SPOIL SHALL BE

REMOVED AND THE SITE SHALL BE CLEARED TO THE SATISFACTION OF THE CHIEF EXECUTIVE

OFFICER AND/OR THEIR REPRESENTATIVE.

30. ALL DRAINS BEHIND KERB AND CHANNEL SHALL BE BACKFILLED TO MATCH PAVEMENT SUBGRADE

LEVEL WITH 20mm CLASS 3 F.C.R. COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY VALUE

DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.2.1-2003.

ALL DRAINS, SEWERS, GAS & WATER MAINS LAID THROUGH THE ROAD PAVEMENT (EXCEPT

CONDUITS) ARE TO BE BACKFILLED WITH 20mm CLASS 2 F.C.R. COMPACTED TO 98% OF THE

MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE

WITH A.S.1289.5.2.1-2003.

31. PAVEMENT DEPTH SPECIFIED IS A MINIMUM DEPTH AND MAY BE VARIED BY THE CHIEF

EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. SOFT SPOTS SHALL BE EXCAVATED TO

A PROOF ROLLED BASE AND BACKFILLED WITH APPROVED MATERIAL COMPACTED IN 150mm

LAYERS TO ACHIEVE TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY VALUE

DETERMINED BY THE STANDARD COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.1.1-2003.

32. ALL EXISTING ASSETS AFFECTED BY THE WORKS (SIGNS, VEHICLE CROSSINGS, FOOTPATHS,

KERB AND LINEMARKING) SHALL BE REINSTATED BY THE CONTRACTOR PRIOR TO THE

COMPLETION OF THE WORKS TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR

THEIR REPRESENTATIVE.

33. ALL FIRE HYDRANTS ARE TO BE MARKED IN ACCORDANCE WITH "IDENTIFICATION OF STREET

HYDRANTS FOR FIREFIGHTING PURPOSES" PUBLICATION (DEVELOPED BY C.F.A., M.F.E.S.B.

& N.R.E.). MARKINGS TO BE VIA BLUE PAVEMENT MARKER AND A (RED TOPPED) WHITE POST.

34. AGRICULTURAL DRAINS ARE TO BE PLACED BEHIND ALL KERB AND CHANNEL, KERB ONLY AND

EDGE STRIPS IN ACCORDANCE WITH COUNCIL STANDARD DRAWING SD282.

35. ALL TABLE DRAINS AND VERGES ARE TO BE REINSTATED UPON COMPLETION OF WORKS TO THE

SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

36. ALL TRAFFIC CONTROL MEASURES, SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH

A.S.1742 - 1, 2 & 3. STREET NAME SIGNS ARE TO BE IN ACCORDANCE WITH STANDARD

DRAWING SD408 AND TO BE MOUNTED ON STREET LIGHT POLES WHERE POSSIBLE.

37. ALL LINEMARKING PAINT SHALL BE LONG LIFE TYPE IN ACCORDANCE WITH SECTION 95C OF

THE HUME CITY COUNCIL SPECIFICATIONS. LATERAL WORKS AND ARROWS BEING COLD APPLIED

PLASTIC TROWELLED INTO PLACE (MATERIAL DEGADUR PLASTELINE) AND LONGITUDINAL LINES

BEING EXTRUDED THERMOPLASTIC MATERIAL.

38. ALL SIGNS TO BE CLASS 1 HIGH INTENSITY TYPE AND TO COMPLY WITH THE REQUIREMENTS

OF A.S.1743-2001.

39. HOUSE DRAIN CONNECTIONS TO 150mm DIAMETER PIPES TO BE VIA A MANUFACTURED

JUNCTION PIECE. 150mm DIAMETER STORMWATER PIPES ARE TO BE HEAVY DUTY SEWER GRADE.

PVC PIPES SHALL BE BACKFILLED WITH 10mm MINUS F.C.R. TO 150mm ABOVE TOP OF PIPE

IN ALL LOCATIONS.

40. LOTS DENOTED THUS 36H ARE TO BE PROVIDED WITH A 100mm HOUSE DRAIN CONNECTION

TO BE LAID AT AN OFFSET OF 6.0M FROM THE LOW SIDE TITLE BOUNDARY AND PROPERTY

INLETS 1.0M FROM THE LOW CORNER OF THE LOT UNLESS OTHERWISE SHOWN.

41. DRAINAGE AND PITS TO BE SET OUT FROM OFFSETS SHOWN RATHER THAN FROM CENTRELINE

PIPE CHAINAGES. CENTRELINE OF PITS AT KERB T.P.'s TO BE 1.20m OFF T.P.

42. BATTERS SHALL BE IN 1 IN 5 FOR FILL AND 1 IN 3 FOR CUT UNLESS OTHERWISE SHOWN.

43. LOTS TO BE GRADED AND LEFT CLEAN TO THE SATISFACTION OF THE ENGINEER.

ALL LOTS TO BE 1 IN 150 MINIMUM SLOPE.

44. THE WATER CONDUIT OFFSET FROM THE LOT BOUNDARY IS GIVEN ON THE WATER RETICULATION

PLAN. THE CONTRACTOR MUST CONSTRUCT CONDUITS TO ACCORD WITH THE GIVEN OFFSET AND

ENSURE THAT THE CONCRETER MARKS THE KERB AND FOOTPATH EXACTLY ABOVE THE CONDUIT.

45. TELSTRA/NBN Co TO BE NOTIFIED SEVEN (7) DAYS PRIOR TO CONCRETE WORKS BEING PLACED.

46. LOCATION OF GAS, WATER AND TELSTRA/NBN Co CONDUITS ARE TO BE APPROPRIATELY MARKED ON

THE FACE OF THE KERB AND CHANNEL WITH G, W, T AND O RESPECTIVELY. ALL CONDUIT ENDS

SHALL BE SECURELY PLUGGED. TELSTRA/NBN Co, GAS & WATER CONDUITS TO BE 50mm CLASS 12 UPVC.

OTHERWISE SHOWN.

48. ALL DRIVEWAY RAMPS INTO PROPERTIES ARE TO BE CUT IN AT A MAXIMUM GRADE OF

1 IN 4 TO THE SATISFACTION OF THE ENGINEER.

49. CONTRACTOR SHALL ERECT AND MAINTAIN ALL NECESSARY SHORING, PLANKING, STRUTTING

AND DEWATERING DEVICES, BARRICADES, SIGNS, LIGHTS, ETC. NECESSARY TO KEEP THE

WORKS IN A SAFE AND STABLE CONDITION AND PROTECT THE PUBLIC FROM THE WORKS.

50. ALL CONCRETE TO BE 25MPa UNLESS OTHERWISE SPECIFIED.

51. THE CONTRACTOR MUST COMPLETE A LEVEL CHECK BETWEEN ALL TBM'S TO VERIFY

LEVEL VALUES BEFORE COMMENCEMENT OF WORKS. ALL TBM,s AND CONTROL POINTS

ARE TO BE MAINTAINED AND PROTECTED AT ALL TIMES DURING CONSTRUCTION.

SHOULD ANY MARKS BE DISTURBED, THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE

DEVELOPER'S CONSULTANT TO ARRANGE RE-INSTATEMENT AT THE CONTRACTORS EXPENSE.

52. KERB TYPE TO BE USED AS SHOWN.

53. STANDARD FOOTPATH AS PER VPA EDCM 401.

54. PROVIDE 1.8m HIGH PALING FENCE ALONG ANY COMMON BOUNDARY BETWEEN A LOT AND

MUNICIPAL RESERVE. PALINGS TO BE ON THE RESERVE SIDE AND STAINED IN A DARK

GREEN COLOUR ON THE SIDE FACING THE RESERVE TO THE SATISFACTION OF COUNCIL.

47. ALL DRIVEWAYS ARE TO BE CONSTRUCTED AS PER VPA EDCM 501 AND EDCM 502 UNLESS

DRAINAGE PIT

DRAINAGE PIT

TITLE

TITLE

NTS

HB2

HB2

PAVEMENT DETAILS

SCREENINGS

EMBEDDED IN 20mm NOM. SIZE

100mm CLASS 400 SLOTTED PVC

SUBGRADE

C.B.R > 2.5%) WITHIN 2% OF THE OPTIMUM MOISTURE CONTENT.

