ergon power s a c - company overview - november 2013

66
ERGON POWER COMPANY OVERVIEW November - 2013

Upload: henry-levano

Post on 29-Dec-2015

251 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

COMPANY OVERVIEW

November - 2013

Page 2: ERGON POWER S a C - Company Overview - November 2013

Company Overview

• Name of Company : Ergon Power Representaciones S.A.C

• General Manager : Ricardo A. Velasco, Eng.

• Peru Offices address:

• 125 F. Bolognesi St, Office 1401 – Centro Ejecutivo Pardo, Miraflores,

Lima – Perú (GM and Commercial Office)

• Perú Telephone Central : (511) 7165907 – Tel.Fax : (511) 4466617

• Chile Office address:

• 2670 Vitacura Av, Floor 15, Las Condes, Santiago – Chile

(Commercial Office)

• Chile Telephone Central: (56 2) 8204339

• Web: www.ergonpower.com

Page 3: ERGON POWER S a C - Company Overview - November 2013

Company Overview

• ERGON POWER is a privately held company, created mainly to provide

specialized machinery, equipment and services for energy industries.

• We have exclusive contracts and commercial agreements with

worldwide known manufacturers and the main providers of such

equipment in Latin America, Asia and Europe.

• We have always obtained from our customers complete satisfaction for

our modus operandi, our sincerity in leading them to choose the best

kind of equipment for their needs and our after sales service.

• We are also Advisors and Consultants of a very important Investors and

International Generation Companies, that are interested in taking part in

Energy Projects in Latin America or make an Investment in that market.

Page 4: ERGON POWER S a C - Company Overview - November 2013

Energy

Representations

ERGON POWER

Page 5: ERGON POWER S a C - Company Overview - November 2013

Harbin Electric Corporation Ltda:

(www.hec-china.com) Chinese group recognized worldwide by its

technology and quality in the manufacturing

of Electromechanical Equipment for Medium

and High Power Plants. Ergon Power is

working with Harbin in all the Latin America

Energy market with success.

ERGON POWER

Page 6: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

China GEZHOUBA Group Corporation:

(www.gzbgj.com/english ) One of the most important EPC Contractors

in the world. Main Contractor of Three

Gorges Project.

Its business scope includes infrastructure

construction, investment, electrical

projects(with financing) and highways as well

as real estate.

Page 7: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

SEPCO III Electric Power Construction

Corporation:

(www.sepco3.com/english.asp ) No.58 of Top 225 International Engineering

Contractors. More than 23,000MW of power

plant in operation. Contractor in model EPC,

BOO, BOOT + Financing. Its business scope

includes thermal power plants, wind farms

and Solar power plant.

Page 8: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

Harbin Mechanical & Electric Equipment

Co. Ltd. – HMEC

Chinese commercial company from Harbin

Group (HE), Supplier all the Electromechanical

Equipments for Small and Medium Power Plant

(W2W scope). Also of factories as Harbin Boiler

Co. and Harbin Turbine Co. from thermal

electromechanical equipments.

Page 9: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

Wuhan GuoCeSanlian Hydropower

Equipment Co.,Ltd :

:

Chinese company that is a key member of

Wuhan Guoce Science & Technology Co.

Ltd. Partner of HMEC and Specialist

Supplier of Control System for Small

Power Plants.

Page 10: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

SanBian Sci-Tech Co.,Ltd :

Chinese company that was established in

1968, the most important manufacturer of

Transformers in the world, with annual

production capacity more than 24.000.000

kVA.

Page 11: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

Chongqing Fengyu Electric Equipment

Co., Ltd: (www.fengyugroup.com) Top BIOMASS gasifier manufacturer with a history of

more than 24 years, Chinese biomass gasification

technology forerunner, and we own fluided-bed

gasifier patent, which available feedstock are rice husk,

woodchips, sawdust, bark, bagasse, crop stalks, olive

pomace, palm kernel shell, coconut shell, bamboo,

macadamia nut shell and other agricultural residues.

Page 12: ERGON POWER S a C - Company Overview - November 2013

Electro Aço Altona S/A – ALTONA :

(www.altona.com.br)

Brazilian company recognized worldwide by

its technology and quality in the foundry and

manufacture of pieces and components for

manufacturing sector and electrical

generation industry

ERGON POWER

Page 13: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

REIVAX Automation and Control :

(www.reivax.com)

Brazilian company recognized worldwide by

its technology and quality supplying

systems and solutions for the control of

energy generation and in modernization of

existing plants.

