EQUIPMENT NAME : MELTING FURNACE INSTALLATION DATE : 05.12.2013 INDENTIFICATION NO. : SJHC/EQ/01 LAST CALIBRATION DATE : 28.11.2013 CALIBRATION DUE ON : 27.11.2014 EQUIPMENT NAME : ANNEALING FURNACE INSTALLATION DATE : 05.12.2013 INDENTIFICATION NO. : SJHC/EQ/02 LAST CALIBRATION DATE : 28.11.2013 CALIBRATION DUE ON : 27.11.2014 EQUIPMENT NAME : CUPELLATION FURNACE INSTALLATION DATE : 05.12.2013 INDENTIFICATION NO. : SJHC/EQ/03 LAST CALIBRATION DATE : 28.11.2013 CALIBRATION DUE ON : 27.11.2014 EQUIPMENT NAME : QUANTUM XRF ANALYSER INSTALLATION DATE : 07.12.2013 INDENTIFICATION NO. : SJHC/EQ/04 CALIBRATION FREQUENCY : AS PER DEFINED FREQUENCY (3 TIMES/WORKING DAY) CALIBRATION DUE ON : AS PER DEFINED FREQUENCY (EVERY WORKING DAY)

Upload: mangesh

Post on 06-Nov-2015

212 views

Category:

Documents


0 download

DESCRIPTION

Equip

TRANSCRIPT

EQUIPMENT NAME:MELTING FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/01LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014

EQUIPMENT NAME:ANNEALING FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/02LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014

EQUIPMENT NAME:CUPELLATION FURNACEINSTALLATION DATE:05.12.2013INDENTIFICATION NO.: SJHC/EQ/03LAST CALIBRATION DATE:28.11.2013CALIBRATION DUE ON:27.11.2014

EQUIPMENT NAME:QUANTUM XRF ANALYSERINSTALLATION DATE:07.12.2013INDENTIFICATION NO.: SJHC/EQ/04CALIBRATION FREQUENCY:AS PER DEFINED FREQUENCY (3 TIMES/WORKING DAY)CALIBRATION DUE ON:AS PER DEFINED FREQUENCY (EVERY WORKING DAY)