SILTY CLAY COMPACTED TO AT LEAST 100% STD DRY DENSITY RATIO (SOAKED

PAVEMENT TO CONSIST OF:

MI

N

150

COMPACTED TO 95% SDDR

ORDINARY BACKFILL

100mm TOPSOIL

KERB TYPE AS SPECIFIED

MI

N

TENDER SUBMISSION.ADDITIONAL COSTS WILL NOT BE CONSIDERED POST TENDER.SUBMITTED TO THE CONSULTANT AND COUNCIL FOR APPROVAL PRIOR TONOTE:THE MATERIAL TO BE USED AS "SELECTED GRANULAR MATERIAL" IS TO BE

DRAINAGE PIT

DRAINAGE PIT

TITLE

TITLE

HB2

HB2

NTS

0.60 6.40 0.60 2.80 1.50 0.05

100mm TOPSOIL DRESSING AS SPECIFIED

REALM VISTA

AMBERFIELD STREET, BRABOURNE STREET, HEATHCOTE STREET

DEPTH (585mm)

a) i 30mm COMPACTED DEPTH SIZE 10 TYPE N ASPHALT WITH C170 BINDER

ii 30mm COMPACTED DEPTH SIZE 10 TYPE N ASPHALT WITH C170 BINDER

d) 125mm COMPACTED DEPTH 20mm NOMINAL SIZE CLASS 2 FCR

e) 100mm COMPACTED DEPTH 20mm NOMINAL SIZE CLASS 3 FCR.

SOAKED CBR OF 10% COMPACTED TO 98% SDDR.

g) 150mm COMPACTED DEPTH SELECT GRANULAR MATERIAL WITH MINIMUM

f) 140mm COMPACTED DEPTH 20mm NOMINAL SIZE CLASS 4 FCR.

b) 10mm SAMI SEAL

c) PRIME

AMBERFIELD STREET, BRABOURNE STREET,

HEATHCOTE STREET & REALM VISTANTS

55. EXISTING DAM OR WATERCOURSE TO BE EXCAVATED TO A FIRM BASE AND BACKFILLED

CARRIED OUT TO THE SATISFACTION OF THE COUNCIL SUPERVISING ENGINEER.

AS SPECIFIED. DEVELOPER'S CONSULTANT TO BE NOTIFIED WHEN THE DAM/WATERCOURSE

ARE EXCAVATED TO A FIRM BASE. NO FILLING IS TO BE PLACED PRIOR TO

DAM/WATERCOURSES BEING INSPECTED AND LEVELS TAKEN. BACKFILLING IS TO BE

Max 1 in 3

Max 1 in 5

20. PRIOR TO STATEMENT OF COMPLIANCE ALL DISTURBED AREAS (INCLUDING NATURE STRIPS,

REINSTATED TO A CLEAN, TIDY CONDITION, TOP DRESSED (100mm LOAMY TOP SOIL FREE OF

BATTERS, ALLOTMENTS WITH GRADES OF 1:5 AND GREATER, AND RESERVES) ARE TO BE

RUBBISH, DEBRIS, CLUMPS, SODS AND CLAY LUMPS), LIGHTLY COMPACTED AND HYDRO MULCHED

WITH A SEED MIX OF 40KG/HA KIKUYU, 200KG/HA TURF TYPE PERENNIAL RYE, 100KG/HA

CREEPING RED FESCUE AND 1,500KG/HA OF CELLULOSE FIBRE AND A SOIL BINDER, SPECIFICALLY

MANUFACTURED FOR HYDROMULCHING, USED AT MANUFACTURERS RECOMMENDED RATES.(E.G. ORGANIC

GAUR TACKIFIERS @ 20-30KG/HA, BASED UPON SITE CONDITIONS). PLEASE NOTE BITUMEN BINDERS

ARE NOT ACCEPTED BY COUNCIL.

GRASS IS TO BE ESTABLISHED PRIOR TO THE END OF THE MAINTENANCE PERIOD, UNLESS

OTHERWISE AGREED IN WRITING.

BOLLARD & CABLE DETAILNTS

BOLLARDS

COMPOSITE TIMBER

SOLID RECYCLED OR

12mm STEEL CABLE

E

AHD

-

OF

-

BPD

05-

Dec-

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R02_NOTE.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

05-

Dec-

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R02_NOTE.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 3: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

Radius

CURVE SETOUT DIAGRAM

Chord

Mid

Ord

Qtr

Ord

Qtr

Ord

3

North

-0.50 % 0.50 % -0.50 % 0.50 %

-5.010

252.732

0.000

252.707

A1

6.337

252.738

13.509

252.702

A2

18.509

252.727

CHAINAGE

DESIGN LIP

DATUM 252

LIP LINE A

0.50 % 0.90 % 0.50 %

-5.010

252.559

0.000

252.585

B1

13.509

252.707

B2

18.519

252.732

CHAINAGE

DESIGN LIP

DATUM 252

LIP LINE B

-0.50 % 0.50 % 0.90 % 0.70 %

-5.010

253.283

0.000

253.258

C1

4.4

22

253.280

13.804

253.364

C2

18.814

253.399

CHAINAGE

DESIGN LIP

DATUM 252

LIP LINE C

-0.70 % -1.50 % -2.37 % -0.50 % 0.50 %

5m V.C.

-5.000

253.399

0.000

253.364

D1

2.600

253.325

7.214

253.216

9.714

253.168

12.214

253.144

13.509

253.138

D2

18.509

253.163

CHAINAGE

DESIGN LIP

DATUM 252

LIP LINE D

-0.50 % 0.50 % -0.50 % -0.50 %

-5.010

253.814

0.000

253.789

E1

2.545

253.801

14.175

253.743

E2

19.185

253.718

CHAINAGE

DESIGN LIP

DATUM 253

LIP LINE E

0.50 % 0.50 % -0.50 %

-5.010

253.645

0.000

253.670

F1

13.509

253.738

F2

14.672

253.743

F3

19.682

253.718

CHAINAGE

DESIGN LIP

DATUM 253

LIP LINE F

A 1 2 -90.000 -8.600 13.509 2.519 1.864 2.790 3.291 3.377 252.736

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

A 5 314793.599 5842914.003 252.719

A 4 314796.140 5842911.810 252.736

A 3 314797.648 5842908.813 252.724

A 2 314790.413 5842915.056 252.702

A 1 314797.894 5842905.466 252.707

Point no Easting Northing RL

Alignment A

B 1 2 -90.000 -8.600 13.509 2.519 1.864 2.790 3.291 3.377 252.646

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

B 5 314805.298 5842907.860 252.676

B 4 314807.490 5842910.401 252.646

B 3 314810.488 5842911.909 252.615

B 2 314804.245 5842904.674 252.707

B 1 314813.834 5842912.155 252.585

Point no Easting Northing RL

Alignment B

C 1 2 -91.966 -8.600 13.804 2.624 1.941 2.825 3.359 3.451 253.302

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

C 5 314790.039 5842705.256 253.333

C 4 314789.443 5842701.881 253.302

C 3 314787.575 5842699.006 253.275

C 2 314789.269 5842708.597 253.364

C 1 314784.734 5842697.089 253.258

Point no Easting Northing RL

Alignment C

D 1 2 -90.000 -8.600 13.509 2.519 1.864 2.790 3.291 3.377 253.227

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

D 5 314803.240 5842706.166 253.163

D 4 314799.929 5842706.707 253.227

D 3 314797.076 5842708.474 253.307

D 2 314806.507 5842706.933 253.138

D 1 314795.117 5842711.198 253.364

Point no Easting Northing RL

Alignment D

E 1 2 -94.441 -8.600 14.175 2.759 2.039 2.868 3.444 3.544 253.779

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

E 5 314691.710 5842704.281 253.761

E 4 314689.335 5842701.685 253.779

E 3 314686.118 5842700.258 253.796

E 2 314692.847 5842707.612 253.743

E 1 314682.600 5842700.238 253.789

Point no Easting Northing RL

Alignment E

F 2 3 -4.441 -15.000 1.163 0.011 0.008 0.291 0.291 0.291 253.740

F 1 2 90.000 8.600 13.509 2.519 1.864 2.790 3.291 3.377 253.704

Curve no I Radius Arc Mid Ord Qtr Ord X Y l Mid Ord RL

F 9 314699.160 5842706.539 253.742

F 8 314699.116 5842706.252 253.740

F 7 314699.066 5842705.965 253.739

F 6 314698.998 5842702.324 253.721

F 5 314700.269 5842699.219 253.704

F 4 314702.632 5842696.837 253.687

F 3 314699.198 5842706.827 253.743

F 2 314699.011 5842705.680 253.738

F 1 314705.727 5842695.540 253.670

Point no Easting Northing RL

Alignment F

4 2 0 4 8 16

LENGTHS ARE IN METRES

SCALE 1 : 200

SCALE 1:200

INTERSECTION DETAILS

LIP OF KERB PROFILES

VERTICAL 1:20

SCALE: HORIZONTAL 1:200

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R03_INT1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R03_INT1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

