Page 1: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Nodal 101

Page 2: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

This presentation provides a general overview of the Texas Nodal Market and is not intended to be a substitute for the ERCOT Protocols, as amended from time to time. If any conflict exists between this presentation and the ERCOT Protocols, the ERCOT Protocols shall control in all respects.

For more information, please visit:http://www.ercot.com/mktrules/nprotocols/

Legal

PROTOCOL DISCLAIMER

2

Page 3: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Housekeeping

• Restrooms

• Refreshments

• Attendance sheet

• Exam

• Questions Please turn off cell phones & other electronics

Page 4: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

A high-level overview of the ERCOT Nodal Market for all Market Participants and ERCOT personnel.

Target Audience

ERCOT Nodal 101:

4

Page 5: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Identify major components of the Nodal Market

• For each component of the Nodal Market, describe

• Purpose

• Inputs

• Outputs

• Processes

Course Objectives

Upon completion of this course you will be able to:

5

Page 6: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Modules in this course include:

Introduction to ERCOT and MarketModule 1

Module 2

Module 3

Module 4

Module 5

Module 6

Locational Marginal Pricing

Congestion Revenue Rights

Day-Ahead Market

Reliability Unit Commitment

Real-Time Operations

Page 7: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Introduction to ERCOT

Page 8: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Key features of the ERCOT Grid

• ERCOT Responsibilities

• Reliability and Markets

• Capacity and Energy

• Congestion Management

• Network Modeling

• Market Overview

Overview

Topics in this lesson . . .

8

Page 9: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Represents 90% of Texas Load

• 77,000 MW of generation capacity

• 46,500 miles of transmission lines

• Electrical island with several DC Ties

ERCOT Introduction

Key Features of the ERCOT Grid

9

Page 10: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Match generation with demand• Operate transmission system within established limits

ERCOT Responsibility

ERCOT’s Primary Responsibility is Reliability

10

Execute competitive markets for reliability services

Page 11: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Markets support reliability• Reliability makes the markets

possible

ERCOT Operational Concepts

Reliability and Competitive Markets

11

ERCOT finds the balance between Reliability and

Economics

Page 12: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Responsibility

Energy and Capacity

12

ERCOT dispatches Energy to follow the

system demand

Page 13: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Responsibility

Energy and Capacity

13

Capacity

Forecast

ERCOT must also ensure sufficient Capacity is on-line

to meet the forecasted demand

Page 14: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Responsibility

More about Capacity

14

Capacity Reserved for Ancillary Services

Ancillary Services needed to respond quickly to changing system conditions

Page 15: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Acquired through competitive markets

ERCOT Responsibility

Ancillary Service Capacity

15

System Capacity

Ancillary Service Capacity

Page 16: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Responsibility

Ancillary Service Capacity

16

Non-Spin Reserve

Regulation Reserve

Responsive ReserveThree types of Ancillary Services

Page 17: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Generators and Loads separated by distance

• Transmission system has limits

ERCOT Responsibility

Transmission Congestion

17

Congestion management keeps transmission system

operating within limits

Page 18: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Responsibility

Network Operations Model

18

Models allow ERCOT to:• “See” grid at any point in time• Predict how various actions

affect grid

Representation of a physical system

Page 19: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Physical characteristics• Ratings• Operational limits

Including• Transmission Elements• Resources• Topology• Telemetry mapping

ERCOT Responsibility

19

Network Operations Model

Page 20: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Checkpoint Jeopardy!

20

ERCOT finds the balance!

Match the following answers with the questions:

$50

Capacities reserved for responding quickly to changing conditions!$50

The process of keeping the transmission system operating within limits!$50

Page 21: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Introduction

Page 22: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Participants

Who are the Players?

22

Qualified Scheduling EntitiesQSE

Load Serving EntitiesLSE

Transmission and/or DistributionService ProvidersTDSP

Resource EntitiesResource Entity

Page 23: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Participants

23

Page 24: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Bilateral Market• ERCOT Facilitated Markets

• Day-Ahead Ancillary Services Market

• Day-Ahead Energy Market• Real-Time Energy Market

ERCOT Nodal Market Design

Commercial Markets

24

Page 25: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Energy Dispatch• Resource-specific offers• Resource-specific dispatch

Goal• Balance generation & demand• Manage congestion

Energy Pricing• Location-specific prices for energy• Prices include congestion costs

ERCOT Nodal Market Design

25

Page 26: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• All costs are directly assigned

• Congestion Revenue Rights available for hedging

ERCOT Nodal Market Design

Congestion Costs

26

Page 27: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Nodal Market Design

ERCOT is an energy-only market … but what does that mean?

27

In ERCOT, these costs must be recovered with revenues from energy production and operating reserves.

