  • Environmental Management Completed Projects 2005-Present

    October21,2013 U.S.DepartmentofEnergy

    Photos of decontamination and decommissioning of the Heavy Water Components Test Reactor at

    the Savannah River Site (from ENERGY.GOVs Photostream at http://www.flickr.com/photos/departmentofenergy/).

    In order to promote transparency with stakeholders and the public, the Office of Environmental Management (EM) is posting key project management information. This web page provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each projects performance related to cost, schedule, and scope. The EM cleanup projects address large quantities of radioactive wastes, spent nuclear fuel, excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater resulting from five decades of nuclear weapons production and energy research during the Cold War. The EM cleanup projects fall into several categories including soil and water remediation, ground water remediation, solid waste stabilization and disposition, nuclear and non-nuclear decommissioning and demolition. In each of these cleanup categories, EM has to complete a series of individual projects at the various sites. The cleanup at a site is broken into multiple individual projects with a well-defined scope, schedule, and cost. The table below shows the individual projects EM has completed in each category at each site. At many sites, additional projects are ongoing or will be needed in the future to finish the cleanup in each category. The table highlights the projected costs, actual costs, projected completion dates, and actual completion dates. The EM projects were completed through October 21, 2013 with the following success metrics:

    95 percent (82 of 86 projects) completed all scope defined at project start 90 percent (77 of 86 projects) completed on schedule 83 percent (71 of 86 projects) completed within 10 percent of project budget

  • Environmental Management Completed Projects 2005-Present

    Approved Actual

    SoilandWaterRemediationSoilandWaterRemediation

    ANLE0030a 28$ 30$ 2007 2007 Yes Yes Yes

    NuclearFacilityDeactivationandDecommissioningANLE0040

    18$ 14$ 2009 2010 Yes Yes Yes

    CompletedScope?

    Site Category ProjectName NotesApprovedBudget$M

    ActualCost$MCompletionDate(Calendar

    Year) CostSuccess?ScheduleSuccess?

    G G G

    G G G

    NuclearFacilityDecontaminationandDecommissioningBuilding310

    ANLE0040.NEW.R1.113$ 8$ 2011 2011 Yes Yes Yes

    NuclearFacilityD&DBuilding330ANLE0040.NEW.R1.2

    34$ 15$ 2011 2011 Yes Yes Yes

    Ashtabula,OH SoilandWaterRemediationSoilandWaterRemediation

    OHAB0030a 157$ 147$ 2006 2006 Yes Yes Yes

    ArgonneNationalLaboratory,ILNuclearFacilityDeactivationand

    DecommissioningG G G

    G G G

    G G GOH AB 0030

    SoilandWaterRemediationSoilandWaterRemediation

    BRNL0030a 196$ 202$ 2005 2005 Yes Yes Yes

    NuclearFacilityDecontaminationandDecommissioningBrookhavenGraphiteResearch

    Reactor54$ 74$ 2012 2012 No Yes Yes

    NuclearFacilityDecontaminationandDecommissioningHighFluxBeamReactor 12$ 15$ 2012 2010 No Yes Yes

