Environmental Impact Assessment Report for Xiangyang Urban Transportation Project with World Bank Loan (FINAL VERSION TO WORLD BANK) Prepared by : China Railway Siyuan Survey and Design Group Co., Ltd. Class A: G.H.P.Z.J.Zi No.2605 Construction unit: Xiangyang Construction Investment & Operation Co., Ltd. Nov 2011 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 03-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Environmental Impact Assessment Report

    for Xiangyang Urban Transportation

    Project with World Bank Loan

    (FINAL VERSION TO WORLD BANK)

    Prepared by : China Railway Siyuan Survey and Design Group Co., Ltd.

    Class A: G.H.P.Z.J.Zi No.2605

    Construction unit: Xiangyang Construction Investment & Operation Co.,

    Ltd.

    Nov 2011

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • Table of Contents

    1.0 General

    description……………………………………………………………………………45

    1.1 General situation of the project

    ……………………………………………………………...45

    1.2 OBJECTIVE OF ENVIRONMENTAL IMPACT ASSESSMENT …………………………………………..56

    1.3 GUIDING IDEOLOGY ………………………………………………………………………….…..67

    1.4 ASSESSMENT BASIS ……………………………………………………………………….… …..67

    1.5 ASSESSMENT RATING AND SCOPE ………………………………………………….……… …….89

    1.6 ASSESSMENT FACTORS

    …………………………………………………………………….……1011

    1.7 ASSESSMENT STANDARD

    ………………………………………………………….…………….1011

    1.8 ASSESSMENT PREDICTION TIME INTERVAL …………………………………………….……

    …..1314

    1.9 EMPHASES OF THE ASSESSMENT ……………………………………………………………

    …..1314

    1.10 ASSESSMENT TECHNICAL METHOD ………………………………………………………

    ……1415

    1.11 IDENTIFICATION OF THE CONSTRUCTION PROJECT IMPACT ELEMENTS

    …………………………1415

    1.12 ENVIRONMENT PROTECTION OBJECT

    …………………………………………………………..1718

    2.0 Overview of the project……………………………………………………………………..

    .2425

    2.1 URBAN ROAD COMPONENT………………………………………………………………………

    2526

    2.2 PT

    COMPONENT…………………………………………………………………………………2728

  • 2.3 TRAFFIC MANAGEMENT COMPONENTAS………………………………………………………….

    3637

    2.4 SUB-PROJECT OF ORGANIZATION DEVELOPMENT AND CAPACITY CONSTRUCTION

    ………………..3738

    2.5 INVESTMENT ESTIMATION AND FINANCING

    ………………………………………………………3738

    2.6 GENERAL IMPLEMENTATION PROGRESS FOR THE PROJECT

    ……………………………………….3839

    2.7 OVERVIEW OF THE PROJECT LAND OCCUPATION………………………………………………….

    3940

    2.8 THE EARTH WORK

    ………………………………………………………………………………..3940

    2.9 OVERVIEW OF THE INTERIM LAND OCCUPATION ………………………………………………

    …4344

    3.0 Overview of natural environment and social environment………………………………

    4546

    3.1 NATURAL ENVIRONMENT OVERVIEW

    ……………………………………………………………4546

    3.2 SOCIAL ENVIRONMENT OVERVIEW

    ………………………………………………………………4950

    3.3 OVERVIEW OF INFRASTRUCTURE DEVELOPMENT IN PROJECT AREA……………………………..

    5354

    3.4 PROJECT AREA WHERE VARIOUS TYPES OF PROTECTED AREAS AND PROTECTION OF HISTORICAL

    AND CULTURAL OVERVIEW…………………………………………………………………………..