It’s all about the recovery of costs to build generation.

Page 28: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Nodal Market Design

ERCOT is an energy-only market … but what does that mean?

28

Scarcity pricing – higher energy prices during periods where energy reserves are scarce

Energy Pricing must support investment in new generation

Page 29: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

29

Page 30: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

30

An Independent Market Information System Registered Entity (IMRE) may register with ERCOT solely to access MIS Secure.

Page 31: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

31

Page 32: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Locational Marginal Pricing

Page 33: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Locational Marginal Prices (LMPs)• Define LMPs• Determination of LMPs

• Congestion Rent• Settlement Point Prices• Reserve Prices• Market Information

Overview

Topics in this lesson . . .

33

Page 34: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

What is Locational Marginal Pricing (LMP)?

• Pricing: Cost • Marginal: to serve the next increment of Load• Locational: at an Electrical Bus

Locational Marginal Pricing

34

Locational Marginal Pricing

Page 35: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Energy• Congestion

Locational Marginal Pricing

LMP Components

35

In some markets, LMPs have a component for

losses.

The Nodal Market does NOT include losses in

LMPs.

Page 36: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

36

Introducing the players… EXAMPLE

Locational Marginal Pricing

Gen 1

Gen 2

Page 37: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

37

Let’s solve for LMPs at each Bus:EXAMPLE

Locational Marginal Pricing

10 MW($4 per MWh)

20 MW ($2 per MWh)

10 MW

Gen 1

Gen 2

Page 38: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

38

Let’s solve for LMPs at each Bus:EXAMPLE

Locational Marginal Pricing

10 MW($4 per MWh)

20 MW ($2 per MWh)

10 MW

Gen 1

Gen 2

When there is no congestion, all LMPs are equal

Page 39: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Locational Marginal Pricing

Example: No Congestion

39

Charges to Load

LMP MW

$2 10 $20

Total $20

Payment to Resources

LMP MW

$2 0 $0

$2 10 $20

Total $20

Gen 1

Gen 2

Page 40: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

40

Now there is congestion.EXAMPLE

Locational Marginal Pricing

10 MW($4 per MWh)

20 MW ($2 per MWh)

10 MW

4 MW constraint

Gen 1

Gen 2

Page 41: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

41

EXAMPLE

Locational Marginal Pricing

10 MW($4 per MWh)

20 MW ($2 per MWh)

10 MW

4 MW constraint

Gen 1

Gen 2

With congestion, LMPs are different.

Page 42: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Charges to Load

LMP MW

$4 10 $40

Total $40

Payment to Resources

LMP MW

$4 6 $ 24

$2 4 $8

Total $32

Locational Marginal Pricing

42

Example: Congestion

Gen 1

Gen 2

Page 43: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Rent

43

$40

$32

$8

Payments to

ResourcesCharges to Load

Congestion Rent used to fund Congestion

Revenue Rights (CRRs)

Page 44: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• LMPs at Electrical Buses

• Settlement Points used for financial settlement

• Settlement Point Prices calculated using LMPs

Settlement Point Prices

LMPs and Settlement Point Prices

44

Settlement Point Price

LMP1

LMP2

LMP3

LMP4

LMP5

Electrical Buses

Page 45: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Reserve Price Adder: the economic value of reserves that are available for energy dispatch in Real-Time

• LMPs and Reserve Price Adders are used together to form SPPs in Real-Time

Settlement Point Prices

Additional Real-Time pricing component…

43

LMPs are location-specific. Reserve Price Adders represent the value of reserves ERCOT-wide.

Page 46: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

LMPs and Settlement Point Prices• Every Hour

LMPs and Reserve Price Adders• Every 5 minutes*

Settlement Point Prices• Every 15 minutes

Settlement Point Prices

How often are LMPs & Settlement Point Prices calculated?

46

* LMPs and Reserve Price Adders generated at each SCED cycle (possibly more often than 5 minutes)

Page 47: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Settlement Point Prices

Three Types of Settlement Points:

47

ResourceNodes

LoadZones

Hubs

Page 48: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

An Electrical Bus where a Resource’s measured output is settled

Settlement Point Prices

What is a Resource Node?

48

Resource Electrical Bus

Page 49: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead MarketLMP at the Resource Node

Real-Time OperationsTime-Weighted Average of LMPs at the Resource Node

Time-Weighted Average of Reserve Price Adders

Settlement Point Prices

Settlement Point Prices for Resource Nodes

49

+

Resource Electrical Bus

Page 50: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

A group of Electrical Buses assigned to the same geographical zone

Settlement Point Prices

What is a Load Zone?