    BrookhavenNationalLab,NYNuclearFacilityDecontaminationand

    Decommissioning

    R

    G G G

    G G

    GR G

    BRNL0041

    Columbus(WestJefferson),OHNuclearFacilityDecontaminationand

    Decommissioning

    NuclearFacilityDecontaminationandDecommissioning

    OHCL0040a 163$ 163$ 2006 2006 Yes Yes Yes

    SolidWasteStabilizationandDispositionSolidWasteStabilizationandDisposition

    OHFN0013a 1,489$ 1,599$ 2006 2006 Yes Yes Yes

    SoilandWaterRemediationSoilandWaterRemediation

    OH FN 0030a 1,110$ 1,069$ 2006 2006 Yes Yes YesFernald,OH

    G G G

    G G G

    G G GOHFN0030

    NuclearFacilityDecontaminationandDecommissioning

    NonNuclearFacilityDecontaminationandDecommissioning

    OHFN0050a 512$ 234$ 2006 2006 Yes Yes Yes

    NuclearMaterialsStabilizationandDisposition

    NuclearMaterialsStabilizationandDispositionID0011

    35$ 13$ 2012 2010 Yes Yes Yes

    Construction Line Item ProjectSodiumBearingWasteTreatmentPlant

    462$ 571$ 2010 2012 No No Yes

    ,

    R

    G G G

    G G G

    GRConstructionLineItemProject06D401

    462$ 571$ 2010 2012 No No Yes

    SoilandWaterRemediation2012IdahoID0030B.C1

    743$ 548$ 2012 2012 Yes Yes No

    AcceleratedRetrievalProjectVIIIID0030B/CC003

    49$ 38$ 2013 2013 Yes Yes Yes

    BuriedWaste75$ 64$ 2011 2011 Yes Yes No

    IdahoNationalLaboratory,ID

    SoilandWaterRemediation

    R

    G G

    G G G

    G G

    R

    RID0030B.R1.1

    75$ 64$ 2011 2011 Yes Yes No

    InSituGroutingID0030B.R1.2

    23$ 7$ 2011 2011 Yes Yes Yes

    NuclearFacilityDecontaminationandDecommissioning

    NuclearFacilityDecontaminationandDecommissioningINL

    ID0040B753$ 356$ 2012 2012 Yes Yes Yes

    G G

    G G G

    G G G

    R

    10/21/2013 Page 1 of 5

  • Environmental Management Completed Projects 2005-Present

    Approved Actual

    CompletedScope?

    Site Category ProjectName NotesApprovedBudget$M

    ActualCost$MCompletionDate(Calendar

    Year) CostSuccess?ScheduleSuccess?

    InhalationToxicologyLab,NM SoilandWaterRemediationSoilandWaterRemediation

    CBCITL0030a 8$ 11$ 2006 2008 No No Yes

    KansasCityPlant,MO SoilandWaterRemediationSoilandWaterRemediation

    VLKCP0030a 29$ 28$ 2006 2006 Yes Yes YesG G G

    GR R

    LabforEnergyRelatedHealthResearch,CA

    NuclearFacilityDecontaminationandDecommissioning

    NuclearFacilityDecontaminationandDecommissioning

    LEHR0040a 41$ 38$ 2005 2005 Yes Yes Yes

    SolidWasteStabilizationandDispositionSolidWasteStabilizationandDisposition

    LLNL0013a 74$ 72$ 2006 2005 Yes Yes Yes

    SoilandWaterRemediationLLNL0030

    a 123$ 123$ 2006 2005 Yes Yes YesLawrenceLivermoreNationalLab,CA

    G G G

    G G G

    G G G

    LLNL 0030

    SoilandGroundwaterRemediationProject,Site300VLLLNL0031

    a,c 54$ 125$ 2008 2010 No No Yes

    LawrenceBerkeleyNationalLab,CA

    SoilandWaterRemediationSoilandWaterRemediation

    CBCLBNL0030a 34$ 34$ 2006 2007 Yes No Yes

    NuclearFacilityDecontaminationandDecommissioning

    DecontaminationandDecommissioningoftheTritiumSystemsandTestAssembly(TSTA)Facility, 15$ 14$ 2010 2010 Yes Yes Yes

    CASoilandWaterRemediation

    G G G

    G G

    G

    R

    RR

    DecommissioningCapitalAsset

    DPSiteMDABLANL0030.R1.1

    111$ 132$ 2012 2013 No Yes Yes

    DefenseSoilandGroundwaterGroundwaterWellsLANL0030.R1.2

    45$ 37$ 2012 2011 Yes Yes Yes

    NuclearFacilityDecontaminationandD i i i

    DefenseDecontaminationandDecommissioningTA21 74$ 49$ 2012 2011 Yes Yes Yes

    LosAlamosSiteOffice,NM SoilandWaterRemediation

    G G G

    G G G

    GR G

    DecommissioningLANL0040D.R1

    $ $

    MoabUMTRAProject,UT SoilandWaterRemediationUraniumMillTailingsRemediationProject(UMTRA)