    7071

    4.0 Survey and assessment of existing environment

    …………………………………………...7475

    4.1 SURVEY AND ASSESSMENT OF EXISTING ECOLOGICAL ENVIRONMENT

    ……………………….…..7475

    4.2 SURVEY AND ASSESSMENT OF EXISTING ACOUSTIC ENVIRONMENT

  • ……………………………...7677

    4.3 SURVEY AND ASSESSMENT OF EXISTING WATER ENVIRONMENT

    …………………………………7879

    4.4 SURVEY AND ANALYSIS OF EXISTING AMBIENT AIR

    ………………………………………………8081

    5.0 Scheme comparison and selection

    …………………………………………………………..8384

    5.1 ZERO-SCHEME COMPARISON

    …………………………………………………………………….8485

    5.2 ROAD CROSS SECTION COMPARISON AND SELECTION

    ………………………………………….8586

    5.3 COMPARISON AND SELECTION FOR ROAD STRIKE

    ………………………………………………..9394

    5.4 BUS YARD SITE COMPARISON AND SELECTION

    ………………………………………………….9495

    6.0 Environmental Impact Assessment

    …………………………………………………………9798

    6.1 ENVIRONMENTAL IMPACT ANALYSIS DURING CONSTRUCTION PERIOD

    ………………………….9798

    6.2 ANALYSIS OF ENVIRONMENTAL IMPACT DURING OPERATION PERIOD

    ………………………….106107

    6.3 ANALYSIS OF IMPACT ON WATER AND SOIL LOSS

    ……………………………………………….126127

    6.4 IMPACT ON TRAVEL AND LIVING QUALITY OF THE RESIDENTS ALONG THE ROAD

    ………………132133

    6.5 ANALYSIS OF DEMOLITION AND RESETTLEMENT OF THE PROJECT

    ……………………………..133134

    6.6 ACCIDENT RISK ANALYSIS……………………………………………………………………..

    135136

    6.7 ANALYSIS OF WASTEWATER DISCHARGE ABILITY IN PANGGONG DISTRICT DURING OPERATION

  • PERIOD…………………………………………………………………………………………….

    139140

    6.8 APPLICATION OF ENVIRONMENT, HEALTH AND SAFTY GUIDE LINES………………………… 140141

    7.0 Public Consultations and Information Publicity

    …………………………………………142143

    7.1 PURPOSE AND SIGNIFICANCE…………………………………………………………………..

    142143

    7.2 SURVEY SCOPE AND MODES……………………………………………………………………

    142143

    7.3 SURVEY RESULTS

    ……………………………………………………………………………….151152

    8.0 Environmental Management Plan………………………………………………………...

    159160

    9.0 Overall Conclusions

    ………………………………………………………………………..159160

    1.0 General description

    1.1 General situation of the project

    1.1.1 Name of the project

    Xiangyang Urban Transportation Project with Loan of World Bank

    1.1.2 Composition of the project

    Xiangyang Urban Transportation Project with Loan of World Bank, according to the

    different administration and implementation organizations, is divided into 4 sub-

    projects of PT component,urban road component,traffic management componentas

    well as the organization development and capability construction sub-project.

    1.1.3 Location of the project

    All contents of the project are distributed within the scope of Xiangyang urban area,

    the newly built roads of the Urban road component in civil works are located at

    PangGong new zone of Xiangcheng District of Xiangyang; In the PT component, the

    improvement project of 13 public transport corridors will cross Fancheng District and

    Xiangcheng District,, newly built Xianshan parking and service yard is located within

  • Panggong new zone of Xiangcheng district, newly built Xiangyang Economic

    Development Zone parking and service yard is inside Shenzhen Industrial Park of

    Xiangzhou district. Details refer to the diagram of its geographic location.

    1.1.4 Construction unit

    Xiangyang Urban Investment & Operation Co., Ltd.

    1.1.5 Background of the project

    Along with the drawing up of the national strategy of “the growing up of Central

    China”, Xiangyang as a sub-central city in Hubei, the most important metropolis in

    northwest of Hubei has met with unprecedented development opportunities. Resort to

    its unique geographical location and convenient traffic conditions, Xiangyang shall

    enjoy with the stronger external radiation and industrial cohesion. At present, the

    traffic construction of Xiangyang is faced with austere challenges, the location

    advantage shall be changed into the economic advantage only by taking the traffic or

    communication as a bridge, and embodying the urban fascination and enhancing the

    urban comprehensive competitive power needs to construct a modernized urban

    traffic system. In order to improve the urban traffic and urban functions, boost the

    construction of the experiment zone reform test of state level of Xiangyang urban

    circle, at the same time, it’s necessary to further increase the force or the traffic

    construction and meet the traffic demand of continuous development.

    In July 2009, at the loan project meeting jointly held by National Development and

    Reform Commission and Ministry of Finance, World Bank agreed to the draft

    resolution of USD 100,000,000 loan to Xiangfan urban traffic project. At the meeting,

    each party planned to submit the project to be built to the board of director of World

    Bank for approval, in order to be included into World Bank 2012 financial loan

    program.

    From Nov. 5~6, 2009, World Bank dispatched the first delegation to Xiangfan for

    conducting the preliminary communication for this project.

    In May 2010, the Proposal for Utilizing World Bank Loan by Xiangfan Urban Project

    Construction by Xiangfan city, Hubei Province was completed.

