Page 1: Equipment and installation

Plastic Piling – Installations

Page 2: Equipment and installation
Page 3: Equipment and installation

The Hammerman Equipment Plastic Piling Company Limited

Trades as T.H.E. Plastic Piling Co. &The Hammerman Equipment PPC

Page 4: Equipment and installation

Installation of Plastic Piling

• Handheld Hammers and Mauls• Air hammers• Compactor Plates• Excavator Mounted Piling Vibrators• Crane Suspended Vibrators• Leader Rigs• Mandrels

• Side Sleeves• Side Mandrels• Internal Mandrels

Page 5: Equipment and installation

Handheld Hammers

Small equipment

Portable

Low power

Suffer recoil

Supplied with Powerpack

Page 6: Equipment and installation

Handheld Hammers

Page 7: Equipment and installation

Air Hammers

Long established equipment

Limited to short lengths of Piling

Noisy

Oil Pollution

Page 8: Equipment and installation

Air Hammers

Page 9: Equipment and installation

Compactors

Good availability

Good control

Limited power

Page 10: Equipment and installation

Compactors

Page 11: Equipment and installation

Excavator Mounted Vibrators

Powerful units

Can work with Mandrels

Top and side driving versions available

Can drive and extract

Page 12: Equipment and installation

Excavator Mounted Vibrators

Page 13: Equipment and installation

Mini Crane Suspended Vibrators

Work of crane boats

Independent powerpack

May need ballast weights

Include worlds smallest ESF03

Page 14: Equipment and installation

Crane Suspended Vibrators

Page 15: Equipment and installation

Leader Rigs

Not frequently used

Excellent force

Excellent verticality

Ideally suited to long lengths of pile and mandrels

Page 16: Equipment and installation

Leader Rigs

Page 17: Equipment and installation

Piling Mandrels – supports pile and vibroSide Sleeves Side Mandrels Internal mandrels

Page 18: Equipment and installation

Slide Sleeves

•Basic steel strengthener

•Only overlaps on interlock

•Useful on budget light duty piling

•Limited to around 2-3m

•Must always be shorter than pile – plugging

•Easily suits different sheets

Page 19: Equipment and installation

Side Mandrels

•Provides top and side support

•Prevents sheet buckling

• Safer than rear mandrels

• Works ahead of the pile

•Requires quite large equipment

•Heavy

•Expensive to produce

•Suit narrow range of sheets

Page 20: Equipment and installation

Internal Mandrels

•Only for advanced range of piles

•Light weight minimises equipment size

•Internal backbone allow greater downcrowd

•Extends beyond pile and reduced toe friction and plugging

Page 21: Equipment and installation

Internal Mandrels

•Only for advanced range of piles

•Light weight minimises equipment size

•Internal backbone allow greater downcrowd

•Extends beyond pile and reduced toe friction and plugging

Page 22: Equipment and installation

New developmentsBSP BH120

Page 23: Equipment and installation

Remaining Issues

The main issues that relate today are:

Selecting the right pile for the job

Getting in equipment that is powerful enough for the task

Vibrator biased

Page 24: Equipment and installation

Thank you Any questions?