Environmental Monitoring Report Environmental Monitoring Report (Revised) May 2020 MYA: Greater Mekong Subregion East-West Economic Corridor Eindu to Kawkareik Road Improvement Volume II July – December 2019 Prepared by Pyunghwa Engineering Consultant, Ltd., in Joint Venture with Korea Expressway Corporation and Construction, Research, Design and Consultancy Cooperative Ltd for the Department of Highways, Ministry of Construction of Republic of Union of Myanmar for the Asian Development Bank.

Upload: others

Post on 16-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Environmental Monitoring Report

    Environmental Monitoring Report (Revised) May 2020

    MYA: Greater Mekong Subregion East-West Economic Corridor Eindu to Kawkareik Road Improvement Volume II July – December 2019 Prepared by Pyunghwa Engineering Consultant, Ltd., in Joint Venture with Korea Expressway Corporation and Construction, Research, Design and Consultancy Cooperative Ltd for the Department of Highways, Ministry of Construction of Republic of Union of Myanmar for the Asian Development Bank.

  • This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

  • 30

    ANNEX 1

    Status of the Consultant's Mobilization (July to December 2019)

    The current status of the mobilization of Consultant staff is shown in the following table:

    Ref.

    Position Input (P-M)

    Name

    Date Progress

    Mobilization Demobilization To

    date V/O No.1

    V/O No.2

    V/O No.3

    Balance Rate (%)

    International Key Staff

    KI-

    01

    Project

    Manager/Contr

    act

    Management

    specialist

    39

    Richard Joseph

    CAMISE 10 Sep. 16 08 Apr. 17 6.901

    Peter Dinan 23 Jun. 17 31 Oct. 17 4.067

    Chang Dal KIM 02 Dec. 17 08 Jul. 18 7.267

    Kyuho Yoon 09 Jul. 18 9 Dec. 19 13.675

    Total 32.210 6.79 82.58

    KI-

    02

    Senior

    Resident

    Engineer

    33

    Vimal Ranjith

    DALUWATTE 09 Sep. 16 09 Dec. 16 3.000

    Mohan Krishnan 01 Mar. 17 02 Aug. 17 4.867

    Yong Bin CHO 25 Aug. 17 On-going 27.456

    Total 35.323 6.0773 3.7540 90.39

    KI-

    03

    Senior Bridge

    Engineer 6 Hee Chul KANG

    27 Oct. 16

    13 Feb. 17

    25 Oct. 17

    17 Dec. 16

    30 Mar. 17

    24 Nov. 17

    4.003 -1.9967 0 100.00

    KI-

    04

    Senior

    Material

    Engineer

    6

    H.D.G

    SARATHCHAN

    DRA

    27 Oct. 16

    01 Feb. 17

    10 Jan. 17

    15 May.17 4.822

    Jose B.

    TEODORO 02 May.18 06 Jun. 18 1.168

    Total 5.990 0.6334 -0.6434 0 100.00

    KI-

    05

    Senior

    Pavement

    Engineer

    3 Han Jun AHN 05 Nov. 17 04 Dec. 17 2.168 -0.8323 0 100.00

    KI-

    06

    Senior

    Resettlement

    Specialist

    3

    Mohammad Isa

    ANSARI

    26 Dec. 16

    07 Sep. 17

    10 Feb. 17

    21 Oct. 17 2.351

    Criste Zuniga-

    Navida

    28 Oct. 18

    19 May.19

    19 Dec. 18

    01 Jun. 19 2.849

    Total 5.200 4.1631 -1.9964 0.0333 100.00

    KI-

    07

    Senior

    Environment

    Specialist

    9

    Emmanuel S.