    CBCMOAB0031.C141$ 39$ 2012 2010 Yes Yes Yes

    SolidWasteStabilizationandDispositionSolidWasteStabilizationandDisposition

    OHMB0013a 202$ 265$ 2006 2006 No Yes Yes

    SoilandWaterRemediationa 164$ 250$ 2006 2006 No Yes Yes

    G G G

    G

    G

    G

    G

    R

    ROHMB0030

    a 164$ 250$ 2006 2006 No Yes Yes

    SoilandWaterRemediationOU1OHMB0031

    34$ 43$ 2008 2011 No No Yes

    MoundOU1OHMB0031NEW.R1

    20$ 18$ 2011 2011 Yes Yes Yes

    NuclearFacilityDecontaminationandNuclearFacilityDecontaminationand

    Decommissioning a 484$ 505$ 2006 2006 Yes Yes Yes

    Mound,OH SoilandWaterRemediation

    G G G

    G G G

    GR R

    DecommissioningDecommissioningOHMB0040

    a 484$ 505$ 2006 2006 Yes Yes Yes

    NevadaTestSite,NV SolidWasteStabilizationandDispositionSolidWasteStabilizationandDisposition

    VLNV001330$ 29$ 2008 2009 Yes No Yes

    G G G

    G GR

    10/21/2013 Page 2 of 5

  • Environmental Management Completed Projects 2005-Present

    Approved Actual

    CompletedScope?

    Site Category ProjectName NotesApprovedBudget$M

    ActualCost$MCompletionDate(Calendar

    Year) CostSuccess?ScheduleSuccess?

