equipment name
DESCRIPTION
EquipTRANSCRIPT
EQUIPMENT NAME:MELTING FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/01LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014
EQUIPMENT NAME:ANNEALING FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/02LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014
EQUIPMENT NAME:CUPELLATION FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/03LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014
EQUIPMENT NAME:QUANTUM XRF ANALYSERINSTALLATION DATE:07.12.2013INDENTIFICATION NO.: SJHC/EQ/04CALIBRATION FREQUENCY:AS PER DEFINED FREQUENCY (3 TIMES/WORKING DAY)CALIBRATION DUE ON:AS PER DEFINED FREQUENCY (EVERY WORKING DAY)