    In Dec. 2010, World Bank further promoted conducting the feasibility study on

    Xiangyang Urban Transportation Project with loan of World Bank by Xiangyang,

    perfecting the road network system of Panggong area, boosting the construction on

    the parking lots and public traffic stations. Greatly implement the strategy of “public

  • traffic preference”, enhance the public traffic service level. Strengthen the traffic

    control and get done with the traffic jam removal and smooth traffic protection work.

    From January 13 to January 16, 2011, feasibility study consultants did a 12-hour

    traffic volume survey of Changhong Bridge, No.1 Han River Bridge, and so as the on-

    site reconnaissance of Panggong road network. Then they made a full communication

    with Project Office of Xiangyang Construction Investment Co. Ltd.

    From March 30 to April 1, 2011, a delegation of World Bank experts went to

    Xiangyang. They gave a preliminary discussion of the program, made the feasibility

    study of the component report .

    From April 25 to April 28, 2011, World Bank experts were in conjunction with

    Project Office of Xiangyang Urban Construction Investment Co., Ltd., once again

    clarify the urban road component job content and scope of work.

    From June 13 to June 18, 2011, a delegation of World Bank experts was in

    conjunction with Yangyang Public Transport Company and Xiangyang City traffic

    police detachment on items pre-assessment of the road sub and proposed

    improvement measures for specific projects.

    1.2 Objective of environmental impact assessment

    The construction and operation of the project shall have certain impact on the

    environment of the area for building the project, on basis of investigation on the

    current situation of the project area, through analysis on its pollution, the assessment

    intends to predict the impact of the project construction on the environment, put

    forward the feasible measures for controlling the pollution and alleviating the impact,

    in order to provide reference to the decision making for the project, guide the design

    for its environment protection and the environment management for its construction

    period and operation period, enable the construction of the project to reach the

    unification of economic benefit, social benefit and environment benefit.

    1.3 Guiding ideology

    The guiding ideology of the assessment is based on the detailed project analysis, in

    accordance with the requirement of Technical Guidance Rules for Environmental

    Impact Assessment (HJ/T2.1-93, HJ/T2.3-93, HJ/T2.2-2008, HJ/T2.4-1995, HJ19-

    2011) and Environmental Impact Assessment Codes for Highway Construction

    Works(trial) (JTJ 005-96), fully utilized the current basic information and use for

    reference the related highway construction works assessment results, reasonably

    determined the assessment scope, monitoring items. And according to the

    characteristics of the project, selected the most representative monitoring locations,

  • monitoring factors and predictive models. The conclusion would be maximally

    scientific, objective, just, clear and reliable.

    1.4 Assessment basis

    1.4.1 Laws, rules and regulations and policies of the country

    (1) Environmental Protection Law of the People’s Republic of China, implemented on

    Dev. 26, 1989;

    (2) Law of the People’s Republic of China on Environmental Impact Assessment,

    implemented on Sept 1, 2003;

    (3) Law of the People's Republic of China on the Prevention and Control of

    Atmospheric Pollution, implemented on Sept 1, 2000;

    (4) Law of the People's Republic of China on Prevention and Control of Pollution

    from Environmental Noise, implemented on March 1, 1997;

    (5) Law of the People's Republic of China on Prevention and Control of Water

    Pollution, revised on Feb. 28, 2008;

    (6) Law of the People’s Republic of China on the Prevention and Control of

    Environmental Pollution, implemented on April 1, 2005;

    (7) Urban and Rural Planning Law of the People’s Republic of China, implemented

    on Jan. 1, 2008;

    (8) Law of the People's Republic of China on Land Management, implemented on

    August 28, 2004;

    (9) Law of the People's Republic of China on Water and Soil Conservation,

    implemented on June 29, 1991;

    (10) The People's Republic of China- State Council (1998) No. 253 order for

    Regulations for Environmental Protection Management for the Construction Works,

    implemented on Dec. 12, 1998;

    (11) Document of State Environmental Protection Administrative Bureau H.F.[2003]

    No.94: Notification Relating to Environmental Noise in the Environmental Impact

    Assessment for highway, railway (include light railway) and other construction

    works;

    (12) State Environmental Protection Administrative Bureau H.F. 2006[No. 28]

    Tentative Procedure for the Public Participating the Environmental Impact

    Assessment; implemented on March 18, 2006.