    ConstructionLineItemProjectU233DispositionProjectBuilding3019

    OR0011Z240$ 225$ 2020 2011 Yes Yes No

    SolidWasteStabilizationandDispositionSolidWasteStabilizationandDisposition

    OR0013a 461$ 465$ 2006 2006 Yes Yes YesG G G

    G G R

    SoilandWaterRemediationOR0030

    a 352$ 351$ 2006 2006 Yes Yes Yes

    SoilandWaterRemediationOffsitesOR0031

    a 13$ 11$ 2012 2010 Yes Yes Yes

    Zone1RemedialActionOR0040 C2

    19$ 19$ 2017 2011 Yes Yes Yes

    SoilandWaterRemediation

    G G G

    G G G

    G G GOR 0040.C2

    ETTPMainPlantAreaDecontaminationandDecommissioningFacilities

    OR0040.C319$ 11$ 2017 2011 Yes Yes Yes

    K27DemolitionPreparationProjectOR0040.R1.1

    27$ 26$ 2012 2011 Yes Yes Yes

    K33DemolitionProjectOR 0040 R1 2

    65$ 58$ 2012 2012 Yes Yes Yes

    G G G

    G G G

    G G GOR0040.R1.2

    K33Slab&SoilsBuyBackOR0040.R1.3

    23$ 14$ 2012 2013 Yes Yes Yes

    Cell6ExpansionOR0041.C1

    31$ 22$ 2012 2011 Yes Yes Yes

    DisposalFacilityExpansionCell5OR 0041 R1 3

    13$ 9$ 2011 2011 Yes Yes Yes

    OakRidge,TN

    G G G

    G G G

    G GG

    OR0041.R1.3$ $

    DisposalFacilityExpansionSanitaryLandfillOR0041.R1.4

    11$ 9$ 2012 2011 Yes Yes Yes

    Y12BiologyComplexDecontaminationandDecommissioningOR0041.NEW.R1.2

    30$ 14$ 2011 2011 Yes Yes Yes

    TankW1A48$ 51$ 2012 2012 Yes Yes Yes

    NuclearFacilityDecontaminationandDecommissioning

    G G G

    G G G

    G G GOR0042.C1.1

    48$ 51$ 2012 2012 Yes Yes Yes

    FacilityDemolitionBuilding3026/WoodenFacilitiesOR0042.R1.2

    13$ 12$ 2011 2011 Yes Yes Yes

    BethelValleyBurialGroundsOR0042.R1.5

    16$ 18$ 2011 2011 Yes Yes Yes

    FacilityDemolitionSmallFacilities11$ 12$ 2012 2012 Yes Yes Yes

    G G G

    G G G

    G G GOR0042.R1.6

    11$ 12$ 2012 2012 Yes Yes Yes

    NonDefenseFacilityDemolition2000ComplexOR0042.NEW.R2.2

    13$ 9$ 2011 2011 Yes Yes Yes

    OfficeofRiverProtection,WA SolidWasteStabilizationandDispositionSYFarmTransferLineUpgrade

    ORP0014.R1.518$ 15$ 2011 2011 Yes Yes Yes

    G G G

    G G G

    G G G

    10/21/2013 Page 3 of 5

  • Environmental Management Completed Projects 2005-Present

    Approved Actual

    CompletedScope?

    Site Category ProjectName NotesApprovedBudget$M

    ActualCost$MCompletionDate(Calendar

    Year) CostSuccess?ScheduleSuccess?