50

Every Electrical Bus with Load must be assigned to

a Load Zone for Settlement purposes

Page 51: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead MarketLoad-Weighted Average of LMPs in Load Zone

Real-Time OperationsLoad-Weighted and Time-Weighted Averages of LMPs in Load Zone

Time-Weighted Average of Reserve Price Adders

Settlement Point Prices

Settlement Point Price for Load Zones

51

+

Page 52: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Competitive Load Zones

• Non Opt-in Entity Load Zones

• DC Tie Load Zones

Settlement Point Prices

Three types of Load Zones

52

Page 53: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• North

• South

• West

• Houston

2003 Congestion Management zones

Settlement Point Prices

Competitive Load Zones

53

Page 54: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Established by one or more NOIE(s)

• Some large NOIEs required to establish own NOIE Load Zones

• NOIEs that don’t establish NOIE Load Zone are assigned to Competitive Load Zone

Settlement Point Prices

Non Opt-in Entity Load Zones

54

Page 55: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Used to settle exports across DC Ties

• One for each DC Tie

• Contains only the electricalbus connected to the DC Tie

Settlement Point Prices

DC Tie Load Zones

55

All Load must be assigned to a Load Zone for Settlement purposes

Page 56: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Group of 345kV Hub-buses• Defined by Protocols

Settlement Point Prices

What is a Hub?

56

Hub

Page 57: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT Hub Average

ERCOT Bus Average

Settlement Point Prices

Six Hubs in ERCOT Market

57

Four Regional Hubs• North

• West

• South

• Houston

Two Average Hubs

Page 58: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Hub

Day-Ahead MarketSimple average of LMPs at Hub Buses in each Hub

Real-Time OperationsSimple average of Time-Weighted Average LMPs at the Hub Buses in the Hub

Time-Weighted Average of Reserve Price Adders

Settlement Point Prices

Settlement Point Price for Hubs

58

+

Page 59: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• LMP Contour Map• Day-Ahead Market SPPs• Real-Time LMPs• Real-Time SPPs

Market Information System

59

Page 60: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

$100

Checkpoint Jeopardy!

60

These Settlement Points come in half-a-dozen!

Match the following answers with the questions:

$25

Energy and congestion!$50

A price formed by combining LMP’s with Reserve Price Adders!

Page 61: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Nodal Market Operations

Page 62: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Nodal Market Operations

Market Components

62

Page 63: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

Page 64: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Purpose of CRRs• CRR Account Holders• Types of CRRs• How CRRs are acquired• Settlements• Market Information System

Overview

Topics in this lesson . . .

64

Page 65: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

65

Page 66: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Financial instruments• Hedge against congestion costs• Financial investment

• Payment or charge when Grid is congested

Congestion Revenue Rights

Purpose of Congestion Revenue Rights

66

A CRR is not a right to

deliver physical energy

Page 67: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Costs

Congestion Cost exposure

67

Resource Node A

Resource Node B

$30/MWh$40/MWh

$45/MWh

Congestion costs are built in to the Settlement Point prices

Load Zone

Page 68: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

68

Introducing a new player:CRR Account Holder

Page 69: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

69

To own CRRs, Market Participants:• Must be registered with ERCOT

• Must qualify as CRR Account Holders

Page 70: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

70

Barred from owning CRRs:• TSPs & DSPs

• ERCOT

Page 71: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Point-to-Point Congestion

Revenue Rights

• Designated point of injection (source) and point of withdrawal (sink)

• Settlement based on difference between sink and source Settlement Point Prices

• Two Instruments:• PTP Options – payment only• PTP Obligations – payment or

charge

Congestion Revenue Rights

Congestion Revenue Rights as Financial Instruments

71

Page 72: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

72

$5/MWh

$10/MWh

$15/MWh

Source A

Source C

Sink B

Obligation AB Payment = $5.00

Obligation CB Payment = -$5.00

Point-to-Point (PTP) ObligationsEXAMPLE

Congestion Revenue Rights

?

Page 73: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

73

Option AB Payment = $5.00

Option CB Payment = $0.00

$5/MWh

$15/MWh

Source A

Source C

Sink B

Point-to-Point (PTP) OptionsEXAMPLE

Congestion Revenue Rights

?