252.60

252.60

252.70

252.70

252.80

252.80

K&C - HB2

R8.60

R8.60

K&C -

HB2

4.24

252.79

BL252.94

TOP253.16

TOP252.95

BL252.84

252.74

1325

TOP253.04

BL252.96

252.79

4.24

BL252.96

252.75

12.50

BL252.99

252.66

BL252.93

252.65

14

252.64

TOP252.96

BL252.86

1413

935

944

939

940

941

28

28

28

H

H

10

11

12

18

26

CRO

WN

ST

RE

ET

HE

AT

HC

OT

E

29.00

LTP189.74

AMBERFIELD STREET

LTP166.14

LTP11.81

RTP11.80

B1

B2

B3

B4

B5

A1

A2

A3

A4

A5

50m

BUFFER

INTO

PROPOSED CONSERVATIO

N RES

ERVE

253.20

253.20

253.20

253.2

0

253.30

253.3

0

253.30

253.30

253.40

REALMVI

STA

K&C - HB2

R8.60

CRO

WN

K&C - HB2

R8.60

RTPCH210.6

2

27.38

TOP254.02

BL253.58

253.69

4.24

TOP254.

07

BL253.4

0

253.68

15.2

9

4.22

253.71

BL253.61

TOP253.86

TOP253.

84

BL253.5

1

253.70

31.90

A22.86

923

953

H

LTPCH21

0.67

3

7

6

2

ST

REET

HE

AT

HC

OTE

RTP1047.04

TP1067.47

RTP1071.04

D1

D2

D3

D4

D5

C1

C2

C3

C4

C5

253.70

253.70

253.70

253.70

253.80

253.80

253.80

REALMVISTA

K&C -

HB2

R8.60

CROWN

K&C - HB2

R8.60

254.05

BL254.04

TOP254.10

4.40 TOP254.27

BL253.92254.06

15.35

BL253.99

254.07

4.08

TOP254.29BL254.03254.13

13.05

32.79

902

920

30.56

TPCH458.28

8

4

5

RTP1153.51

RTP1177.11

ST

RE

ET

BR

AB

OU

RN

E

F1

F2

F3

F4

F5

F6

F7

F8

F9

E1

E2

E3

E4

E5

Page 4: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

4

I.P. 253.343

I.P. 253.243

0.50% -0.50% 0.50%DESIGN GRADELINE

VC LENGTH

964.70

252.93

253.03

252.93

253.80

980.00

253.11

253.00

253.75

1000.00

253.37

253.10

253.21

253.10

253.71

1014.70

253.62

253.4

5253.18

253.28

253.18

253.72

253.72

1020.00

253.63

253.4

7253.20

253.31

253.20

253.74

253.74

1026.72

253.64

253.51

253.24

253.34

253.24

253.75

253.75

1032.70

253.64

253.4

8253.21

253.31

253.21

253.74

253.74

1040.00

253.62

253.4

4253.17

253.28

253.17

253.73

253.73

1046.72

253.68

253.4

1253.14

253.24

253.14

253.73

253.73

1047.04

253.68

253.14

253.24

253.14

253.73

253.73

1060.00

253.31

253.20

253.71

253.71

1067.4

7253.35

253.24

253.77

253.77

1071.04

253.70

253.26

253.36

253.26

253.82

253.82

1080.00

253.81

253.57

253.30

253.4

1253.30

253.89

253.89

1095.00

254.15

253.65

253.38

253.4

8253.38

253.98

253.98

1100.00

253.68

253.67

253.4

0253.51

253.4

0254.00

254.00

1120.00

253.56

253.77

253.50

253.61

253.50

254.03

254.03

1121.88

254.01

253.78

253.51

253.62

253.51

254.04

254.04

1132.82

255.10

253.84

253.57

253.67

253.57

253.98

253.98

1138.77

254.11

253.87

253.60

253.70

253.60

254.01

254.01

1140.00

254.08

253.87

253.60

253.71

253.60

254.02

254.02

1153.51

254.06

253.94

253.67

253.78

253.67

254.10

254.10

1160.00

253.81

253.70

254.17

254.17

1177.11

253.90

253.79

254.09

254.09

1180.00

254.15

254.07

253.80

253.91

253.80

254.11

254.11

1189.21

254.11

254.12

253.85

253.96

253.85

254.21

254.21

1200.00

254.11

254.17

253.90

254.01

253.90

254.20

254.20

1205.24

254.12

254.20

253.93

254.04

253.93

254.21

CHAINAGE CENTRE LINE

ES RIGHT TITLE BDY

FS RIGHT TITLE BDY

RIGHT LIP OF KERB

DESIGN CL

LEFT LIP OF KERB

FS LEFT TITLE BDY

ES LEFT TITLE BDY

DATUM 251

REALM VISTA

0.50% -0.50%DESIGN GRADELINE

VC LENGTH

91.65

252.67

252.4

1252.52

252.4

1

93.69

252.68

252.4

2252.53

252.4

2

100.00

252.65

252.39

252.50

252.39

113.69

252.58

252.32

252.4

3252.32

120.00

252.61

252.35

252.4

6252.35

252.62

240.00

253.21

252.95

253.06

252.95

253.22

257.94

253.15

CHAINAGE CENTRE LINE

ES RIGHT TITLE BDY

FS RIGHT TITLE BDY

RIGHT LIP OF KERB

DESIGN CL

LEFT LIP OF KERB

FS LEFT TITLE BDY

ES LEFT TITLE BDY

DATUM 250

AMBERFIELD STREET

LI

MI

T

OF

W

OR

KS

LI

MI

T

OF

W

OR

KS

EXISTING STAGE 8

LI

MI

T

OF

W

OR

KS

EXISTING STAGE 8

LI

MI

T

OF

W

OR

KS

ESTATE (BY OTHERS)

PROPOSED ANNADALE

FUTURE STAGE 10

TP

TP

RTP

RTP

RTP

RTP

LTP

0.50%

140.00

252.71

252.4

5252.56

252.4

5252.72

141.65

252.63

252.72

252.4

6252.57

252.4

6252.73

252.68

154.09

252.57

252.78

252.52

252.63

252.52

252.79

252.71

155.65

252.59

252.79

252.53

252.64

252.53

252.80

252.70

160.00

252.61

252.81

252.55

252.66

252.55

252.82

252.70

166.14

252.63

252.84

252.58

252.69

252.58

252.85

252.73

169.65

252.64

252.86

252.60

252.71

180.00

252.65

252.91

252.65

252.76

183.65

252.65

252.93

252.67

252.78

189.74

252.64

252.96

252.70

252.81

252.70

252.75

196.15

252.66

252.99

252.73

252.84

252.73

253.00

252.77

200.00

252.68

253.01

252.75

252.86

252.75

253.02

252.80

208.65

252.75

253.05

252.80

252.90

252.80

253.07

252.85

218.09

252.82

253.10

252.84

252.95

252.84

253.11

252.90

220.00

252.82

253.11

252.85

252.96

252.85

253.12

252.91

221.15

252.82

253.11

252.86

252.97

252.86

253.13

252.91

235.15

252.88

253.18

252.93

253.04

252.93

253.20

252.98

LTP

LONGITUDINAL SECTION

SCALE HORIZONTAL 1:500

VERTICAL 1:50

EXISTING SURFACE CL

L&R LIP OF KERB

DESIGN CLINTERSECTION OF

REALM VISTA/HEATHCOTE ST

INTERSECTION OF

REALM VISTA/BRABOURNE ST

INTERSECTION OF

AMBERFIELD ST/HEATHCOTE ST

EXISTING SURFACE CL

L&R LIP OF KERB

DESIGN CL

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R04_LS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R04_LS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 5: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