    BATE

    18 Apr. 17

    13 Aug. 17

    20 May.17

    06 Sep. 17 2.167

    Celestino ULEP

    17 Jan. 18

    01 Mar. 18

    24 Jun. 18

    03 Oct. 18

    03 Jan. 19

    10 Jul. 19

    31 Jan. 18

    15 Mar. 18

    14 Jul. 18

    13 Oct. 18

    17 Jan. 19

    23 Jul. 19

    2.996

    Total 5.163 -1.8033 0.6192 2.6526 66.05

    KI-

    08

    Senior

    Monitoring and

    Evaluation

    Specialist

    3 Se Yoon OH

    19 Nov. 17

    17 Dec. 17

    22 Apr. 18

    25 Nov. 17

    23 Dec. 17

    28 Apr. 18

    0.633 -1.0000 1.3667 31.65

  • 31

    KI-

    09

    Senior Social

    Development

    Specialist

    3

    Maria Lyra

    Songco

    ESTARIS

    2.754 -0.2462 3.0800 3.0800 47.20

    Ester Felix

    04 Jan. 18

    03 Mar. 18

    20 May.18

    23 Jun. 18

    17 Feb. 18

    17 Mar. 18

    02 Jun. 18

    01 Jul .18

    National Key Staff

    KN-

    01

    Deputy

    Project

    Manager

    39

    Soe Tint 12 Sep. 16 30 Nov. 16 2.633

    Tha Kyaw Zan

    01 Feb. 17

    02 Jun. 17

    22 Feb. 17

    On-going 30.614

    Total 33.247 5.7533 85.24

    KN-

    02

    Resident

    Engineer(1) 33

    Htun Lwin

    01 Nov. 16

    01 Mar. 17

    01 Jun. 17

    30 Nov. 16

    30 Apr. 17

    30 Sep. 17

    6.600

    Tint Lwin Soe 01 Dec. 17 01 Aug. 18 8.033

    Than Htwe 07 Oct. 17 On-going 2.833

    Total 17.467 15.5333 52.93

    KN-

    03

    Resident

    Engineer(2) 33

    Thein Tun 01 Nov. 16

    01 Feb. 17

    30 Nov. 16

    28 Feb. 17 2.000

    Aung Ngwe 22 Apr. 19 30 Nov. 19 6.490

    Total 8.490 -8.0000 16.5097 33.96

    KN-

    04

    Bridge

    Engineer 33

    Thaung Hlaing 01 Nov. 16 30 Nov. 16 1.000

    Aung Myint

    13 Feb. 17

    01 Mar. 19

    30 Sep. 18

    On-going 27.770

    Total 28.770 8.000 12.2300 70.17

    KN-

    05

    Material

    Engineer(1) 33

    Tun Aung Kyaw 01 Nov. 16 30 Nov. 16 1.000

    Aung Maung

    01 Feb. 17

    01 Mar. 19

    01 Aug. 18

    On-going 23.173

    Total 24.173 8.8267 73.25

    KN-

    06

    Material

    Engineer(2) 33

    Hla Kyi 01 Nov. 16

    01 Mar. 17

    30 Nov. 16

    30 Sep. 17 7.667

    Zaw Lwin 07 Oct. 19 On-going 2.833

    Total 10.500 -15.0000 7.500 58.33

    KN-

    07 Surveyor 33 Tin Maung Thin 0 -6.00 -8.0000 19 0.00

    KN-

    08 QS Engineer 37

    Nyunt Nyunt Tin 01 Mar. 17 31 Jul. 17 4.323

    Myat Hnin Khine 19 Oct. 17 On-going 24.330

    Total 28.653 8.000 16.3467 63.67

    KN-

    09

    Resettlement/

    Social

    Development

    Specialist

    17

    Khin Maung Latt 01 Nov. 16 30 Nov. 16 1.000

    Than Naing Oo 01 Oct. 17 31 Jul. 18 9.633

    Phyo Myint Oo 02 Oct. 18 30 Apr. 19 6.972

    Total 17.605 6.0 -2.000 3.3946 83.83

    KN-

    10

    Environmental

    Specialist 33

    Soe Myint 01 Nov. 16 30 Nov. 16 1.000

    Thapye Myo Oo 12 Jan. 18 31 Jul. 18 6.633

    Naing Win 02 Oct. 18 16 Nov. 18 1.533

    Myo Min Kyaw 13 Dec. 18 28 Feb. 19 2.633

    Phyo Myint Oo 15 May.19 31 Jul. 19 2.534

  • 32

