7/26/2019 EoM Progrees Period March 2016 for Ao
1/1
Back Fill P2 :
- G23 :12,835 LCM- G31 : 83,233 LCM- G32 : 1,911 LCM- G37 : 1,267 LCM- G38 : 153 LCM
Total : 99,400 LCM
P2-G.36 P2-G.37
PIT 02 _ G31,G32,G37 & G38OB removal : 1,558.34 BCM
Bdy area : 1,775.14 Sq.M
Coal extracted : 8,216.39 M.Tonnes
Bdy area : 16,415.61 Sq.M (Mine Out)
PIT 06 _ G53_G54 & G58Coal extracted : 68,182.27 M.TonnesBdy area : 15,711 Sq.M
Mine Out Area : 9,521 Sq.M
PIT 06 - G39,G44 & G49
Coal extracted : 98,497.67 M.Tonnes
Bdy area : 15,711 Sq.MMine Out area : 9,854 SqM
PIT 06 - G44 & G49
Coal exposed : 17,940.92 Sq.M
PIT 06 - G33A 7 G38A
Coal exposed : 8,79855 Sq.M
MINE PROGRESS SITUATION MAPPERIOD 1ST to 31TH MARCH 2016
Prepared by : Ladjo Pammula (Mine Surveyor)
Checked by :
Approved by :
MAP. Id/Date : Eom3/Surv/III/2016 / April, 3nd 2016
D:\DEPARTEMENT SURVEY\2016 YEAR\FEBRUARY 2016\EoM Progress March 16'\final situation
P2-G.38 P2 -G .39 P 2- G.40 P 2- G.41
P2- G. 42 P 2-G .43 P2 -G. 44 P 2-G. 45 P2- G. 46
P2-G.48P2-G.47 P2-G.49 P2-G.50
P 2- G.51 P 2- G.52 P 2- G.53
P 2-G. 32 P2- G. 33 P 2-G. 34 P2- G. 35
LEGEND :
: OB Removal Area
: Coal Extracted Area
: Coal Exposed Area
: Mine Out Area
: River
: KBK Boundary
: Mine Road
: Loging/Village Road
for A0
30 M
PIT 06 _ G17,G18,G21,G22, & G23
OB removal : 12,796.90 BCM
Bdy area : 22,176 Sq.MCoal exposed : 18,489 SqM