equipment sheet - smit · equipment sheet smit grenada ... loadline certificate gmdss cert. a1 imo...

2
EQUIPMENT SHEET SMIT GRENADA HARBOR TUG CONSTRUCTION/CLASSIFICATION Year of construction 2008 Classification Lloyd's Register X 100 A1 Tug [X] LMC UMS Incl. tonnage and loadline certificate GMDSS cert. A1 IMO number 9396414 FEATURES Air-conditioned accomodation for 8 persons Bunker capacity: potable water 15 m 3 , fuel oil 97 m 3 , foam 8 m 3 Capacity fire-fighting monitors 1 x 600 m³/hr MAIN DATA Gross tonnage 285 Length overall 28.67 m Beam overall 10.43 m Max. draught 4.76 m Main engines 2 x Caterpillar 3516B TA HD/C Total power 3,678 kW Propulsion 2 x fixed pitch ASD propeller Bollard pull (ahead) 60 t Bollard pull (astern) 56 t Speed ahead (max.) 14 kn Speed ahead (economic) 9 kn NAVIGATION AND COMMUNICATION EQUIPMENT Magnetic compass Cassens & Plath Kotter Echo sounder Furuno FE-700 VHF Sailor RT5022 Radar Furuno FR-1505 mk III GPS Furuno GP-150 DECK EQUIPMENT Fore winch Hydraulic Single drum - 130 T. brake load Line pull 18 T. @ 11m/min. on 1 st layer Towing hook Mampaey, 65 t SWL Aft winch Hydraulic Single drum - 130 T. brake load Line pull 18 T. @ 11 m/min. on 1 st layer

Upload: doanngoc

Post on 13-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: equipment sheet - SMIT · equipment sheet smit grenada ... loadline certificate gMDSS cert. a1 IMo number 9396414 features ... t +31 78 69 69 000

equipmentsheetsmit grenadaharbor tug

ConstruCtion/ClassifiCation

Year of construction 2008

Classification Lloyd's register X 100 a1 tug [X] LMC uMS Incl. tonnage andloadline certificate gMDSS cert. a1

IMo number 9396414

features

air-conditioned accomodation for 8 persons

bunker capacity: potable water 15 m3, fuel oil 97 m3, foam 8 m3

Capacity fire-fighting monitors 1 x 600 m³/hr

main data

gross tonnage 285

Length overall 28.67 m

beam overall 10.43 m

Max. draught 4.76 m

Main engines 2 x Caterpillar 3516b ta hD/C

total power 3,678 kW

Propulsion 2 x fixed pitch aSD propeller

bollard pull (ahead) 60 t

bollard pull (astern) 56 t

Speed ahead (max.) 14 kn

Speed ahead (economic) 9 kn

navigation and CommuniCation equipment

Magnetic compass Cassens & Plath Kotter

Echo sounder Furuno FE-700

VhF Sailor rt5022

radar Furuno Fr-1505 mk III

gPS Furuno gP-150

deCk equipment

Fore winch hydraulic Single drum - 130 t. brake load Line pull 18 t. @ 11m/min. on 1st layer

towing hook Mampaey, 65 t SWL

aft winch hydraulic Single drum - 130 t. brake load Line pull 18 t. @ 11 m/min. on 1st layer

Page 2: equipment sheet - SMIT · equipment sheet smit grenada ... loadline certificate gMDSS cert. a1 IMo number 9396414 features ... t +31 78 69 69 000

01

— 2

01

3Th

e in

form

atio

n co

ntai

ned

in th

is d

ata

shee

t is

for

guid

ance

pur

pose

s on

ly a

nd m

ay b

e su

bjec

t to

chan

ges.

© B

oska

lis.

All

right

s re

serv

ed.

SMIt harbour towage Division b.V.Po box 43 3350 aa Papendrecht the Netherlands

t +31 78 69 69 000F +31 78 69 69 555

[email protected] www.smit.com

smit grenadaharbor tug

side view

top view deCk level