    Nandar Kyaw 26 Sep. 19 On-going 0.734

    Total 15.067 2.0000 19.9333 43.04

    KN-

    11

    Benefit

    Monitoring

    Specialist

    2 Win Myint 0 2 0.00

    KN-

    12

    Finance

    Specialist 4 Ohn Kyin 0 -3.0000 1 0.00

    National Non Key Staff

    NN-

    01

    Site Engineer/

    Inspector(1) 33 Tin Win

    01 Mar. 17

    01 Mar. 19

    01 Aug. 18

    On-going 24.733 8.2667 74.94

    NN-

    02

    Site Engineer/

    Inspector(2) 33 Yan Paing Soe

    01 Mar. 17

    01 Mar. 19

    01 Aug. 18

    On-going 25.700 7.4998 14.7998 63.45

    NN-

    03

    Site Engineer/

    Inspector(3) 33

    Swan Thura

    Zaw

    19 Apr. 17

    04 Mar. 19

    01 Aug. 18

    On-going 22.967 10.0333 69.59

    NN-

    04

    Site Engineer/

    Inspector(4) 33 Zin Linn Htet

    25 Apr. 18

    01 Mar. 19

    01 Aug. 18

    On-going 11.233 -6.0000 15.7667 41.60

    NN-

    05

    Site Engineer/

    Inspector(5) 33 Kaung Zaw 03 Jun. 18 On-going 15.933 -5.0000 12.0667 56.90

    NN-

    06

    Site Engineer/

    Inspector(6) 33 Nay Myo Thu 01 Mar. 17 On-going 31.700 13.0000 14.3000 68.91

    NN-

    07

    Site Engineer/

    Inspector(7) 33 Zaw Win 01 Mar. 17 On-going 30.700 11.0000 13.3000 69.77

    NN-

    08

    Site Engineer/

    Inspector(8) 33 Saw Paing Oo 15 May.18 On-going 4.567 -13.0000 15.43333 22.83

    NN-

    09

    Site Engineer/

    Inspector(9) 33 Phyo Wai Zin

    19 Apr. 17

    01 Mar. 19

    01 Aug. 18

    On-going 23.100 9.9000 70.00

    NN-

    10

    Site Engineer/

    Inspector(10) 33

    Kyaw Nyein

    Chan Oo

    01 May.17

    04 Mar. 19

    01 Aug. 18

    On-going 22.667 10.3333 68.68

    NN-

    11

    Laboratory

    Technician(1) 33 Wah Wah Htike

    01 May.17

    01 Mar. 19

    01 Aug. 18

    On-going 21.633 2.2503 13.6170 61.36

    NN-

    12

    Laboratory

    Technician(2) 33 Htet Htet Hnin

    01 May.17

    01 Mar. 19

    01 Aug. 18

    On-going 21.600 11.4000 65.45

    NN-

    13

    Laboratory

    Technician(3) 33 Yu Zana

    01 May.17

    01 Mar. 19

    01 Aug. 18

    On-going 21.700 11.3000 65.75

    NN-

    14

    Laboratory

    Technician(4) 33

    Aye Thida

    05 Mar. 18

    01 Mar. 19

    01 Aug. 18

    On-going 11.900 -7.0000 14.1000 45.76

    Support Staff

    1 Office

    Administrator 48 Win Min 01 Sep. 17 On-going 26.000 22.000 54.16

    2 Bilingual

    Secretary (1) 44

    Nan Su Yee Win 01 Sep. 17 01 Aug. 18 11.030

    32.203 26.81 Thazin Thin 09 Dec. 19 On-going 0.767

    Total 11.797

    3 Bilingual

    Secretary (2) 44 Nan Sagawar

    01 Sep. 17

    01 Nov. 18

    01 Aug. 18

    On-going 24.030 19.970 54.61

    4 Bilingual

    Secretary (3) 44

    Naw Phyo Phyo

    Khine 08 Nov. 17 01 Aug. 18 8.730

    27.237 38.09 Su Myat Ko 01 Mar. 19 31 Sep. 19 6.700

    Than Moe Aye 22 Oct. 19 On-going 1.333

    Total 16.763

    5 Security

    Guard 39 Shwe Zin 01 Mar. 19 On-going 9.000 30.000 23.07

  • 33

    ANNEX 2

    Status of the Contractor’s Mobilization (July to December 2019)

