![Page 1: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/1.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 1 of 67
Uncontrolled when downloaded or printed
Business Unit: VF‐R Contract no. & name: C12505 – Felixstowe Branch Capacity
Environmental Management Plan C12505 – Felixstowe Branch Capacity GRIP 5‐7
June 2017 – October 2019
Prepared by:
Graham Taylor
Environmental Manager
Signature: Date: 18‐08‐17
Reviewed by:
Dan Smith
Project Manager
Signature: Date: 30‐08‐17
Authorised by:
Ben Porter
Senior Project Manager
Signature:
Date: 30.08.2017
This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon
known activities and information available at the time of preparation, in association with the contract documents, including
those produced for tender purposes, and is complementary to VF’s Health & Safety, Environment, Quality and Sustainability
(HSEQS) Management System.
The EMP has been prepared specifically to address the Environmental requirements for this contract, including any restrictions
that may affect the work, such as neighbouring buildings, utility services, vehicular and pedestrian traffic flows, and work
activities of the client. Any variations to the Company Procedures and documents referred to in the HSEQS Management System
shall be detailed within this document.
Review and Acceptance by:
Clive Gray, Project Manager
On behalf of Network Rail / Client
Signature: Date:
![Page 2: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/2.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 2 of 67
Uncontrolled when downloaded or printed
CONTENTS
Revision Record ....................................................................................................................................................................................................................... 5
EMP Revision Record ............................................................................................................................................................................................................... 5
GENERAL REQUIREMENTS .............................................................................................................................. 6
Description of the Works ......................................................................................................................................................................................................... 6
Site Address ............................................................................................................................................................................................................................. 7
Site Compound Location and Parking Arrangements .............................................................................................................................................................. 7
Programme Details .................................................................................................................................................................................................................. 7
Key Programme Details / Milestones ...................................................................................................................................................................................... 7
Working Hours ......................................................................................................................................................................................................................... 8
Existing Records and Plans relevant to Environmental Management on Site .......................................................................................................................... 8
Site Accommodation ............................................................................................................................................................................................................... 8
Requirements for site connections/arrangements .................................................................................................................................................................. 9
Site Restoration ....................................................................................................................................................................................................................... 9
Site Plan 9
Key Environmental Risks / Opportunities .............................................................................................................................................................................. 10
Requirements and Consents .................................................................................................................................................................................................. 11
Permits, Consents and Licenses ............................................................................................................................................................................................. 12
Objectives and Targets .......................................................................................................................................................................................................... 12
Project Goals................................................................................................................................................................... 12
Resources, Roles, Responsibility ............................................................................................................................................................................................ 14
Environmental Responsibilities ...................................................................................................................................... 14
Allocation of Responsibilities, Signatories and EMP Briefing ......................................................................................... 14
Competence, Training and Awareness .................................................................................................................................................................................. 15
Induction ........................................................................................................................................................................ 15
Sub‐contractors .............................................................................................................................................................. 15
On‐going Awareness ....................................................................................................................................................... 15
Internal Communication ........................................................................................................................................................................................................ 16
External Communication and Managing Lineside Neighbours .............................................................................................................................................. 17
Communication with Network Rail ................................................................................................................................ 17
Statutory Authorities and Non‐Governmental Organisations ........................................................................................ 17
Other Stakeholders (neighbours, stakeholders, interest groups, CCS) .......................................................................... 17
Project Neighbours ......................................................................................................................................................... 18
Site Work ........................................................................................................................................................................ 19
Records and Documents ........................................................................................................................................................................................................ 19
Monitoring and Measurement .............................................................................................................................................................................................. 19
![Page 3: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/3.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 3 of 67
Uncontrolled when downloaded or printed
Inspections, Audits and Corrective Action ............................................................................................................................................................................. 20
Inspection and Monitoring Arrangements ............................................................................................................................................................................. 20
Specific Environmental Impact Areas ........................................................................................................... 22
Air Quality .............................................................................................................................................................................................................................. 22
Traffic and Transport ...................................................................................................................................................... 22
Mitigation Measures ...................................................................................................................................................... 23
Archaeology and Cultural Heritage ........................................................................................................................................................................................ 24
Mitigation Measures ...................................................................................................................................................... 24
Contaminated Land ............................................................................................................................................................................................................... 25
Mitigation Measures ...................................................................................................................................................... 25
Ecology & Invasive Species .................................................................................................................................................................................................... 26
Background Information / Key Issues ............................................................................................................................. 26
Management and Mitigation Measures ......................................................................................................................... 27
Species specific mitigation .............................................................................................................................................. 27
Protection of trees .......................................................................................................................................................... 28
Energy & Carbon Emissions ................................................................................................................................................................................................... 29
Landscape & Visual ................................................................................................................................................................................................................ 30
Lighting 30
Materials ............................................................................................................................................................................................................................... 30
Material Storage ............................................................................................................................................................. 31
Noise and Vibration ............................................................................................................................................................................................................... 31
Management of working hours ...................................................................................................................................... 31
Work outside of normal working hours (excluding emergency works) ......................................................................... 32
Siting and orientation Worksites, compounds and plant – use of barriers and enclosures ........................................... 32
Plant, vehicles & Equipment ........................................................................................................................................... 33
Piling 33
Site Rules and Behaviour ................................................................................................................................................ 33
Monitoring and Inspections ........................................................................................................................................... 33
Waste 34
Waste Elimination, Reduction, Reusing and Recycling ................................................................................................... 34
Waste Storage ................................................................................................................................................................ 36
Waste Disposal ............................................................................................................................................................... 36
Water (including drainage and connections) ......................................................................................................................................................................... 37
Reduction measures ....................................................................................................................................................... 37
Concrete wash water management ............................................................................................................................... 38
Silty runoff management ................................................................................................................................................ 39
Pollution prevention measures ...................................................................................................................................... 39
Soil Management ................................................................................................................................................................................................................... 39
![Page 4: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/4.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 4 of 67
Uncontrolled when downloaded or printed
Soil Stripping General Requirements.............................................................................................................................. 39
Topsoil Stripping ............................................................................................................................................................. 40
Subsoil Protection ........................................................................................................................................................... 40
Subsoil Stripping ............................................................................................................................................................. 40
Soil Storage ..................................................................................................................................................................... 41
Soil Reinstatement ......................................................................................................................................................... 41
Aftercare and Handover of Reinstated Land .................................................................................................................. 41
Incident Response Plan (IRP) ........................................................................................................................ 43
Site Information ..................................................................................................................................................................................................................... 43
Contact List ............................................................................................................................................................................................................................ 43
Reporting of Incidents ........................................................................................................................................................................................................... 44
Guidance on when the Environment Agency should be informed ........................................................................................................................................ 44
Refuelling Arrangements ....................................................................................................................................................................................................... 45
Refuelling Procedure ............................................................................................................................................................................................................. 46
Fuel, Oil and Chemicals Requirements .................................................................................................................................................................................. 46
Unexpected Finds Procedure ................................................................................................................................................................................................. 47
Appendix 1 Project Environmental Management Flowchart ......................................................................... 50
Appendix 2 Organisation Chart .................................................................................................................... 52
Appendix 3 Contract Directory ..................................................................................................................... 53
Appendix 4 Site Rules ................................................................................................................................... 54
Appendix 5 Corporate Responsibility Objectives .......................................................................................... 55
Appendix 6 Risk Assessment Charts (E01‐02) ................................................................................................ 57
Appendix 7 Opportunities Register............................................................................................................... 65
Appendix 8 Miscellaneous ............................................................................................................................ 67
![Page 5: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/5.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 5 of 67
Uncontrolled when downloaded or printed
RevisionRecord Minor changes to the EMP (e.g. changing a name on the organisation chart) do not warrant a re‐brief of
the EMP to the project team. These can be recorded below by entering the issue number and AMD, e.g.
1 (AMD).
Major changes, or six subsequent minor changes, do require a full briefing to the project team and a new
issue number. Records of briefing must be retained in Appendix 7 Miscellaneous.
Note, when uploading revisions to Workspace, ensure that during the upload amend the issue number
to match that of the document itself.
EMPRevisionRecordIssue no. Date Section no. Subject Authorised
1 August 2017 All GRIP 5‐7 production GT
2
3
4
5
6
![Page 6: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/6.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 6 of 67
Uncontrolled when downloaded or printed
GENERALREQUIREMENTSThis plan fulfils the requirements of our environmental policy statement and has been prepared to
include any environmental considerations brought to our attention by the Client or their representative.
The VolkerFitzpatrick Environment Policy shall be displayed on the notice boards in all fixed and
temporary locations. A project specific environmental and sustainable development policy shall be
developed, displayed and communicated to the workforce. The Environmental Management Plan (EMP)
should be read in association with business unit policies and procedures, CIP Environmental Manual
(found in the Workspace Document Library), and the Pre‐construction Information where applicable.
Authorisation to construct the additional track was secured by the Felixstowe Dock and Railway
Company in 2008 (by way of the Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 and
the Felixstowe Branch Line (Land Acquisition) Order 2014).Network Rail has submitted a separate
Transport and Works Act Order application to enable the relevant powers to be transferred to Network
Rail. This application was submitted on 28th September 2016 and is currently being considered by the
Secretary of State. Following the determination of the new TWAO the scope of these works will then
been included within this plan as a major revision.
An internal environmental planning meeting (EMS‐01) was held on 14th August 2017 with the
environmental and project management team in attendance. The meeting detailed the specific actions
required for the construction phase.
The project management team are responsible for reviewing the proposed work processes and
monitoring site activities. The environmental implications of the project’s activities will be considered
during design reviews, planning meetings, work package plan and task brief reviews and on site as part
of the health, safety and environment inspections.
An appointed specialist from HSEQS will provide environmental management guidance to the project.
Where necessary further advice may be sought from VW UK shared services or specialist external
consultants. Any advice given by specialist external consultants must be ratified by HSEQS.
We will comply with all employers’ environmental requirements, standards as specified within the
contract.
The Environmental Manager that has been appointed for this project is:
Name: Graham Taylor
Mobile number: 07392 134161
Email address: [email protected]
DescriptionoftheWorksThis scheme is to enhance freight capacity between the Port of Felixstowe in East Anglia, the Midlands, and
the North. As part of this, a need has been identified to upgrade capacity on the Felixstowe Branch Line
between Westerfield and Trimley. The current track configuration is single track with limited passing
facilities.
![Page 7: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/7.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 7 of 67
Uncontrolled when downloaded or printed
The works included within the existing Transport and Works Act (TWAO) comprise an extension of the
double track at Trimley (hereinafter referred to as the ‘Trimley Loop work’), upgrading four existing highway
level crossings between Westerfield and Trimley, as well as signalling and rail systems modifications to
support these works.
The Trimley Loop work includes an approximately 1.4km long section of new track with associated
earthworks widening adjacent to the current single track on the southwest side of the railway (Up side)
between Cordy’s Lane to the west of Trimley Station to the south of Grimston Lane.
SiteAddressThe construction compound has not yet been setup. The location of the compound will be:
Volkerfitzpatrick Site Offices
High Road
Trimley St Martin
Felixstowe
IP11 0RG
SiteCompoundLocationandParkingArrangementsParking at site compound, address above.
ProgrammeDetails Contract Commencement Date: June 2017
Proposed Completion Date: October 2019
Duration of Works: 2 years
KeyProgrammeDetails/Milestones Phase Description
Surveys June 2017 – November 2017
Vegetation clearance November 2017 –January 2018
Enabling works January 2018 – April 2018
Haul road construction March – June 2018
Ancillary civils Jan 2018 – October 2018
Earthworks March 2018 –August 2018
![Page 8: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/8.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 8 of 67
Uncontrolled when downloaded or printed
Railway Systems July 2018 – December 2018
Signalling commissioning May 2019 – June 2019
Level crossing works October 2018 – July 2019
Permanent way works August 2018 – July 2019
Scheme handback March 2018 – October 2019
WorkingHours Activity carried out on
Monday to Friday Core hours 08:00hrs to 18:00hrs
Saturday, Sunday & Public
Holiday
Saturday – 08:00hrs to 13:00hrs
Sunday – no works (unless in agreed possessions)
Public Holiday ‐ no works (unless in agreed possessions)
Possession Hours The majority of the possessions utilised for the project will commence at
18:50 on the Saturday evening and finish at 04:00 Monday morning
Working Restrictions As identified in the planning conditions.
ExistingRecordsandPlansrelevanttoEnvironmentalManagementonSite The extent and location of existing records and plans that are relevant to environmental management on
site, including information about existing structures and underground/overhead services (if appropriate),
will be uploaded and retained on Workspace with hard copies available as appropriate or on request.
This information will be incorporated as appropriate into the EMP, WPPs and Risk Assessments.
SiteAccommodationWhen locating site accommodation, consideration shall be given to minimising visual impact and to
providing wastewater discharge to a suitable approved sewer. Where this is not possible, alternative
arrangements shall be made for temporary storage and subsequent disposal of sewage via specialist
contractor. This will include an appropriate waste duty of care trail.
Consideration shall also be given to the type of foundation to be used for temporary accommodation, to
avoid disruption of the existing environment, where it is not located on an area of proposed hard‐
standing for incorporation into the contract works. Connection of services and other ancillary
requirements will be completed with care and consideration. On project completion the area will be
returned to pre‐existing conditions or according to contract / client requirements.
![Page 9: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/9.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 9 of 67
Uncontrolled when downloaded or printed
Requirementsforsiteconnections/arrangements
Connection / arrangements Applicable Approved (include date of
approval)
Usage
monitoring
arrangements
Water Y
Bowser until moving to a
permanent connection with water
supplier.
Water deliveries
/ meter
readings
Mains electricity Y
Site offices will have metered
supply if existing capacity facilitates
this.
