Environmental Opposition to Collaboration:
Caltrain’s Los Gatos Creek Bridge Replacement
Hilda Lafebre and Leo TiddSeptember 2019
![Page 2: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/2.jpg)
Presentation Overview1. Caltrain System Overview2. Project Introduction 3. Areas of Concern/Opposition 4. Finding Collaboration 5. Conclusion6. Q&A
2
![Page 3: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/3.jpg)
Caltrain System and Capital Program Overview
![Page 4: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/4.jpg)
System Overview• Peninsula Corridor Joint Powers Board
(JPB) operates commuter rail service along the Peninsula from San Francisco to San Jose and Gilroy
• JPB owns and operates 51 miles of right-of-way between San Francisco and south of Tamien, San Jose. Operates on additional 25 miles to Gilroy terminus.
• Railroad has been in service for over 150 years (JPB purchased ROW in 1991)
4
![Page 5: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/5.jpg)
System Map
5
![Page 6: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/6.jpg)
System Overview• Railroad Bridges: 74 • Stations: 31• Fleet: 29 diesel locomotives and 134
passenger cars • Service Frequency:
• Number of weekday trains: 92 • Number of weekday express trains: 22
Number of weekend trains: 68 • Number of weekend express trains: 8
6
![Page 7: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/7.jpg)
Caltrain Modernization• Electrification
from San Francisco to Tamien by 2022
• Currently under construction
![Page 8: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/8.jpg)
Capital Program Overview• FY2019 Capital Program Budget:
• Caltrain Modernization- $248 million • Other infrastructure improvements and
maintenance- $54 milliono State of good repairo Stations, signals, communicationso Bridge replacementso Grade separations
8
![Page 9: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/9.jpg)
Los Gatos Creek Bridge Replacement Project
Overview
![Page 10: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/10.jpg)
Project Location
10
![Page 11: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/11.jpg)
Context• Active rail line,
south of Diridon hub
• Adjacent Residences
• Endangered Species work window
• Riparian Habitat
• Bike/ped trail
11
![Page 12: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/12.jpg)
Pre-Construction Condition
12
![Page 13: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/13.jpg)
13
![Page 14: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/14.jpg)
14
![Page 15: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/15.jpg)
Purpose and Need1. Replace the structurally deficient 1935
railroad bridge and meet current safety, seismic and engineering standards.
2. Improve operations at San Jose Diridonstation
15
![Page 16: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/16.jpg)
1935 Bridge Condition
16
![Page 17: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/17.jpg)
Project Description• Demolish two-track 1935 bridge• Replace with three new single track bridges• Include tail track to maintain operations
throughout construction and improve operational flexibility post-construction
17
![Page 18: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/18.jpg)
Project Description (cont’d)• Creek mitigation elements- riparian
restoration and in-channel enhancements • Construct project in one June- October in-
channel work window • Project cost- approximately $35 million • Construction cost- approximately $18
million
18
![Page 19: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/19.jpg)
Area of Opposition #1Resource Agencies
• Threatened Central Califorina Coast Steelhead
• Concerns on effect of new bridge design on channel stability, erosion and water quality
• Lack of resource agency input opportunities in preliminary engineering
19
![Page 20: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/20.jpg)
Area of Opposition #1- Solutions• Re-do 35% design with close input and collaboration of
resource agency stakeholders • Design for net environmental benefit to the creek and
habitat, wider channel with reduced velocity and scour
20
![Page 21: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/21.jpg)
Area of Opposition #2Local Residents
• Construction noise and vibration impact• Nighttime and weekend construction • Change in views, tracks closer to homes
21
![Page 22: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/22.jpg)
Area of Opposition #2- Solutions• Proactive communication on project
benefits to the neighborhood (including safety, aesthetics)
• Construction noise/vibration mitigations• Communication before and during
construction (website, tracking and response to complaints etc.)
22
![Page 23: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/23.jpg)
Area of Opposition #3Local Government
• City sponsored trail extension project underneath the railroad bridge
• Requested JPB project be delayed or postponed to ensure compatibility
23
![Page 24: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/24.jpg)
Area of Opposition #3- Solutions• Leadership to persevere – the bridge had to be replaced
for safety and could not be delayed.• Coordinated design to allow future trail (maintains
acceptable clearance etc.)
24
![Page 25: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/25.jpg)
Construction Completed Jan. 2018
25
![Page 26: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/26.jpg)
Fish Protection and Relocation Effort
26
![Page 27: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/27.jpg)
Mitigation Implementation and Monitoring
27
![Page 28: Environmental Opposition to Collaboration: Caltrain’s Los ... · Microsoft PowerPoint - H LAFEBRE Los Gatos.pptx Author: schandl Created Date: 10/14/2019 11:17:08 AM](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb1d0327838e5410f0656e5/html5/thumbnails/28.jpg)
Conclusion-Early identification of potential opposition :
• Regulatory agencies• Neighboring community• Political• City plans and projects
-Developing engagement strategies• Participation in the design phase• Site visits at different stages of the project• Board member constituencies
-Engineering and Construction Team Understanding of Environmental Challenges-Developing documents with emphasis on the benefits of the project (i.e., environmental, infrastructure safety and reliability, property value)
28