ERP St i C itt ERP St eering Committ ee Excerpt from Steering Committee meeting presentation (CFS Finance Only) May 18, 2010

Upload: others

Post on 20-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERP St iSt eering - Fullerton

ERP St i C ittERP Steering CommitteeExcerpt from Steering Committee meeting presentation (CFS Finance Only)

May 18, 2010

Page 2: ERP St iSt eering - Fullerton

Technical Update (cont )Technical Update (cont.)• Data Warehousing/EPM CFS Data Warehouse CFS Data Warehouse

• Proposed DBLINK to allow access to existing reports in CFS until DW is live• Development environment has been acquiredC ti t PS Q i d R t• Converting top PS Queries and Reports

• Warehouse will contain CFS CO delivered reports along with a custom “Fullerton” campus reports will be  made available.D t t L l it ill b il bl i th CFS D t W h• Department Level security will be available in the CFS Data Warehouse 

Campus Solutions DW Pilot• In collaboration with the Chancellor’s Office, working on building three student EPM data marts: Records, Admissions, and Student Financials.

• Data validation will begin once the data mart builds are completed.

Page 3: ERP St iSt eering - Fullerton

Project Status Update – FinanceProject Status Update – Finance 

CFS – Go Live July 2010

Page 4: ERP St iSt eering - Fullerton

CFS OverviewCFS Overview 

• Overview of status of CFS provided to pHR and Finance coordinators

4

Page 5: ERP St iSt eering - Fullerton

fi fBenefits of CFSDesigned to be a cost effective and efficient ERPgsystem to reduce:

• Overall operational hardware and software costs• Overall operational, hardware, and software costs

Each CSU presently maintains approximately 4 to 6 financial environments with 6 servers per environment (conservatively 24 

)servers per campus)

• Upgrade and maintenance costs over the lifecycle of the Oracle PeopleSoft productOracle PeopleSoft product  

Each upgrade or maintenance pack must be installed and retrofitted to each baseline and application modification in each environment. 

5

Page 6: ERP St iSt eering - Fullerton

dCMS Compared to CFSC b i f ti lit ill ti ll i• Core business functionality will essentially remain the same, moving toward system uniformity

• The new system will look and feel the same as CMS• The new system will look and feel the same as CMS  • Slight differences in CFS baseline modules Ad ti t d di d b i ti d• Adopting standardized business practices and reporting

• Eliminated all campus‐based modification

6

Page 7: ERP St iSt eering - Fullerton

C Fi S t Hi h L l P j t Ti liCommon Finance System High Level Project Timeline

7

Page 8: ERP St iSt eering - Fullerton

Rapid Implementation Key DatesRapid Implementation Key Dates

• April 2009 to Sept 2009 – Central CFS design team p p ganalysis 

• Sept 2009 to Jan 2010 Central CFS Configuration and• Sept 2009 to Jan 2010 – Central CFS Configuration and Development  

• February 2010 – Campus Demo Environment Delivered 

• March 2010 – CSU No Modification DecisionMarch 2010   CSU No Modification Decision

• March  2010  – CSUF Campus Fit Gap

Page 9: ERP St iSt eering - Fullerton

Working with GroupsWorking with Groups Each functional change is moving through the following groups

» Finance Central Office \ Functional Owners» Division Financial Managers» End Users 

** A significant difference from the first implementation is that baseline will not accommodate modificationsthat baseline will not accommodate modifications. 