Fuel deliveries /
meter readings
Generator Y Generator power for site welfare Fuel deliveries
Gas N Not anticipated N/A
Foul – Mains Y Currently reviewing permanent
connection to local sewer
Foul – Septic tank Y Welfare cabin septic tanks to be
emptied weekly
SiteRestorationAt the end of the contract, those areas of natural habitat and agriculture affected by construction
activities but not permanently lost to development shall be restored in accordance with the landscape
design and contract requirements. As per the design trees will be planted to integrate the scheme with
the surrounding landscape. No surplus materials and waste will be left onsite and will be removed. The
project is committed to no net loss of biodiversity and so compensatory habitats will be provided in line
with recommendations from our ecologists.
SitePlan A site plan will be produced and form part of the site induction. The site plan will be displayed in
prominent positions such as notice boards or induction / meeting rooms and must be reviewed during
the life of the project and amended accordingly.
The site plan should include, but not be restricted to:
1. General site layout
2. Site access / entry points, including access for emergency services
3. Parking areas
4. Vehicle routes / pedestrian walkways
5. Storage areas, including any lay‐down areas
6. Containers on site and their contents
7. Waste storage arrangements
8. Any segregation of working areas e.g. areas under specific subcontractor responsibility
![Page 10: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/10.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 10 of 67
Uncontrolled when downloaded or printed
9. Any restricted or special working areas e.g. proximity to neighbours
10. Site drainage system including drain covers, surface water or foul water systems, discharge
points, soakaways, oil separators/interceptors, and any shut‐off valves. It should also indicate
the direction of flow within the drainage system. (Note it is good practice to mark surface water
drain covers blue and foul water covers red)
11. Location of the mains water supply stopcock, any sprinkler control valves, and fire hydrants
12. Position of controlled waters e.g. streams, ponds, culverts, spring, borehole, well, aquifer
13. Any potentially sensitive areas of porous or unmade ground
14. Environmentally sensitive areas e.g. nesting bats or birds, badger setts, newt fences, invasive
plants
15. Location of pollution prevention materials e.g. spill kits, sand
16. Concrete wash‐out point
KeyEnvironmentalRisks/Opportunities At the project environmental planning meeting the E01‐02 Environmental Risk Assessment is
implemented to identify the significant project environmental impacts and aspects. Projects must ensure
the significant environmental risks are suitably controlled. Appendix 7 includes the Opportunities
Register which is used to detail opportunities identified during the design or construction phase that can
be incorporated into the project.
The common project environmental risks are detailed within section 1.2. Risk assessments detailed in
the pre‐construction information, together with further risk assessments deemed necessary including
those for activities carried out by other Contractors, shall be reviewed and approved for use. The
identification and effective management of activities with risks to the environment is planned,
organised, controlled, monitored and reviewed at the four‐weekly health, safety and environmental
meetings.
Method statements/work package plans are prepared for activities with significant environmental risk,
and these will be briefed to site operatives and a record kept (HSE‐19).
All persons attending site, whether visitors, employees or self‐employed, will be informed of the risks
together with the preventive and protective measures established, so that they understand what they
need to do.
Environmental permit to work systems to protect environmentally sensitive areas on site (e.g.
waterways) will be instigated when required and records will be maintained in the site offices. The
requirement for environmental permits to work shall be agreed during the EMS‐01 pre‐start meeting.
The following lists should be made site specific as applicable, non‐applicable items must be deleted
Control measures to deal with these will be clearly set out in section 2.0 and in method statements and
risk assessments as applicable.
Activity / Task Impact Duration of
works (wks.)
Day / Night /
Possession
Risk Rating
(from E01‐
02)
![Page 11: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/11.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 11 of 67
Uncontrolled when downloaded or printed
Use of
concrete Land and controlled waters throughout All
Medium ‐
6
Civils Noise and vibration Throughout All Medium ‐
6
Permanent
way works Noise and vibration Throughout All
Medium ‐
6
Earthworks ‐
excavation Dust 16 weeks All
Medium ‐
6
Earthworks ‐
excavation Disturbance of archaeology 16 weeks All
Medium ‐
6
Earthworks ‐
excavation Disturbance of land contamination 16 weeks All
Medium ‐
6
Vegetation
clearance and
ground works
Impact on flora and fauna (refer to
E01‐02 for specific details) 12 weeks Day
Medium ‐
6
Vehicle / plant
movement Noise, dust and emissions throughout All
Medium ‐
6
Waste storage Duty of care throughout All Medium ‐
6
Waste
movement Duty of care throughout All
Medium ‐
6
Waste
disposal Duty of care throughout All
Medium ‐
6
RequirementsandConsentsThe project will meet its legal requirements through compliance with any planning, local authority,
enforcement agency conditions and to all relevant legislation. Updates will be made available to the
project team via the Environmental Manager. The legal register is maintained and accessed externally
through subscription to the ENDS compliance Manager. The H03‐01 form ENDS Compliance Register
details all applicable environmental legislation. Full details of how we manage legal compliance are
detailed in VolkerFitzpatrick (VF) procedure H03 Legislation Compliance.
Environmental aspects and impacts are detailed on the register (E01‐01) which is available on
Workspace. A copy of the E01‐01 is also within Appendix 6. Full details of how we manage our aspects
and impacts are detailed in VolkerFitzpatrick (VF) procedure E01 Environmental Aspects and Impacts.
Specific requirements as detailed in pre‐construction information pack shall be incorporated into this
plan. This includes (where applicable):
![Page 12: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/12.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 12 of 67
Uncontrolled when downloaded or printed
Ground Investigation Reports
Access & egress control to site and adjacent properties
Ecological surveys
Archaeology and Built Heritage assets
Environmental Statement information
Opportunities taken in the design stage to improve sustainability performance
Consents will be programmed with sufficient timescales to allow for dialogue with the consent granting
authority.
Permits,ConsentsandLicensesThe following table should record all relevant permits, consent, licenses and exemptions. As the
ecological surveys have not yet been fully completed the requirements for some protected species
licences are not known.
Type Issuing Body Date of Expiry Additional Comments
Section 61 Suffolk County
Council Not yet known
Initial start up meeting held with council on 17‐
08‐17. Application to be made by 15‐09‐17
Effluent discharge Anglian Water Not yet known Temporary offices (TBC)
Abstraction licence Environment
Agency Not yet known
Option to reduce reliance on potable water
supply.
European protected
species (Bat)
Natural
England Not yet known
Requirement to follow full survey information
(considered unlikely)
Development licence
(badger)
Natural
England Not yet known Requirement to follow full survey information
Ordinary
watercourse consent
Local
Authority Not yet known
Required where works may impact ditch, stream
or small watercourse
ObjectivesandTargetsProjectGoals Objectives are prepared and published for VF under the VW UK Corporate Responsibility programme;
the overall objectives of are contained in Appendix 5.
The following table summarises project specific objectives derived from the project’s sustainability
strategy objectives. Review of performance to these objectives will be conducted as part of internal
audits and progress meetings. Progress against objectives and targets shall be communicated to the
wider project team and the construction workforce through noticeboards, posters, tool box talks and
meetings.
No. Target Minimum requirements for the Project Monitoring Arrangements
![Page 13: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/13.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 13 of 67
Uncontrolled when downloaded or printed
1. Report accurate date for eKPIs
Attain 100% accurate reporting of energy usage, waste creation & fuel use
Delivery notes (hard copies kept on file), HSE-03 subcontractor pre-start (uploaded to workspace)
2. Eliminate waste going to landfill (100%)
Achieve 95% of waste diverted from landfill
Site Waste Management Plan
3. Net positive biodiversity (120%)
No net loss of biodiversity Biodiversity offsetting values
calculated
5.
10% Carbon reduction against design baseline
Achieve a carbon reduction following carbon reduction workshops for bridleway bridge & ancillary civils
RSSB rail carbon tool
6.
Procure sustainable materials with a preference for local supply
Ensure all timber (including subcontractors) on site is 100% FSC or PEFC certified
All delivery tickets to be maintained and data reported through eKPIs
7. CEEQUAL award ‘excellent’
CEEQUAL award ‘very good’ CEEQUAL assessment and verification process
8. Achieve a CCS score of 45
Register CCS and score a minimum of 40
CCS monitor visits
9.
Generation of renewable energy for onsite use
Green energy tariff for purchased electricity
Usage monitoring / usage summaries
from suppliers
10. Non-potable water to supply 25%
Non-potable water to supply 10% of requirements
Water usage logs / meters
The sites will also:
Comply with all relevant environmental legislation avoiding prosecutions for the contravention of
environmental law and regulations
Raise environmental awareness throughout the site management team and sub‐contractors by means of
regular environmental tool box talks and awareness sessions
Implement suitable and sufficient controls to achieve zero pollution incidents (emergency spills, noise /
nuisance, water contamination, waste management issues) whilst maintaining an operational work site
![Page 14: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/14.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 14 of 67
Uncontrolled when downloaded or printed
Implement the waste hierarchy: prevent waste where we can; reuse materials until we can’t use them
again; recycle waste where reasonably practicable; recover waste (e.g. energy recovery); and only
dispose of waste if no other options within the hierarchy are possible
Identify and recognise all designated sites (Sites of Special Scientific Interest, Areas of Outstanding
Natural Beauty etc.), listed buildings and protected flora, fauna and wildlife that may potentially be
affected by site activities. The site will instigate appropriate mitigation measures to ensure adequate
protection and that minimum disturbance is caused.
Resources,Roles,ResponsibilityEnvironmentalResponsibilitiesIt is the responsibility of management and supervisory staff to ensure that the Environmental
Management System is complied with on this project. At the pre‐contract safety meeting some project
specific environmental responsibilities are identified and allocated using EMS‐01 Environmental Planning
Meeting.
Whilst the overall responsibility for the environmental compliance, obligations and performance of these
works rests with the Project Manager (Dan Smith), specific safety roles may be performed by competent
nominated persons identified in HSE‐33 Allocation of Responsibilities. These responsibilities are reviewed
at the 4‐Weekly Health, Safety and Environmental Meetings. Current responsibilities for this project are
summarised in HSE‐33 which is held within the Construction Phase Plan.
AllocationofResponsibilities,SignatoriesandEMPBriefing General duties of employees with respect to environmental management are set out in the
Environmental Policy and Practice.
Allocation of site specific responsibilities and a record of signatures shall be maintained on HSE‐33 as
applicable and inserted in to Appendix 8 Miscellaneous. Section 2 of HSE‐33 requires allocation of a
responsible person to the following site project roles:
Demolition Coordinator
Emergency Coordinator
Environmental Coordinator
Waste Coordinator
Fuel Storage Coordinator
Community Liaison Representative
Noise Monitoring
Energy & Utility Warden
All those responsible persons, named in section 2, must sign section 15 of HSE‐33 as a record of their
signature and acceptance of responsibilities.
All relevant project management staff must be briefed on this EMP and their roles according to HSE‐33,
including any subsequent revisions (refer to 1.4 above) and records of the briefings must be retained on‐
site.
![Page 15: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/15.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 15 of 67
Uncontrolled when downloaded or printed
Competence,TrainingandAwarenessThe Project Manager will ensure that all individuals employed on the contract have the appropriate
training and experience required for the implementation of this EMP.
In particular those members of staff identified as having an environmental role in HSE‐33 above must be
suitably experienced and competent to undertake the role.
A VF programme of Environmental Awareness training is available to staff members and where
appropriate members of the team will be allocated attendance.
Two minuted design workshops will be held during the detailed design phase which will focus on
designing out waste, carbon reduction, material types, reuse of materials and innovative production
methods.
InductionSite specific inductions will be given to all personnel entering site (as appropriate). In particular they will
be made aware of the site plan, site rules, the extent of the site, ground conditions and access
authorisation. This induction will highlight specific environmental risks and hazards on site, together
with the preventive and protective measures, including permits to work, as well as emphasising each
individual’s duties with regard to environmental management. Relevant parts of the EMP and Work
Package Plans will be made known. A record will be kept of all inductions carried out.
Sub‐contractorsSub‐contractors’ Supervisors will be given specific instructions and rules prior to starting work, which will
be recorded using form HSE‐17 Site Supervisors Instructions. Sub‐contractor’s sustainability performance
will be measured and reviewed quarterly.
On‐goingAwarenessToolbox talks and environmental alerts will be given on key topics arising during the construction phase.
The 4‐Weekly HSEQ Meeting will be the main forum to review the performance against objectives and
highlight areas of concern, as well as plan future health & safety requirements.
Instructions regarding environmental issues that require immediate action will be conveyed verbally,
followed up in writing when applicable.
No TBT Topic Target Audience Frequency
1. Noise and Vibration All Contractors 6 monthly
2. Dust All Contractors Prior to earthworks
3. Waste Duty of Care All Contractors 6 monthly
4. Re‐fuelling/spills All Contractors 6 monthly
![Page 16: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/16.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 16 of 67
Uncontrolled when downloaded or printed
5. Ecology – nesting birds, bats,
GCN, reptiles, dormice, badgers
All Contractors Prior to vegetation works and where
working in proximity to areas of
potential.
6. Concrete wash water All contractors 6 monthly
7. Asbestos All contractors Prior to earthworks
8. Land contamination All contractors Prior to earthworks and piling
9. Being a good neighbour All contractors 6 monthly
10. Archaeology Earthwork contractors Prior to breaking ground
11. Sustainability awareness All contractors and staff 6 monthly
12. CCS requirements All contractors and staff 6 monthly
13. Water use All contractors 6 monthly
14. Scrap materials policy Site team Once
15. Material storage All contractors and staff 6 monthly
InternalCommunicationIt is the responsibility of the project / site manager to authorise the EMP, and to ensure that during the
contract period it is reviewed and developed to reflect the contract requirements and works being
carried out, including information from designers, sub‐contractors and any variations.
Minor changes to the EMP (e.g. changing a name on the organisation chart) do not warrant a re‐brief of
the EMP to the project team. These can be recorded below by entering the issue number and AMD, e.g.
1 (AMD).