    Lot 1: km 0+000 to km 40+440

    No. Position Minimum

    Requirement Name Status

    1 Project Manager (LOT1&2) 1 Wang Yaolong On site

    2 Construction Manager 1 Lv Hongliang On site

    3 Senior Highway Engineer 1 Fan Pengfei On site

    4 Senior Bridge Engineer 1 Fan Sheng tong On site

    5 Geotechnical Engineer (LOT1&2) 1 U.N.O subcontractor

    6 Quality Control Engineer 1 Yang Wen hui On site

    7 Plant and Equipment Engineer 1 Li Yuliang On site

    8 Quantity Surveyor (LOT1&2) 1 Bu Yunhua On site

    9 Assistant Quantity Surveyor 1 Yang Chuan On site

    10 Setting out Engineer 1 Deng Lei On site

    11 Environment, Health & Safety Specialist 1 Ju Jian Bo On site

    Total 11

    No. Description Schedule Actual Remark

    1 Professional 12 12

    2 Technician 27 27

    3 Skilled Worker 35 85

    4 Unskilled Worker 102 330

    Lot 2: km 42+160 and km 66+455

    No. Position Minimum

    Requirement Name Status

    1 Project Manager (LOT1&2) 1 Wang Yao long On site

    2 Construction Manager 1 Li Zhao On site

    3 Senior Highway Engineer 1 Wang Meng On site

  • 34

    4 Senior Bridge Engineer 1 Cui Zhaofu On site

    5 Geotechnical Engineer 1 U.N.O From subcontractor

    6 Quality Control Engineer 1 Wang Xiaoping On site

    7 Plant and Equipment Engineer

    1 Wu Xin On site

    8 Quantity Surveyor (LOT1&2) 1 Bu Yunhua

    (Bruce) On site

    9 Assistant Quantity Surveyor 1 He Zhixue On site

    10 Setting out Engineer 1 Li Xiaoping On site

    11 Environment, Health & Safety Specialist

    1 Phae Phyo Win On site

    Total 11

    No. Description Schedule Actual Status

    1 Professional 12 12

    2 Technician 27 27

    3 Skilled Worker 35 85

    4 Unskilled Worker & subcontractors 102 330

    Status of CSC Staffs (Environmental Specialists) Mobilization (July to December 2019)

    Position Name Mobilization

    Start End

    International Celestino ULEP

    10 July

    7 Jan 20

    24 Jan

    23 July19

    13 Jan 20

    30 Jan 20

    National U Phyo Myint Oo 15 May 19 31 July 19

    Daw Nandar Aye 26 Sep 19 10 Jan 20

  • 35

    ANNEX 3

    Status of the Contractor’s Equipment (July to December 2019)

    No. Equipment Capacity Required LOT 1 & LOT2

    Balance On site

    To be Added

    Total

    1 Bulldozer 110 CV 7 7 7 0

    2 Wheel Loader 7 7 7 0

    3 Excavator 24 24 24 0

    4 Backhoe Loader 2 2 2 0

    5 Concrete Batching Plant 2 2 2 0

    6 Asphalt Plant 120 ton/h 1 1 1 0

    7 Crusher Plant 1 1 1 0

    8 Aggregate Mixing Machine 1 1 1 0

    9 Asphalt Paver 300 ton/h 1 1 1 0

    10 Granular Material Paver 1 1 1 0

    11 Motor Grader 12 feet 8 12 12 4

    12 Concrete Agitator 6 m3 4 4 4 0

    13 Vibratory Roller 12~16

    ton 13 18 18 5

    14 Sheep Foot Roller 1 1 1 0

    15 Pneumatic Roller 10 ton 2 2 2 0

    16 Dump Truck 12 ton 107 107 107 0

    17 Water Tank Lorry 5 ton 14 18 18 4

    18 Fuel Tank Lorry 2 2 2 0

    19 Asphalt Distributor 1 1 1 0

    20 Cargo Crane Truck 20 ton 2 2 2 0

    21 Tractor with Trailer 1 1 1 0

    22 Low Bed Trailer 1 1 1 0

    23 Tractor-Truck 1 1 1 0

    24 Forklift 1 1 1 0

    25 Air Compressor various 2 2 2 0

    26 Power Broom 2 2 2 0

    27 Tower Light 0 6 6 6

    28 Generator 14 14 14 0

    29 Breaking Hammer 6 6 6 0

    30 Jackhammer 6 6 6 0

    31 Hammer Drill 1 2 2 1

    32 Weighbridge 0 2 2 2

    33 Gantry Crane 0 2 2 2

    34 Balance Beam 1 1 1 0

    Total 237 261 0 261 24

  • 36

    Status of Contractor’s EHSO for Lot 1 and Lot 2 Mobilization

    Lot Position

    Name Mobilization

    Start End

    1 Environmental Health

    and Safety Officer Ju Jianbo 17 July 2016

    On

    going

    2 Environmental Health

    and Safety Officer Pyae Phyo 15 May 2017

    On

    going

  • 37

    ANNEX 4

    ECC issued to the Sanfree Quarry

  • 38

  • 39

  • 40

  • 41

  • 42

  • 43

    ANNEX 4a Environmental Approval for Lun Nya Asphalt Plant

  • 44

  • 45

  • 46

  • 47

  • 48

  • 49

  • 50

  • 51

  • 52

  • 53

  • 54

  • 55

  • 56

  • 57

  • 58

  • 59

    ANNEX 5

    MONTHLY NOISE MONITORING REPORTS FROM CONTRACTOR

  • 60

    December 2019

    DATE MONITORED: 25/12/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source