    1.4.2 Local rules, policies and documents

    (1) Environmental Protection Regulations of Hubei revised), Hubei Provincial

    People’s Standing Commission, implemented on Jan.1, 1998;

    (2) Regulations for Atmosphere Pollution Control in Hubei, Hubei Provincial

    People’s Congress Standing Commission, implemented on Dec. 3, 1997;

  • (3) Regulations for Hubei Urban Environmental Noise Control, Hubei Provincial

    People’s Congress Standing Commission, implemented on April 1, 1987;

    (4) Procedure for Hubei to Implement the People’s Republic of China Water

    Pollution Control Law, implemented on Jan. 1, 2001;

    (5) Implementation Procedures for Xiangfan Urban Construction Wastes Control,

    X.F.Z.F[2005] No.36;

    (6) Procedure for Controlling Xiangyang Urban Hightime Construction, Xiangyang

    People’s Government ordinance No. 16.

    1.4.3 Relevant documents of World Bank

    (1) World Bank OP/BP4.01 and appendixes (environmental assessment), Jan. 1999;

    (2) World Bank OP/ (environmental assessment), Jan. 1999;

    (3) Documents assembly of World Bank environmental impact assessment.

    �4�General guidelines on environment, health and safety, World Bank/IFC, 2008�

    1.4.4 Documents related to the planning and environmental function division

    (1) Xiangfan Urban Master Plan (2008—2020);

    (2) Xiangfan Overall Planning of Land Uses (1997—2010);

    (3) Xiangfan Comprehensive Urban Traffic Planning (2007);

    (4) Xiangfan Urban Public Traffic Planning(2007�2020);

    (5) Xiangcheng district Planning for Ancient City Protection (2007);

    (6) Panggong New Zone Planning (2010);

    (7) Xiangfan environmental function division;

    (8) Xiangfan statistical yearbook and related statistics bulletin in past years.

    1.4.5 The project design information

    (1) The Feasibility Study Report on Xiangyang Urban Transportation Project with

    World Bank Loan (general report) 2011.10;

    (2) The Feasibility Study Report on Xiangyang Urban Transportation Project with

    World Bank Loan (PT component) 2011.10;

    (3) The Feasibility Study Report on Xiangyang Urban Transportation Project with

    World Bank Loan (urban road component) 2011.10;

    (4) The Feasibility Study Report on Xiangyang Urban Transportation Project with

    World Bank Loan (traffic management componentas) 2011.10.

    1.4.6 Technical codes for environmental impact assessment

    (1) The People’s Republic of China environmental protection industry standard

    HJ/T2.1-93 Environmental Impact Assessment Technical Guide Rules-General

    Principles;

  • (2) The People’s Republic of China environmental protection industry standard

    HJ2.2-2008 Environmental Impact Assessment Technical Guide Rules-Atmosphere

    environment;

    (3) The People’s Republic of China environmental protection industry standard

    HJ/T2.3-93 Environmental Impact Assessment Technical Guide Rules-surface water

    environment;

    (4) The People’s Republic of China environmental protection industry standard

    HJ/T2.4-2009 Environmental Impact Assessment Technical Guide Rules·-acoustic

    environment;

    (5) The People's Republic of China environmental protection industry standard HJ19-

    2011 Environmental Impact Assessment Technical Guide Rules-ecological impact;

    (6) The People’s Republic of China industrial standard-code for Highway

    Construction Environment Impact Assessment (JTG B03-2006).

    1.4.7 Standard letters of affirmation

    Letters of Xiangyang Environmental Protection Bureau Relating to Environmental

    Impact Assessment Implementation Standard for Xiangyang Urban Transportation

    Project with World Bank Loan (X.H.P[2011]No.25).

    1.5 Assessment rating and scope

    1.5.1 The division method stipulated by World Bank OP4.01

    According to the division method stipulated by World Bank business handbook—

    Environmental Impact Assessment (OP4.01), the assessment type is divided as type

    B.

    1.5.2 Work class of domestic environmental impact assessment

    Work class of domestic environmental impact assessment is different to that of World

    Bank, according to technical guide rules of environmental impact assessment of

    China, the assessment work classes are divided into 3 classes. According to the

    characteristics and the local environmental characteristics of the sub-project to be

    constructed, in accordance to the technical guide rules of environmental impact

    assessment and code for highway environmental impact assessment on the topic of

    each sub-project assessment and the assessment work class, the determined results

    refer to table 1-1.

    Table 1-1 Assessment topic and assessment work class division

    Name of sub-

    project

    Assessment

    topic Rating Rating determination basis

  • Ecology Class 1

    Impact scope

  • Air Public traffic station project scope and its construction possible

    involved area.

    Water

    environment

    Not divide the assessment scope, only conduct the discharge

    standard qualification analysis.