Major changes, or six subsequent minor changes, do require a full briefing to the project team and a new
issue number. Records of briefing must be retained in Appendix 8 Miscellaneous.
Note, when uploading revisions to Workspace, ensure that during the upload amend the issue number
to match that of the document itself.
The Project / Site Manager is to ensure that the existence of this Plan and its provisions are made well
known to all personnel on site and any other interested parties. Site Inductions shall address
environmental issues, plus other training sessions as needed, including toolbox talks to raise awareness
of the environmental issues affecting the site and how they are to be tackled.
Specific Environmental Risks and Mitigation shall also be included in Work Package Plans. Details of the
communication methods can be found below:
Level Method People involved When
![Page 17: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/17.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 17 of 67
Uncontrolled when downloaded or printed
Project Four‐weekly HS&E meetings / Safety
Committee / Project closeout
Management / workforce /
H&S manager
Four weekly /
as planned
Site team
Toolbox talks, task briefings, subcontractor
progress meeting, subcontractor
supervisor meeting (HSE‐05)
Workforce /
subcontractors
Weekly / daily /
as planned
Individual Feedback/suggestion boxes/hazard, near
miss, close call reporting
Directly with each
employee
Open door
policy
Stakeholders Additional stakeholder meetings Emergency services, LA,
schools, residents etc.
Pre‐
construction /
as planned
In addition to this, arrangements for all people on site to be consulted and contribute to H&S will be
provided by:
Encouraging all site staff to attend 4‐Weekly health, safety and environmental meetings
Daily contact with employees and their employers
Items specifically highlighted during sub‐contractors’ progress meetings
Analysing responses to information posted on the site notice board
The opportunities during site induction, method statement briefings (HSE‐19) and toolbox talks
(HSE‐20) to take part in the organisation of Health & Safety on site
Site management will liaise with all persons on site, taking account of and co‐ordinating their
views
Encouraging the workforce to elect an employee safety representative
ExternalCommunicationandManagingLinesideNeighboursCommunicationwithNetworkRailRegular progress meeting will be organised with the client every 28 days or as otherwise agreed.
Updates may include but not be limited to risk mitigation, environmental performance indicators,
progress against targets and a review of inspections and audit findings.
StatutoryAuthoritiesandNon‐GovernmentalOrganisationsAll communications with statutory bodies including applications or agreements must be done in
agreement with the client representative.
Records of discussions and meeting minutes will be held on file on VF form HSE‐47 Record of Third Party
Visits.
Where a statutory body makes an unplanned approach to site the client representative will be informed
as soon as practicable.
OtherStakeholders(neighbours,stakeholders,interestgroups,CCS)VW UK are an Associate member of the Considerate Constructors Scheme (CCS). As such all projects
(acting in the Principal Contractor role) over six weeks duration will be registered with CCS, unless
advised to the contrary by the environmental manager. Compliance with the Scheme’s Site Code of
![Page 18: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/18.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 18 of 67
Uncontrolled when downloaded or printed
Considerate Practice indicates a site is achieving a standard beyond statutory requirements. The CCS code of practice shall be prominently displayed within the site offices. The policy shall be communicated to project management and the workforce through posters, tool box talks and briefings.
The five criteria of the CCS code are:
Enhancing the Appearance
Respecting the Community
Protecting the Environment
Securing everyone’s Safety
Caring for the Workforce
Project performance against these criteria will be evaluated by an independent assessment by the
Considerate Constructors Scheme. For further information refer to the CCS website: http://www.considerateconstructorsscheme.org.uk/
ProjectNeighboursNeighbour Type* Considerations** Letter drop
Thorpe Lane Residential Traffic of site vehicles, Site noise minimisation,
visual
yes
Grimston Lane Residential Traffic of site vehicles, Site noise minimisation,
visual
yes
High Road Residential Traffic of site vehicles, Site noise minimisation,
visual
yes
Reeve Lodge
Residential Home
Residential Traffic of site vehicles, Site noise minimisation, visual yes
Trimley Saint Mary
Primary School
School Traffic of site vehicles, Site noise minimisation, visual yes
St. Mary’s Close Residential Traffic of site vehicles, Site noise minimisation, visual yes
Gaymers Lane Residential Traffic of site vehicles, Site noise minimisation, visual yes
Stennetts Close Residential Traffic of site vehicles, Site noise minimisation, visual yes
Second Avenue Residential Traffic of site vehicles, Site noise minimisation, visual yes
Cordy’s Lane Residential,
industrial
Traffic of site vehicles, Site noise minimisation, visual yes
Station Road Residential Traffic of site vehicles, Site noise minimisation, visual yes
* Type ‐ e.g. School / College, Domestic, Industrial, Business / Office
![Page 19: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/19.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 19 of 67
Uncontrolled when downloaded or printed
** Considerations – any restrictions on working operations must be detailed within the Working Hours table
of section 1.1 above
SiteWorkA member of the project team will be nominated with responsibility for briefing all staff on acceptable
conduct and delivery of notification letters approved by the client Community Relations representatives.
A minimum of 10‐14 days pre‐notification shall be provided prior to commencement of all work.
However, for some emergency and late notice work this will not always be possible. In this instance pre‐
notification shall be provided as soon as reasonably practicable. If it is not possible to provide pre‐
notification then the details of the work shall be provided to the clients Community Relations team. All
notification letters will include details of the Network Rail 24 hour contact number.
24hr Network Rail Helpline number: 08457 11 41 41
Complaints and Compliments will be recorded using QMF‐05 Compliments, comments, complaints log.
Details of the complaint will be provided to the client representative within 12 hours of the complaint
receipt.
RecordsandDocumentsAll documents will be stored on our document management system – Workspace. Hard copies will be
available on site of key environmental documentation including:
Environmental Management Plan
Site Waste Management Plan
Specific Consent Approvals (e.g. Section 61 consent)
Waste Transfer Notes / Hazardous Waste Consignment Notes
Copies of all licences, consents, permits and permissions will be provided to the client Project Manager
in accordance with the requirements of the Contract and within 7 days of receipt.
At the end of the project final versions of key project environmental documentation will be provided
either as standalone documentation or for inclusion in the H&S file / O&M manuals. This will include but
is not limited to:
The Environmental Risk Assessment
The Environmental Management Plan
The Site Waste Management Plan
Mitigation and commitment measures
Details of environmental incidents
MonitoringandMeasurementReporting to the client will be undertaken on a four weekly basis. KPIs will be completed on a 4 weekly
basis detailing the information below:
Number and Type of Incidents
![Page 20: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/20.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 20 of 67
Uncontrolled when downloaded or printed
Number and Type of Close Calls
Number and Type of complaints
Waste Produced – Landfill, Recycled or reused (tonnes)
Energy and Carbon – electricity (kWh), gas (m3), diesel and petrol (litres)Water Used – site water
use for cabins and work activities (litres)
Timber sourced (tonnes)
Inspections,AuditsandCorrectiveActionMonitoring of site operations will be carried out on a day‐to‐day basis by site management. Weekly site
safety inspections (HSE‐07) will be carried out and recorded by site staff on a rota basis (HSE‐06). Health
& safety, environmental and quality managers will also carry out regular inspections and audits.
Additional inspections will also be carried out by Directors and senior managers. Subcontractor
performance is used as part of future selection processes, and contributes to the further improvement
of supply chain performance through the application of lessons learnt. Investigations will be carried out
by site staff, or the relevant Manager, of all incidents and complaints whether causing injury, loss, or
near miss.
An audit will be conducted within the first 6 weeks of project start and at six monthly intervals
thereafter. The audit encompasses the whole suite of environmental management requirements. Issues
identified will be categorised as a Major (breach of legislation; mitigation), Minor Non‐Conformance
(breach of VF policy or procedure) or Action (observation).
Where a Major non‐conformance is identified the close out for compliance should be no more
than 7 days unless otherwise agreed
Where a minor non‐compliance is identified the close out should be no more than 14 days from
issue unless otherwise agreed
Where an action is identified this should be completed within a 1 month period
Close out of audits will require evidence and this will be kept in workspace identifying close out and the
close out timescales. The Project Manager will have ultimate responsibility for closing out any issues
identified but they may choose to delegate to appropriate individuals of the project team.
InspectionandMonitoringArrangements The following table summarises the monitoring arrangements in place for this project
Monitoring Type When Method
Site inspection Daily Site tour
H, S &E inspection Weekly HSE‐07 by site rep as per HSE‐06 rota
Senior manager inspection Monthly HSE‐07B
Subcontractor review Monthly / end of package HSE‐05
Environmental inspection Every four weeks EMS‐07 by environmental manager
Internal environmental audit 6‐8 weeks then 6 months Audit report and NCRs
![Page 21: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/21.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 21 of 67
Uncontrolled when downloaded or printed
14001 Planned Registration body, audit report and NCRs
Statutory inspections Planned As required
Site visits by HSE or EA Generally unplanned Inspection report, HSE‐47
![Page 22: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/22.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 22 of 67
Uncontrolled when downloaded or printed
SpecificEnvironmentalImpactAreasThis section details the specific impact areas and mitigation the project will employ to manage the
environmental risks and opportunities available. If a heading is deemed ‘not applicable’, it must be
stated why not.
AirQualityAs far as is reasonably practicable the project will seek to control and limit emissions to the atmosphere
in terms of gaseous and particulate pollutants from vehicles and plant used on the site and dust from
construction activities through:
Identifying potential sources of emissions to the atmosphere and applying appropriate control
techniques
Implementing measures to reduce the impact of dust in a timely manner
TrafficandTransportA Traffic Management Plan is to be developed at GRIP 5 (detailed design) stage to include measures to
manage traffic flows during construction. However, general mitigation measures to be implemented in
relation to traffic and transport, including non‐motorised users, will include the following measures:
Wherever possible construction vehicles will travel along the strategic highway network –from
the A14 (to the east of the construction site);
Access would initially be from the existing road network to the haul roads, with dedicated site
compounds. Importantly, construction vehicles accessing compounds to the west of the rail line
will arrive at site via the A1156, from Junction 58 of the A14 to Thorpe Lane to join the haul
roads. Vehicles will leave the site the same way, turning turn left from Thorpe Lane onto High
Road and re‐join the A14 to the north of the site as not to route through the centre of the village
when departing from site;
Construction vehicles accessing compound sites to the east of the rail line will travel from the
A14, via Howlett Way and not route through the centre of Trimley village;
During the works, access to the local area will be maintained for vehicles with as much
construction as possible being conducted outside of peak hours;
Site rules for drivers shall be established and will be signed by the driver to conform to the
standards;
This will include:
Permitted routes to and from site
No idling while waiting to be loaded or unloaded
No parking in residential streets surrounding the site
Site speed limit of 10mph to be adhered to
Follow signage and only reverse under supervision of competent banksman
Drivers to wait in designated areas and where PPE when out of their vehicles
All loaded vehicles leaving site should be sheeted
Where required vehicles shall be washed down prior to leaving site
![Page 23: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/23.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 23 of 67
Uncontrolled when downloaded or printed
A copy of the site rules will form part of the traffic management plan.
Clear signage will be positioned to show temporary diversion routes for the affected Motorised
Travelers routes, PRoWs, footpaths and cycleways;
Users of the affected PRoWs, footpaths and cycleways will be notified of planned diversion with
signs along the sections to be closed during construction at least one month prior to the works;
Construction works will be programmed so that affected PRoW, footpaths or cycleways remain
open for part or duration of the construction works, and also that other routes can act as a
diversion route for those affected;
Local residents and recreational users will be informed of the works in advance and updating on
construction progress.
MitigationMeasuresWhere possible, dust creating activities will be completed away from sensitive receptors e.g. crushing or
cutting of concrete materials. The following control measures will be implemented as a minimum:
All plant and equipment will be well maintained and regularly inspected to ensure that exhaust
fumes and particulate matter is kept to a minimum. If a fault is identified the plant shall be
quarantined and repaired as required;
No burning of waste materials will take place on site;
Vehicles or plant will not be left running if not in use;
Dust suppression is required in times of dry weather, particularly during excavation and
demolition. All personnel working on site will ensure damping down of dusty materials using
water sprays is carried out;
Sufficient dust‐suppression equipment, including water bowsers with spray bars, will always be
available on site;
Dust logs will be maintained during dry periods (frequency to be confirmed);
Making sure that loose materials are stockpiled on site for the shortest possible time and
keeping stockpiles or mounds at a height of no more than 3m. Stockpiles of material shall be
covered during extended dry periods.
Slopes on stockpiles will be no steeper than the natural angle of repose of the material and
maintain a smooth profile;
long term stockpiles shall be left to re‐vegetate to stabilise surfaces;
Bentonite, grouts and other similar materials will be mixed only in designated areas which will
be enclosed or shielded as appropriate;
A trial of calcium magnesium acetate (CMA) or similar surfactant shall be used on the project for
its effectiveness compared to water alone (following liaison with the EA);
Confining haulage and delivery vehicles to designated roads within the site in accordance with
the traffic management plan;
Requiring contractors to use self‐sheeting lorries for the transport of dusty materials to and from
site;
All vehicles carrying friable material from the site will be fully sheeted;
A mechanical road sweeper will be utilised on the public highway to maintain the route free
from mud and dust;
![Page 24: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/24.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 24 of 67
Uncontrolled when downloaded or printed
Providing an approved and easily cleaned hard surface and keeping clear of loose surface
materials on all site areas where vehicles regularly move around;
Regularly brushing down and spraying heavily used hard standing areas on site;
Establishing speed limits of 10mph across the site; and
All drilling and excavation surfaces to be wetted where there is a risk of airborne dust
generation.
ArchaeologyandCulturalHeritageSuffolk County Council has been consulted with regard to this scheme and has highlighted a number of
points relating to the potential impact of the works upon heritage assets within the study area. This
information was included in the Environmental Statement (Table 4.40). Due to the reduction in the
project scope some of these locations will no longer be impacted by the scheme and therefore require
no further assessment. The zones of archaeological potential are detailed in the table below:
Level of potential Description of area Applicable
High – May contain archaeology of national importance
Levington Heath Barrow Cemetery Scheduled Ancient Monument and adjacent land.