5

0.50% -0.50% 0.50% 0.80% 0.50% -0.50% 0.50%DESIGN GRADELINE

VC LENGTH

205.4

0252.83

252.56

252.66

252.56

252.85

220.00

252.90

252.63

252.74

252.63

252.93

234.03

252.97

252.70

252.81

252.70

240.00

252.94

252.67

252.78

252.67

249.03

252.90

252.63

252.73

252.63

260.00

252.95

252.68

252.79

252.68

252.98

269.03

253.00

252.73

252.83

252.73

253.02

280.00

252.81

252.92

252.81

253.11

300.00

253.24

252.97

253.08

252.97

253.27

305.4

0253.29

253.02

253.12

253.02

253.31

310.89

253.50

253.33

253.06

253.17

253.06

253.36

253.4

0

319.4

0253.53

253.4

0253.13

253.23

253.13

253.4

2253.4

3

320.00

253.53

253.4

0253.13

253.24

253.13

253.4

3253.4

3

324.89

253.55

253.4

4253.17

253.28

253.17

253.4

7253.4

7

333.4

0253.54

253.51

253.24

253.35

253.24

253.54

253.53

338.89

253.59

253.55

253.28

253.39

253.28

253.58

253.56

340.00

253.59

253.56

253.29

253.4

0253.29

253.59

253.56

343.06

253.62

253.59

253.32

253.4

2253.32

253.61

253.58

345.90

253.63

253.60

253.33

253.4

4253.33

253.63

253.59

351.39

253.68

253.63

253.36

253.4

7253.36

253.66

253.59

359.90

253.69

253.67

253.4

0253.51

253.4

0253.70

253.62

360.00

253.69

253.67

253.4

0253.51

253.4

0253.70

253.62

367.39

253.69

253.71

253.4

4253.55

253.4

4253.74

253.65

372.56

253.74

253.73

253.4

6253.57

253.4

6253.76

253.69

373.90

253.75

253.73

253.4

6253.56

253.4

6253.75

253.70

380.00

253.81

253.70

253.4

3253.53

253.4

3253.72

253.75

383.39

253.84

253.68

253.4

1253.52

253.4

1253.71

253.78

387.56

253.85

253.66

253.39

253.50

253.39

253.69

253.80

387.90

253.85

253.66

253.39

253.50

253.39

253.69

253.80

395.89

253.86

253.70

253.4

3253.54

253.4

3253.73

253.83

400.00

253.87

253.72

253.4

5253.56

253.4

5253.75

253.83

400.4

0253.87

253.72

253.4

5253.56

253.4

5253.75

253.83

409.89

253.96

253.77

253.50

253.61

253.50

253.80

253.87

414.4

0254.00

253.79

253.52

253.63

253.52

253.82

253.87

420.00

254.06

253.82

253.55

253.66

253.55

253.85

253.90

426.4

3254.09

253.85

253.58

253.69

253.58

253.88

253.91

429.91

254.10

253.87

253.60

253.71

253.60

253.90

253.92

440.00

253.96

253.92

253.65

253.76

253.65

253.95

253.96

458.28

254.05

254.01

253.74

253.85

253.74

254.04

254.04

460.00

253.86

254.05

471.03

253.91

CHAINAGE CENTRE LINE

ES RIGHT TITLE BDY

FS RIGHT TITLE BDY

RIGHT LIP OF KERB

DESIGN CL

LEFT LIP OF KERB

FS LEFT TITLE BDY

ES LEFT TITLE BDY

DATUM 251

BRABOURNE STREET

LI

MI

T

OF

W

OR

KS

FUTURE STAGE 10

INTERSECTION

REALM VISTA

INTERSECTION

REALM VISTA

INTERSECTION

AMBERFIELD STREET

TP

I.P. 253.513

0.50% -0.50% 0.50% -0.50% 0.50% -1.89%DESIGN GRADELINE

15.00VCVC LENGTH

0.00

252.75

11.80

252.80

252.98

252.71

252.81

252.71

252.96

252.80

20.00

252.86

253.02

252.75

252.85

252.75

253.00

252.82

24.16

252.86

253.04

252.77

252.87

252.77

253.02

252.82

36.16

252.90

253.10

252.83

252.93

252.83

253.08

252.88

38.16

252.91

253.11

252.84

252.94

252.84

253.09

252.88

40.00

252.93

253.12

252.85

252.95

252.85

253.10

252.88

52.16

252.99

253.18

252.91

253.01

252.91

253.16

252.92

58.69

253.00

253.21

252.94

253.05

252.94

253.20

252.91

60.00

253.00

253.20

252.93

253.04

252.93

253.19

252.92

66.16

253.03

253.17

252.90

253.01

252.90

253.16

253.00

73.4

1253.11

253.14

252.87

252.97

252.87

253.12

253.03

80.00

253.14

253.17

252.90

253.01

252.90

253.15

253.06

80.16

253.14

253.17

252.90

253.01

252.90

253.16

253.07

82.16

253.15

253.18

252.91

253.02

252.91

253.17

253.09

96.16

253.21

253.25

252.98

253.09

252.98

253.24

253.18

100.00

253.23

253.27

253.00

253.11

253.00

253.25

253.20

110.16

253.29

253.32

253.05

253.16

253.05

253.31

253.25

111.20

253.30

253.33

253.06

253.16

253.06

253.31

253.25

120.00

253.37

253.28

253.01

253.12

253.01

253.27

253.31

126.01

253.39

253.25

252.98

253.09

252.98

253.24

253.34

126.16

253.39

253.25

252.98

253.09

252.98

253.24

253.34

140.00

253.4

2253.32

253.05

253.16

253.05

253.31

253.4

3

140.16

253.4

2253.32

253.05

253.16

253.05

253.31

253.4

3

142.16

253.4

4253.33

253.06

253.17

253.06

253.32

253.4

5

156.16

253.54

253.4

0253.13

253.24

253.13

253.39

253.52

160.00

253.56

253.4

2253.15

253.26

253.15

253.4

1253.53

170.16

253.62

253.4

7253.20

253.31

253.20

253.4

6253.60

177.70

253.67

253.51

253.24

253.35

253.24

253.50

253.68

177.96

253.67

253.51

253.24

253.35

253.24

253.50

253.68

180.00

253.66

253.53

253.25

253.36

253.25

253.50

253.69

181.83

253.64

253.57

253.26

253.37

253.26

253.50

253.67

185.95

253.69

253.55

253.28

253.39

253.28

253.54

253.64

200.00

253.73

253.62

253.35

253.4

6253.35

253.61

253.65

203.51

253.75

253.64

253.37

253.4

8253.37

253.62

253.68

206.64

253.74

253.65

253.38

253.4

8253.38

253.63

253.70

210.62

253.72

253.4

7253.70

211.01

253.71

253.4

7253.70

218.51

253.37

220.00

253.34

222.4

7253.30

CHAINAGE CENTRE LINE

ES RIGHT TITLE BDY

FS RIGHT TITLE BDY

RIGHT LIP OF KERB

DESIGN CL

LEFT LIP OF KERB

FS LEFT TITLE BDY

ES LEFT TITLE BDY

DATUM 251

HEATHCOTE STREET

TP

TP

RTP

LTP

LONGITUDINAL SECTION

SCALE HORIZONTAL 1:500

VERTICAL 1:50

DESIGN CL

EXISTING SURFACE CL

L&R LIP OF KERB

DESIGN CL

EXISTING SURFACE CL

L&R LIP OF KERB

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R05_LS2.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R05_LS2.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 6: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