    1.6 Assessment factors

    According to the pollution characteristics of the project, through selection and

    identification, environmental impact assessment factors of each assessment topic refer

    to Table 1-3.

    Table 1-3 Summary table for main factors of environmental impact assessment

    Assess main factors Assessment

    elements Construction period Operation period

    Acoustic

    environment

    Equivalent continuous acoustic

    level A Equivalent continuous acoustic level A

    Vibration

    environment VLzmax VLz10

    Water

    environment SS, COD, oil, etc.

    PH,BOD5,COD, animal and vegetable oil, oil type,

    ammonia nitrogen

    Environment

    air TSP NOX(NO2),CO

    Solid wastes Construction waste, domestic

    waste

    Domestic waste of the public traffic station staff and

    passenger carried waste.

    Ecological

    environment

    Water and soil loss, urban

    greening Landscape, vegetation recovery.

    1.7 Assessment standard

    1.7.1 Acoustic environment

    According to letters of standard affirmation, assessment adopted acoustic

    environmental noise refers to Table 1-4.

    Table 1-4 Implemented standards for acoustic environment assessment

    Standard No. Standard

    name

    Standard value and

    class

    (Type)

    Scope of application Remarks

    Southeast section of inner ring road, Xingguang

    Avenue, Jianghua Road, Xiangyang Road,Zhakou

    Road,Panggong Road, planned No.13 road, area of

    the building facing to one side of the road.

    Next to the

    road is 3f or

    over building

    Class 4a area:

    Daytime 70dB(A)

    Night time

    55dB(A) The adjacent is type 2,3 standard applicable area,

    respectively area within 35,25m to the road

    boundary line

    Next to the

    road is 3f or

    less building

    GB3096-2008

    Acoustic

    environment

    quality

    standard

    Class 3 area:

    Day time 65dB(A)

    Night time

    55dB(A)

    Scope of industrial area

  • Class 2 area:

    Day time 60dB(A)

    Night time

    50dB(A)

    Other areas and other sensitive points of project

    scope

    Include

    school class

    rooms and

    hospital

    within class 4

    area

    GB12348-2008

    Environment

    noise

    discharge

    standard for

    industrial

    enterprise

    boundary

    for industrial

    enterprise

    boundary

    Class 2 area:

    Day time 60dB(A)

    Night time

    50dB(A)

    Public traffic station(Xianshan parking and service

    yard, Xiangzhou district-Shenzhen Industrial Park

    Parking and Service Yard, railway public traffic

    hub)1m outside the boundary

    GB12523-90

    Noise Limits

    for

    Construction

    Site

    Earthwork period:

    Day time75dB,

    Night time 55d B;

    Piling period: Day

    time 85dB, Night

    time no

    construction;

    Structural period:

    Day time

    70dB,Night time

    55d B;

    Decoration period:

    Day time 65dB,

    Night time 55d B.

    With the boundary line of relevant construction site

    of sensitive areas

    1.7.2 Vibration environment

    According to letters of standard affirmation, vibration environment standards refer to

    Table 1-5.

    Table 1-5 Implemented standards for vibration environment assessment

    Standard

    No.

    Standard

    name

    Standard value

    and class Scope of application

    Standard

    Selection

    basis

    Mixed area

    standard: Day

    time 75dB,

    Night time

    72dB

    Sensitive points located within

    noise function division type “2”

    area

    Industrial area

    standard: Day

    time75dB, Night

    time 72dB

    Sensitive points located within

    noise function division type “3”

    area GB10070-

    88

    Environment

    vibration

    standard for

    urban area Standard value

    for two sides of

    primary traffic

    road network:

    Day time75dB,

    Night time

    72dB

    Sensitive points located within

    noise function division type “4a”

    area

    Determination

    for the

    standard class

    refers to noise

    function area

    type

  • 1.7.3 Water environment

    The project is mainly urban road, sewage during construction period and operation

    period is sewage pipe network of urban drained sewage, finally entering urban sewage

    treatment plant, according to the letter of standard affirmation, sewage discharge

    standard is implementing class 3 Standard of sewage comprehensive discharge

    standard (GB8978-1996), details refer to Table 1-6.

    Table 1-6 Implemented standard for water environment assessment

    Standard No. Standard name Standard value

    and class Pollutants Standard value(mg/L)

    pH 6 9

    SS 400

    BOD5 300

    COD 500

    Oil type 20

    Animal and

    vegetation oil

    v���

    100

    Ammonia nitrogen

    /

    GB8978-1996

    Comprehensive

    sewage discharge

    standard

    Class 3

    LAS 20

    This project is close to Han River, according to the function division for Xiangyang

    earth’s surface water environment, Hanjiang section where the project is located is

    type � water body, and the water quality standard refers to Table 1-7.