N/A
Medium – areas likely to be undisturbed by modern agriculture or construction
Small areas to the north of the alignment, east of Stratton Hall Drift
N/A
Area to west of residential area at Gaymers Land / Stennetts Close
Yes‐ although on northern side whereas track works are on south side of railway.
Strip of land at Westerfield. Scope reduced to upgrading level crossing from half to full barriers only.
Medium – areas of known archaeological potential that are likely to be subject to excavation
Permanent land take areas adjacent to the alignment, including those associated with the haul road and temporary land take areas where excavation will take place.
Yes
Low Permanent land take areas adjacent to the alignment, including those associated with the haul road and temporary land take areas where no excavation will take place.
Yes
MitigationMeasuresA programme of archaeological mitigation will be integrated into the construction programme. The exact
nature and scope of the programme of mitigation will be agreed with the Suffolk Archaeology Service
![Page 25: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/25.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 25 of 67
Uncontrolled when downloaded or printed
once more detailed plans of the groundworks are available. A Written Scheme of Investigation shall be
produced;
Investigation techniques are likely to include geophysical surveys and/or evaluation trenching. Mitigation
will depend upon the significance and location of any remains found, but may include a further
programme of archaeological fieldwork designed to record archaeological remains likely to be affected.
The use of non‐invasive mitigation techniques such as building up ground levels and no dig solutions will
be explored where possible, subject to engineering requirement;
Opportunity shall be taken to promote the local historic environment. This will be through:
Information boards on site hoarding
Website information / media
Open days to view finds (if applicable)
Engagement with the local community in relation to the archaeological works will be explored
which may include school visits, open days and viewing platforms. Any programme of outreach
or public engagement will be undertaken following consultation with the project’s Community
Relations Manager.
Reports and archives from the baseline studies shall be submitted prior the end of construction to the relevant local government Historic Environment Record (HER).
ContaminatedLandThe principal historical sources of contamination identified which have the potential to affect current
receptors are considered to be:
Contaminated Made Ground from any historical uses within the proposed works location
including along the railway which are no longer present;
Contaminated Made Ground associated with the construction, operation, and maintenance of
the railway track; and
Contaminated groundwater or perched water associated with the construction, operation, and
maintenance of the railway track.
Persistant Organic Pollutants (POPs) arising from use as a fertiliser or pesticide.
However, further investigation is required at this stage to fully understand the potential impacts of land
contamination arising from this project.
MitigationMeasuresMitigation measures will be confirmed following completion of the ground investigation which will
include appropriate testing for contaminants. However, general measures to be incorporated include:
Ground Investigation, ground gas and groundwater monitoring, interpretive report and
Contaminated Land Risk Assessment will be udnertaken to ascertain risks from ground
contamination and gas. The data, assessments and reports will also provide details on the
expected quantities and locations of contaminated waste, and inform suitable material
management;
Piling and foundation design in areas of confirmed contamination should specify appropriate
materials to be resistant to any corrosive contaminants present (as necessary);
![Page 26: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/26.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 26 of 67
Uncontrolled when downloaded or printed
Design to consider inclusion of quarantine area for contaminated wastes; any brushing down
and spraying heavily used hard standing areas should include drainage interceptors to avoid
contaminating surface/groundwater;
The design will ensure that minimal excavation is carried out and where possible repetition of
design or simplification and standardisation will be used to reduce bespoke on site work;
Efforts will also be made to source local material, or reuse of material within the wider scheme;
Efforts will be made to reduce the area of ground impacted by the works, to reduce the
transportation of materials on and off site, and the storage of materials on site for significant
time;
Consideration will be given to the design to maximise off‐site construction which will reduce
both materials used and waste generated on site;
Where possible recycled and secondary aggregates will be specified in the design, thereby
reducing the demand for virgin material;
Where applicable, decommissioned equipment will be taken by Route Services, a NR service for
internal management of resources and redundant assets; and
The design will seek to actively reduce the amount of materials of a hazardous nature where
viable.
Piling and foundation design in areas of confirmed contamination should specify appropriate
materials to be resistant to any corrosive contaminants present (as necessary);
Determine if asbestos is present and if so, appoint a suitably qualified contractor to safely
remove and dispose of all asbestos (as necessary);
Any piling or excavation in areas of confirmed contamination should be designed in accordance
with Environment Agency guidance;
Design to consider inclusion of quarantine area for contaminated wastes;
The Scheme will explore the option to use the CL:AIRE code of practice to retain soil and stones
for reuse on site, iwithin the agreed threshold limits, removing any environmental permit
requirements;
Contaminated spoil requiring disposal will be classified through representative sampling. On‐site
treatment should be the preferred option followed by off‐site treatment, and disposal at landfill
should be the least preferred option if on‐site or off‐site treatment options are not practicable;
and
Preferred disposal options should be identified in the project Site Waste Management Plan
(SWMP) and disposal will be undertaken by an appropriately licensed waste carrier. Disposal will
be at an appropriately licensed facility and waste records will be maintained.
Ecology&InvasiveSpeciesBackgroundInformation/KeyIssuesAt present it is assumed that licences for badgers will be required for the purposes of the EMP given that
surveying has nearly been completed for bat and dormice with no presence identified. However, licence
and mitigation requirements will be confirmed on completion of further ecological surveys and a
Landscape Ecology Management Plan (LEMP) created to detail the ecological mitigation measures
required (including planting) and ensure the long term management of habitats and protected species
![Page 27: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/27.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 27 of 67
Uncontrolled when downloaded or printed
following completion of the Scheme. Implementation of the maintenance strategy shall be the
responsibility of Network Rail’s Infrastructure Maintenance Delivery Manager.
ManagementandMitigationMeasures Take all reasonably practicable measures to minimise harm to and disturbance of
wildlife caused by noise and vibration, dust and light pollution.
Minimise habitat loss by keeping the working corridor and extent of working areas to the
minimum necessary for the works. Removal of habitats and new compensatory planting
shall be undertaken in consultation with Natural England and the local authorities.
Adjacent habitats which are to be retained will be fenced off and sign posted to prevent
incursion or damage.
All areas of temporary land take will be restored as agreed with landowners and
landscape design.
The workforce and staff on the project shall be briefed on all ecological requirements
and records retained.
Vegetation shall be at times of the year detailed in the precautionary method of
working. Where there is a conflict of clearance times between protected species (e.g.
reptiles and nesting birds) further ecological advice will be sought.
SpeciesspecificmitigationThe following mitigation is proposed, based on current understanding of the species present at the
proposed scheme location:
Replacement planting ‐ Following completion of the works, species rich hedgerows and
woodland will be planted within the study area. This will include a species rich mix of
native species (as derived from ‘Mitigation Species Network Rail Preferred List’) such as
hazel, hawthorn, crab apple, blackthorn, buckthorn, field maple, white beam, alder,
hornbeam, beech, common oak, wild cherry and sessile oak. This will include areas of
scrub to be planted along the route, joining the newly planted hedgerow and woodland
to provide a series of connected habitats to replace those that are to be lost as part of
the Scheme works.
Dormice – Following the survey results undertaken in August 2017 no Dormice have
been found on the site.
Badgers ‐ The study area contains an active badger sett. As the Scheme works will
involve the loss of this badger sett, a development licence will need to be completed,
submitted and approved by Natural England to close the sett. This licence will detail the
timings of the works, methods to be used and will likely include the creation of an
artificial badger sett (as part of the mitigation works), within the retained area of the
woodland where it is currently located. Ecologists’ completing the dormice surveys
identified third party works that may have impacted the badger sett. A technical note is
being prepared by our ecologists to assess and inform what is now required. This
potential legal breach has been reported to the authorities however no communication
has been received to date.
Bats – The project contains a tree with potential for bats which shall be removed as part
of the scheme. Following further 2017 bat emergence and re‐entry surveys, it may be
![Page 28: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/28.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 28 of 67
Uncontrolled when downloaded or printed
confirmed that the tree is not being used as a bat roost, no European Protected Species
Mitigation Licence (EPSML) will be required and the tree will be soft felled as part of the
Scheme vegetation clearance works. If bats are identified then an EPSML will need to be
completed, submitted and approved by Natural England to close the roost. This licence
will detail the timings of the works, methods to be used and will include the creation of
an artificial roosting features (as part of the mitigation works), within the retain area of
the woodland where it is currently located.
Bats ‐ The study area contains a connective habitat corridor along the railway route. As
the Scheme proposes the clearance of a large section of this vegetative corridor, it is
considered that this would cause disturbance to the bats that utilise this route. To
mitigate and reduce the impact from the loss of the vegetative corridor. It is proposed
that a temporary corridor is created along the route during the Scheme works. This
temporary corridor will involve the creation of a fence line (on one side of the railway
line) that will consist of a double line of heras fencing, covered in canvas (this will appear
to be a more natural corridor rather than using plastic or other man made material that
will appear foreign/alien to bats when echolocating along this route)
Bats ‐ A lighting scheme will be adopted to minimise light spill onto the surrounding
habitats. This will include use of cowled directional lighting.
Nesting birds ‐ If vegetative clearance works are not fully undertaken during the winter
preventative measures will be adopted during the clearance works to prevent impacts
on nesting birds. Where possible, vegetation will be cleared outside of the core breeding
bird season (March – August). If any vegetation clearance is required during the core
breeding bird season, the area will be subject to a nesting bird survey prior to clearance.
If an active nest is found an appropriate size buffer (min. 5 m) will created around the
nest with no construction activity within this exclusion zone until the chicks have fledged
the nest
Wintering birds ‐ To ensure that clearance works do not inadvertently effect nearby
areas where wintering birds may potentially use in the future, a Precautionary Method
of Working guidance will be adopted and in place before and during the Scheme works.
Reptiles ‐ Mitigation measures will be adopted to prevent harm to individual reptiles
that could be present in suitable habitat during the Scheme works. This will include
ensuring all clearance works follow a detailed Precautionary Method of Working
guidance document, which will be provided prior to the commencement of the works.
On discovery of any unexpected protected species or invasive species in areas not
identified in the ecology surveys works in the area shall cease and the unexpected finds
procedure detailed in section 3.4 will be followed.
Protectionoftrees The loss of trees shall be avoided as far as reasonably practicable. Prior to any felling of
trees within the working corridor, they will be assessed for their suitability for protected
species and any necessary measures taken.
All tree surgery operations shall comply with BS3998:2010 Recommendations for Tree
Works and shall be undertaken by specialist contractors.
Woody materials generated should be retained on site as far as reasonably possible.
![Page 29: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/29.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 29 of 67
Uncontrolled when downloaded or printed
Selective removal of lower branches in an approved manner, to reduce mechanical
damage by construction plant.
Where trees are to be retained they shall be protected from damage (if likely) with
fencing and signage to the extent to the drip line.
The use of matting around the root zone to minimise soil compaction.
The use of chestnut paling around tree trunks to prevent damage.
No heavy materials or plant shall be stored within the canopy extent.
Energy&CarbonEmissionsThe project will look to make a connection to the grid rather than use temporary generators. The use of
generators will be required for transient cabin setups or where the remote nature of compounds means
that a mains connection is not feasible.
Site office accommodation will be eco‐efficient models and will include:
Highly insulated cabins (including floors).
Windows will be fully double glazed windows.
Heating control will be either by thermostat or timer.
Lighting will be via energy effcient high frequency fittings with low energy bulbs
controlled by passive infra‐red (PIR) sensors.
Instant hot water will be provided but will be suitably insultated.
Drying rooms will be through a combination of heaters and dehumidifers.
Onsite controls of energy management will be:
Plant operators will be required to switch off all plant and machinery where not in use.
All plant operators will ensure that any defect or malfunction in plant is reported and
quarantined until a repair can be undertaken.
Energy efficient plant will be chosen where practicable.
Plant and equipment shall be maintained to maximise fuel efficiency and minimise
carbon emissions. Maintainence records shall be maintained.
Durng the procurement process consideration shall be given to their energy efficiency
and carbon emissions.
Alternative energy sources, for example batteries or mains power, rather than
generators are preferred.
Energy use in office accommodation will follow best practise:
PCs to be set to energy saving modes.
Employees willbe required to switch off office equipment when not in use.
Employees will be encouraged to only print if neeccessary and double sided printing.
All printers are configured to go into energy‐saving mode when not in use.
Office equipment pruchased to have at least a energy rating of ‘A’.
The appoitned energy and utility warden shall ensure the above it being implimented.
Energy consumption shall be monitored both during our construction activities and at fixed offices, with
a view to seeking opportunities for further reduction wherever practical.
![Page 30: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/30.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 30 of 67
Uncontrolled when downloaded or printed
Company owned and operated vehicles shall generally be diesel powered, which is considered to be
more energy efficient than equivalent petrol driven vehicles, resulting in less fuel consumed by our fleet.
Vehicles operated by the Company shall also be serviced in accordance with the manufacturer’s details
to maintain efficiency and minimise pollution.
Landscape&VisualThe following measures shall be implemented to minimise landscape and visual impacts during
construction:
Tree and vegetation removal will be avoided where possible;
Materials and machinery will be stored in a manor to minimise the impacts on views;
The contractor’s compound will be located away from residential properties as far as
possible and kept to the minimum size required for effective operation;
On completion of construction, all remaining construction materials will be removed
from the site;
Compounds will be fenced to provide visual attenuation;
The following measures shall be implemented to minimise landscape and visual impacts during
operation:
Landscaping to be undertaken at the end of the project in accordance with the design;
Due to the extents of the construction work site it is expected that there will be loss of
vegetation in some areas. These will be replaced with similar species and provide
opportunities for both visual screening and ecological benefit; and
Vegetation species will be selected based upon guidance provided by Network Rail and
Suffolk County Council and based on advice from landscape architects and ecologists.