19.00

2.553.001.50

19.00

2.553.001.50

6

1014.70

1 in 11 1 in 50

1 in 10

1 in -30 1 in -301 in 20

1 in 50

1 in

3

-10.85

253.72

253.72

-9.35

253.71

253.59

-6.35

253.70

253.53

-3.80

253.68

253.28

-3.69

253.68

253.28

-3.65

253.68

253.13

-3.20

253.68

253.18

0.00

253.66

253.28

3.20

253.65

253.18

3.65

253.64

253.13

3.69

253.64

253.28

3.80

253.64

253.28

6.60

253.63

253.4

2

8.10

253.62

253.4

5

8.15

253.62

253.4

5

8.4

5253.61

253.4

5

9.95

253.60

253.95

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

1047.04

1 in 8

1 in 501 in 10

1 in -30 1 in -301 in 20

1 in 50

1 in

3

-10.85

253.73

253.73

-9.35

253.72

253.55

-6.35

253.70

253.4

9

-3.80

253.69

253.24

-3.69

253.69

253.24

-3.65

253.69

253.09

-3.20

253.69

253.14

0.00

253.67

253.24

3.20

253.67

253.14

3.65

253.67

253.09

3.69

253.67

253.24

3.80

253.67

253.24

6.60

253.68

253.38

8.10

253.68

253.4

1

8.15

253.68

253.4

1

8.4

5253.68

253.4

1

10.4

5253.68

254.07

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

1071.05

1 in 10

1 in 50 1 in 10

1 in -30 1 in -301 in 20

1 in 50

1 in

3

-10.85

253.82

253.82

-9.35

253.82

253.67

-6.35

253.81

253.61

-3.80

253.80

253.36

-3.69

253.80

253.36

-3.65

253.80

253.21

-3.20

253.80

253.26

0.00

253.77

253.36

3.20

253.74

253.26

3.65

253.74

253.21

3.69

253.74

253.36

3.80

253.74

253.36

6.60

253.71

253.50

8.10

253.70

253.53

8.15

253.70

253.53

8.4

5253.70

253.53

9.4

5253.70

253.86

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

1121.88

1 in 14 1 in 50

1 in 10

1 in -30 1 in -301 in 20

1 in 50

1 in

3

-10.85

254.04

254.04

-9.35

254.03

253.93

-6.35

254.00

253.87

-3.80

253.98

253.61

-3.69

253.98

253.61

-3.65

253.98

253.4

6

-3.20

253.97

253.51

0.00

253.93

253.62

3.20

253.86

253.51

3.65

253.88

253.4

6

3.69

253.88

253.61

3.80

253.88

253.61

6.60

254.01

253.75

8.10

254.01

253.78

8.15

254.01

253.78

8.4

5254.01

253.78

9.4

5254.01

254.12

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

1153.51

1 in 89 1 in 501 in 10

1 in -30 1 in -301 in 20

1 in 50 1 in

3

-10.85

254.10

254.10

-9.35

254.11

254.09

-6.35

254.13

254.03

-3.80

254.14

253.77

-3.69

254.14

253.77

-3.65

254.13

253.62

-3.20

254.13

253.67

0.00

254.09

253.78

3.20

254.03

253.67

3.65

254.02

253.62

3.69

254.02

253.77

3.80

254.02

253.77

6.60

254.04

253.91

8.10

254.06

253.94

8.15

254.06

253.94

8.4

5254.06

253.94

9.4

5254.08

254.27

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

1177.11

1 in 50

1 in -30 1 in -301 in 20

1 in 501 in

3

-10.85

254.09

254.09

-9.35

254.09

-6.35

254.09

-3.80

254.10

253.89

-3.69

254.10

253.89

-3.65

254.10

253.74

-3.20

254.10

253.79

0.00

254.10

253.90

3.20

254.12

253.79

3.65

254.12

253.74

3.69

254.12

253.89

3.80

254.12

253.89

6.60

254.14

254.03

8.10

254.14

254.06

8.15

254.14

254.06

8.4

5254.14

254.06

9.15

254.13

254.29

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

VERTICAL 1:50

SCALE HORIZONTAL 1:100

CROSS SECTIONS

REALM VISTA

0.051.500.606.400.60 2.80

OPEN SPACE

CONSERVATION

TIT

LE B

DY

NO

RT

HER

N

TIT

LE B

DY

SO

UT

HER

N

0.051.500.606.400.60 2.80

OPEN SPACE

CONSERVATION

TIT

LE B

DY

NO

RT

HER

N

TIT

LE B

DY

SO

UT

HER

N

TIT

LE B

DY

SO

UT

HER

N

CONSERVATION

OPEN SPACE

TIT

LE B

DY

CONSERVATION

OPEN SPACE

TIT

LE B

DY

CONSERVATION

OPEN SPACE

TIT

LE B

DY

CONSERVATION

OPEN SPACE

TIT

LE B

DY

CONSERVATION

OPEN SPACE

TIT

LE B

DY

NO

RT

HER

NTIT

LE B

DY

TIT

LE B

DY

TIT

LE B

DY

TIT

LE B

DY

SO

UT

HER

NS

OUT

HER

N

SO

UT

HER

NS

OUT

HER

N

NO

RT

HER

NN

ORT

HER

N

NO

RT

HER

NN

ORT

HER

N

1205.24

1 in 50

1 in -30 1 in -301 in 20

1 in 50

-10.85

254.21

-9.35

254.21

-6.35

254.21

-3.80

254.21

254.03

-3.69

254.21

254.03

-3.65

254.21

253.88

-3.20

254.21

253.93

0.00

254.20

254.04

3.20

254.17

253.93

3.65

254.17

253.88

3.69

254.17

254.03

3.80

254.17

254.03

6.60

254.14

254.17

8.10

254.12

254.20

8.15

254.12

254.20

8.4

5254.11

254.20

8.91

254.11

254.11

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

BER

M

BER

MBER

M

BER

MBER

MBER

MBER

M

1 in

31 in 20

254.21

254.20

254.17

254.08

254.01

1 in 20

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R06_RV_XS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R06_RV_XS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 7: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