    Table 1-7 Han River water environment quality standard for the project area

    Standard No. Standard name

    Standard

    value and

    class

    Pollutants Standard value(mg/L)

    pH 6~9

    SS 0.2

    BOD5 4

    COD 20

    Oil type 0.05

    Ammonia nitrogen

    1.0

    GB3838-2002

    Earth’s surface

    water

    environment

    quality standard

    Type �

    LAS 0.2

  • 1.7.4 Atmosphere environment

    According to letters of standard affirmation, atmosphere environment quality standard

    for the area along the project shall implement class 2 standard of Ambient Air Quality

    Standard (GB3095-1996), details refer to Table 1-8.

    Table 1-8 Implemented standard for atmosphere environment assessment

    Standard No. Standard name

    Standard value and class

    Pollutants Standard value(mg/cubic

    meter)

    Annual mean 0.2 TSP

    Daily mean 0.3

    Annual mean 0.05

    Daily mean 0.10 NOX

    1h mean 0.15

    Annual mean 0.04

    Daily mean 0.08 NO2

    1h mean 0.12

    Daily mean 4.0

    GB3095-1996

    Embient air quality standard

    Class 2

    CO

    1h mean 10.0

    1.8 Assessment prediction time interval

    This assessment time intervals are construction period and operation period.

    Construction is same to the project construction period; Operation period is consistent

    to vehicle flow prediction year. Namely:

    Construction period: 2011y~2015y.

    Operation period: 2015y~2020y.

    1.9 Emphases of the assessment

    According to major potential environment impact of the project and the regional

    environment sensitive degree, this assessment takes the topic of the following

    environmental impact assessment as emphases of the assessment:

    (1)Topic on acoustic environmental impact assessment: Stress on assessing the impact

    of the project operation on schools, hospitals and concentrated residents quarters at

    two sides of the road.

    (2)Topic on urban ecological environmental impact assessment: Mainly analyze the

    harmony of the road landscape and the surrounding environment.

  • (3)Topic on environment air impact assessment: Stress on assessing the impact of

    vehicle tail gas on schools, hospitals and concentrated residents quarters at two sides

    of the road.

    (4)Public participation: Stress on investigation for units, schools, hospitals and

    concentrated residents quarters at two sides of the road.

    1.10 Assessment technical method

    According to the principle of “based on the point, combining point with the line and

    feedback of whole line, it’s adopted mode calculation, analog method and

    investigation and research method for conducting assessment.

    Ecological environment is adopted the method of data collection and diagnosis; water

    environment assessment is adopted analog method; Acoustic and atmosphere

    environment assessments are adopted mode calculation method; Social environment is

    adopted diagnosis method; Risk analysis is adopted the method of probability analysis

    combining with mode prediction.

    1.11 Identification of the construction project impact elements

    According to the construction project nature and the improvement of the traffic

    environment and discharge characteristics of pollutants and others, environment

    impact elements identification table for the project impact environment is adopted

    for identifying the degree and nature of the project impact element on the

    environment, identification results refer to Table 1-9, Table 1-10.