LightingLighting type, direction and positioning shall be such to minimise the impacts on housing and adjacent
habitats. Lighting should be placed in such a way as to not cause significant nuisance or disturbance to
surrounding properties, dwellings and habitats. Construction lighting will be directed away from roads
and residential areas, to reduce light pollution.
Lighting will be switched off when not specifically required for construction, security or
health and safety. PIR lighting shall be used in offices so unused areas will switch off
automatically.
Restrict high‐level floodlighting installations to areas of major construction and possibly
the main site compounds. Sky glow will be minimized through the use of low spill lights.
MaterialsThe design shall minimise the specification of materials that:
Contain substances known to contribute to stratospheric ozone depletion or with the
potential to contribute to global warming
Have a hazardous nature or include hazardous materials where viable alternatives exist
![Page 31: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/31.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 31 of 67
Uncontrolled when downloaded or printed
The design shall minimise the use of non‐sustainable resources. This shall include, but
not be limited to;
Designing solutions to reduce material consumption
Designing to minimise the requirement for primary materials such as aggregates
Identifying potential for reuse of products or materials within the project and via
Network Rail.
Where possible, recycled or secondary aggregates will be used to avoid the use of virgin
aggregate
Products with a recycled content will be used in preference to those without where
possible
Locally sourced materials will be used preferentially where this is economically feasible
Where specification allows, the use of cement replacements will be investigated to
lower the embodied carbon or concreting operations
Only timber that is from a demonstrable sustainable source will be used. Delivery tickets
will be on file with each line item stating whether it is from an FSC / PEFC source and
referencing the chain of custody certificate number. The chain of custody certificate will
also be on file showing the list of products covered under the certificate. This will be
followed in line with VW UK applicable business unit procedures
Materials vulnerable to damage through the weather / vehicle movements etc. will be
stored in designated areas and suitably protected.
MaterialStorageThe follow measures shall be followed to minimise wastage of materials:
Storage areas shall be clearly marked
Where hazardous materials are required these will be locked away
Where applicable, storage containers shall be maintained to a good standard
All materials will be securely stored to prevent breakage, vandalism or theft
Materials sensitive to weather shall be protected/covered
Storage of waste shall be separate from material storage
NoiseandVibrationConsents under Section 61 the Control of Pollution Act 1974 will be obtained for out of hours working.
Liaison with Suffolk County Council will be required to establish whether a Section 61 application will be
made for these works. It may be agreed with the client and the local authority that for certain activities
not anticipated to be noise sensitive such as site investigation and site set up, a Section 61 will not be
necessary.
Construction methodology will be assessed and where appropriate modified to reduce the impact on
sensitive receptors.
Best practicable means to minimise noise and vibration shall include:
Managementofworkinghours The management of working hours shall be used to mitigate the impact of noise and
vibration on sensitive receptors
![Page 32: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/32.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 32 of 67
Uncontrolled when downloaded or printed
Normal working hours shall be:
0800 to 1800 Monday to Friday and
0800 to 1300 on Saturday
There shall be no working on Sundays and Public Holidays unless work on the operational railway is
required under temporary possession and communicated to the Local Authority (Section 61 to be
confirmed).
The site may operate from 0700 Monday to Saturday but no powered plant, machinery or power tools
shall be used or operated externally before the working hours above.
Deliveries to site shall be outside of peak traffic times where possible to minimise disruption to the local
road network.
Workoutsideofnormalworkinghours(excludingemergencyworks) Where possible all works shall take place during normal working hours. The duration and extent
of any work that must be carried out outside of normal working hours shall be minimised.
Works shall only take place outside normal working hours for justified health and safety reasons.
Work shall only take place outside normal working hours if any resident (or other sensitive
receptor) who may be significantly affected have been notified of the dates and times of all such
work at least 4 weeks prior to commencement, or as required by the local authority.
Work outside of normal working hours shall only take place if there has been prior notification
of it to the Local Authority and nearby residents. Prior notification shall be given to the local
authority as far in advance as is reasonably practicable (minimum of 14 days).
Prior notification to the local authority shall include:
1. The reasons that the work cannot be carried out during normal working hours.
2. The proposed dates and times of the work.
3. The proposed location of the work
4. Details of how the duration and extent of the work is to be minimised.
5. Details of the mitigation proposed to minimise impact on noise sensitive receptors.
6. Where required, an assessment of the impact of noise and vibration on sensitive receptors
performed. This shall be using best
Emergency works are unforeseeable works which are urgently and unavoidably required in the
interests of Health and Safety or the preservation of a building structure. Where emergency
works are carried out which may have a significant effect on residences the Local Authority shall
be notified as soon as reasonably practicable of the extent, duration and likely impact of the
emergency works.
SitingandorientationWorksites,compoundsandplant–useofbarriersandenclosures
Worksites, compounds, semi‐static and static equipment (e.g. generators, compressors and
pumps etc.) will be sited and orientated so as to minimise the impact of noise on sensitive
receptors (e.g. use of existing structures as acoustic barriers). Acoustic barriers and enclosures
shall be used to minimise the impact of noise on sensitive receptors, where this will make a
significant difference to noise exposure.
![Page 33: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/33.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 33 of 67
Uncontrolled when downloaded or printed
Acoustic barriers are most effective when placed as close as possible to the source of the noise
or to the receptor.
Work areas may also be screened to mitigate visual nuisance.
Plant,vehicles&Equipment Modern, silenced and well maintained plant will be used at all times. Where practicable, plant
will be fitted with efficient attenuators, mufflers or acoustic covers. All plant and equipment will
be expected to meet noise limit and noise marking requirements prescribed by the Noise
Emission in the Environment by Equipment for Use Outdoors Regulations 2001.
All equipment will be shut down when not in use, vehicles will be required to switch off engines
if waiting unless required for operational reasons. This requirement will be briefed out to all
associated project staff and contractors as part of the induction process.
Wherever practicable, mains electricity will be used instead of generators. If generators are
required for use, low noise (“super silenced”) models shall be used as well as acoustic enclosure
to ensure noise is minimised.
All materials will be delivered, handled, stored and used in a manner that minimises noise.
Except for on‐track plant, all vehicle audible warning systems (including reversing alarms) shall
be of broad spectrum (“white noise”) type.
Reversing alarms shall be disconnected in certain circumstances (e.g. work outside of normal
working hours or when in close proximity to sensitive receptors) and a banksman allocated to
ensure noise nuisance is reduced to a minimum while maintaining safe working practices.
Piling Piling methods shall be chosen so as to minimise the impact of noise and vibration on sensitive
receptors. Piling works will be limited to day time working only for the Bridleway Bridge works.
SiteRulesandBehaviour All VF staff and associated contractors shall be subject to the generic site rules governing
shouting and the use of inappropriate language.
Shouting and raised voices shall be kept to a minimum except in cases where warnings of danger
must be given. Anti‐social behaviour by staff will not be tolerated and disciplinary action will be
taken where warranted, by VF Site Management.
MonitoringandInspections Periodically during normal working hours (and at least once per month) the site shall be checked
by a suitably qualified person (Environmental Manager) to ensure the use and correct
implementation of the best practicable means to minimise noise and vibration.
A record (EMS‐07) of all such checks, including the person carrying them out and any action
taken shall be kept and be made available on demand.
Prior to any work taking place outside of normal working hours a suitably qualified person shall
check to ensure that the best practicable means to minimise noise and vibration are in place and
that they are implemented at all times.
Monitoring will be undertaken periodically with a calibrated Type I noise meter.
![Page 34: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/34.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 34 of 67
Uncontrolled when downloaded or printed
WasteWaste can have significant effects on the environment. Waste management preferred contractors will
be selected to help VF achieve its goals, increasing reuse and recycling rates, and reducing waste sent to
landfill. Evidence shall be requested from waste management contractors of their recycling rates prior to
waste being sent there. All waste shall be managed in accordance with the waste hierarchy principles:
Eliminate > Reduce > Reuse > Recycle > Recover > Dispose
EMS‐03 Site Waste Management Plan (or the clients own Site Waste Management Plan) must be
completed for all waste and non‐waste movements and maintained as a live record in folder 11.9.10 Site
Waste Management Plan (SWMP)
The following duty of care information shall be recorded on workspace (including those of all sub‐
contractors removing waste):
Copies of all waste carrier licences
Copies (including originals) of all waste transfer notes and hazardous waste consignment notes
Copies of all facilities (permits/exemptions)
Key waste contractors facilities to be visited and documented
Duty of care checks made on the public register shall be made and documented within the SWMP.
Where waste is produced, reports (preferably waste returns) will be requested to show the actual
tonnage of waste produced and the breakdown of how this waste was dealt with, e.g. diversion from
landfill rate
Procedure E04 Waste Management provides further detail on managing waste
Where possible, precast or pre‐cut materials to eliminate waste creation on site
WasteElimination,Reduction,ReusingandRecyclingThe table below outlines measures that will be considered during the construction phase.
General
Reduction measures Reuse measures
Designed elements to use standard module sizes of available
materials.
Groundwater and concrete wash out water to be
used for dust suppression or in wheel or boot
wash facilities (following treatment). This shall be
done in line with guidance on low risk waste
activities.
Procure size‐specific items which do not require cutting to
size.
Accurate measurement to ensure minimal wastage when
ordering materials.
Materials are to be delivered just in time for the work package
to minimise storage requirements and risk of damage onsite.
![Page 35: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/35.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 35 of 67
Uncontrolled when downloaded or printed
Materials are to be stored and transported correctly so as to
avoid damage.
Materials while onsite are to be kept off the ground by the use
of pallets or timber bites.
The following components are to be prefabricated where
possible:
Rebar cages for piles
Concrete (sleepers)
Steel (rail, line side equipment)
All operatives are to receive training on the agreed reduction
measures.
Concrete and hardcore
Reduction measures Reuse measures
Concrete orders to be as accurate as possible to reduce possibility of waste.
Use recycled aggregate in temporary works
where specification allows.
Use excess concrete elsewhere or return to batching plant where possible.
Excavated material (soil & stones)
Reduction measures Reuse measures
Trenches to be sheeted rather than battered to reduce excavated material.
Re-use of site won materials where possible.
Timber
Reduction measures Reuse measures
Reusable pallets to be used. Reusable formwork to be employed wherever practicable.
System shuttering to be used wherever practicable. Loose timber can be re-sized and used for formwork.
PVC hoarding to eliminate the use of timber. This would be retained after the project for use on future projects.
Designated area for waste timber to be stored before being sent to Community Wood Recycling Scheme.
Packaging
Reduction measures Reuse measures
![Page 36: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/36.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 36 of 67
Uncontrolled when downloaded or printed
Educate workforce to handle items carefully which can reduce the requirement for excess packaging.
Where packaging is unavoidable, arrange with the supplier to take back packaging for reuse or recycling.
Where timber pallets are delivered, these are to be sent back to the supplier for reuse.
Consider different types of packaging such
as heavy duty or permanent packaging which can be returned to the supplier and reused.
WasteStorage All waste containers will be signed to show the accepted waste stream (including EWC code)
Different waste streams will be segregated to aid in maximising reuse and recycling rates
Containers and skips shall be enclosed or secured as required to prevent waste from escaping
and pests/rodents getting access
Hazardous waste will be stored separately from inert and non‐hazardous waste, and different
hazardous waste will not be co‐mingled
Hazardous waste shall be stored in a specific area and stored in suitable containment where
required.
Storage of waste shall be on impermeable hard standing and positioned away from drains.
Consideration shall be given to position the waste storage area away from receptors near to the
main compound. This will also reduce noise impact during bin emptying or skip exchanges.
Exemptions for storing waste onsite shall be obtained as required.
Registration as a hazardous waste producer is no longer a requirement in England
WasteDisposal Full environmental permits, exemptions or other evidence will be obtained and checked to
ensure that disposal locations can accept the waste type to be sent there, and in the quantity
required
All waste transfer notes / hazardous waste consignment notes are to be checked before
signature to ensure all required information is recorded before the waste is removed
All waste duty of care information and waste movements will be captured in EMS‐03 Site Waste
Management Plan
Where possible excavated natural material will be used in accordance with CL:AIRE The
Definition of Waste: Development Industry Code of Practice. This will ensure that these
materials do not get classified as waste and are used in a sustainable manner
Where feasible, inert waste from demolition and construction will be crushed in line with the
WRAP Quality Protocol for the Production of Aggregate from Inert Waste and reused either on
site or transported for use at other construction sites
Procedure E09 Use of Materials on Projects gives more detail on the options to be considered on
site
![Page 37: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/37.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 37 of 67
Uncontrolled when downloaded or printed
Water(includingdrainageandconnections)The objectives of water section are to implement working methods to protect surface and groundwater
from pollution and other adverse impacts including change to flow volume, water levels and quality. This
section shall also include water reduction measures to be implemented during construction.
Works will be undertaken in accordance with approvals from the Environment Agency and where
appropriate, site drainage, including surface runoff and dewatering effluents, will be discharged to
sewers where reasonably practicable and relevant permissions will be obtained from the sewerage
undertaker or statutory undertakers as required. Effects to surface and ground waters will be minimised
through best practice techniques which will include adherence to the relevant Pollution Prevention
Guidance notes published by the Environment Agency.
A site wide drainage plan will be development and will identify surface waters, groundwater protection
areas, pollution control devices, locations of spill kits, refuelling locations and gully locations.
At present there are no known works required near to surface waters although there are ditches likely
for land drainage at some field boundaries. If any temporary or permanent works affect these then the
appropriate consent shall be sought prior to works commencing. There is a principal aquifer and
superficial A aquifer throughout the extent of the site. Construction activities may provide a potential
pollution pathway (piling works) is considered to be high.
