    ERP covers the technique and concepts

    employed for the integrated managementof business as a whole,

    ERP packages are integrated software

    packages that support the above ERPconcepts.

  • 8/6/2019 Erp Imple Stages

    3/26

    ERP lifecycle is in which highlights the

    different stages in implementation of AnERP.

  • 8/6/2019 Erp Imple Stages

    4/26

    Pre evaluation Screening

    Evaluation Package

    Project Planning GAP analysis

    Reengineering

    Team training

    Testing

    Post implementation

  • 8/6/2019 Erp Imple Stages

    5/26

    Pre-selection Process

    Package Evaluation

    Project Planning

    Gap Analysis Reengineering Configuration

    Implementation

    Team TrainingTesting End- user Training

    Going Live

    Post implementation

    Phase

    ERP implementation Life Cycle

  • 8/6/2019 Erp Imple Stages

    6/26

    Decision for perfect package

    Number of ERP vendors

    Screening eliminates the packages that arenot at all suitable for the companys

    business processes.

    Selection is done on best few packageavailable.

  • 8/6/2019 Erp Imple Stages

    7/26

    Package is selected on the basis ofdifferent parameter.

    Test and certify the package and alsocheck the coordination with differentdepartment

    Selected package will determine thesuccess or failure of the project.

  • 8/6/2019 Erp Imple Stages

    8/26

    Package must be user friendly

    Regular Up-gradation availability

    Cost factor

  • 8/6/2019 Erp Imple Stages

    9/26

    Designs the implementation process.

    Resources are identified.

    Implementation team is selected and task

    allocated.

    Special arrangement for contegencies.

  • 8/6/2019 Erp Imple Stages

    10/26

  • 8/6/2019 Erp Imple Stages

    11/26

    Implementation is going to involve asignificant change in number of employees

    and their job responsibilities.

    Process become more automated andefficient.

  • 8/6/2019 Erp Imple Stages

    12/26

    Takes place along with the process ofimplementation.

    Company trains its employees toimplement and later, run the system.

    Employee become self sufficient toimplement the software after the vendorsand consultant have left.

  • 8/6/2019 Erp Imple Stages

    13/26

    This phase is performed to find the weak linkso that it can be rectified before itsimplementation.

  • 8/6/2019 Erp Imple Stages

    14/26

    The work is complete, data conversion isdone, databases are up and running, the

    configuration is complete & testing is done.

    The system is officially proclaimed.

    Once the system is live the old system isremoved

  • 8/6/2019 Erp Imple Stages

    15/26

    The employee who is going to use thesystem are identified and trained.

  • 8/6/2019 Erp Imple Stages

    16/26

    This is the maintenance phase.

    Employees who are trained enough tohandle problems those crops up time totime.

    The post implementation will need adifferent set of roles and skills than thosewith less integrated kind of systems.

  • 8/6/2019 Erp Imple Stages

    17/26

    Financial ERP package selection

    Behavioral

    Communication Process management Training & education Cultural & structural changes

    Technical Project management Legacy systems management Systems integration Systems testing

  • 8/6/2019 Erp Imple Stages

    18/26

    IT Leadership

    Business systems thinking

    Relationship building Have needed technical platform

    Ability to troubleshoot

    Informed buying

    Contract efforts coordinated

    Suppliers held accountable

    Long-term relationships with suppliers

  • 8/6/2019 Erp Imple Stages

    19/26

    Business case ustify need for system, establish objectives

    Benchmark Import best practices

    Implementation strategy Align system with corporate strategy

    Project management

    Change management BPR Installation

  • 8/6/2019 Erp Imple Stages

    20/26

    Business Strategy Total local autonomy

    Headquarters control financial only

    Headquarters coordination Network coordination

    Total centralization

    Software Configuration Single/multiple financial/operations

    Technical Platform Centralized/Distributed

    Management Execution Big bang/Phased rollout

  • 8/6/2019 Erp Imple Stages

    21/26

    Strategy Months %

    Big bang 15 41Phased rollout by site 30 23

    Phased rollout by module 22 17

    Mini big bang 17 17

    Phased rollout by module & site 25 2

  • 8/6/2019 Erp Imple Stages

    22/26

    Strategy Months %

    Big bang 15 41

    Phased rollout by site 30 23

    Phased rollout by module 22 17

    Mini big bang 17 17

    Phased rollout by module & site 25 2

  • 8/6/2019 Erp Imple Stages

    23/26

    Big bang seemingly cheapest

    Dangerous

    Often makes sense in ERP if carefullyplanned

    Phased rollout reduces risk

    Especially good for large organizations

  • 8/6/2019 Erp Imple Stages

    24/26

    An organization can get the maximum

    value of these inputs if it successfullyadopts and effectively uses the system.