ERP covers the technique and concepts
employed for the integrated managementof business as a whole,
ERP packages are integrated software
packages that support the above ERPconcepts.
-
8/6/2019 Erp Imple Stages
3/26
ERP lifecycle is in which highlights the
different stages in implementation of AnERP.
-
8/6/2019 Erp Imple Stages
4/26
Pre evaluation Screening
Evaluation Package
Project Planning GAP analysis
Reengineering
Team training
Testing
Post implementation
-
8/6/2019 Erp Imple Stages
5/26
Pre-selection Process
Package Evaluation
Project Planning
Gap Analysis Reengineering Configuration
Implementation
Team TrainingTesting End- user Training
Going Live
Post implementation
Phase
ERP implementation Life Cycle
-
8/6/2019 Erp Imple Stages
6/26
Decision for perfect package
Number of ERP vendors
Screening eliminates the packages that arenot at all suitable for the companys
business processes.
Selection is done on best few packageavailable.
-
8/6/2019 Erp Imple Stages
7/26
Package is selected on the basis ofdifferent parameter.
Test and certify the package and alsocheck the coordination with differentdepartment
Selected package will determine thesuccess or failure of the project.
-
8/6/2019 Erp Imple Stages
8/26
Package must be user friendly
Regular Up-gradation availability
Cost factor
-
8/6/2019 Erp Imple Stages
9/26
Designs the implementation process.
Resources are identified.
Implementation team is selected and task
allocated.
Special arrangement for contegencies.
-
8/6/2019 Erp Imple Stages
10/26
-
8/6/2019 Erp Imple Stages
11/26
Implementation is going to involve asignificant change in number of employees
and their job responsibilities.
Process become more automated andefficient.
-
8/6/2019 Erp Imple Stages
12/26
Takes place along with the process ofimplementation.
Company trains its employees toimplement and later, run the system.
Employee become self sufficient toimplement the software after the vendorsand consultant have left.
-
8/6/2019 Erp Imple Stages
13/26
This phase is performed to find the weak linkso that it can be rectified before itsimplementation.
-
8/6/2019 Erp Imple Stages
14/26
The work is complete, data conversion isdone, databases are up and running, the
configuration is complete & testing is done.
The system is officially proclaimed.
Once the system is live the old system isremoved
-
8/6/2019 Erp Imple Stages
15/26
The employee who is going to use thesystem are identified and trained.
-
8/6/2019 Erp Imple Stages
16/26
This is the maintenance phase.
Employees who are trained enough tohandle problems those crops up time totime.
The post implementation will need adifferent set of roles and skills than thosewith less integrated kind of systems.
-
8/6/2019 Erp Imple Stages
17/26
Financial ERP package selection
Behavioral
Communication Process management Training & education Cultural & structural changes
Technical Project management Legacy systems management Systems integration Systems testing
-
8/6/2019 Erp Imple Stages
18/26
IT Leadership
Business systems thinking
Relationship building Have needed technical platform
Ability to troubleshoot
Informed buying
Contract efforts coordinated
Suppliers held accountable
Long-term relationships with suppliers
-
8/6/2019 Erp Imple Stages
19/26
Business case ustify need for system, establish objectives
Benchmark Import best practices
Implementation strategy Align system with corporate strategy
Project management
Change management BPR Installation
-
8/6/2019 Erp Imple Stages
20/26
Business Strategy Total local autonomy
Headquarters control financial only
Headquarters coordination Network coordination
Total centralization
Software Configuration Single/multiple financial/operations
Technical Platform Centralized/Distributed
Management Execution Big bang/Phased rollout
-
8/6/2019 Erp Imple Stages
21/26
Strategy Months %
Big bang 15 41Phased rollout by site 30 23
Phased rollout by module 22 17
Mini big bang 17 17
Phased rollout by module & site 25 2
-
8/6/2019 Erp Imple Stages
22/26
Strategy Months %
Big bang 15 41
Phased rollout by site 30 23
Phased rollout by module 22 17
Mini big bang 17 17
Phased rollout by module & site 25 2
-
8/6/2019 Erp Imple Stages
23/26
Big bang seemingly cheapest
Dangerous
Often makes sense in ERP if carefullyplanned
Phased rollout reduces risk
Especially good for large organizations
-
8/6/2019 Erp Imple Stages
24/26
An organization can get the maximum
value of these inputs if it successfullyadopts and effectively uses the system.
-
8/6/2019 Erp Imple Stages
25/26
Questions ?
-