$10/MWh

Page 74: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• CRR Auction• Allocation (Special Case)• Bilateral Trades

Congestion Revenue Rights

Three ways of acquiring CRRs:

74

Auction

Allocation

Trade

CRRs

Page 75: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Time-of-Use Blocks• One month strips

Congestion Revenue Rights

CRRs are auctioned and allocated by:

75

Page 76: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• CRR Auction• Monthly and Semi-Annual Auctions• Based on Network Operations Model

Congestion Revenue Rights

76

Page 77: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Pre-Assigned CRRs (PCRRs)• Allocated to Non-Opt-In Entities (NOIEs)• Based on long-term supply contracts• May be allocated as Options or Obligations• No charge or a percentage of the Auction clearing price

Congestion Revenue Rights

Allocation of CRRs

77

Page 78: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• PTP Options• PTP Obligations• Characteristics remain unchanged• Both parties must meet credit requirements

Congestion Revenue Rights

Trading CRRs Bilaterally

78

Page 79: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Three Settlement Processes• CRR Auction Settlement• CRR Settlement• CRR Balancing Account

Congestion Revenue Rights

CRR Settlements

79

Page 80: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights Settlements

CRR Auction Settlements

80

Settlements

Payments

Charges

Page 81: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

CRR Auction Settlements Timeline

81

Auction Completed Day 1* Day 3** Day 4**

Auction Invoice

PaymentsDue to ERCOT

PaymentsDue to CRR Account Holders

Auction Results

Day 2** Day 5***

** Bank Business Day

*** Business Day and Bank Business Day

* Business Day

Page 82: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

CRR Auction Settlement

82

Monthly

CRR Auction Revenues

+PCRR Revenues

Pay to QSEs representing Load

Page 83: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Congestion Revenue Rights

CRR Settlement

83

CRRs are settled in the Day-Ahead Market

Payments

Charges

Page 84: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Payment due toCRR Account Holders

Hourly

Congestion Revenue Rights

CRR Settlement

84

Page 85: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Payment due toCRR Account Holders

Hourly

Congestion Revenue Rights

CRR Settlement

85

may be short paid in some hours

Page 86: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Payment due toCRR Account Holders

MonthlyPay to QSEs representing Load

Congestion Revenue Rights

CRR Balancing Account

86

Page 87: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Payment due toCRR Account Holders

Congestion Revenue Rights

CRR Balancing Account

87

Monthly

X

may remain short paid

Page 88: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

Posted after each Auction:

88

• CRRs awarded • CRR Account Holders• Auction clearing prices• CRR Bids and offers

Page 89: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

$100

Checkpoint Jeopardy!

89

Assigned, awarded, or traded!

Match the following answers with the questions:

$25

A fund that is used to pay CRR Account Holders what they are due!$50

A fund that is uplifted to QSEs representing Load!

Page 90: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

Page 91: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Purpose of Day-Ahead Market• Market Participants• Day-Ahead Market Process• Process Inputs and Outputs• Settlements• Market Information System

Overview

Topics in this lesson . . .

91

Page 92: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

92

Page 93: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Centralized Forward Market• Buy and sell Energy• Sell Ancillary Services to ERCOT• Forward market provides price

certainty

Day-Ahead Market

Purpose of the Day-Ahead Market

93

Page 94: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

94

Only QSEs participate in the Day-Ahead Market.

Page 95: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

95

CRRs are settled with Day-Ahead Market Prices

Page 96: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

When does the Day-Ahead Market occur?• Market opens at 0600• Clearing Process begins at 1000• Results posted by 1330

Day-Ahead Market

96

0600 1330 0000 Real-TimeOperations

Page 97: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

An Offer is a proposal to sell:• A Product• At a Location• For a Price

A Bid is a proposal to buy:• A Product• At a Location• For a Price

Day-Ahead Market

97

EnergyLoadZone 4

$40

Page 98: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

98

Page 99: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

99

Page 100: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

100

Types of Offers:• Three-Part Supply Offer • Ancillary Service (AS) Offer• Day-Ahead Market Energy-Only Offer

Page 101: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Startup Offer Minimum-Energy Offer Energy Offer Curve

$ / MWh (at LSL) $ / MWh (above LSL)

$ / Start

Day-Ahead Market

Three-Part Supply Offer

101

Energy Offer Curve can be submitted without Start-up or Minimum Energy Offers

Page 102: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Resource specific • Regulation Reserve• Responsive Reserve• Non-Spinning Reserve

• A Resource may be offered• For multiple Ancillary Services• For Energy and Ancillary

Services

Day-Ahead Market

Ancillary Service (AS) Offers:

102

Ancillary Service Offer

Page 103: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Proposal to sell energy in DAM• Offered at any Settlement Point

Day-Ahead Market

Day-Ahead Market Energy-Only Offer

103

DAM Energy-Only Offer

h

Valid only in the Day-Ahead Market

Financial obligation in Real-Time

Slide 103

Page 104: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

104

Types of Bids:• Energy Bid• PTP Obligation Bid

Page 105: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Proposal to buy energy• Submitted at any Settlement Point

DAM Energy Bid

h

Day-Ahead Market

Day-Ahead Market Energy Bid

105

Valid only in the Day-Ahead Market

Financial credit in Real-Time

Page 106: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Purpose of DAM PTP Obligations