**Significant work has gone into utilizing delivered functionality to match campus needs 

9

Page 10: ERP St iSt eering - Fullerton

Key Functionality ChangesKey Functionality Changes

Purchase Requisition  • New process for adding requisitions• New process for emailing• New process for approvals

Budget TransferN d h t l d• New spreadsheet upload process

10

Page 11: ERP St iSt eering - Fullerton

Key Functionality Changes ContinuedKey Functionality Changes‐ Continued

• Chargeback• Chargeback • New chargeback functionality will be implemented(transparent to department users)(transparent to department users)

• Departmental Reporting and QueriesDepartmental Reporting and Queries• Newly delivered reporting and queries will utilize CFS data warehouse maintained by the Chancellor’s Office

• Development is still a work‐in‐progress on certain data warehouse deliverables

h d ll b d l d• New enhanced queries will be deployed

11

Page 12: ERP St iSt eering - Fullerton

Key Functionality Changes Continued• Department Security  

• Baseline PeopleSoft does not deliver department security

Key Functionality Changes‐ Continued

• Baseline PeopleSoft does not deliver department security• Fullerton's department security modification will not be carried forward

• For Inquiry, it will be restricted to core accounting group. End q y, g g pusers inquiry on transactions will be done through reporting. 

• For reporting, the data ware house will deliver department security In the interim while the data warehouse is developed users will be In the interim, while the data warehouse is developed users will be 

able to utilize the existing reporting functionality to retrieve CFS data 

• For transaction entry (e.g. PO entry) there will be no department securitydepartment security.   However, there will be configuration set to limit the opportunity 

for error (e.g. identifying defaults)  Baseline enhancements will continue to be delivered the CO and by 

campuscampus

12

Page 13: ERP St iSt eering - Fullerton

i d hContinued Enhancements to CFSBased on current feedback, we understand that enhancements to CFS will need to be made

• Campus activities towards enhancements:Campus activities towards enhancements:CSUF now has a CMS Executive Committee Member in Academic Affairs VP Ephraim Smith 

There will be additional existing baseline functionality weThere will be additional existing baseline functionality we can use as CFS develops (e.g. MP3 deliverables, workflow in purchasing, 

Central looking at possible API for use in integrations withCentral looking at possible API for use in integrations with other systems (.Net, FileNet, etc..)

We are watching discussions with SFSU, Northridge, San Jose on what a “common” bolt on might look likeJose o at a co o bo t o g t oo e

13

Page 14: ERP St iSt eering - Fullerton

CFS Activity for May June and JulyCFS Activity for May, June, and July

KeyAcceptance testingCFS Database deliveryConfiguration, Conversion, ValidationPO AP Go Live CFSGL Go Live

Page 15: ERP St iSt eering - Fullerton

Setup Tasks CompletedSetup Tasks Completed• Technical infrastructure for consolidated databaseTechnical infrastructure for consolidated database• CSUF configuration migration• CSUF chart field migrationCSUF chart field migration• CSUF business process rework 58 modifications to 2 (handout included)**58 modifications to 2 (handout included)

• Implementation of new baseline processes• Technical rework example chargeback modification• Technical rework – example chargeback modification, scanning interface using “ds” account

Page 16: ERP St iSt eering - Fullerton

CSUF CFS ModificationsCSUF CFS Modifications

Page 17: ERP St iSt eering - Fullerton

System TestingSystem Testing• The following modules/processes have been tested using test CO delivered test scripts:

Accounts PayableAccounts PayablePurchasingGeneral ledgerAsset ManagementAsset ManagementAccounts ReceivableBillingBudgeting Integration brokerCashnet InterfacesCashnet Interfaces

Page 18: ERP St iSt eering - Fullerton

Unit TestingUnit Testing• The following conversions have been tested:

VendorC tCustomer1099 /AR / BIGL – in processPO Conversion

• Manual process now underway

Page 19: ERP St iSt eering - Fullerton

G Li Si OffGo Live Sign Off  • Modified Pilot Go Live sign off process will be used: Sign off on the core modules as tested with  additional components delivered following July 1st

• Current List of Outstanding Items:  Data Warehouse implementation and End User Reporting  Asset Management Conversion Asset Management Conversion Bank Reconciliation Query security SFTP issues SFTP issues Requisition process refinements (enhancements will be posted 

in MP3 but not a part of acceptance testing MP2)  Performance testing Performance testing

Page 20: ERP St iSt eering - Fullerton

What about financial system close?What about financial system close?

20