There shall be no discharge to ground or watercourses. Discharge consents will be obtained from
the Environment Agency before discharge into a watercourse takes place, and provisions made
to ensure such discharge is safe. There shall be no discharge to drains (surface or foul) without
consent from the relevant sewerage undertaker and/or Environment Agency. Treatment
requirements prior to discharges shall be agreed as part of this consultation.
Where work is being carried out near a foul tank or trunk sewer, we will give the required notice
to the Water Authority prior to commencement of any works
For new water connections (temporary and permanent) the required approval from the water
supplier shall be obtained
No detergents or surfactants shall be used where they may enter to the drainage system or
watercourse. In addition oil separator will be adversely affected with detergents and surfactants
and shall not be used.
A piling risk assessment will be undertaken in accordance with the Environment Agency
guidance and piling techniques deemed appropriate to identify and manage potential risks as a
result of creating pathways to groundwater will be implemented. A groundwater monitoring
regime shall be set up for piling work elements.
ReductionmeasuresDuring the development of the project the following will be considered:
Where water will be used (including what construction activities
Where could water potentially be wasted
What behaviours and or technologies (push taps, aerators, low flow fixtures, save a flush devices, PIR
sensors for urinals) can be introduced to reduce water wasted onsite
![Page 38: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/38.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 38 of 67
Uncontrolled when downloaded or printed
Where an existing building is to be used consideration shall be given to retrofit water saving devices. The
water supplier for the area often support businesses looking to improve their water efficiency.
Metering and measuring facility water use help to analyse saving opportunities. This also assures water
using/saving devices are operating correctly to help prevent water waste from leaks or malfunctioning
equipment.
The Table below details where water will used, how usage will be recorded and what measures can be
implemented to reduce consumption.
Where water will be used and what activities will use water
Proposed source of water
How usage will be recorded
Options for increasing efficiency / Reducing reliance on potable water
Dust suppression Attenuation from hard standing / mains
Water use logs / meter Reuse of water from onsite water treatment facility
Attenuation pond
Use of chemical binders
Office
Rainwater / mains Sub‐meter Rainwater for WCs
Duel flush toilets
Control on urinals
Tap aerators
boot wash Mains Sub‐meter Water recycling tank
ConcretewashwatermanagementConcrete washout shall be contained within an impermeable (lined) skip or similar container. Signage
will indicate that this area is the agreed location for washout. Excess water shall be left to evaporate
during the summer months. Where small volumes of concrete washwater is generated then additional
cement can be added. Once hard it can then be removed as an inert waste. Where larger quantities of
concrete wash waters are generated then a settlement and pH adjustment of the water with CO2 shall
be used. This will then enable treated washwaters to be reused onsite. Prior to the discharge of treated
wash waters the environmental manager shall be consulted to confirm it is not likely to cause pollution.
This shall be done in line with guidance on low risk waste activities.
Containment will be positioned around concrete pumps and mixers to prevent excess concrete
contaminating the bare ground.
No concrete operations or washout shall take place within 10m of a watercourse or drains
without a specific risk assessment being completed
![Page 39: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/39.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 39 of 67
Uncontrolled when downloaded or printed
Siltyrunoffmanagement Where possible, grassy vegetation buffer strips (>5m) shall be maintained around areas where
vegetation has been removed.
The use of silt fencing should be positioned where overland flow occurs. Silt fences do not
provide adequate silt removal from concentrated sources such as dewatering excavations or
discharges through a pipe.
Fencing shall be positioned to ensure that water cannot go around the fence nor underneath it.
The silt fence shall be dug into the ground
When stockpiling materials consider the gradient to ensure that during rainfall events the slope
will not collapse or cause significant volumes of surface runoff
Pollutionpreventionmeasures Works within 10m of a main watercourse or within an ordinary water course will require the
approval of the Environment Agency (main watercourses) or the Local Authority (ordinary
watercourses). If an environmental permit is required then there may be specific controls that
need to be implemented.
On‐site drainage will identify whether the outfalls are surface or foul through appropriate
signage. Spray paint shall not be used due to the pollution risk from application and wearing.
Stockpiles of materials and soil shall be located a minimum of 10m from watercourses or drainage gullies.
Arising’s from earthworks and piling shall only be stored on site in areas designated for the
purpose and should be regularly inspected to ensure that no surrounding ground or watercourse
is being contaminated by runoff or seepage. Fuel stores will be equipped with impermeable
bunds and plant nappies for use during refuelling
Equipment that uses fuel or oil (including generators and hydraulic equipment) must be
positioned on plant nappies on an impermeable surface where practicable
The use of plastic or metal drip trays are not permitted onsite for use as secondary containment
SoilManagementSoilStrippingGeneralRequirementsThe requirements for topsoil stripping are set out below and shall be read in conjunction with the
appropriate (available online) Defra good practice guidance:
In order to achieve good restoration it is important to undertake topsoil stripping in a planned
approach. This should allow reinstatement of agricultural land to similar quality of the original,
taking into account acceptable gradients for cultivation machinery and provision of suitable falls
and outlets for drainage systems.
Soil handling shall always be planned to minimise risks of structural damage, contamination and
erosion of soils.
Damage to soil structure is primarily a result of compaction by machinery, smearing from the
passage of machine blades or by the slippage of wheels trafficking over the land. Such damage
will be minimised if the movement of equipment is controlled with soil stripping carried out:
o Under as dry conditions as practicable, ideally between May and October.
o No works after 24 hours of heavy rain (i.e. more than 25mm in 24 hours)
![Page 40: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/40.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 40 of 67
Uncontrolled when downloaded or printed
o Following heavy rain, only once the surface has dried out sufficiently to support vehicle
movement.
o Movements of machinery shall be restricted so no unnecessary trafficking takes place
over topsoil or subsoil. Careful supervision will be provided to ensure agreed routes and
works areas are understood and maintained throughout the operation.
o Selection of appropriate machinery taking into account the recommendations of the
Defra guidelines.
No stripping shall take place under the canopy spread of existing trees to be retained or adjacent
offsite trees.
Controls measures of managing silty runoff as detailed in section 2.9.1 shall be implemented to
minimise risks of soil erosion.
TopsoilStrippingThe area of permanent agricultural land take with topsoil is approximately 500m2. This will result in
topsoil for use. In addition, there will be temporary agricultural land take for contractors site compound,
construction laydown areas and haul routes where the original soils shall be used to restore the land.
Vegetation above 100mm shall be cut (taking into account any ecological precautionary method
of working) and remove from the land surface prior to topsoil stripping. This will help minimise
the risk of anaerobic zones developing in the soil stockpiles.
Topsoils shall be carefully stripped from all areas that will returned to agriculture and placed in
soil storage within the same area which will be used in the restoration of that land. It is not
necessary to strip topsoil from the areas where topsoil will be stored.
To minimise the risk of spreading animal diseases and soil borne plant pests the movement of
soil will be minimised and kept within the same farm holding for restoration use in the same
location.
Recommended topsoil stripping depths will be informed by trial holes.
Overdeep stripping will mix topsoil and subsoil and must be avoided. Colour differences will help
identify the layers in conjunction with the recommended topsoil stripping depths. If it is unclear
the depth of subsoil advice should be sought from the Environmental Manager.
Once topsoils have been stripped from temporary land take areas the contractor shall survey the
extent of any exposed land drains and have their condition assessed and recorded.
SubsoilProtection On areas of temporary land take which are to be restored to agriculture where no change of
level is proposed the subsoil surface shall be covered with a protective membrane prior to laying
down 150mm (to be confirmed) of hardcore. This will reduce the risk of contamination from
other soil types, construction materials, chemicals and will help prevent loss and damage to the
subsoils.
Where a change in level is required the subsoil will be stripped in addition to the topsoil.
SubsoilStrippingWhere subsoil is to be stripped this will be undertaken to a depth of approximately 550mm (upper
subsoil layer). Actual depths will depend upon the nature of the subsoil encountered and may be
informed by trial holes. Depending on the composition of the subsoil this will inform its use on site as a
![Page 41: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/41.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 41 of 67
Uncontrolled when downloaded or printed
low nutrient substrate for areas of species rich grassland or select areas of woodland. Potential uses for
these will be developed with the design and incorporated into the Soil Management Section.
SoilStorage All topsoils required for agricultural restoration shall be stored on the farm of origin to prevent
the spread of any disease.
Topsoil and subsoil shall be stored separately and ‘like on like’ to minimise contamination and
loss of suitable material. E.g. topsoil should only be stored on topsoil. Topsoils shall be stripped
and removed from any areas where subsoil is to be stored.
Records will be maintained of the origin and storage location of all topsoils and subsoils to
enable restoration in the correct place and sequence.
Areas of soil storage onsite will be signed with the type of soil and protected from machine
incursion.
Soil storage locations will be positioned away from tree canopies and hedges (at least 10m).
Soil storage mounds shall not exceed 2m in height and shall be carefully constructed using the
minimum amount of compaction necessary to ensure stability.
No materials shall be stored on top of soil stockpiles and the operation of construction plant on
storage mounds shall be restricted to placement and removal of soils.
Where stockpiles are to be long term (>3 months) consideration of seeding to control potential
dust generation (TBC with input from designer and landowner).
The temporary storage of soil if agreement with local interested parties will be positioned as
such to act as a temporary screen of the construction activities.
SoilReinstatementSoil reinstatement in good weather conditions is critical to the success of land restorations. If specific
uses for subsoil is identified (e.g. as a low nutrient substrate) then this section will be updated to include
the specific reinstatement requirements.
When all structures, machinery and materials (including the protective membrane installed
above the subsoil) have been removed grading shall take place to ensure the necessary
drainable levels are achieved.
The subsoil shall be thoroughly loosened but only in dry conditions. Suitable rotary equipment
(e.g. winged tine subsoiler) shall be used to working to a depth of 250mm in the subsoil. Subsoil
loosening shall be carried out before topsoil replacement taking care around buried services and
shallow drains.
Topsoil shall be replaced to the original depth (as identified prior to earthworks commencing)
whilst minimising compaction of the loosened subsoil and limiting work to dry conditions.
Ideally topsoil should be loose tipped and levelled without re‐compacting the subsoil. If this
cannot be achieved further loosening shall be carried out once the topsoil has been replaced.
Any stones greater than approximately 100mm in diameter shall be removed.
AftercareandHandoverofReinstatedLand Reinstatement of the agricultural areas shall be carried out in consultation with the relevant
landowner.
![Page 42: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/42.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 42 of 67
Uncontrolled when downloaded or printed
Continuing communication with the landowner shall be maintained to keep them informed of
progress and to deal with any matters arising.
A before and after survey of levels to ensure correct drainage and soil depths.
The landowner shall approve and agree the reinstatement works before and after soil
replacement.
Cropping as soon as possible is strongly advised with a crop that has a good rooting system
(grass or cereals). This will help minimise soil slumping and erosion in the event of heavy rainfall.
Handover packs (TBC) will be provided to the landowner detailing specific aftercare
recommendations.
![Page 43: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/43.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 43 of 67
Uncontrolled when downloaded or printed
IncidentResponsePlan(IRP)The purpose of this plan is to ensure the effective management and co‐ordination of resources in the
event of a leakage or spill or any other environmental emergency occurring on or at locations where
works by VolkerFitzpatrick (VF) are being undertaken.
It also defines the criteria for the reporting and the investigation of leakages and spills occurring on or at
VF locations. This IRP can be printed off separately and shall be referred to in the event of an
environmental incident or emergency.
SiteInformationName of Company: VolkerFitzpatrick Ltd
Head Office Address: VolkerFitzpatrick Ltd, Hertford Road, Hoddesdon, Hertfordshire, EN11 9BX
Location of site this IRP relates:
postcode of main compound is IP11 0RH off High Road / Howlett Way. Grid reference: TM 27434 37346
ContactList
External Contacts
Contact Description Contact Number
Environmental regulator incident hotline Environment Agency 0800 807060
Local Water company / authority Essex and Suffolk Water 0800 526 337
National Grid Gas 24 hour gas emergency number 0800 111 999
UK Power Networks 24 hour emergency / supply loss 0800 783 8866
British Telecom UK based corporate sector customers 0800 028 5314
Network Rail Emergency 24 hour helpline 03457 11 41 41
NR Project Manager Clive Gray 07515 620086
Local Authority EHO Mobile Number TBC
Adler and Allan Emergency spill response 0800 592 827
Internal Contacts
VolkerFitzpatrick Head Office Main switchboard 01992 305 000
Ben Porter Senior Project Manager 07747 464061
Dan Smith Project Manager 07469 414971
![Page 44: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/44.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 44 of 67
Uncontrolled when downloaded or printed
Gary MacNeil Works Manager 07739 162670
Graham Taylor Environmental Manager 07392 164161
James McMorrow Senior HSEQ Manager 07824 599353
Andy Battye Head of HSEQ 07786 335995
Adrian Shah‐Cundy Head of CR 07789 031090
TBC Health and Safety Manager
ReportingofIncidentsIncidents are captured via the VF incident reporting form (HSE‐31). Where an incident occurs on site the
VF Project Manager and the client Project Manager should be informed. Any incidents on the live railway
should be reported to the NR Asset Management Control Centre.
In the event of an environmental incident then the following actions shall be instigated as per the H07‐
04 below:
Close calls (where an environmental incident could have occurred) will be completed via the Close Call
cards located on‐site or via the link https://www.surveymonkey.co.uk/r/Close_call.
GuidanceonwhentheEnvironmentAgencyshouldbeinformedThis information has been taken from the Network Rail’s memorandum of understanding with the
Environment Agency. This information is available in the Contract Requirements Environment
(NR/L2/ENV/015).
Spillages of Hazchem listed chemicals
Spillages of low hazard products with polluting potential (refer to Table 9 below)
![Page 45: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/45.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 45 of 67
Uncontrolled when downloaded or printed
Hydrocarbon spillages (e.g. oil, biodegradable oil, paraffin, diesel, petrol) greater than 20 litres
Incidents by / near a watercourse
Incidents at Environment Agency identified “sensitive” areas
Major incidents in combined drainage areas e.g. in stations
At times there may be incidents that do not fall into any precise category, and if there is any doubt, the
Agency should always be contacted.
