Equinor W ind USIntergovernmenta l Renewa ble Energy Ta sk Force for the New Y ork Bight
November 28, 2018
Open 28 November 20 18
Dogger Bank, UK
New York Bight, Equinor Wind US
2 | Equinor W ind US
Open 28 November 20 18
Phase 2
Phase 314
mile
s
20.5
mile
s
25 m
iles
19.5 miles
Equinor W ind O C S- A 0 512
3 | Equinor W ind US
Site Key Data
Area 80,000 acres
Water Depth 65-130 ft
Distance to shore 14 to 35 miles
Lease capacity Up to 2GW
Est. Construction 2022-2023
Est. First Power 2024-2025
• Design envelope• Potentia l phased development• Interconnection to New York & New
J ersey
Open 28 November 20 184 | Document Title
Schedules
C omplete Ongoing Ongoing Nov 20 17 to J uly 20 19
Summer 20 19 Summer 20 19 18- 24 months
C onstruction & Operations Plan (C OP), state & federal permits
Survey Plans Pre- survey Meetings Surveys Data Analysis SAP
SubmissionSAP
ApprovedBuoy
Deployments
Site Assessment Plan (SAP)
Approved Feb 20 18
J anuary 20 18
March 20 18
March-J une 20 18
J une 20 18
November 20 18
end 20 18
20 22 20 24+
C ritical issues & data gap analysis Survey plans Pre- survey
meetingsSurveys, studies &
assessmentsSubmit C OP
Submit state & federal
applicationsNEPA
review, RO D C onstruction First power / O perations
“Before we can build, we need a contract to sell our electricity”
800MW New York State Offshore Wind Power Procurement
February 2019
1100MW New Jersey State Offshore Wind Power Procurement
December 2018
Open 28 November 20 18
Surveys, a ssessments & outrea ch
5 | Equinor W ind US
FLiDAR 1
FLiDAR 2
www.remote.normandeau.com
© Equinor ASA
This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, is owned by Equinor. C opyright to all material including, but not limited to, written material, photographs, drawings, images, tables and data remains the property of Equinor. All rights reserved. Any other use, reproduction, translation, adaption, arrangement, alteration, distribution or storage of this presentation, in whole or in part, without the prior written permission of Equinor is prohibited. The information contained in this presentation may not be accurate, up to date or applicable to the circumstances of any particular case, despite our efforts. Equinor cannot accept any liability for any inaccuracies or omissions.
Julia Bovey, External Affairs [email protected]
Martin Goff, Environment & Permitting Offshore [email protected]
Laura Morales, Environment & Permitting Onshore [email protected]
Stephen Drew, Fisheries Liaison [email protected]
Equinor Wind US