    SoilandWaterRemediationSoilandWaterRemediation

    VLPX0030a,c 168$ 186$ 2008 2010 No No Yes

    NuclearFacilityDecontaminationandDecommissioning

    NuclearFacilityDecontaminationandDecommissioning

    VL PX 0040a,c 18$ 15$ 2007 2007 Yes Yes Yes

    PantexPlant,NM

    G

    G G G

    R R

    gVLPX0040

    ConstructionLineItemProjectDepletedUraniumHexafluorideConversionProject

    (DUF6)Portsmouth&Paducah02U101

    346$ 580$ 2008 2010 No No Yes

    NuclearFacilityDecontaminationandDecommissioningPaducahGaseousDiffusionPlant

    PA0040.C130$ 35$ 2012 2012 No Yes Yes

    C746AEastEndSmelterProjectPA0040 R1 3

    32$ 19$ 2011 2011 Yes Yes Yes

    PortsmouthPaducahProjectOffice(PPPO),KYandOH NuclearFacilityDecontaminationand

    DecommissioningG G G

    G

    G

    G

    R

    R

    R

    PA 0040.R1.3

    C340ComplexDecontaminationandDecommissioningPA0040.R1.2

    36$ 36$ 2011 2011 Yes Yes Yes

    SoilandWaterRemediationGroundwaterRemedyImplementationfor200ZP1

    and100DXTreatmentSystemsRL0030.C

    385$ 336$ 2011 2012 Yes Yes Yes

    UPlant/OtherDecontaminationandDecommissioning 257$ 206$ 2011 2012 Yes Yes Yes

    Decommissioning

    G G G

    G G G

    G G G

    RL0040.R1.1

    OuterZoneDecontaminationandDecommissioningRL0040.R1.2

    115$ 89$ 2011 2011 Yes Yes Yes

    100KAreaRemediationRL0041.R1.1

    203$ 188$ 2012 2011 Yes Yes Yes

    ERDFCellExpansionRL 0041 R1 2

    56$ 48$ 2012 2011 Yes Yes YesRichland,WA

    G G G

    G G G

    G G GRL0041.R1.2

    $ $

    AcceleratedRemediation&DisposalRL0041.R1.3

    89$ 49$ 2012 2011 Yes Yes Yes

    SuperCell10RL0041.R1.4

    36$ 29$ 2012 2011 Yes Yes Yes

    61810TrenchRemediation72$ 57$ 2012 2011 Yes Yes Yes

    ,NuclearFacilityDecontaminationand

    DecommissioningG G G

    G G G

    G G GRL0041.R2

    72$ 57$ 2012 2011 Yes Yes Yes

    TrenchRemediation61810RL0041.R3

    20$ 20$ 2012 2012 Yes Yes Yes

    NuclearMaterialsStabilizationandDisposition

    NMStabilizationandDispositionRF0011

    b 2006 2005 Yes Yes Yes

    Solid Waste Stabilization and DispositionSolidWasteStabilizationandDisposition

    b 2006 2005 Yes Yes Yes

    G G G

    G G G

    G G GSolidWasteStabilizationandDispositionRF0013

    b 2006 2005 Yes Yes Yes

    NuclearFacilityDecontaminationandDecommissioningNorthSideFacilityClosures

    RF0040b 2006 2005 Yes Yes Yes

    NuclearFacilityDecontaminationandDecommissioningSouthSideFacilityClosures

    RF0041b 2006 2005 Yes Yes Yes

    7,500$ 6,707$

    NuclearFacilityDecontaminationandDecommissioning

    RockyFlats,CO

    G G G

    G G G

    G G G

    10/21/2013 Page 4 of 5

  • Environmental Management Completed Projects 2005-Present

    Approved Actual

    CompletedScope?

    Site Category ProjectName NotesApprovedBudget$M

    ActualCost$MCompletionDate(Calendar

    Year) CostSuccess?ScheduleSuccess?

    SaltstoneDisposalUnit2SR0014.C3.1

    32$ 33$ 2012 2012 Yes Yes Yes

    SaltstoneDisposalUnits3&5SR0014.C3.2

    77$ 69$ 2014 2013 Yes Yes Yes

    RadioactiveLiquidTankWasteStabilizationandDisposition

    G G G

    G G G

    PAreaAshBasinRemedialActionProjectSR0030.R1.3

    30$ 18$ 2011 2011 Yes Yes Yes

    RAreaAshBasinRemedialActionProjectSR0030.R1.5

    12$ 10$ 2011 2011 Yes Yes Yes

    PReactorDecommissioningProjectSR0030 R1 2

    142$ 81$ 2012 2012 Yes Yes Yes

    SavannahRiverSite,SC

    SoilandWaterRemediation

    G G G

    G G G

    G G GSR 0030.R1.2

    RReactorDecommissioningProjectSR0030.R1.4

    149$ 78$ 2012 2012 Yes Yes Yes

    HeavyWaterComponentsTestReactorBuildingDecommissioningSR0030.R3.2

    11$ 8$ 2011 2011 Yes Yes Yes

    SandiaNationalLaboratory,NM SoilandWaterRemediationSoilandWaterRemediation

    VL SN 0030a,c 50$ 59$ 2006 2010 No No Yes

    NuclearFacilityDecontaminationandDecommissioning

    G G G

    G G G

    GR RVLSN0030

    SeparationsProcessReactorUnit,NY

    SoilandWaterRemediationContaminatedSoilRemovalNorthField

    SPRU0040.R1.215$ 13$ 2011 2011 Yes Yes Yes

    StanfordLinearAcceleratorCenter,Stanford,CA

    SoilandWaterRemediationSoilandWaterRemediation2SLAC

    CBCSLAC0030.R133$ 40$ 2012 2011 No Yes Yes

    WestValleyDemonstrationP j NY

    NuclearFacilityDecontaminationandD i i i

    MainPlantDecontaminationandDecommissioningWV 0040 C1

    46$ 100$ 2012 2011 No Yes NoR R

    G G G

    G G

    G

    R

    Project,NY Decommissioning WV0040.C1$ $

    18,889$ 17,436$ 71 77 82

    83% 90% 95%

    (a)Theseprojectswerebaselinedatdifferenttimesandunderdifferentguidance.Thecost,schedule,andscopesuccessismeasuredagainstvaluesreportedtoCongressinJuly2004bytheDepartmentofEnergy'sOfficeofManagementandBudget.(b)RockyFlatsClosureProjectcost,schedule,andscopesuccessismeasuredagainstthe2001ClosureBaseline.(c)ProjectsachievedPhysicalCompletionin2009.FormalProjectCloseout(CriticalDecision4)documentationwascompletedin2010.

    Total(of86Projects)

    %Success

    10/21/2013 Page 5 of 5