Low Hazard Products with Polluting Potential – Circumstances requiring EA notification
Substance Threshold Example
Detergents 25 litres Washing powder, washing up liquid, Shampoo, Soap and car cleaning
products
Disinfectants 25 litres Household bleach, Dettol
Food stuffs 250 litres Most have the potential to cause problems, especially sauces, sugars,
salt, syrups, milk, yoghurt and vinegar
Fertilisers 250 litres All
Paints and dyes 25 litres All
Inorganic powders 250 litres Silt, Sand, Cement, Chalk, Gypsum/ Plaster
Organic liquids/
slurries Varies
Blood, Offal, Sewage Sludge, Anti‐freeze, Cutting lube, Cooking oils,
Glycerine, Alcohols, Latex and Soluble polymers
The effects of these products vary; some such as detergents are directly toxic to aquatic life. Silt and
sand can cause the smothering and choking of aquatic life while others such as foodstuffs, drinks and
blood can lead to deoxygenating of the watercourse. Others still may produce a combination of these
effects. Every effort should be made to contain these products. The threshold values listed above are
only a rough guide and in the event of any spillage advice is freely available from the EA.
At times there may be incidents that do not fall into any precise category, and if there is any doubt, the
EA should always be contacted.
RefuellingArrangementsBelow is the minimum standard for sites and should be supplemented with any relevant site‐specific
information / controls.
Each site must nominate a Fuel Storage Coordinator (as detailed in HSE‐33) and all storage locations /
mechanisms must be inspected weekly and recorded on HSE‐07.
The key criteria for storage are:
a) Petrol
The maximum size of the container should be 10 litres
The containers should be suitably constructed and adequately labelled
![Page 46: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/46.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 46 of 67
Uncontrolled when downloaded or printed
Containers should be stored in the fuel store within the site compound
Ideally the storage place should be more than 6m from the nearest building, highway or
footpath
Any storage area should be bunded or the fuel store must be leak‐proof
When used remotely on site, to fuel pumps or generators, containers should be placed on a
plant nappy and a spill kit must be on hand in case of spillage
b) Diesel
Diesel stored in a tanker / bowser shall be clearly labelled and locked when not in use
All tanks and bowsers must be fully bunded
When a diesel bowser is used on site there should be a spill kit on hand in case a spillage occurs
When diesel is stored on site in small containers they should be adequately constructed,
correctly labelled, and placed on a plant nappy to contain any spillage that may occur and
protected from impact damage
RefuellingProcedureThis procedure outlines the steps to be taken when refuelling on site.
All local watercourses must be identified and site drainage determined. This information should
be recorded / available on site maps
No plant or machinery is to be refuelled within 10m of any watercourse without a specific Risk
Assessment and Work Package Plan being in place
Where possible, all plant must be taken to the main fuel tank for refuelling. For large or
stationary plant and equipment a bunded fuel bowser shall be filled from the main tank in order
to distribute the fuel
A spill kit or absorbent granules must be kept adjacent to the main tank, carried with any mobile
bowser and kept in the machines to be refuelled. The operative carrying out the refuelling
operations shall check this prior to transferring any fuel
Prior to transferring any fuel the person carrying out the operation must dip the tank to be filled
to assess the quantity required
All ancillary equipment (hoses / pistols / valves etc.) must be kept within secondary containment
When not in use, nozzles on fuel tanks / bowsers must be securely padlocked to prevent
accidental / deliberate discharge
In the event of a leak or spillage on site, refer to the EMS‐09 Emergency Spill Procedure below.
This is to be displayed with all spill kits and on the site noticeboard.
Fuel,OilandChemicalsRequirementsThe storage of fuels oils and chemicals is to be strictly in compliance with the Control of Pollution (Oil
Storage) (England) Regulations. This applies to all fuel stored on site including that of our
subcontractors.
Each site must nominate a Fuel Storage Coordinator (as detailed in HSE‐33 Allocation of Responsibilities)
and all storage locations must be inspected weekly and recorded on HSE‐07 Site Health, Safety and
Environmental Inspection Record.
![Page 47: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/47.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 47 of 67
Uncontrolled when downloaded or printed
All fuel deliveries must be supervised by the Fuel Storage Coordinator(s) for the entire duration of the
refuelling operation.
All fuels, oils and chemicals shall be stored in containers specifically manufactured for the
purpose, to prevent contamination in the event of spillage or damage. Tank capacity shall be
checked before delivery to prevent overfilling
Fuel tanks or bowsers must comply with the specifications set out in the regulations. All ancillary
equipment (hoses, pistols, valves etc.) will be kept within secondary containment. Tanks and
bowsers must be lockable and kept locked when not in use
All other fuel storage and chemical stores must remain locked when not in use.
All containers/vessels must be of an approved type and clearly marked/labelled.
The storage arrangements for fuels, oils and chemicals are detailed in the table below.
Contractor / trade Approx.
quantity Storage mechanism / location Responsible person
TBC
UnexpectedFindsProcedureWhere there is an unexpected find (ecology / archaeology / suspected land contamination), the
following procedure ‐ similar to the spill procedure ‐ will be followed:
1. Works in the area are stopped
2. Suspected issues are reported to the VFL Project Manager, Environmental Manager and Health
and Safety Manager
3. Notification of occurrence is reported to the client Project Manager and when applicable then
SCO 24:7 will be informed
4. Completion of incident and accident form / close call card
5. If specialist input is required, i.e., ecologist/archaeologist/land contamination specialist
(watching brief, mitigation), this will be sought
6. Potential involvement with the regulator – Local Authority, Natural England ‐ in conjunction with
the client Project Manager / Environment Specialist
7. Mitigation and / or remedial actions implemented
8. On‐site procedures (EMP, WPP and Task Briefs) updated to reflect change in working conditions
Reporting will be undertaken using the VF reporting process detailed in H07‐07 Safety and
Environmental Incident Actions.
![Page 48: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/48.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 48 of 67
Uncontrolled when downloaded or printed
IN THE EVENT OF A LEAK OR SPILLAGE ON SITE
SCALE OF THE SPILL ‐ DO YOU NEED AN EMERGENCY SPILL CONTRACTOR?
Is it a small spill or heavy flow?
Can you and your colleagues tackle it or do you need the one of our emergency spill contractors?
Contact the emergency spill contractor if for example:
- It is a large chemical / hydrocarbon spillage (e.g. oil, biodegradable oil, paraffin, diesel, petrol) even if
have been able to prevent the spillage from spreading / entering a watercourse or if it has already
entered a watercourse / seeped into the ground
- It is a large chemical / hydrocarbon spillage near an identified “sensitive” area e.g. SSSI
Adler and Allan are on a companywide retainer for all projects, contact:
Adler and Allan 0800 592 827
Quote project name (Felixstowe), site contract number (C12505) and full name
Email: [email protected]
STOP WORK immediately and RAISE THE ALARM
Fast, immediate response is vital
Raise the alarm if necessary
BE AWARE ‐ IDENTIFY THE SPILL
Identify the source and substance spilling, don’t try to identify the substance by touch or smell
If you are not sure what the substance is, don’t take any risks
If the spillage is flammable, extinguish all sources of ignition
PROTECT YOURSELF
PPE – safety boots, gloves, non‐absorbent overalls, must be suitable for the liquids spilled and goggles if
th i i k f l hi
HELP THE INJURED
If anyone is injured help them first, but only if it is safe to do so. Rushing in could make you a victim too.
STOP THE SOURCE
For example: patch holes in drums with leak sealing putty; turn off valves, pumps or engines; or upright
drums or containers
![Page 49: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/49.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 49 of 67
Uncontrolled when downloaded or printed
CONTAIN THE SPILL
Stop the spill from spreading and from reaching drains, open ground or sensitive areas
Use spill granules, sand, bunds or socks and booms to contain the spill
NOTIFY
Notify a VF representative on site
Notify your project’s Environmental Manager Graham Taylor (07392 134 161)
If your Environmental Manager is not immediately available contact your H&S Manager
If the spill has reached a surface water drain, stream or ditch or soaked away in open ground, the EA
should be contacted immediately on the 24hr helpline 0800 80 70 60
The Environmental Manager will liaise with the Environment Agency as per Section 3.3 of the IRP
CLEAN‐UP
Cordon off the area to make sure no‐one walks or drives through the spill
Use absorbents (granules, pads and/or pillows) to soak up the spill
WASTE DISPOSAL
Used spill kit materials, rags and anything else that’s become contaminated including PPE will need to be
disposed of correctly
Take the disposal bags to the waste to avoid trailing spent or leaking absorbents around the site
Tag each bag with a clear description of its contents
If the waste resulted from an oil or chemical spill it will be classified as hazardous and must be disposed of
RESTOCK
Make sure the site manager is aware of the situation and that the spill kit is restocked
An empty spill kit is as bad as no spill kit
REPORT
The incident should be reported according to the requirements of HSE‐31 Accident and Incident Report
![Page 50: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/50.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 50 of 67
Uncontrolled when downloaded or printed
Appendix1ProjectEnvironmentalManagementFlowchart
Key outputs / actions at each stage
Contract Award
Internal pre‐start and tender
handover meeting
Environmental Audit
According to requirements agreed at
l i ti
Site Waste Management Plan
(SWMP) produced
Environmental Management Plan
Prior to mobilisation onsite
Environmental Planning Meeting
GRIP 5 (detailed design)
Contract award memo
Minutes of meeting(s)
- ‘Internal Pre Start Meeting’
- ‘Tender Handover Document Transmittal’
Environmental Planning Meeting Agenda minutes (EMS-01)
Environmental Risk Assessment (E01-02)
Audit requirements / date(s) agreed
Site Management Plan (incorporating Environmental Management Plan)
Initial production of SWMP (EMS-03)
SWMP to be maintained by project team throughout project life
Audit report
If the project lifecycle is more than 6 months,
additional audits are required, date(s) agreed.
![Page 51: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/51.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 51 of 67
Uncontrolled when downloaded or printed
Post‐contract Review Meeting
No more than 8 weeks after project
l i
Project completion
![Page 52: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/52.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 52 of 67
Uncontrolled when downloaded or printed
Appendix2OrganisationChartThe following chart should be used to summarise the basic structure for the management of the project. The full project
team must be shown on the internal contacts list of the project record in Workspace. HSE‐33 Allocation of Responsibilities
details the full range of responsibilities assigned to team members.
Senior HSEQS
Manager
James McMorrow
Rail Division Director
Andy Gardner
Quality Manager
Naeem Ahmed
Project Director
Mike Evans
Senior Project
Manager
Ben Porter
Project Manager
Dan Smith
Site Engineer
TBC
Quantity
Surveyor
Chris Potter
Works
Manager /
Foreman
Site Agent / Manager
TBC
Managing Director
John CoxAdrian Shah-Cundy
Head of CR VW UK
Health & Safety Manager
TBC
Environmental Manager
Graham Taylor
![Page 53: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/53.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 53 of 67
Uncontrolled when downloaded or printed
Appendix3ContractDirectoryThe following directory should be used only when there is no access to the External Organisations and Contacts band on Workspace. It must be regularly reviewed and
updated. Add suppliers / sub‐contractors / designers etc., on an on‐going basis.
![Page 54: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/54.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 54 of 67
Uncontrolled when downloaded or printed
Appendix4SiteRulesRules are issued / discussed with all personnel at induction and evidence of this is recorded on HSE‐18
Safety Induction Register.
The rules outlined below are the absolute minimum; they should be supplemented by any site‐specific
additions. These may be client requirements (e.g. PTS on Railways), to address details in the Pre‐
construction Information or in response to own past experience.
SITE RULES – ENVIRONMENTAL
1. Diesel, Fuel, Oil and Chemicals to be stored only in proper designated storage areas. All
containers must be returned to designated areas
2. All diesel deliveries and refuelling is to be carried out with great care to ensure spillages do not
occur. Always use drip trays
3. No water whether surface water or other is to be discharged into any drains or manholes unless
authorised by the local Water Authority or Sewerage Undertaker
4. Any works which are likely to emit excessive noise are to be advised to the Site Manager for
instruction prior to proceeding
5. Waste must not be allowed to accumulate, and must be disposed of in the skips provided
6. No waste is to be placed outside of site boundary
7. All hazardous waste, e.g. glue pots, paint tins etc. are to be disposed of in suitable waste bins or
removed from site by the sub‐contractor on site
8. Where dedicated skips are provided for materials such as metal only, masonry only, timber only
etc., these are only to be used for disposal of the respective material, NO mixing of material
9. For all waste leaving site, copies of waste carrier licences, disposal facility licences and waste
transfer notes must be made available to site management
10. Bonfires are not permitted
11. All plant, i.e. disc cutters, chasers, skill saws etc. must have dust bags fitted wherever possible or
dust extraction equipment to prevent dust pollution of the atmosphere
12. In the event of any spillage, i.e. diesel, petrol, paint, glue etc. please advise the Site Manager
immediately for instruction on the respective cleaning up / emergency procedure
13. Toolbox talks on Environmental issues and how they affect their present work are to be held on
a monthly basis
14. If you have any queries or are in doubt, please contact site management
15. ADD ADDITIONAL SITE SPECIFICS (CONTINUE DOWN THE PAGE AS NECESSARY)
Note: we encourage the use of, where possible, materials that are non‐hazardous and friendly to the
environment
![Page 55: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/55.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 55 of 67
Uncontrolled when downloaded or printed
Appendix5CorporateResponsibilityObjectives Theme Objectives
Marke
tplace
Engagement with
industry
To be the preferred contractor of our existing clients through delivery of an excellent quality
service, and to carefully select new opportunities with clients with whom we wish to work who
are aligned to our core beliefs and objectives.