Page 14: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

Wuhan GuoCe Nordic New Energy Co.,Ltd :

Joint venture company founded by Chinese

Wuhan Guoce Science & Technology Co.,Ltd.

and Swedish Deltawind AB. The business

scope of the company is the production, erection,

commissioning, operation, maintenance and

after-sales service of Wind Turbines

Page 15: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

SUMEC Complete Equipment & Engineering

Co.,Ltd (www.sumec.com ) :

:

SUMEC Complete Equipment & Engineering Co. Ltd

(SUMEC-CEEC) is one of the core subsidiaries of

SUMEC Group Corporation. EPC contractor for Small

Hydro power plants, Biomass Power Plants, Wind

Power Plant, Solar Power Plant Seawater

Desalinization. Manufacturer of Gen Set for Biomass

Power Plant.

Page 16: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

Jiangsu Antai New Energy Technology

Co., Ltd.(JAE):

:

JAE., is a joint venture established by Jiangsu Antai Power

Machinery Co., Ltd. (one of the most famous engine

manufacturer in China) and SUMEC Complete Equipment

& Engineering Co., Ltd. (a reputable International

Engineering Company). JAE is the largest low speed gas

engine and gas generator set manufacturer in China with

technology joint venture with MAN (Germany).

Page 17: ERGON POWER S a C - Company Overview - November 2013

ERGON POWER

PHONO SOLAR Technology Co.:

:

Phono Solar Technology Co., Ltd., was founded by SUMEC

Group Corporation, a member of the China National

Machinery Industry Corporation (SINOMACH). Phono Solar

is a leading brand in the renewable energy industry,

producing high quality solar products since 2004. The

Phono Solar brand has become synonymous with high

performing, top quality photovoltaic panels and specializes

in PV technology innovation, application and system

development.

Page 18: ERGON POWER S a C - Company Overview - November 2013

Hydro Projects

ERGON POWER

Page 19: ERGON POWER S a C - Company Overview - November 2013

Contract in operation

• POECHOS 2 HPP (02 x 5.5 MW) - Peru

• Client: Sinersa (Private Company)

• Scope: 02 Butterfly Valves - 3.2m including commissioning

• Contractual Date: August , 2007

• BONYIC HPP (03 x 11 MW) - Panama

• Final Client: Hidroecologica del Teribe S.A.

• Scope: Harbin (HE) supplied Mechanical BoP Equipments (Francis Turbines) in

consortium with ABB. The scope include commissioning.

• Contractual Date: June, 2008

Page 20: ERGON POWER S a C - Company Overview - November 2013

Contracts in operation

• PIAS 1 HPP (2 x 6.2 MW) - Peru

• Client: AYEPSA (Private Company)

• Scope: Harbin (HE) supplied the Electromechanical Equipments, Horizontal

Francis Turbines (without Main Transformer and electrical auxiliaries), including

erection and commissioning. ( Turn Key)

• Operation Date: October 2011

• INTERPLUS HPP (5 KW) - Chile

• Final Client: Universidad de Santiago de Chile

• Scope: Tubular Compact Turbine-Generator-Governor-Valve Group

• Operation Date: July 2011

• .

Page 21: ERGON POWER S a C - Company Overview - November 2013

Contracts in operation

• YAUPI HPP (112 MW) - Peru

• Direct Client: REIVAX Brazil

• Scope: Erection of 5 generation groups including man power, tools, local

transportation, supervisors, commissioning and maintenance service.

• Contractual Date: Since August 2010

• MACHUPICCHU HPP (1 x 100 MW) - Peru

• Final Client: EGEMSA (Public Company)

• Direct Client: Grana y Montero (EPC contractor)

• Scope: Francis Turbine, Generator, Valves, Governor, Excitation Sys from Harbin

(HE), and Substation and Control Sys. from ABB. The scope include

commissioning of the equipments supplied

Page 22: ERGON POWER S a C - Company Overview - November 2013

Contracts on execution

• CHUCAS HPP (02 x 25 MW) - Costa Rica

• Final Client: ICE / Direct Client: ENEL

• Scope: Harbin (HE) will supply Mechanical BoP Equipments (Francis Turbines) in

consortium with ABB. The scope include commissioning.

• Updated Situation : Contract on execution.

• SOPLADORA HPP (03 x 164 MW) - Ecuador

• Final Client: Government Project

• Scope: EPC Contract (with CGGC as EPC Contractor and Harbin (HEC) as

supplier of E&M Equipments – Francis Turbines).

• Updated Situation: Contract on execution.