    (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 58 100m N/A 25/12/2019(7:30AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 52 100m N/A 25/12/2019(7:50AM)

    3 AAQ05 Km9+690 Kawkadar High School 57 57 100m N/A 25/12/2019(8:30AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 55 100m N/A 25/12/2019(9:15AM)

    5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 25/12/2019(9:45AM)

    6 AAQ08 Km39+530 Gyaing High School 59 58 100m N/A 25/12/2019(10:35AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 25/12/2019(11:20AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 58 100m N/A 25/12/2019(11:55AM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 56 100m N/A 25/12/2019(13:00PM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 57 100m N/A 25/12/2019(13:40PM)

    11 AAQ14 KM 37+700 Batching Plant 51 55 100m N/A 25/12/2019(14:40PM)

    12 AAQ15 Km 5+250 AC Plant 65 59 100m N/A 24/12/2019(9:30AM)

    13 AAQ15 Sanfree Quarry/Crusher Plant 62 68 100m N/A 24/12/2019(11:00AM)

  • 61

    November 2019

    DATE MONITORED: 26/11/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 26/11/2019(7:00AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 55 100m N/A 26/11/2019(7:40AM)

    3 AAQ05 Km9+690 Kawkadar High School 57 55 100m N/A 26/11/2019(8:30AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 56 100m N/A 26/11/2019(8:50AM)

    5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 26/11/2019(9:35AM)

    6 AAQ08 Km39+530 Gyaing High School 59 56 100m N/A 26/11/2019(10:15AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 55 100m N/A 26/11/2019(10:40AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 57 100m N/A 26/11/2019(11:25AM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 55 100m N/A 26/11/2019(12:40PM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 54 100m N/A 26/11/2019(13:30PM)

    11 AAQ14 KM 37+700 Batching Plant 51 53 100m N/A 26/11/2019(14:00PM)

    12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 27/11/2019(9:00AM)

    13 AAQ15 Sanfree Quarry/Crusher Plant 62 65 100m N/A 27/11/2019(13:00PM)

  • 62

    October 2019

    DATE MONITORED: 24/10/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 58 100m Yes 24/10/2019(7:30AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 54 100m N/A 24/10/2019(8:20AM)

    3 AAQ05 Km9+690 Kawkadar High School

    57 60 100m Yes 24/10/2019(8:50AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 55 100m Yes 24/10/2019(9:30AM)

    5 AAQ07 Km34+900 Thadao Village School

    55 56 100m Yes 24/10/2019(10:30AM)

    6 AAQ08 Km39+530 Gyaing High School 59 57 100m N/A 24/10/2019(11:00AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 54 100m N/A 24/10/2019(11:35AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 58 100m Yes 24/10/2019(12:20PM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 56 100m N/A 24/10/2019(13:00PM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 55 100m Yes 24/10/2019(13:30PM)

    11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 24/10/2019(15:00PM)

    12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 25/10/2019(10:30AM)

  • 63

    September 2019

    DATE MONITORED: 25/09/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 25/09/2019(7:00AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 55 100m N/A 25/09/2019(7:40AM)

    3 AAQ05 Km9+690 Kawkadar High School

    57 55 100m N/A 25/09/2019(8:30AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 56 100m N/A 25/09/2019(8:50AM)

    5 AAQ07 Km34+900 Thadao Village School 55 55 100m N/A 25/09/2019(9:35AM)

    6 AAQ08 Km39+530 Gyaing High School 59 56 100m N/A 25/09/2019(10:15AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 55 100m N/A 25/09/2019(10:40AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 57 100m N/A 25/09/2019(11:25AM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 55 100m N/A 25/09/2019(12:40PM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 54 100m N/A 25/09/2019(13:30PM)

    11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 25/09/2019(14:00PM)