Innovation and
awards
Striving for excellence motivates us to improve the way we do things for ourselves, our clients,
and our industry. It is important that we recognise our achievements through success, praise
and award.
Stakeholder
engagement
We will improve our accountability toward our corporate responsibility strategy through
feedback on our activities from our employees, clients, subcontractors, suppliers and the
communities in which we work.
Theme Objectives
Workplace
Employees To provide a supportive environment where all our employees have the time and resources
to achieve their own ambitions for the good of our clients, the company and themselves.
Health, safety
and wellbeing
We will continually strive to prevent work related injuries and ill‐heath of our employees
and those working on our behalf, whilst improving their wellbeing.
Training To stimulate the learning and development of our employees.
Diversity To attract employees and volunteers from all cultures and socio‐economic groups, in order
to develop and retain the skills and talent needed to meet our business objectives.
Theme Objectives
Environment
Procurement The purchase of products and services in a socially and environmentally responsible way that
delivers value for money and benefits to our clients our communities.
Carbon Reduce our carbon emissions year on year.
Waste To reduce the amount of waste we produce from activities, with a particular focus on the
prevention of construction, demolition and excavation waste sent to landfill.
Impacts To maximise improvements and mitigate any adverse impacts on the environment arising from
our activities.
![Page 56: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/56.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 56 of 67
Uncontrolled when downloaded or printed
Theme Objectives
Community
Integrity To ensure that all of our employees are open and honest; our business is ethically and morally
strong and each of us is accountable.
Society Respect people and their local environment; be responsive to the communities in which we
work.
![Page 57: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/57.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 57 of 67
Uncontrolled when downloaded or printed
Appendix6RiskAssessmentCharts(E01‐02)This section contains a copy of the completed risk assessments from the health & safety and environmental planning meetings. Copies of the completed records must be
inserted behind this cover sheet.
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Construction ‐ concrete washout Yes Concrete washout L, W Land, Controlled
Waters
Any cement or similar based filling
material will be mixed at least 10m away
from any watercourse or surface water
drain.
Unused cement will be bagged and
removed from site and no wash waters
from concrete and cement works will be
discharged into water or ground.
Low 2 Moderate 3 6 MEDIUM
Construction ‐ civil works Yes Noise and vibration L, A Humans, Flora &
Fauna
Works to be undertake outside of
possessions where possible. Piling
methodologies to consider social
implications. Tool box talks on noise
controls to be delivered to workforce.
Section 61 consent for works. Letter
drops to inform residents of works
programme and working hours. noise and
vibration monitoring where in close
proximity to residents. Screening to be
used where possible.
Low 2 Moderate 3 6 MEDIUM
Construction ‐ p'way works yes Noise A Humans, Flora &
Fauna
Tool box talks on noise controls to be
delivered to workforce. Section 61
consent for works. Letter drops to inform
residents of works programme and
working hours. Screening to be used
where possible.
Low 2 Moderate 3 6 MEDIUM
![Page 58: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/58.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 58 of 67
Uncontrolled when downloaded or printed
Earthworks ‐ excavation of material Yes Dust L, A, W Humans, Flora &
Fauna
Stockpiles of potentially dusty materials
to be maintained as far away from
sensitive locations as possible, and where
possible contain or cover stockpiles to
prevent dust mobilisation. A soil
management plan shall be produced to
identify storage location and best
practices. Regular inspections shall be
undertaken to ensure dust is not being
generated. Long term storage shall be
allowed to self seed.
Low 2 Moderate 3 6 MEDIUM
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Earthworks Yes ground disturbance L archaeology
A project specific written scheme of
investigation shall be produced to advise
the mitigation requirements for areas
identified as a high and medium
archaeological risk.
Low 2 Moderate 3 6 MEDIUM
![Page 59: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/59.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 59 of 67
Uncontrolled when downloaded or printed
Rail ‐ use of rolling stock Yes land contamination L, W land, controlled
waters
The siting of excavation for GI will be
located away from contaminated land
areas where possible.
Ground investigation works for
excavations within 100m of the site will
include appropriate testing for
contaminants and where appropriate,
potentially gas monitoring in locations
close to those associated with former
landfill sites and identified as being in
danger of landfill gas migration.
Piling and foundation design in areas of
confirmed contamination will specify
appropriate materials to be resistant to
any corrosive contaminants present.
Any piling or excavation in areas of
confirmed contamination will be
designed in accordance with Environment
Agency guidance. IRP procedure in place
in the event of identifying unexpected
contamination.
Low 2 Moderate 3 6 MEDIUM
Storage of fuels, oils and other lubricants Yes Fuel, oil or lubricant L, A, W Land, Controlled
Waters
Fuel storage to be compliant with Oil
Storage Regs. Chemicals to be contained
within flamvault or similar. Refuelling
procedure to be followed all times.
COSHH briefings to include
environmental controls. Spill kits to be at
worksite and fully stocked. plant nappies
to be used under static plant and
containers. maintenance and oil only spill
kits to be available. Grid connection to
minimise onsite use of diesel for power
generation. Storage to be positioned
away from drainage.
Low 2 Moderate 3 6 MEDIUM
![Page 60: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/60.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 60 of 67
Uncontrolled when downloaded or printed
Storage of loose material (stone/soil) Yes Dust A Humans, Flora &
Fauna
Stockpiles of potentially dusty materials
to be maintained as far away from
sensitive locations as possible, and where
possible contain or cover stockpiles to
prevent dust mobilisation. A soil
management plan shall be produced to
identify storage location and best
practices. Regular inspections shall be
undertaken to ensure dust is not being
generated. Long term storage shall be
allowed to self seed.
Low 2 Moderate 3 6 MEDIUM
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Vegetation control ‐ nesting birds Yes Disturbance or
destruction Vegetation Flora
Precautions will be taken at all times of
the year to avoid damaging active nests
of birds that may be nesting. If it is not
possible to remove vegetation outside
the bird nesting season (March ‐ August),
an ecologist will carry out a detailed
inspection of the vegetation for nesting
birds no more than 24 hours prior to
removal. If any nesting birds are
identified during the survey or the works
they will be left in situ for their entire
nesting period and alternative
approaches to the work proposed. This
may include leaving an exclusion zone
around the nests to avoid disturbance.
Main programme of vegetation works
planned for November 2017.
Low 2 Moderate 3 6 MEDIUM
Vegetation control ‐ reptiles / GCN Yes Disturbance or
destruction Vegetation Flora & Fauna
A precautionary method of working shall
be produced for the areas where a PMW
is required. Operatives shall be briefed on
the identification of animals. Procedure
for unexpected protected species find
within IRP.
Low 2 Moderate 3 6 MEDIUM
![Page 61: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/61.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 61 of 67
Uncontrolled when downloaded or printed
Vegetation control ‐ disturb/destruc'n of
fauna or flora Yes
Disturbance or
destruction Fauna or flora Flora & Fauna
Environmental statement, phase 1 and
phase 2 habitat surveys completed.
Vegetation clearance drawings to show
where can and cant be cleared. Ecological
watching brief to be in attendance for
vegetation clearance activities. Certain
areas to be covered by PMW.
Low 2 Moderate 3 6 MEDIUM
Vegetation control ‐ scarce plants Yes Disturbance or
destruction Flora Flora
Botanist to attend site to confirm
presence/absence. If present a
precautionary method of working shall be
developed in liaison with the council.
Low 2 Moderate 3 6 MEDIUM
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Vegetation control ‐ badgers Yes Disturbance or
destruction Vegetation Badgers
Impacts on badger setts will be avoided
as far as possible by careful design of the
location of civil engineering works and
precautionary methods of working
(PMW) close to any active setts. If it is
considered that works are likely to have
an adverse impact, the issue will be
discussed with Natural England to
determine if a licence is required.
Low 2 Moderate 3 6 MEDIUM
![Page 62: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/62.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 62 of 67
Uncontrolled when downloaded or printed
Vegetation control ‐ bats Yes Disturbance or
destruction Vegetation bats
phase 2 habitat survey to identify
whether bats present or absent. If
present then a protected species licence
shall be obtained prior to works
commencing. A precautionary method of
works shall be used when trees with
potential but bats not identified during
the survey are felled.
Low 2 Moderate 3 6 MEDIUM
Vehicle movements Yes Noise and dust L, A, W Humans, Flora &
Fauna
Speed limit to be enforced on all surfaced
and unsurfaced routes. Speed limit signs
to be displayed. Vehicles will be sheeted
to prevent the load from creating dust.
For large removal of spoil the option of
train removal will be explored.
Low 2 Moderate 3 6 MEDIUM
Vehicle movements Yes Emissions A Climate
No idling policy to be enforced. Signs to
be displayed onsite at welfare locations
and within the main compound. Plant and
equipment to be maintained in
accordance with the manufacturers
requirements. If plant is emitting black
smoke other than at start up it shall be
quarantined for repair or removed from
site.
Low 2 Moderate 3 6 MEDIUM
Waste ‐ storage of hazardous waste Yes Hazardous waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
Hazardous waste storage to be limited to
compound area only. Area shall be
signposted and hazardous wastes stored
separately. Individual containers shall be
labelled. The storage area shall be on an
impermeable ground with spill kit
available.
Low 2 Moderate 3 6 MEDIUM
![Page 63: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/63.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 63 of 67
Uncontrolled when downloaded or printed
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Waste ‐ transport of inert waste Yes Inert waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. All
movements of waste to be accompanied
by waste transfer notes. Authorised
persons only to sign off waste tickets.
Low 2 Moderate 3 6 MEDIUM
Waste ‐ transport of non‐hazardous waste Yes Non‐hazardous
waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. All
movements of waste to be accompanied
by waste transfer notes. Authorised
persons only to sign off waste tickets.
Low 2 Moderate 3 6 MEDIUM
Waste ‐ transport of hazardous waste Yes Hazardous waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. All
movements of waste to be accompanied
by hazardous waste consignment notes.
Part E return to be uploaded to
workspace once returned by the receiving
facility. Authorised persons only to sign
off waste tickets.
Low 2 Moderate 3 6 MEDIUM
Waste ‐ disposal of inert waste Yes Inert waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. Visit to the
facility to confirm destination receiving
Low 2 Moderate 3 6 MEDIUM
![Page 64: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/64.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 64 of 67
Uncontrolled when downloaded or printed
waste is the same as detailed on the
ticket. Follow lorry to its destination.
Activity / Aspect Applies? Hazard (Source) Pathway Receptor Barriers (Controls)
Likelihood
of
exposure
Score Consequences Score Multiplied Residual Risk
Waste ‐ disposal of non‐hazardous waste Yes Non‐hazardous
waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. Visit to the
facility to confirm destination receiving
waste is the same as detailed on the
ticket. Follow lorry to its destination.
Low 2 Moderate 3 6 MEDIUM
Waste ‐ disposal of hazardous waste Yes Hazardous waste L, A, W
Land, Controlled
Waters, Humans,
Flora & Fauna
All duty of care checks to be undertaken
prior to movement of waste. Copies of
waste carrier licences and permits to be
held on Workspace and details of check
recorded within the SWMP. Visit to the
facility to confirm destination receiving
waste is the same as detailed on the
ticket. Follow lorry to its destination.
Low 2 Moderate 3 6 MEDIUM
![Page 65: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/65.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 65 of 67
Uncontrolled when downloaded or printed
Appendix7OpportunitiesRegister
![Page 66: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/66.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 66 of 67
Uncontrolled when downloaded or printed
Topic Opportunity Timing Responsibility Status Comments
Materials Use of geobind for soil stabilisation as an alternative to traditional haul road
construction. Consider the use for interface areas with the public highway so they
can be easily maintained free of mud and debris.
Prior to enabling
works
Site team Open
Ecology Engagement with local wildlife groups/charities to help achieve the no net loss of
biodiversity target.
During main
works
Environmental Open
Waste /
Water
Develop onsite treatment facility for road sweeper arisings to allow for the reuse of
water.
Early in
construction
phase
Site team /
Environmental
Open
Materials Wood from large trees to be repurposed, for example benches, information signs or
donated to local groups / schools.
Early in
construction
phase
Site team /
Environmental
Open
Carbon /
Materials
Carbon reduction and material workshop to be held to identify opportunities such
as foundation modification, material types, reuse of materials and innovation.
GRIP 5 Design / site
team
Open
Noise Topsoil to be positioned to create temporary visual and acoustic screen for
neighbouring properties.
Enabling works Construction
team
Open
Carbon /
Materials
RSSB rail carbon tool to be used to assess the embodied carbon content to identify
carbon hotspots and potential alternatives to lower carbon.
GRIP 5 Design team /
construction
team /
environmental
Open
Energy /
Water
Cabin procurement to EPC rating ‘B’ with water saving devices. Explore the option
of rain water harvesting to reduce reliance on potable water.
Prior to enabling
works
Construction
team
Open
![Page 67: Environmental Management Plan...This Environmental Management Plan (EMP) is the property of VolkerFitzpatrick Ltd (VF). It has been developed based upon known activities and information](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a7e63a96e5e5f421047c4/html5/thumbnails/67.jpg)
Environmental Management Plan R06‐05VF‐B
n/a
VF‐C
n/a
VF‐R
VH
n/a
VR
n/a
VS
n/a
VB
n/a
VGE
n/a
VL
n/a
VI
n/a
Shared Services
n/a
Issue no: 7 Date: Jul 2015 Parent document: R06 Work Package Planning Process
Approved for IMS: IMS Manager Document owner: Rail Standards and Compliance Manager Workspace file: 11.1 Page 67 of 67
Uncontrolled when downloaded or printed
Appendix8MiscellaneousMiscellaneous documents which are relevant to the SMP, but do not have a specified location, should have their details
entered in the table below and then be inserted in to the SMP behind this page.
Miscellaneous documents added to the SMP
Document Reference Comments
Details of relevant documentation
Environmental Planning meeting minutes:
EMS‐01
HSE‐33 Allocation of Responsibilities