Page 23: ERGON POWER S a C - Company Overview - November 2013

• TOPO HPP (02 x 14.8 MW) - Ecuador

• Final Client: Hydrotopo

• Scope: Harbin (HEC) offered Main Electromechanical Equipments (Horizontal

Francis Turbines)

• Updated Situation: Contract on execution.

• CANCHAYLLO HPP (5.2 MW) - Peru

• Client: Empresa de Generacion Electrica Canchayllo (Private Company)

• Scope: Complete Electromechanical Equipments (02 Horizontal Francis Turbine)

from Harbin (HMEC), erection and commissioning (Turn Key)

• Updated Situation: Contract on execution.

Contracts on execution

Page 24: ERGON POWER S a C - Company Overview - November 2013

Contracts on execution

• ITATA HPP (2 x 10.2 MW) - Chile

• Client: Electrica Puntilla S.A. (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

commissioning (Turn Key) considering Vertical Francis Turbine.

• Updated Situation: Contract on execution.

• CHAPIQUINA HPP ( 10.2 MW) - Chile

• Client: E-CL (GDF Suez – Private Company)

• Scope: Erection of governor and control systems from REIVAX, including man

power, tools, local transportation, supervisors, commissioning and maintenance

service.

• Updated Situation: Contract on execution.

Page 25: ERGON POWER S a C - Company Overview - November 2013

Contract on execution

• Transformers Corporate Purchase(163 MVA) - Peru

• Client: Electro Oriente, SEAL, ELSE, ELSUR, ELPU, Electro Ucayali, Grupo

Distriluz (Public Company)

• Scope: Supply of 1650 transformers to all country (Sanbian factory)

• Updated Situation: contract on execution.

• Mazuko Substation (35 MVA) - Peru

• Client: ELSE (Public Company)

• Scope: Supply of transformer of 35 MVA 138/22.9/10kV, erection service and civil

works (Sanbian factory)

• Updated Situation: contract on execution.

Page 26: ERGON POWER S a C - Company Overview - November 2013

Contract on execution

• Restitucion HPP (3 x 100 MW) - Peru

• Client: Electroperu (Public Company)

• Scope: Voltage Regulators, Excitation System of Generators with test, erection,

supervision and commissioning ( REIVAX factory)

• Updated Situation: contract on execution

• Canon del Pato (263 MW) - Peru

• Client: Duke Energy (Private Company)

• Scope: Service in site , Exciter Rings, 6 pairs

• Updated Situation: contract on execution.

Page 27: ERGON POWER S a C - Company Overview - November 2013

Contract awarded

• SANTA MARIA HPP (750 MW) - Peru

• Client: Energia Azul (Private Company)

• Scope: EPC Contract (CGGC as EPC Contractor – 04 units x 187 MW).

• Updated Situation: EIA was approved. Energia Azul signed a MoU Agreement

with CGGC, CGGC will obtain the 96% of shares, will be the EPC Constructor and

will obtain the financial close. The construction could be beginning in year 2014.

• PIAS I HPP (3rd Unit - 6 MW) - Peru

• Client: AYEPSA (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: The client approved this project.

Page 28: ERGON POWER S a C - Company Overview - November 2013

Contract awarded

• Hydrika 1 HPP (6.6 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies.

• Hydrika 2 HPP (4.0 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies

Page 29: ERGON POWER S a C - Company Overview - November 2013

Contract awarded

• Hydrika 3 HPP (10 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies.

• Hydrika 4 HPP (8 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies.

Page 30: ERGON POWER S a C - Company Overview - November 2013

Contract awarded

• Hydrika 5 HPP (10 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies.

• Hydrika 6 HPP (8.8 MW) - Peru

• Client: Hydrika Generacion SAC (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: This project are finalizing the feasibility studies.

Page 31: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• SANTA RITA HPP (3 x 85 MW) – Peru

• Client: ELECTRICIDAD ANDINA (Private Company)

• Scope: EPC Contract by CGGC including Electromechanical Equipments (03

Francis Turbine).

• Updated Situation: CGGC prepared an Optimization Technical Study ,. The

Chinese Banks are analyzing the client.

• Huatziroki 1 HPP (20 MW) - Peru

• Client: ARSAC – GEHISA (Private Company)

• Scope: Complete Electromechanical Equipments (HMEC), (Turn Key)

• Updated Situation: This project obtained RER contract with government for 20

years.