    12 AAQ15 Km 5+250 AC Plant 65 57 100m N/A 24/09/2019(10:30AM)

  • 64

    August 2019

    DATE MONITORED: 23/08/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 56 100m N/A 23/08/2019(7:30AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 55 100m N/A 23/08/2019(8:00AM)

    3 AAQ05 Km9+690 Kawkadar High School

    57 55 100m N/A 23/08/2019(8:20AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 55 100m N/A 23/08/2019(8:40AM)

    5 AAQ07 Km34+900 Thadao Village School 55 56 100m N/A 23/08/2019(9:15AM)

    6 AAQ08 Km39+530 Gyaing High School 59 55 100m N/A 23/08/2019(9:35AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 23/08/2019(10:00AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 57 100m N/A 23/08/2019(10:15AM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 56 100m N/A 23/08/2019(10:40AM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 55 100m N/A 23/08/2019(11:00AM)

    11 AAQ14 Km 37+700 Batching Plant 51 54 100m N/A 23/08/2019(1:00PM)

    12 AAQ15 Km 5+250 AC Plant 65 58 100m N/A 24/08/2019(8:30AM)

  • 65

    July 2019 DATE MONITORED: 27/07/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No

    Km Chainage

    Location Baseline dB(A)

    Noise Level dB(A) Leq

    Distance from source (m)

    Visual Dust

    Date & Time Measured

    1 AAQ01 Km 0+00 Start at Eindu 57 57 100m N/A 27/07/2019(7:45AM)

    2 AAQ04 Km6+680 Khaneindo Middle School

    58 55 100m N/A 27/07/2019(8:00AM)

    3 AAQ05 Km9+690 Kawkadar High School

    57 57 100m N/A 27/07/2019(8:20AM)

    4 AAQ06 Km18+420 Thayagone Primary School

    58 60 100m N/A 27/07/2019(8:40AM)

    5 AAQ07 Km34+900 Thadao Village School 55 59 100m N/A 27/07/2019(9:15AM)

    6 AAQ08 Km39+530 Gyaing High School 59 58 100m N/A 27/07/2019(9:35AM)

    7 AAQ09 Km44+800 Kyondoe Hospital 59 56 100m N/A 27/07/2019(10:00AM)

    8 AAQ10 Kyondoe Port Access

    Pagoda near Kyondoe River Port

    55 57 100m N/A 27/07/2019(10:15AM)

    9 AAQ11 Km53+570 Ngar Tin Middle School

    59 58 100m N/A 27/07/2019(10:40AM)

    10 AAQ13 Km62+740 Kawkareik Middle School

    55 58 100m N/A 27/07/2019(11:00AM)

    11 AAQ14 Km 37+700 Batching Plant 51 53 100m N/A 27/07/2019(1:00PM)

    12 AAQ15 Km 5+250 AC Plant 65 60 100m N/A 28/07/2019(8:30AM)

  • 66

    ANNEX 6

    MONTHLY WATER QUALITY MONITORING REPORTS FROM CONTRACTOR

  • 67

    December 2019

    DATE MONITORED: 26/12/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 24.1 7.2 22 4.72 N/A N/A N/A

    2 WQ02 Km19+400 N/A N/A N/A N/A N/A N/A N/A

    3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A

    4 WQ04 Km34+710 25.3 7.4 38 5.58 N/A N/A N/A

    5 WQ05 Km42+160 25.5 7.6 85 5.55 N/A N/A N/A

    6 WQ06 Km43+920 25.12 7.7 112 5.89 N/A N/A N/A

    7 WQ07 Km47+800 25.1 7.5 88 4.15 N/A N/A N/A

    8 WQ08 Km55+410 25.5 6.8 32 5.22 N/A N/A N/A

    9 WQ09 Hlaing Bridge 25.2 7.2 116 6.11 N/A N/A N/A

  • 68

    November 2019

    DATE MONITORED: 26/11/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 25.9 8.12 18 5.92 N/A N/A N/A

    2 WQ02 Km19+400 N/A N/A N/A N/A N/A N/A N/A

    3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A

    4 WQ04 Km34+710 26.8 7.20 45 5.15 N/A N/A N/A

    5 WQ05 Km42+160 25.7 6.63 122 5.25 N/A N/A N/A

    6 WQ06 Km43+920 26.2 7.35 134 5.35 N/A N/A N/A

    7 WQ07 Km47+800 25.8 7.85 98 3.65 N/A N/A N/A

    8 WQ08 Km55+410 25.2 5.22 48 5.72 N/A N/A N/A

    9 WQ09 Hlaing Bridge 26.2 7.10 135 6.35 N/A N/A N/A

  • 69

    October 2019

    DATE MONITORED: 26/10/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 24.6 6.45 58 4.45 N/A N/A N/A