0.05 1.50 2.80 0.60 3.20 3.20 2.500.60 1.50 0.05

16.00

0.05 1.50 2.80 0.60 3.20 3.20 2.500.60 1.50 0.05

16.00

7

VERTICAL 1:50

SCALE HORIZONTAL 1:100

CROSS SECTIONS

AMBERFIELD STREET

141.65

1 in 5 1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 50 1 i

n 5

-8.95

252.69

252.83

-8.4

5252.68

252.73

-8.15

252.68

252.73

-8.10

252.68

252.73

-6.60

252.66

252.70

-3.80

252.65

252.56

-3.69

252.65

252.56

-3.65

252.65

252.4

1

-3.20

252.66

252.4

6

0.00

252.66

252.57

3.20

252.66

252.4

6

3.65

252.66

252.4

1

3.69

252.66

252.56

3.80

252.66

252.56

6.30

252.64

252.69

7.80

252.63

252.72

7.85

252.63

252.72

8.15

252.63

252.72

8.92

252.63

252.89

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

166.14

1 in 5 1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 501 i

n 5

-8.95

252.74

252.95

-8.4

5252.73

252.85

-8.15

252.73

252.85

-8.10

252.73

252.85

-6.60

252.72

252.82

-3.80

252.70

252.68

-3.69

252.70

252.68

-3.65

252.70

252.53

-3.20

252.69

252.58

0.00

252.67

252.69

3.20

252.64

252.58

3.65

252.64

252.53

3.69

252.64

252.68

3.80

252.64

252.68

6.30

252.63

252.81

7.80

252.63

252.84

7.85

252.63

252.84

8.15

252.63

252.84

8.67

252.63

252.94

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

189.74

1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 50

-8.4

5252.75

252.97

-8.15

252.75

252.97

-8.10

252.75

252.97

-6.60

252.74

252.94

-3.80

252.71

252.80

-3.69

252.71

252.80

-3.65

252.71

252.65

-3.20

252.71

252.70

0.00

252.68

252.81

3.20

252.66

252.70

3.65

252.66

252.65

3.69

252.66

252.80

3.80

252.65

252.80

6.30

252.64

252.93

7.80

252.64

252.96

7.85

252.64

252.96

8.15

252.65

252.96

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

208.65

1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 50

-8.4

5252.85

253.07

-8.15

252.85

253.07

-8.10

252.85

253.07

-6.60

252.85

253.04

-3.80

252.85

252.90

-3.69

252.85

252.90

-3.65

252.85

252.75

-3.20

252.85

252.80

0.00

252.81

252.90

3.20

252.80

252.80

3.65

252.80

252.75

3.69

252.80

252.90

3.80

252.80

252.90

6.30

252.77

253.02

7.80

252.75

253.05

7.85

252.75

253.05

8.15

252.74

253.05

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

235.15

1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 50

-8.4

5252.98

253.20

-8.15

252.98

253.20

-8.10

252.98

253.20

-6.60

252.96

253.17

-3.80

252.92

253.03

-3.69

252.92

253.03

-3.65

252.92

252.88

-3.20

252.91

252.93

0.00

252.87

253.04

3.20

252.87

252.93

3.65

252.86

252.88

3.69

252.86

253.03

3.80

252.86

253.03

6.30

252.87

253.15

7.80

252.88

253.18

7.85

252.88

253.18

8.15

252.88

253.18

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

NO

RT

HER

NTIT

LE B

DY

TIT

LE B

DY

SO

UT

HER

N

NO

RT

HER

NTIT

LE B

DY

TIT

LE B

DY

SO

UT

HER

N

TIT

LE B

DY

SO

UT

HER

NTIT

LE B

DY

SO

UT

HER

NTIT

LE B

DY

SO

UT

HER

N

NO

RT

HER

NTIT

LE B

DY

NO

RT

HER

NTIT

LE B

DY

NO

RT

HER

NTIT

LE B

DY

BER

M

BER

MBER

MBER

MBER

M

BER

MBER

MBER

M

BER

M

BER

M

INDICATES STRUCTURAL FILL

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R07_AS_XS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R07_AS_XS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 8: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

1.50 2.50 0.60 3.20 3.20 2.800.60 1.50

16.00

0.05 0.05

1.50 2.50 0.60 3.20 3.20 2.800.60 1.50

16.00

0.05 0.05

8

WESTER

NTIT

LE B

DY

TIT

LE B

DY

EA

STER

N

VERTICAL 1:50

SCALE HORIZONTAL 1:100

CROSS SECTIONS

HEATHCOTE STREET

11.80

1 in 51 in 50 1 in 20

1 in -30 1 in -30 1 in 201 in 50

-9.15

252.79

253.16

-8.15

252.79

252.96

-7.85

252.80

252.96

-7.80

252.80

252.96

-6.30

252.80

252.93

-3.80

252.82

252.81

-3.69

252.82

252.81

-3.65

252.82

252.66

-3.20

252.82

252.71

0.00

252.83

252.81

3.20

252.82

252.71

3.65

252.82

252.66

3.69

252.82

252.81

3.80

252.82

252.81

6.60

252.81

252.95

8.10

252.80

252.98

8.15

252.80

252.98

8.4

5252.80

252.98

8.75

252.80

253.04

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

38.16

1 in 51 in 50 1 in 20

1 in -30 1 in -301 in 20

1 in 50

-9.28

252.87

253.32

-8.15

252.87

253.09

-7.85

252.88

253.09

-7.80

252.88

253.09

-6.30

252.88

253.06

-3.80

252.88

252.94

-3.69

252.88

252.94

-3.65

252.88

252.79

-3.20

252.89

252.84

0.00

252.90

252.94

3.20

252.91

252.84

3.65

252.91

252.79

3.69

252.91

252.94

3.80

252.91

252.94

6.60

252.91

253.08

8.10

252.91

253.11

8.15

252.91

253.11

8.4

5252.91

253.11

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

73.41

1 in 5

1 in 50 1 in 20 1 in -301 in -30 1 in 20 1 in 50

-10.15

253.03

253.52

-8.15

253.03

253.12

-7.85

253.03

253.12

-7.80

253.03

253.12

-6.30

253.02

253.09

-3.80

253.03

252.97

-3.69

253.03

252.97

-3.65

253.03

252.82

-3.20

253.03

252.87

0.00

253.06

252.97

3.20

253.08

252.87

3.65

253.09

252.82

3.69

253.09

252.97

3.80

253.09

252.97

6.60

253.10

253.11

8.10

253.11

253.14

8.15

253.11

253.14

8.4

5253.11

253.14

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

126.01

1 in 51 in 50

1 in 201 in -30 1 in -30

1 in 201 in 50

1 in

3

-10.15

253.34

253.64

-8.15

253.34

253.24

-7.85

253.34

253.24

-7.80

253.34

253.24

-6.30

253.34

253.21

-3.80

253.35

253.08

-3.69

253.35

253.08

-3.65

253.35

252.93

-3.20

253.35

252.98

0.00

253.36

253.09

3.20

253.37

252.98

3.65

253.37

252.93

3.69

253.37

253.08

3.80

253.37

253.08

6.60

253.38

253.22

8.10

253.39

253.25

8.15

253.39

253.25

8.4

5253.39

253.25

8.87

253.39

253.39

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

156.16

1 in 5

1 in 50 1 in 201 in -30 1 in -30

1 in 201 in 50

-10.15

253.52

253.79

-8.15

253.52

253.39

-7.85

253.52

253.39

-7.80

253.52

253.39

-6.30

253.52

253.36

-3.80

253.50

253.23

-3.69

253.50

253.23

-3.65

253.50

253.08

-3.20

253.50

253.13

0.00

253.51

253.24

3.20

253.53

253.13

3.65

253.53

253.08

3.69

253.53

253.23

3.80

253.53

253.23

6.60

253.55

253.37

8.10

253.54

253.4

0

8.15

253.54

253.4

0

8.4

5253.54

253.4

0

8.86

253.54

253.54

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

210.62

1 in 51 in 50

1 in 201 in -30 1 in -30

1 in 201 in 50

-10.15

253.70

254.02

-8.15

253.70

253.62

-7.85

253.70

253.62

-7.80

253.70

253.62

-6.30

253.71

253.59

-3.80

253.71

253.4

6

-3.69

253.71

253.4

6

-3.65

253.71

253.31

-3.20

253.71

253.36

0.00

253.72

253.4

7

3.20

253.72

253.36

3.65

253.72

253.31

3.69

253.72

253.4

6

3.80

253.72

253.4

6

6.60

253.71

253.60

8.10

253.72

253.63

8.15

253.72

253.63

8.4

5253.72

253.63

8.69

253.72

253.72

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

BER

M

WESTER

NTIT

LE B

DY

TIT

LE B

DY

EA

STER

N

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

TIT

LE B

DY

EA

STER

NTIT

LE B

DY

EA

STER

NTIT

LE B

DY

EA

STER

N

TIT

LE B

DY

EA

STER

N

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R08_HS_XS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R08_HS_XS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 9: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