Page 32: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• COLCA HPP – CHILCAY HPP (4 x 8.2 MW) - Peru

• Client: Cascade Hydropower (Private Company)

• Scope: Complete Electromechanical Equip.from Harbin (HMEC), erection and

commissioning (Turn Key) (02 Francis Turbines for each HPP)

• Updated Situation: In negotiation.

• HUASICANCHA HPP (2 x 4.6 MW) - Peru

• Client: Cascade Hydropower (Private Company)

• Scope: Complete Electromechanical Equip.from Harbin (HMEC), erection and

commissioning (Turn Key) (02 Francis Turbines for each HPP)

• Updated Situation: In negotiation.

Page 33: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• M HPP (2 x 9.1 MW) - Peru

• Client: ENDESA – Generalima (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key) (02 Pelton Turbines)

• Updated Situation: In negotiation.

• A HPP (2 x 6.1 MW) - Chile

• Client: ENDESA (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key).

• Updated Situation: In negotiation.

Page 34: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• POTRERO HPP (20 MW) - Peru

• Client: KIEV Asociados (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key) (02 Francis Turbines)

• Updated Situation: In negotiation.

• PIAS 2 HPP (24 MW) - Peru

• Client: AYEPSA (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key).

• Updated Situation: The client confirmed the investment.

Page 35: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• CHILCOCO HPPs (2 MW + 20 MW) - Chile

• Client: Carran Ltd. (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: We are in negotiation

• ALLIPENO HPP (20 MW) - Chile

• Client: GTD (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: We are in negotiation

Page 36: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• CHERQUENO HPP (9 MW) - Chile

• Client: GTD (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: We are in negotiation

• ANIHUERAQUIO HPP (4.5 MW) - Chile

• Client: GTD (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key)

• Updated Situation: We are in negotiation

Page 37: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• EDEGEL HPPs - Peru

• Direct Client: REIVAX (Private Company)

• Scope: Erection services of Control equipments including manpower, tools, local

transportation, supervisors and commissioning, for Huinco, Matucana,

Moyopampa and Huampani HPPs for 5 years.

• Updated Situation: In stand by until year 2014.

• ANGEL II, III HPP (04x 10.3 MW) - Peru

• Client: GEPSA (Privates Companies)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection

and commissioning (Turn Key) with 2 Pelton units for each hpp.

• Updated Situation: In negotiation.

Page 38: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• Marino 1 HPP (8 MW) - Peru

• Client: Marino Co. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection and

commissioning (Turn Key) – 02 Kaplan turbines.

• Updated Situation: 2Q 2013 will be defining contractors.

• Marino 2 HPP (10 MW) - Peru

• Client: Marino Co. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection and

commissioning (Turn Key) – 02 Kaplan turbines.

• Updated Situation: 2Q 2013 will be defining contractors

Page 39: ERGON POWER S a C - Company Overview - November 2013

• Marino 3 HPP (8 MW) - Peru

• Client: Marino Co. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection

and commissioning (Turn Key) – 02 Kaplan turbines.

• Updated Situation: 2Q 2013 will be defining contractors.

• Marino 4 HPP (19 MW) - Peru

• Client: Marino Co. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection

and commissioning (Turn Key) – 02 Kaplan turbines.

• Updated Situation: 2Q 2013 will be defining contractors.

Contracts in Negotiation

Page 40: ERGON POWER S a C - Company Overview - November 2013

• Cativen 1 HPP (15 MW) - Peru

• Client: Minera Poderosa. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection

and commissioning (Turn Key).

• Updated Situation: 4Q 2013 will be defining contractors.

• Cativen 2 HPP (15 MW) - Peru

• Client: Minera Poderosa. (Private Company)

• Scope: Complete Electromechanical Equipments from HMEC, erection

and commissioning (Turn Key).

• Updated Situation: 4Q 2013 will be defining contractors.

Contracts in Negotiation

Page 41: ERGON POWER S a C - Company Overview - November 2013

Projects in bid

LA PERLA HPP (18 MW) - Costa Rica

• Client: Gas Natural Fenosa

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

erection and commissioning (Turn Key)

• LAGUNA AZUL HPP(19.9 MW) - Peru

• Client: Hidroelectrica Laguna Azul SRL (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

erection and commissioning (Turn Key), Kaplan turbines

Page 42: ERGON POWER S a C - Company Overview - November 2013

Projects in bid

BELESAR 3 HPP (2 x 107 MW) - Espana

• Client: Gas Natural Fenosa (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

erection and commissioning (Turn Key) – 02 Reversible Turbines

• PEARES 3 HPP (157 MW )- Espana

• Client: Gas Natural Fenosa (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

erection and commissioning (Turn Key), Francis turbine

Page 43: ERGON POWER S a C - Company Overview - November 2013

• AGUAS VERDES (20 MW) - Peru

• Client: Energoret (Private Company)

• Scope: Complete Electromechanical Equipments from Harbin (HMEC),

erection and commissioning (Turn Key).