    2 WQ02 Km19+400 25.4 5.20 42 4.85 N/A N/A N/A

    3 WQ03 Km25+290 N/A N/A N/A N/A N/A N/A N/A

    4 WQ04 Km34+710 N/A N/A N/A N/A N/A N/A N/A

    5 WQ05 Km42+160 25.9 7.9 142 5.10 N/A N/A N/A

    6 WQ06 Km43+920 26.8 7.67 165 4.90 N/A N/A N/A

    7 WQ07 Km47+800 N/A N/A N/A N/A N/A N/A N/A

    8 WQ08 Km55+410 N/A N/A N/A N/A N/A N/A N/A

    9 WQ09 Hlaing Bridge 24.9 7.4 55 6.52 N/A N/A N/A

  • 70

    September 2019

    DATE MONITORED: 25/09/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 26.9 8.12 18 5.92 N/A N/A N/A

    2 WQ02 Km19+400 25.6 7.18 15 4.25 N/A N/A N/A

    3 WQ03 Km25+290 25.8 6.85 39 6.42 N/A N/A N/A

    4 WQ04 Km34+710 26.8 7.20 45 5.55 N/A N/A N/A

    5 WQ05 Km42+160 25.7 6.73 131 5.25 N/A N/A N/A

    6 WQ06 Km43+920 26.2 7.35 134 5.35 N/A N/A N/A

    7 WQ07 Km47+800 26.8 7.85 98 3.65 N/A N/A N/A

    8 WQ08 Km55+410 25.2 5.22 48 5.72 N/A N/A N/A

    9 WQ09 Hlaing Bridge 26.2 7.10 135 6.35 N/A N/A N/A

  • 71

    August 2019

    DATE MONITORED: 26/08/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 27.9 8.15 19 6.22 N/A N/A N/A

    2 WQ02 Km19+400 28.6 7.98 13 4.19 N/A N/A N/A

    3 WQ03 Km25+290 28.2 6.41 40 6.12 N/A N/A N/A

    4 WQ04 Km34+710 26.8 7.20 45 5.55 N/A N/A N/A

    5 WQ05 Km42+160 25.7 7.33 125 5.25 N/A N/A N/A

    6 WQ06 Km43+920 26.2 7.25 92 5.35 N/A N/A N/A

    7 WQ07 Km47+800 26.8 7.55 78 3.55 N/A N/A N/A

    8 WQ08 Km55+410 25.9 6.25 35 5.92 N/A N/A N/A

    9 WQ09 Hlaing Bridge 26.2 7.10 135 6.75 N/A N/A N/A

  • 72

    July 2019

    DATE MONITORED: 28/07/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Km Chainage Temp oC pH

    Conductivity μS/cm

    DO mg

    Visual (plume from work site?

    Plume Oil Sheen

    Construction wastes

    1 WQ01 Km 6+820 25.9 5.69 19 7.24 N/A N/A N/A

    2 WQ02 Km19+400 25.6 7.98 13 7.39 N/A N/A N/A

    3 WQ03 Km25+290 26.2 6.41 40 7.01 N/A N/A N/A

    4 WQ04 Km34+710 26.8 7.20 45 6.65 N/A N/A N/A

    5 WQ05 Km42+160 25.7 7.33 125 5.75 N/A N/A N/A

    6 WQ06 Km43+920 26.2 6.25 92 5.15 N/A N/A N/A

    7 WQ07 Km47+800 26.8 6.95 78 4.95 N/A N/A N/A

    8 WQ08 Km55+410 25.9 7.10 35 5.90 N/A N/A N/A

    9 WQ09 Hlaing Bridge 25.6 7.5 135 5.95 N/A N/A N/A

  • 73

    ANNEX 7

    MONTHLY AIR QUALITY MONITORING REPORTS FROM CONTRACTOR

  • 74

    December 2019

    DATE MONITORED: 25/12/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21

    2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65

    3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38

    4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15

    6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22

    10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200

  • 75

    November 2019 DATE MONITORED: 27/11/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21