  • Table 1-9 Identification of environment impact element degree of the project

    Natural environment Ecological resources Social environment Living quality

    Environment

    resources Under-

    round

    hydrolog

    y

    Undergroun

    d

    water quality

    Surface

    hydrology

    Surface

    Water

    quality

    Atmospher

    e

    quality

    Noise

    environment

    Urban

    ecology

    Fore

    st

    veg

    etat

    ion

    Wil

    d a

    nim

    al

    Aquat

    ics

    anim

    al

    Endanger

    ed

    anim

    al

    Fis

    hin

    g

    bre

    edin

    g

    Lan

    d u

    se

    Indust

    rial

    dev

    elopm

    en

    t Agri

    cult

    ura

    l dev

    elo

    pm

    ent

    Wat

    er

    supply

    Tra

    ffic

    Fu

    el

    stru

    cture

    Save

    ener

    gy

    Est

    het

    ics

    tour

    Hea

    lth

    safe

    ty

    So

    cial

    ec

    onom

    y

    Rec

    reat

    ion

    Cult

    ura

    l an

    tiquit

    y

    Liv

    ing

    stan

    dar

    d

    Site clear / / / -1 -1 -1 -1 / / / / / / / / / -1 / / -1 / / / / /

    Ground

    exc. / / / -1 -2 -2 -1 / / / / / / / / / -1 / / -1 / / / / /

    Transp. / / / -1 -1 -1 / / / / / / / / / / -1 / / -1 / / / / /

    Install

    constr. / / / / / -1 / / / / / / / / / / -1 / / -1 / / / / /

    Const

    ruct

    ion p

    erio

    d

    Material

    store / / / -1 -1 / / / / / / / / / / / / / / -1 / / / / /

    Sub-total / / / -4 -5 -5 -2 / / / / / / / / / -4 / / -4 / / / / /

    Sewage

    discharge / / / / / / / / / / / / / / / / / / / / +1 / / / /

    Waste

    gas

    dis-

    charge

    / / / / -1 / / / / / / / / / / / / / / / -1 / / / /

    Noise / / / / / -1 / / / / / / / / / / / / / / -1 / / / /

    Solid dis-

    charge / / / / / / / / / / / / / / / / / / / / / / / / /

    Product / / / / / / / / / / / / / / / / / / / / / / / / /

    Employ-

    ment / / / / / / / / / / / / / / / / / / / / / +1 / / +1

    House / / / / / / / / / / / / / / / / / / / / / +1 / / +1

    Sub-total / / / / -1 -1 / / / / / / / / / / / / / / -1 +2 / / +2

    Notes: � 3�Major impact;2�medium impact;1�light impact; “�” indicates favorable impact; “�” indicated unfavorable impact. � Degree of environment impact element by the project operation period includes positive and negative respects, whereas the benefit is bigger than the harm, the

    listed in the table are major impacts.

  • Table 1-10 Analysis on the nature of the project impact on the environment

    Unfavorable impacts Favorable impacts

    Construction period Operation period Construction period Operation period Impact nature

    Environment resource Short term

    Long term

    Reversible Irreversible Local Wide Short term

    Long term

    Reversible Reversible Local Wide Short term

    Long term

    Local Wide Short term

    Long term

    Local Wide

    Underground hydrology

    Underground water quality Earth’s surface hydrology Earth’s surface water quality √ √ √

    Atmosphere quality √ √ √ √ √ √

    Natural

    resources

    Noise environment √ √ √ √ √ √ Urban ecological √ √ √ √ √ Forest animals

    Wild animals

    Aquatic animals�

    Endangered animals

    Living

    resources

    Fishing breeding

    Land use √ √ √ √ √ Industrial development √ √ Agricultural development √ √ √ Water supply √ √ √ √ √ Traffic √ √ √ √ √

    Social

    environment

    Fuel structure

    Save energy source

    Esthetics tour √ √ √ √ √ Health safety

    Social economy √ √ √ √ √ Recreation

    Cultural antiquity

    Living

    quality

    Living level √ √ √ √ √

  • It’s clear from Table 1-9 and Table 1-10, unfavorable impacts of the project on the

    environment are mainly in construction period, mainly manifest in the impact on the

    land occupation of the construction section, traffic, social economy, acoustic

    environment, environment air and ecological environment, the nature is local, in short

    term, but can be reversible; Main unfavorable impact during operation period,

    environment elements of the impact include urban ecological, industrial development,

    traffic and transport, social economy and living standard along the line, the nature is

    wide and long term.

    1.12 Environment protection object

    1.12.1 Ecological sensitive object

    Through investigation, the assessment scope of the project has not involved natural

    reserves, scenic spots, forest parks, historical and cultural sites under government

    protection, basic farmland protection area and other ecological sensitive objects.

    1.12.2 Water environment protection object

    Due to Panggong area where the main civil works located having no river water

    system at present, at the same time, the project has not involved the scope inside Han

    River levee, so the project has not involved water source protection area. But, due to

    partial road section of the project road works being close to Han River, in

    consideration of the water drainage in construction period and environmental accident

    risk in operation period, which may possibly cause impact on Han River, therefore,

    Han River is taken as the water environment protection object by this assessment. Han

    River water environment function surrounding the project is classified as class III

    water quality.

    1.12.3 Noise, atmosphere environment protection object

    According to the determined assessment scope, its noise and atmosphere environment

    protection objects refer to Table 1-11.

  • Table 1-11 Noise and atmosphere environment protection object within the assessment scope

    Minimum distance(m) Distance to related roads(m)

    Road

    name No.