• Updated situation: the client are founding investor partner.

Project on Evaluation

Page 44: ERGON POWER S a C - Company Overview - November 2013

• LLUTA I, II & LLUCLLA HPPs (510 MW) - Peru

• Client: EGASA – PROINVERSION (Public Company)

• Scope: EPC contract, probably Concession Contract (30 years).

03 Power Plants : LLuta I HPP - 2 Pelton (214MW), Lluclla HPP - 2

Pelton (238.4 MW), Lluta II HPP: 2 Francis (52.47 MW)

• Investment $ 1076 MM aprox.

• ERGON POWER are defining the Representation to taking part.

Government will be bidding on 2013.

Project on Evaluation

Page 45: ERGON POWER S a C - Company Overview - November 2013

• SAN JOSE HPP (127 MW) - Bolivia

• Client: ENDE (Public Company)

• Scope: EPC contract, using 03 Pelton turbines of 42.3 MW each.

-First stage: HPP with 2 Pelton Turbines, 42.3 MW per each.

-Second stage: HPP with 1 Pelton Turbines, 42.3 MW

• Investment : 197 MM aprox.

• TANGARA HPP (75 MW) - Bolivia

• Client: EDEGEL (Private Company)

• Scope: EPC contract.

• Investment : 100 MM aprox.

Project on Evaluation

Page 46: ERGON POWER S a C - Company Overview - November 2013

Biomass Projects

ERGON POWER

Page 47: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• CAMPOSOL (4 MW) - Peru

• Client: Camposol (Private Company)

• Scope: Considering 08 gen sets of 500kW, Biomass Power Plant using

Asparagus - Turn Key Contract with FENGYU.

• VIRU (1.2 MW) - Peru

• Client: Viru (Private Company)

• Scope: Considering 03 gen sets of 400kW, Biomass Power Plant using

Asparagus - Turn Key Contract with FENGYU

Page 48: ERGON POWER S a C - Company Overview - November 2013

Contracts in Negotiation

• DANPER (3.6 MW) - Peru

• Client: Danper (Private Company)

• Scope: Considering 07 gen sets of 500kW, Biomass Power Plant using

Asparagus - Turn Key Contract with FENGYU.

• CAMPOSUR (1.5 MW) - Peru

• Client: Camposur (Private Company)

• Scope: Considering 03 gen sets of 500kW, Biomass Power Plant using

Rice husk - Turn Key Contract with FENGYU

Page 49: ERGON POWER S a C - Company Overview - November 2013

Thermal Projects

ERGON POWER

Page 50: ERGON POWER S a C - Company Overview - November 2013

• PIRQUENES Coal Power Plant (60 MW) - Chile

• Client: SWC (Private Company)

• Scope: EPC Contract with CGGC as EPC Contractor.

• Updated Situation: We are in the short list. The client are waiting the

approbation of the EIA.

• EL FARO Dual Power Plant (300 MW) - Peru

• Client: Shougesa (Chinese Private Company)

• Scope: EPC Contract. Considering 01 gas turbine, a heat recovery boiler

and steam turbine.

Contracts in Negotiation

Page 51: ERGON POWER S a C - Company Overview - November 2013

• OLIMPIC Gas Power Plant (10 MW) - Peru

• Client: Clean Energy (Private Company)

• Scope: Turn Key electromechanical equipments and commissioning.

• Updated Situation: We are in the short list.

• INKA Gas Power Plant (300 MW) - Peru

• Client: Cemento Inka (Private Company)

• Scope: Turn Key electromechanical equipments and commissioning.

• Updated Situation: We are in the short list.

Contracts in Negotiation

Page 52: ERGON POWER S a C - Company Overview - November 2013

• CALDERA Coal Power Plant (900 MW) - Chile

• Client: ABS GROUP(Private Company)

• Scope: EPC Contract.

• Updated Situation: Ergon Power are helping the owner to obtain EPC

Contractor and Investor. Investment : 1,200 MM aprox

• NODO SUR Power Plant (500 MW) - Peru

• Client: Enersur (Private Company) – IC Power (Private Company)

• Scope: EPC Contract.