1.50 2.50 0.60 3.20 3.20 2.800.60 1.50

16.00

0.05 0.05

1.50 2.50 0.60 3.20 3.20 2.800.60 1.50

16.00

0.05 0.05

9

305.40

1 in 5 1 in 501 in 15

1 in -30 1 in -301 in 20

1 in 50

-9.65

253.38

253.61

-8.15

253.38

253.31

-7.85

253.38

253.31

-7.80

253.38

253.31

-6.30

253.39

253.28

-3.80

253.4

0253.12

-3.69

253.4

0253.12

-3.65

253.4

0252.97

-3.20

253.4

1253.02

0.00

253.4

3253.12

3.20

253.4

5253.02

3.65

253.4

5252.97

3.69

253.4

5253.12

3.80

253.4

5253.12

6.60

253.4

7253.26

8.10

253.4

8253.29

8.15

253.4

8253.29

8.4

5253.4

8253.29

8.91

253.4

8253.38

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL251.0

333.40

1 in 5 1 in 50 1 in 15

1 in -30 1 in -30 1 in 201 in 50

-9.15

253.52

253.74

-8.15

253.53

253.54

-7.85

253.53

253.54

-7.80

253.53

253.54

-6.30

253.54

253.51

-3.80

253.55

253.34

-3.69

253.55

253.34

-3.65

253.55

253.19

-3.20

253.56

253.24

0.00

253.55

253.35

3.20

253.55

253.24

3.65

253.55

253.19

3.69

253.55

253.34

3.80

253.55

253.34

6.60

253.55

253.4

8

8.10

253.54

253.51

8.15

253.54

253.51

8.4

5253.54

253.51

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

359.90

1 in 51 in 50 1 in 15

1 in -30 1 in -30

1 in 20 1 in 50

-9.15

253.61

253.90

-8.15

253.61

253.70

-7.85

253.62

253.70

-7.80

253.62

253.70

-6.30

253.62

253.67

-3.80

253.65

253.50

-3.69

253.65

253.50

-3.65

253.65

253.35

-3.20

253.65

253.4

0

0.00

253.67

253.51

3.20

253.68

253.4

0

3.65

253.69

253.35

3.69

253.69

253.50

3.80

253.69

253.50

6.60

253.69

253.64

8.10

253.69

253.67

8.15

253.69

253.67

8.4

5253.69

253.67

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

387.56

1 in 5 1 in 501 in 15

1 in -30 1 in -301 in 20

1 in 50

-9.15

253.79

253.89

-8.15

253.79

253.69

-7.85

253.80

253.69

-7.80

253.80

253.69

-6.30

253.81

253.66

-3.80

253.83

253.4

9

-3.69

253.83

253.4

9

-3.65

253.83

253.34

-3.20

253.83

253.39

0.00

253.83

253.50

3.20

253.84

253.39

3.65

253.84

253.34

3.69

253.84

253.4

9

3.80

253.84

253.4

9

6.60

253.84

253.63

8.10

253.85

253.66

8.15

253.85

253.66

8.4

5253.85

253.66

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

414.40

1 in 5 1 in 501 in 15

1 in -30 1 in -301 in 20

1 in 50

-9.15

253.87

254.02

-8.15

253.87

253.82

-7.85

253.87

253.82

-7.80

253.88

253.82

-6.30

253.88

253.79

-3.80

253.89

253.62

-3.69

253.89

253.62

-3.65

253.90

253.4

7

-3.20

253.90

253.52

0.00

253.94

253.63

3.20

253.97

253.52

3.65

253.98

253.4

7

3.69

253.98

253.62

3.80

253.98

253.62

6.60

254.00

253.76

8.10

254.00

253.79

8.15

254.00

253.79

8.4

5254.00

253.79

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

458.28

1 in 50 1 in 15

1 in -30 1 in -30

1 in 20 1 in 50

-8.4

6254.04

254.10

-8.15

254.04

254.04

-7.85

254.04

254.04

-7.80

254.04

254.04

-6.30

254.03

254.01

-3.80

254.01

253.84

-3.69

254.01

253.84

-3.65

254.01

253.69

-3.20

254.00

253.74

0.00

253.99

253.85

3.20

254.02

253.74

3.65

254.02

253.69

3.69

254.02

253.84

3.80

254.02

253.84

6.60

254.04

253.98

8.10

254.05

254.01

8.15

254.05

254.01

8.4

5254.05

254.01

OFFSET

EXISTING

SURFACE

DESIGN

SURFACE

DATUM RL252.0

VERTICAL 1:50

SCALE HORIZONTAL 1:100

CROSS SECTIONS

BRABOURNE STREET

WESTER

NTIT

LE B

DY

TIT

LE B

DY

EA

STER

NBER

MBER

MBER

MBER

M

BER

M

BER

MBER

M

BER

MBER

MBER

M

TIT

LE B

DY

EA

STER

NTIT

LE B

DY

EA

STER

NTIT

LE B

DY

EA

STER

N

TIT

LE B

DY

EA

STER

N

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

WESTER

NTIT

LE B

DY

TIT

LE B

DY

EA

STER

N

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R09_BS_XS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R09_BS_XS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 10: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

10

525 RRJ

1 in 226

0.26m3/s

0.29m3/s

L=30.552m

1.32m/s

253.645

253.304

0.000

251.490

251.490

1.814

1.814

252.016

1

450 RRJ

1 in 209

0.18m3/s

0.20m3/s

L=25.092m

1.24m/s

253.670

253.260

30.552

251.625

251.700

1.635

1.560

252.150

252.187

2

375 RRJ

1 in 309

0.07m3/s

0.10m3/s

L=78.695m

0.90m/s

253.740

253.384

55.643

251.820

251.895

1.564

1.489

252.286

252.363

252.359

3

300 RRJ

1 in 99.3

0.01m3/s

0.10m3/s

L=24.823m

1.37m/s

254.013

253.790

134.338

252.150

252.225

1.640

1.565

252.525

252.579

252.570

4

254.131

253.914

159.162

252.4

75

1.439

252.775

252.777

5

CHAINAGE

NATURAL SURFACE

FINISHED SURFACE

INVERT

HGL LEVEL

DEPTH FS TO INVERT

GRADE

DIAMETER AND TYPE (CLASS 2)

DESIGN (m3/s)

CAPACITY (m3/s)

VELOCITY (m/sec)

DATUM RL

300 RRJ

1 in 94.1

0.09m3/s

0.10m3/s

L=8.468m

1.41m/s

253.670

253.260

0.000

251.625

251.850

1.635

1.410

252.150

252.187

2

253.693

253.279

8.4

68

251.940

1.339

252.259

252.610

6

300 RRJ

1 in 57.8

0.12m3/s

0.13m3/s

L=8.457m

1.80m/s

253.740

253.384

0.000

251.820

251.974

1.564

1.410

252.286

252.363

252.359

3

253.807

253.4

02

8.4

57

252.120

1.282

252.4

81

252.951

7

300 RRJ

1 in 89.5

0.07m3/s

0.10m3/s

L=8.501m

1.45m/s

254.013

253.790

0.000

252.150

252.225

1.640

1.565

252.525

252.579

252.570

4

254.135

253.813

8.501

252.320

1.493

252.620

252.873

8

525 RRJ

1 in 206

0.29m3/s

0.30m3/s

L=22.665m

1.38m/s

252.657

252.591

0.000

250.820

250.820

1.771

1.771

251.506

9

525 RRJ

1 in 210

0.28m3/s

0.30m3/s

L=11.539m

1.37m/s

252.698

252.703

22.665

250.930

251.005

1.773

1.698

251.608

251.689

10

525 RRJ

1 in 213

0.27m3/s

0.30m3/s

L=8.503m

1.36m/s

252.822

252.832

34.205

251.060

251.13

5

1.772

1.697

251.736

251.795

11

450 RRJ

1 in 359

0.13m3/s

0.15m3/s

L=61.000m

0.95m/s

252.821

252.831

42.707

251.17

5

251.250

1.656

1.581

251.829

251.957

251.949

12

253.092

252.989

103.707

251.420

1.569

252.080

252.135

13

375 RRJ

1 in 292

0.09m3/s

0.10m3/s

L=52.602m

0.93m/s

253.092

252.989

103.707

251.420

251.495

1.569

1.494

252.080

252.135

13

300 RRJ

1 in 123

0.05m3/s

0.09m3/s

L=56.625m

1.23m/s

253.374

253.104

156.310

251.675

251.750

1.429

1.354

252.268

252.322

14

253.636

253.4

13212.934

252.210

1.203

252.510

252.678

15

CHAINAGE

NATURAL SURFACE

FINISHED SURFACE

INVERT

HGL LEVEL

DEPTH FS TO INVERT

GRADE

DIAMETER AND TYPE (CLASS 2)

DESIGN (m3/s)

CAPACITY (m3/s)

VELOCITY (m/sec)