    2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65

    3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38

    4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15

    6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22

    10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200

  • 76

    October 2019 DATE MONITORED: 25/10/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 43.54 4.50 21.12 25.45 195.22

    2 AQ02 16°44'47.36"N 97°48'17.22"E 60.12 4.20 21.34 25.32 68.25

    3 AQ03 16°43'44.53"N 97°49'20.95"E 7.48 3.75 14.55 43.85 78.50

    4 AQ04 16°43'34.53"N 97°53'29.84"E 9.15 5.56 8.42 27.62 132.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 11.45 6.35 6.70 71.15 122.45

    6 AQ06 16°36'33.27"N 97°59'40.95"E 18.35 6.62 24.12 30.24 215.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 7.10 5.18 7.85 25.42 132.55

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 5.32 4.55 26.40 145.22

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 5.61 1.70 12.48 7.42 83.12

    10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 6.65 10.38 44.64 142.20

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200

  • 77

    September 2019 DATE MONITORED: 25/09/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 45.52 4.15 22.15 21.15 178.21

    2 AQ02 16°44'47.36"N 97°48'17.22"E 38.22 4.35 31.34 24.22 58.65

    3 AQ03 16°43'44.53"N 97°49'20.95"E 7.41 3.15 15.57 35.82 57.38

    4 AQ04 16°43'34.53"N 97°53'29.84"E 10.15 4.46 9.31 25.71 122.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 11.15 3.12 5.63 75.12 114.15

    6 AQ06 16°36'33.27"N 97°59'40.95"E 13.38 4.82 18.12 20.64 191.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 6.14 5.68 9.65 18.31 112.11

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 12.41 4.42 5.65 28.42 95.23

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.62 2.83 17.45 8.45 78.22

    10 AQ10 16°33'0.04"N 98°11'11.81"E 21.12 5.42 11.34 41.61 112.11

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200

  • 78

    August 2019 DATE MONITORED: 26/08/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 43.54 4.50 21.12 21.45 195.22

    2 AQ02 16°44'47.36"N 97°48'17.22"E 60.12 4.20 21.34 25.32 68.25

    3 AQ03 16°43'44.53"N 97°49'20.95"E 7.48 2.65 14.55 33.85 58.48

    4 AQ04 16°43'34.53"N 97°53'29.84"E 9.15 5.56 8.42 27.62 152.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 11.45 6.35 6.70 77.15 122.45

    6 AQ06 16°36'33.27"N 97°59'40.95"E 18.35 5.62 24.12 30.24 245.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 7.10 5.78 7.85 25.42 132.55

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 5.62 4.55 26.40 155.22

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 4.61 1.70 12.48 7.42 83.12

    10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 6.65 10.38 43.64 162.10

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200

  • 79

    July 2019 DATE MONITORED: 29/07/2019

    MONITORING BY: Pyae Phyo(HSE Officer)

    Station No Coordinates

    TSP

    (µg/m3)

    24 hrs averaging

    period

    PM10

    (µg/m3)

    24 hrs averaging period

    SO2

    (µg/m3)

    24 hrs averaging period

    NO2

    (µg/m3)

    1 hr averaging period

    CO2

    (µg/m3)

    1

    AQ01

    16°46'15.50"N 97°45'6.30"E 47.54 6.50 26.12 36.45 195.22

    2 AQ02 16°44'47.36"N 97°48'17.22"E 40.12 6.20 27.34 40.32 98.25

    3 AQ03 16°43'44.53"N 97°49'20.95"E 10.48 4.65 14.55 35.85 89.48

    4 AQ04 16°43'34.53"N 97°53'29.84"E 32.15 7.5 7.42 44.62 132.22

    5 AQ05 16°37'19.61"N 97°57'13.46"E 18.45 7.35 9.70 85.15 128.45

    6 AQ06 16°36'33.27"N 97°59'40.95"E 22.35 6.62 18.12 48.24 172.14

    7 AQ07 16°35'42.84"N 98° 2'25.69"E 20.10 6.78 9.85 61.42 137.55

    8 AQ08 16°35'34.31"N 98° 2'22.15"E 16.43 7.62 5.55 38.40 112.22

    9 AQ09 16°34'1.91"N 98° 6'42.98"E 22.61 6.70 11.48 24.42 64.91

    10 AQ10 16°33'0.04"N 98°11'11.81"E 15.15 7.65 13.38 52.64 120.10

    Myanmar National Environmental Quality

    (Emission) Guidelines 50 20 200