• Hedge against congestion costs in Real-Time

• Charge or payment when Grid is congested in Real-Time

Day-Ahead Market

Day-Ahead Market PTP Obligation Bids

106

Page 107: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Like coupled Energy Bid and Energy Offer• Purchased at DAM Settlement Point Price Spread• Settled at Real-Time Settlement Point Price Spread

Day-Ahead Market

Day-Ahead Market PTP Obligation Bids

107

Source A

Sink BEnergy Offer

Energy Bid

PTP Obligation

DAM PTP Obligation canresult in a payment or

charge

Page 108: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

108

Day-Ahead Market PTP ObligationsEXAMPLE

Day-Ahead Market

QSE charge in Day Ahead Market = $2

QSE payment in Real Time = $7 ?

?

$10/MWh $12/MWh

Source A Sink B

PTP Obligation

DAM :

$8/MWh $15/MWhReal-Time :

Settlement Point Prices {{

Page 109: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

109

CRR Auction Day-Ahead Market Real-Time

Page 110: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

110

The Day-Ahead Market

Page 111: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Anticipated Resource operating conditions• Resource Status• Resource Limits• Ancillary Service Commitments

• Submitted by QSE

Day-Ahead Market

The Current Operating Plan (COP)

111

QSE must maintain the COP for each hour of the next 7 days

Page 112: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

112

Page 113: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Day-Ahead Market does not solve reliability issues

• System must support the Day-Ahead Market solution

Day-Ahead Market

The Network Model in the Day-Ahead Market

113

The Network Operations Model ensures that DAM solution

respects system limits

Page 114: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

114

Page 115: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

115

Cleared Offers = Costs

Cleared Bids = Revenues

Page 116: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market clearing process

116

MaximizeThe Gap

Bid-based Revenues

Offer-based Costs

Page 117: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Offer-based Costs

MaximizeThe Gap

Bid-based Revenues

Day-Ahead Market

The Day-Ahead Market clearing process

117

Energy&AncillaryService Costs

The Day-Ahead Market is a Co-optimized Market

Page 118: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market

The Day-Ahead Market

118

Page 119: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

QSEs may update COP• Awarded Energy Offers• Ancillary Service Commitments

QSEs may submit Trades

Day-Ahead Market

After Day-Ahead Market

119

Page 120: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• QSE-QSE transactions• Transfers financial responsibility• Types

• Capacity• Energy• Ancillary Service

Day-Ahead Market

Trades

120

Trades are used only in Settlements

Page 121: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Day-Ahead Market Settlements

121

Payments

Charges

Page 122: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Daily statements include • Payments due• Charges incurred

Day-Ahead Market

Day-Ahead Settlement Timeline

122

Operating Day

Day 2Day Ahead

DAM Statement

Day 1

Page 123: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Daily invoices include• DAM Statements• RTM Statements

Day-Ahead Market

Single Daily Settlement Invoice

123

Operating Day

Day 5 Day 6

ERCOT Issues DAM

Statement & Invoice Payment Due

(to ERCOT)

Payment Due (to Market Participant)

Day 2

17001700

Day Ahead

InvoiceDay + 2

InvoiceDay + 3

ERCOT Issues Invoice• DAM Statements • RTM Statements Payment Due

(to ERCOT)

Payment Due (to Market

Participant)

InvoiceDay

17001700

Page 124: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

Posted by 0600 Day-Ahead:

124

• Network Operations Model

• Weather Assumptions • Load Forecasts (next 7 days)• Forecasted Load Profiles

Page 125: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

Posted by 1330 Day-Ahead:

125

• LMPs • Settlement Point Prices• MCPCs for each Ancillary Service• Energy bought and sold

Page 126: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

$100

Checkpoint Jeopardy!

126

Inputs that indicate a willingness to buy or sell products in DAM!

Match the following answers with the questions:

$25

A DAM transaction that creates a financial credit in Real-time!$50

Products that may be offered simultaneously from the same Resource!

Page 127: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

Page 128: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Purpose of Reliability Unit Commitment (RUC)• Market Participants involved • The RUC Process• Settlements• Capacity Shortfall• Market Information System

Overview

Topics in this lesson . . .

128

Page 129: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

129

Page 130: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

It ensures:

• Enough capacity is committed to serve the forecasted load

• Committed capacity is in the right locations

Reliability Unit Commitment

Purpose of Reliability Unit Commitment (RUC)

130

Page 131: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

131

Operational impacts on:QSEs with Resources

Page 132: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

132

Funds collected from:• Capacity-Short QSEs

• QSEs representing Load

Page 133: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

The Reliability Unit Commitment Process

133

Page 134: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

Committing Enough Capacity

134

Page 135: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

Committing Capacity in the Right Locations

135

Page 136: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

What if ERCOT must commit additional capacity?