DATUM RL

300 RRJ

1 in 94.5

0.01m3/s

0.10m3/s

L=8.503m

1.41m/s

253.092

252.989

0.000

251.420

251.570

1.569

1.419

252.080

252.135

13

253.026

252.990

8.503

251.660

1.330

252.136

252.138

16

300 RRJ

1 in 95.1

0.01m3/s

0.10m3/s

L=8.557m

1.40m/s

253.374

253.104

0.000

251.675

251.750

1.429

1.354

252.268

252.322

14

253.348

253.107

8.557

251.840

1.267

252.323

252.328

17

525 RRJ

1 in 461

0.15m3/s

0.20m3/s

L=11.526m

0.93m/s

252.821

252.831

0.000

251.17

5

251.250

1.656

1.581

251.829

251.957

251.949

12

450 RRJ

1 in 317

0.14m3/s

0.16m3/s

L=25.354m

1.01m/s

252.716

252.828

11.526

251.275

251.350

1.553

1.478

251.963

251.982

18

450 RRJ

1 in 358

0.14m3/s

0.15m3/s

L=12.521m

0.95m/s

252.872

252.954

36.879

251.430

251.505

1.524

1.449

252.044

252.150

252.128

19

450 RRJ

1 in 320

0.14m3/s

0.16m3/s

L=4.800m

1.00m/s

252.951

253.140

49.4

01

251.540

251.615

1.600

1.525

252.159

252.267

252.245

20

375 RRJ

1 in 130

0.14m3/s

0.15m3/s

L=52.600m

1.39m/s

252.974

253.161

54.201

251.630

251.705

1.531

1.456

252.257

252.366

252.343

21

375 RRJ

1 in 303

0.09m3/s

0.10m3/s

L=54.500m

0.91m/s

253.247

253.4

07

106.801

252.110

252.185

1.297

1.222

252.680

252.813

22

253.513

253.668

161.301

252.365

1.303

252.950

252.982

23

SCALE HORIZONTAL 1:500

VERTICAL 1:50

DRAINAGE LONGITUDINAL SECTIONS

INDICATES 5YR HGL

INDICATES CRUSHED ROCK BACKFILL 00

00

5

0.5

10

1

1:500

1:50

10

1

20

2

40

4

NOTE:

CLASS 2 F.C.R.

ALL DRAINS LAID UNDER BACK OF KERB AND FOOTPATH TO

TO BE CLASS 3 AND UNDER ROAD PAVEMENT TO BE MINIMUM

VISTA

REALM

STREET

STREET

HEATHCOTE

STREET

BRABOURNE

VISTA

REALM

VISTA

REALM

STREET

HEATHCOTE

HEATHCOTE

STREET

HEATHCOTE

249.0 248.0 248.0 249.0 248.0

248.0 248.0 248.0 248.0

(CLASS 4) (CLASS 4) (CLASS 4)

(CLASS 4) (CLASS 4)

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R10_DLS1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R10_DLS1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 11: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

11

300 RRJ

1 in 185

0.06m3/s

0.07m3/s

L=71.210m

1.01m/s

253.513

253.668

161.301

252.365

252.4

40

1.303

1.228

252.950

252.982

23

225 RRJ

1 in 91.9

0.01m3/s

0.05m3/s

L=10.104m

1.18m/s

253.930

253.930

232.511

252.825

252.900

1.10

5

1.030

253.294

253.4

44

253.4

30

24

253.897

253.993

242.614

253.010

0.983

253.4

36

253.4

55

25

CHAINAGE

NATURAL SURFACE

FINISHED SURFACE

INVERT

HGL LEVEL

DEPTH FS TO INVERT

GRADE

DIAMETER AND TYPE (CLASS 2)

DESIGN (m3/s)

CAPACITY (m3/s)

VELOCITY (m/sec)

DATUM RL

300 RRJ

1 in 94

0.01m3/s

0.10m3/s

L=8.463m

1.41m/s

252.716

252.828

0.000

251.275

251.410

1.553

1.418

251.963

251.982

18

252.650

252.827

8.4

63

251.500

1.327

251.983

251.985

26

225 RRJ

1 in 100

0.01m3/s

0.04m3/s

L=20.089m

1.13m/s

253.930

253.930

0.000

252.825

252.900

1.10

5

1.030

253.294

253.4

44

253.4

30

24

253.813

253.803

20.089

253.100

0.703

253.4

46

253.4

77

27

SCALE HORIZONTAL 1:500

VERTICAL 1:50

DRAINAGE LONGITUDINAL SECTIONS

INDICATES 5YR HGL

INDICATES CRUSHED ROCK BACKFILL

00

00

5

0.5

10

1

1:500

1:50

10

1

20

2

40

4

NOTE:

CLASS 2 F.C.R.

ALL DRAINS LAID UNDER BACK OF KERB AND FOOTPATH TO

TO BE CLASS 3 AND UNDER ROAD PAVEMENT TO BE MINIMUM

STREET

AMBERFIELD

249.0 248.0 249.0

(CLASS 4)

246.0

375 RRJ

1 in 166

0.10m3/s

0.14m3/s

L=87.920m

1.23m/s

253.4

35

253.091

0.000

251.570

251.570

1.521

1.521

251.808

28

225 RRJ

1 in 121

0.04m3/s

0.04m3/s

L=39.878m

1.03m/s

253.837

253.512

87.920

252.100

252.250

1.412

1.262

252.4

75

252.616

29

225 RRJ

1 in 35

0.02m3/s

0.08m3/s

L=18.700m

1.91m/s

254.064

253.711

127.798

252.580

252.655

1.13

1

1.056

252.878

252.986

252.967

30

253.943

253.998

146.4

98

253.190

0.808

253.4

15

253.502

31

247.0

300 RRJ

1 in 94.4

0.01m3/s

0.10m3/s

L=8.021m

1.41m/s

253.837

253.512

0.000

252.100

252.175

1.412

1.337

252.4

75

252.616

29

253.828

253.4

89

8.021

252.260

1.229

252.616

252.621

32

BRABOURNE

STREET

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R11_DLS2.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R11_DLS2.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

Page 12: ERVE RVA TIO N D PCO NSE O SE - Villawood Properties · 2018. 12. 5. · 0.75 3.50 3.50 3.50 4.70 8.20 SCALE 1:500 PLAN SYMBOL LEGEND 28.5 7 Cut Prop/Ex Retaining Wall TW28.57 S S

50m

BUFFER

INTO

PROPOSED CONSERVATIO

N RES

ERVE

GE

LLI

BR

AN

D

DRI

VE

936

STAGE 8EXISTING

STAGE 10FUTURE

921922

920

931

925

924

926

928

927

929

930

932

933

934

935

911

912

913

914

915

916

917

918

919

910

909

908

907

906

905

904

903

901902

945

946

947

948

949

950

951

952

954

953

923

944 943

937 938

942941

940939

CONSERVATION OPEN SPACE

STAGE 14ANNADALE PROPOSED

STAGE 8EXISTING

SIGN SCHEDULE

E

AHD

-

OF

-

BPD

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R12_PP1.dgn

22/11/17A

WARATAH ESTATE

8711

STAGE 9

366-E-6

SBS

TVT

AS SHOWN

9

HUME

AUG' 17 12 A

CONSTRUCTION ISSUE

MUNICIPALITY

REFERENCE

SHEETDATEDATUMSCALE

MELWAY REF.

SURVEY

DESIGN

DRAWN

CHECKEDREMARKSDATE

AM

EN

DM

EN

TS

VER.

22/

11/

20

17

Pl

otte

d:

I:\H8711\ENG\ST09\E9_R12_PP1.dgn

1/19 cato street

hawthorn east, 3123

telephone 8823 2300

fax no. 8823 2310land surveyors civil engineers

North

12

A "STREET NAME" SIGN

R1-2B

C "NO ROAD" SIGN (HCC SD407)

NOTE:

WHERE POSSIBLE

STREET NAME SIGN TO MOUNT ON LIGHTING POLE

STREET SIGNS TO HAVE MINIMUM 2 WEDGES

IN THE POLE SLEEVES

PARKING AND SIGNAGE & LINEMARKING PLAN

SCALE 1:500

REALM VISTA

HE

AT

HC

OT

E S

TR

EE

T

BR

AB

OU

RN

E S

TR

EE

T

AMBERFIELD STREET

A

A

A

C

C

B