• Updated Situation: Ergon Power are interested in taking part in the bid

Project on Evaluation

Page 53: ERGON POWER S a C - Company Overview - November 2013

Wind Farm Projects

ERGON POWER

Page 54: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• CALAMA Wind Farm (128 MW) - Chile

• Client: E-CL S.A.(Private Company)

• Scope: EPC Contract with financing. Considering turbines of 2.0 MW or

1.5 MW.

• Investment: $ 240 MM aprox.

• Updated Situation: ERGON POWER are helping the owner to obtain

EPC Contractor - Investor.

Page 55: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• LEBU Wind Farm (280 MW + 158 MW) - Chile

• Client: Bosquemar Ltd.(Private Company)

• Scope: EPC Contract with financing. Considering 140 turbines of 2.0 MW

+ 79 turbines for the second stage.

• Investment : $ 540 MM aprox.

• Updated Situation: ERGON POWER are helping the owner to obtain

EPC Contractor - Investor.

Page 56: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• LLANQUIHUE Wind Farm (54 MW) - Chile

• Client: ENER RENOVA.(Private Company)

• Scope: EPC Contract with financing. Considering turbines of 2.0 MW.

• Updated Situation: ERGON POWER are helping the owner to obtain

EPC Contractor - Investor.

• CKANI Wind Farm (240 MW) - Chile

• Client: AM Eolica Alto Loa S.P.A.(Private Company)

• Scope: EPC Contract with financing. Considering turbines of 2.0 MW or

1.5 MW.

• Updated Situation: ERGON POWER are helping the owner to obtain

EPC Contractor - Investor.

Page 57: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• LLAY LLAY Wind Farm (56 MW) - Chile

• Client: Servicios Eolicos L S.A.(Private Company)

• Scope: EPC Contract with financing. Considering 28 turbines of 2.0 MW.

• Updated Situation: ERGON POWER are helping the owner to obtain

EPC Contractor - Investor.

Page 58: ERGON POWER S a C - Company Overview - November 2013

Solar Projects

ERGON POWER

Page 59: ERGON POWER S a C - Company Overview - November 2013

Projects in bid

• Danper Power Plant (3 MW) - Peru

• Client: Danper (Private Company)

• Scope: EPC Contract with SUMEC.

• Updated Situation: We are preparing the proposal.

• Solar Power Plant (20 MW) - Peru

• Client: Peru Energia Renovable – Enhol (Private Company)

• Scope: EPC Contract with SUMEC.

• Updated Situation: We are preparing the proposal.

Page 60: ERGON POWER S a C - Company Overview - November 2013

Infrastructure Projects

ERGON POWER

Page 61: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• San Martin Port - Peru

• Client: PROINVERSION (Public Company)

• Scope: BOOT Contract - Concession bid for 30 years

• Investment: $ 101.2 MM aprox.

• ERGON POWER are defining the Representation to taking part. The

Government opened the qualification bid.

Page 62: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• Chincheros International Airport - Peru

• Client: PROINVERSION (Public Company)

• Scope: BOOT Contract - Concession bid for 30 years

• Investment: $ 420 MM aprox.

• ERGON POWER are defining the Representation to taking part. The

Government opened the qualification bid.

Page 63: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• Electric Train Metro – Line 2 - Peru

• Client: PROINVERSION (Public Company)

• Scope: BOOT Contract - Concession bid for 30 years

• Investment: $ 3000 MM aprox.

• ERGON POWER are defining the Representation to taking part. The

Government will open the qualification bid on year 2013.

Page 64: ERGON POWER S a C - Company Overview - November 2013

Project on Evaluation

• National Highway - Peru

• Client: PROINVERSION (Public Company)

• Scope: BOOT Contract - Concession bid for 30 years

• Investment: $ 3800 MM aprox.

• ERGON POWER are defining the Representation to taking part. The

Government will open the qualification bid on year 2013.

Page 65: ERGON POWER S a C - Company Overview - November 2013

OFICINA EN PERÚ:

Dirección:

F. Bolognesi 125 Of. 1401 – Centro Ejecutivo

Pardo, Miraflores, Lima – Perú.

Gerencia General y Of. Comercial

Central Telefónica: (511) 7165907

OFICINA EN CHILE:

Dirección:

Av. Vitacura 2670 Piso 15, Las Condes, Santiago –

Chile.

Oficina Comercial

Central Telefónica: (56 2) 8204339

Page 66: ERGON POWER S a C - Company Overview - November 2013

Request a Reference Lists of our

Representations by email

[email protected]

THANKS !