Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology. Eovsa Site development. Eovsa Site development. Sign for Building. Surveying Inner Antennas. Design conduit runs for entire system Determine diameter and length of all runs - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/1.jpg)
EOVSA SITE DEVELOPMENT
Kjell NelinOVSA Site Manager, Center for Solar-Terrestrial ResearchNew Jersey Institute of Technology
![Page 2: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/2.jpg)
EOVSA SITE DEVELOPMENT
Surveying Inner Antennas
Sign for Building
![Page 3: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/3.jpg)
BEFORE CONTACTING CONTRACTORS Design conduit runs for entire system
Determine diameter and length of all runs Determine possible expansion/future needs
Design concrete pads 13 antenna sites Breakout shed Transformer platforms at shed & building Pads for solar power systems at 12 & 13?
![Page 4: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/4.jpg)
BEFORE WORK STARTS Caltech/NJIT MOU (now in progress) DWP final go-ahead (by July 1, hopefully earlier) Obtain EPA permit for SWPPP (by July 1) Identify and schedule biologist (bird nesting) Arrange archeologist schedule Identify and schedule contractors, with all
paperwork done to permit them to work Identify and purchase materials not provided by
contractors.
![Page 5: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/5.jpg)
CONTRACTORS To be contacted in May:
Grading/Road contractor Trenching/conduit contractor Concrete contractor Fencing contractor Building contractor (handled by NJIT/CIT?)
![Page 6: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/6.jpg)
SCHEDULE OF CONSTRUCTION Construction period Aug. 5 – Dec. 15
Above dates may be modified due to weather Once ground disturbances are over, we can proceed with
construction of breakout shed, installation of cables, solar power, etc.
Task Date Duration Arch/Tribe Monitor?Bird Survey 1-Aug 1 day NoGrading/Clearing 8-Aug 5 days Yes, 1 dayTrenching/Conduit 15-Aug 5 days Yes, 1 dayRoad Improvement 22-Aug 5 days NoExcavate for concrete 29-Aug 5 days Yes, 1 dayPour concrete 5-Sep 5 days NoInstall fences 14-Sep 3 days No
![Page 7: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/7.jpg)
NEW ROADS
![Page 8: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/8.jpg)
GRADING
![Page 9: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/9.jpg)
TRENCHES/CONDUIT
![Page 10: Eovsa Site development](https://reader035.vdocuments.us/reader035/viewer/2022062501/568162a0550346895dd317dd/html5/thumbnails/10.jpg)
TRENCH + ARCHAEOLOGIST