136

Page 137: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

Potential Results of RUC Process:

137

• Resource Commitments• Resource Decommitments• No additional Commitments

Page 138: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Day-Ahead Reliability Unit Commitment (DRUC)• Hourly Reliability Unit Commitment (HRUC)

Reliability Unit Commitment

When does Reliability Unit Commitment (RUC) occur?

138

HRUCDRUC

Page 139: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Make-Whole

Payments

Reliability Unit Commitment

139

*RUC-Committed Resources

Capacity Short

Charges

Make-Whole Uplift

Charges

Page 140: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Make-Whole Payments• RUC-committed Resources recover their

commitment costs

Reliability Unit Commitment

140

Resource Costs

Resource Revenues

$

RUC Make-Whole Payment

Make-Whole Payment

Page 141: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

Capacity Short Charge

141

Capacity Obligations

Capacity Supply

Capacity Shortfall

QSEs with Capacity Shortfall may be assessed Capacity Short Charges

Page 142: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Load (Adjusted Metered Load)• Capacity Trades where the QSE is a seller• Energy Trade where the QSE is a seller• Cleared DAM Energy Offer

Reliability Unit Commitment

What is included in the QSE’s capacity obligation?

142

Capacity Required to meet QSE Obligations

Capacity Obligations

Page 143: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Show capacity from its Resources in its COP• Capacity Trades where the QSE is a buyer• Energy Trades where the QSE is a buyer• Cleared DAM Energy bids

Reliability Unit Commitment

How can a QSE arrange to meet these obligations?

143

Capacity arranged by QSE

Capacity Supply

Page 144: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

QSE must arrange for enough Capacity to meet Obligations

Reliability Unit Commitment

To Minimize Capacity Short Charges…

144

Capacity Obligations

Capacity Supply

Capacity Shortfall

Page 145: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Difference uplifted to QSEs representing Load

Reliability Unit Commitment

Revenues may not be enough for make-Whole Payments

145

Gen 1

RUC Make-Whole

Payments

Make-WholeUplift

Charges

CapacityShortfallCharges

Capacity Short

Page 146: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Reliability Unit Commitment

146

Make-Whole

Payments Capacity Short

Charges

Make-Whole Uplift

Charges

RUC Payments and Charges are included in Real-Time Settlements

Page 147: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

Posted after process completion:

147

• Resources committed • Resources decommitted• Active transmission constraints

Page 148: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

$100

Checkpoint Jeopardy!

148

An input used by RUC to determine how much capacity is needed!

Match the following answers with the questions:

$25

Possible result of a snapshot of a QSE’s obligations!$50

An input used by RUC to determine the least cost solution to commit a Resource!

Page 149: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

Page 150: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Purpose of Real-Time Operations• Market Participants• Real-Time Operations Process

• Security Constrained Economic Dispatch• Load Frequency Control

• Settlements• Market Information System

Overview

Topics in this lesson . . .

150

Page 151: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

You Are Here!

151

Page 152: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Manage reliability• Match generation with demand• Operate transmission system

within established limits• Operate the system at least cost

Real-Time Operations

Purpose of Real-Time Operations

152

Page 153: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

153

ERCOT provides dispatch instructions to QSEs with Resources

Page 154: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

154

ERCOT may also provide dispatch instructions to TSP’s

Page 155: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Operating Period• Includes Operating Hour and Hour-Ahead

Real-Time Operations

When do Real-Time Operations occur?

155

60 mins.prior to

Operating Hour

00000600 Real-TimeOperations

Page 156: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Operating Hour - Real-Time dispatch of energy• Hour-Ahead – Preparations for Real-Time Operations

Real-Time Operations

The Operating Period includes:

156

60 mins.prior to

Operating Hour

0000Real-TimeOperations

0600

Page 157: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

157

Page 158: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Network Security Analysisidentifies transmission constraints

• Security Constrained Economic Dispatch (SCED) determines least-cost solution

Real-Time Operations

Network Security Analysis and SCED

158

NetworkSecurityAnalysis

SecurityConstrainedEconomicDispatch

Real-Time Operations

Page 159: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

Provide Real-Time system data

159

Page 160: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

Identify Constraints, both Transmission & Resource

160

TransmissionConstraints& ResourceDispatch Limits

Page 161: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

SCED evaluates Offers to determine least-cost solution

161

TransmissionConstraints& ResourceDispatch Limits

Page 162: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

SCED uses Energy Offer Curves:

162

Energy Offer Curve Submitted by QSEs:• Three-Part Supply Offer• Stand Alone Energy Offer Curve

During:• Day-Ahead Market• Adjustment Period

Page 163: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

SCED produces Prices and Dispatch Instructions

163

Page 164: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations

How often does all this happen?

