Codes and Standards TopicLong-Range MWELO Options
Demand Management MeasuresIndependent Technical Panel
June 8, 2015
Erin Morris, Senior Planner David Turpel, Quality Control Associate
Deb Lane, Water Resources Analyst City of Santa Rosa
![Page 2: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/2.jpg)
MWELO ImplementationHow does it work?
Background1991 – State: AB 325 (Landscape Model
Ordinance)1992 – Santa Rosa: Water Efficient
Landscape Policy2006 – State: AB 1881 directed Department of
Water Resources (DWR) to revise State Ordinance
2007 – Santa Rosa: Single Family Landscape Standards
2009 – State: DWR releases new State Ordinance
2010 – Santa Rosa: Led stakeholder process for regional revision/adoption
![Page 3: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/3.jpg)
MWELO ImplementationHow does it work?
Adopted Regional Ordinance vs. State OrdinanceRegional State
Applies to projects of all sizes
Applies to projects over 2,500 sqft
MAWA = 60% of ETo MAWA = 70% of ETo
Flow sensor required on meters > 1.5”
Recommended
24” setback of overhead irrigation
Proof of no overspray can eliminate setback requirement
Trees require separate irrigation valve
Recommended
Emergency Building Standards = .55% ETo
![Page 4: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/4.jpg)
MWELO ImplementationHow does it work?
Development Review ProcessDiscretionary
Does it meet policy?Ministerial
Plan check Inspection
![Page 5: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/5.jpg)
MWELO ImplementationHow does it work?
5
Discretionary Review: Sample Project
![Page 6: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/6.jpg)
MWELO ImplementationHow does it work?
Discretionary ReviewDesign Review Board
Public hearing, focus on design guidelinesCompeting factors impact landscape design
![Page 7: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/7.jpg)
MWELO ImplementationHow does it work?
Ministerial review: plan checkDetailed project plansReview submittal for compliance
![Page 8: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/8.jpg)
MWELO ImplementationHow does it work?
Ministerial review: plan check, continuedFollowing plan approval
Approved plans distributedLessons learned
Species verification challenging during plan check Technical expertise helpful
![Page 9: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/9.jpg)
MWELO ImplementationHow does it work?
Ministerial review: inspectionInspection requestEnsures that the installation is consistent with
the approved planCompletion package submitted to EDSFinal inspection performed by EDS
![Page 10: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/10.jpg)
MWELO EnforcementTools
• MAWA (Appendix A): Excel form available
![Page 11: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/11.jpg)
MWELO EnforcementTools
• Submittal checklist
![Page 12: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/12.jpg)
Certificate of Completion (Appendix C)Irrigation AuditFinal inspection by Agency (Some agencies allow
self-certification)Built per planEnsures compliance
MWELO EnforcementTools
![Page 13: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/13.jpg)
MWELO ReportingHow does it work?
Building occupancy tied to final inspection
Landscape water budget based billing structureRequires accurate area measurements
After sign-off, no further involvement with siteCustomer relationship with WUE
![Page 14: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/14.jpg)
MWELO EnforcementLessons Learned
WELO is one of many project components and interrelates with others, i.e. storm water treatmentMultiple departments reviewing plans
Knowledge of plant types criticalIn office, in field
Helpful to consider WELO early in processCoordinate with Green Building/LID
Requirements
![Page 15: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/15.jpg)
MWELO OptionsRecommendations
Well written ordinance Tools to assist with the review process
(Checklists)Training/education for plan check staffSupport from skilled technical staff (WUE)Recognize complexity of development review
process
![Page 16: Erin Morris, Senior Planner David Turpel, Quality Control Associate Deb Lane, Water Resources Analyst City of Santa Rosa](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e685503460f94b63cd6/html5/thumbnails/16.jpg)
Questions?