164

At least every 5 minutes

Page 165: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Every 5 minutes (when SCED runs)LMPs• Electrical buses

Every 15 minutesSettlement Point Prices• Resource Nodes• Load Zones• Hubs

Real-Time Operations

Real-Time Price Calculations

165

Reserve Price Adders• ERCOT-wide

Page 166: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

SCED

• Matches generation with demand• Manages congestion• Achieves least cost dispatch

Real-Time Operations

Security Constrained Economic Dispatch (SCED)

166

SCED

SCED

5 minutes 5 minutes

Base points

Base points

Base points

Page 167: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Matches generation with demand• Responds to frequency deviations• Deploys Regulation Reserve Service

Real-Time Operations

Load Frequency Control (LFC)

167

Frequency (Hz)

60. 0000

5 minutes 5 minutes

Base points

Base points

Base points

Page 168: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Real-Time Operations Settlements

168

Payment for Net Supply

Charge for Net Obligation

Page 169: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

• Metered Generation• DAM Purchase• Trades as Buyer

Examples•__________________ •__________________•__________________

Real-Time Operations Settlements

169

Page 170: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

•Metered Load•DAM Sale•Trades as Seller

Examples•__________________ •__________________•__________________

Real-Time Operations Settlements

170

Page 171: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Daily statements include • Payments due• Charges incurred

Real-Time Operations Settlements

Real-Time Settlement Timeline

171

Day 180

Operating Day

Day 5

Initial Statement

Final Statement

True-Up Statement

Day 55

Page 172: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Daily invoices include• DAM Statement• RTM Statements

Real-Time Operations Settlements

Single Daily Settlement Invoice

172

Operating Day

Day 5 Day 6

ERCOT Issues DAM

Statement & Invoice Payment Due

(to ERCOT)

Payment Due (to Market Participant)

Day 2

17001700

Day Ahead

InvoiceDay + 2

InvoiceDay + 3

ERCOT Issues Invoice• DAM • RTM Initial• RTM Final• RTM True-up

Payment Due (to ERCOT)

Payment Due (to Market

Participant)

InvoiceDay

17001700

Page 173: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Market Information System

Posted after completion of SCED:

173

• Locational Marginal Prices• Settlement Point Prices

• Active transmission constraints

Page 174: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

$100

Checkpoint Jeopardy!

174

The QSE’s submitted energy offer for a specific Resource!

Match the following answers with the questions:

$25

The first leg of the Operating Period!$50

Real-Time value of reserves across the wide range of ERCOT!

Page 175: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Course Conclusion

Page 176: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

NODAL MARKET CURRICULUM ** available as web-based courseNodal 101 ** An introduction to the ERCOT Nodal Market.

Retail 101 An introduction to the competitive retail market in the ERCOT Region.

LSE 201 ** Market tools to manage cost of serving Load in the ERCOT Nodal Market.

Basic Training Program Comprehensive overview of Market and System Operations in the Nodal Market design.

CRR Market Comprehensive overview of Congestion Revenue Rights.

Settlements 301 Comprehensive overview of financial settlements in the ERCOT Nodal Market.

Credit Management Comprehensive overview of financial credit management in the ERCOT Nodal Market.

Transmission 101 Overview of processes in the planning and operation of the ERCOT grid.

Nodal Market Education

ERCOT Market Education [email protected]

ERCOT Training Cataloghttp://www.ercot.com/services/training/

Page 177: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Your Feedback

Your Feedback

ERCOT values your feedback on your experience in completing this instructor-led course.

Survey Handout

www.surveymonkey.com/r/ERCOTMarketTraining

Survey Launch QR Code:

Page 178: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

ERCOT.comERCOT Protocolshttp://www.ercot.com/mktrules/nprotocols/

ERCOT Client [email protected]

ERCOT Account Management [email protected]

ERCOT Market [email protected]

Accessing additional information

Page 179: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

APPENDIX

Page 180: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Checkpoint Jeopardy Answers

180

Module 1 – ERCOT ResponsibilitiesAnswer: ERCOT finds the balance!Question: How does reliability and markets work together?

Answer: Capacities reserved for responding quickly to changing conditions.Question: What are Ancillary Services?

Answer: The process of keeping the transmission system operating within limits.Question: What is congestion management?

Module 3 – LMPAnswer: These Settlement Points come in half-a-dozen!Question: How many Hub Settlement Points are there?

Answer: Energy and congestion.Question: What are the two components of LMP?

Answer: A price formed by combining LMP’s with Reserve Price Adders.Question: What is a Settlement Point Price?

Page 181: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Checkpoint Jeopardy Answers

181

Module 4 – Congestion Revenue RightsAnswer: Assigned, awarded, or traded!Question: How can a CRRAH acquire a CRR?

Answer: A fund that is used to pay CRR Account Holders what they are due.Question: What is Congestion Rent?

Answer: A fund that is uplifted to QSEs representing Load.Question: What is CRR Auction Revenue?

Module 5 – Day-Ahead MarketAnswer: Inputs that indicate a willingness to buy or sell products in DAM.Question: What are Bids and Offers?

Answer: A DAM transaction that creates a financial credit in Real-time.Question: What is a cleared Energy Bid?

Answer: Products that may be offered simultaneously from the same Resource.Question: What are Energy and Ancillary Services?

Page 182: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Checkpoint Jeopardy Answers

182

Module 6 – Reliability Unit CommittmentAnswer: An input used by RUC to determine how much capacity is needed.Question: What is the Load Forecast?

Answer: Possible result of a test in time of a QSE’s obligations!Question: Why might a QSE receive a Capacity Short charge?

Answer: An input used by RUC to determine the least cost solution to commit a Resource.Question: What is the Three-Part Supply Offer?

Module 7 – Real-Time OperationsAnswer: The QSE’s submitted energy offer for a specific Resource!Question: What is the primary input into SCED?

Answer: The first leg of the Operating Period!Question: When does Hour-Ahead occur?

Answer: Real-Time value of reserves across the wide range of ERCOT!Question: What are Reserve Price Adders?

Page 183: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Access Market Information System from ERCOT public website:

183

Digital Certificate required

Page 184: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

LMP Contour Map: http://www.ercot.com/content/cdr/contours/rtmLmpHg.html

Appendix: Pathways to Referenced Data

184

Page 185: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Public access: http://www.ercot.com/mktinfo/crr/index.html

CRR Auction section, Auction Results posting (zip folder)• CRRs, CRRAHs awarded, and Auction Clearing Prices

• Common Market Results file (CSV or XML format) • CRR Bids and Offers

• Common Auction Bids and Offers file (CSV or XML format)

Appendix: Pathways to Referenced Data

CRR Auction Results

185

Page 186: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

CRR Auction Results via Market Information System

186

Page 187: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Day-Ahead Network Operations Model (posted by 0600)

187

Page 188: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Posted by 0600 Day-Ahead:

188

• Weather assumptions• Public access:

http://www.ercot.com/mktinfo/dam/index.html, under System Conditions

• MIS Secure: Markets > Day-Ahead Market > Day-Ahead Public Information

• Forecasted Load Profiles• Public access:

http://www.ercot.com/mktinfo/loadprofile/index.html, under Current Information

• MIS Secure: Markets > Load Profiling > Load Profiling Reports and Extracts (Public)

Page 189: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Posted by 0600 Day-Ahead:

189

• Load Forecasts (next 7 days)• Public access:

http://www.ercot.com/gridinfo/load/index.html, under Current Information

• MIS Secure: Grid > Forecasts > Significant System Conditions

• List of transmission constraints• Public access:

http://www.ercot.com/gridinfo/generation/index.html, under Current Information

• MIS Secure: Grid > Generation > Public Generation Information > Weekly RUC Active and Binding Transmission Constraints

Page 190: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Posted by 1330 Day-Ahead:

190

• DAM Hourly LMPs• DAM Settlement Point Prices• DAM Clearing Prices for Capacity• DAM Total Energy Purchased• DAM Total Energy sold

• Public access: http://www.ercot.com/mktinfo/dam/index.html, under Day-Ahead Market Results Reports

• MIS Secure: Markets > Day-Ahead Market > Day-Ahead Market Results

Page 191: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Posted after RUC completion:

191

• RUC Committed or DecommittedResources

• MIS Secure: Grid > Generation > Reliability Unit Commitment

• Active transmission constraints• Public access:

http://www.ercot.com/gridinfo/generation/index.html under Current Information

• MIS Secure: Grid > Generation > Public Generation Information

Page 192: ERCOT Nodal 101 · Congestion Revenue Rights. Day-Ahead Market. Reliability Unit Commitment. Real-Time Operations. ... a Load Zone for Settlement purposes. Day-Ahead Market. Load-Weighted

Appendix: Pathways to Referenced Data

Posted after completion of SCED:

192

• Locational Marginal Prices• Settlement Point Prices

• Public access: http://www.ercot.com/mktinfo/rtm/index.html, under Real-Time Prices Reports

• MIS Secure: Markets > Real-Time Market > Real-Time Prices

• Active transmission constraints• MIS Secure: Markets > Real-Time Market >

Real-Time Operations