    Sensitive

    point name Mileage Distance

    to road

    central

    line

    Distance

    to road

    red line

    Height

    difference

    Locatio

    n

    relation

    to road

    Related

    road

    name

    Distance

    to road

    central

    line

    Distance

    to road

    red line

    Height

    differenc

    e

    Relation

    related to

    road

    location

    Overview of sensitive

    points

    Environmen

    t impact

    Panggong

    Road 1 Yiheyuan K0+000 45.3 19.6 0 End

    Existing

    Zhakou

    Road

    25.8 12.3 0 Left

    side

    Under construction, 10

    floors, 6 buildings, in frame

    structure, total 240

    households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 2

    Xiangyang

    National

    Taxation Bureau

    yard

    K0+010�K0+070

    24.5 4.5 0 Left side

    Existing

    Zhakou

    Road

    31 17.5 0 Right

    side

    1990s to now, 2fl.office

    building, 1 building, 3fl

    office building, 1 building,

    7fl resident building, 1

    building with 42

    households, brick and

    concrete structure.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 3

    Youzhi Corp/

    Family yard,

    Panggong

    Jiayuan, Taixin

    Garden

    K0+070�K0+200

    28.5 8.5 0 Left side

    2000, 7-8fl resident

    building, 15 buildings with

    630 households, brick and

    concrete structure.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 4

    Panggong

    Garden

    K0+010�K0+110

    20 0 0 Right

    side

    Zhakou

    Road 85 65 0

    Right

    side

    2006, 7fl, 5 buildings, total

    176 households.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 5

    Xiangyang No.

    23 High School

    K0+250�K0+350

    53 33 0 Right

    side

    1700 teachers and students,

    3fl teaching building, 1

    building, 6fl building, 2

    buildings.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 6

    Hongwei

    Chemical Factor

    family yard

    K0+200�K0+280

    22.2 2.2 0 Left side

    1990s, 5fl. 2 buildings,

    brick and concrete

    structure., total 80

    households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 7

    Tihua Textile

    Factory family

    yard

    K0+340�K0+500

    41.7 21.7 0 Right

    side

    1980s, 5fl, 5 buildings,

    brick and concrete

    structure., total 180

    Road traffic

    noise, social

    life noise.

  • households.

    Panggong

    Road 8

    Hongqi Living

    quarter

    K0+500�K0+560

    51 31 0 Right

    side

    Xingguang

    Avenue 76 36 0

    Right

    side

    1990s, 8fl, 3 buildings,

    brick and concrete

    structure, total 192

    households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 9

    Meihua

    Corp.family

    yard

    K0+480�K0+570

    53 33 0 Left side

    2000, 6fl residential

    building, 3 buildings, with

    132 households, brick and

    concrete structure.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 10

    Wangjiawa

    group 7

    K0+320�K0+600

    24.1 4.1 0 Left side

    1990s to now, 2-3 fl, brick

    and concrete structure, total

    33 households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 11

    Weather Bureau

    family yard

    K0+730�K0+800

    22.1 2.1 0 Right

    side

    1980s to now, 4fl

    residential building, 1

    building, 5fl, 3 buildings,

    total 122 households, brick

    and concrete structure.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 12

    Xiangyang

    Degong Hospital

    K0+710�K0+800

    26 6 0 Left side 2fl, 1 building, 30 beds.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 13

    Xinghuo

    Bearing Factory

    employees

    dormitory

    K0+850�K1+000

    24 4 0 Right

    side

    1980s, 7fl residential

    building, 2 buildings, 56

    households, brick and

    concrete structure.

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 14

    Zhongfang

    Dingshengyuan

    K1+000�K1+270

    35 15 0 Right

    side

    Under construction, brick

    and concrete structure.,

    frame structure, 6fl, 2

    buildings, 14fl, 1 building,

    total 120 households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 15

    Xuemei Corp.

    family yard

    K1+020�K1+080

    27.7 7.7 0 Left side

    1990s to now, 6-8fl, brick

    and concrete structure., 6fl,

    1 building, 8f, l3 buildings,

    total 224 households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 16

    Panggongci

    Village group 1

    K1+230�K1+360

    34.9 14.9 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure., 52

    households

    Road traffic

    noise, social

    life noise.

    Panggong

    Road 17

    Panggongci

    Village group 5

    K1+650�K1+840

    20.6 0.6 0 2 sides No. 13

    road 20.6 0.6 0 End

    1990s to now, 2-3fl, brick

    and concrete structure., 25

    households

    Road traffic

    noise, social

    life noise.

  • households life noise.

    Zhakou

    Road 18

    Sujiayuan

    Comunity

    K0+010�K0+280

    37 17 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure., 100

    households

    Social life

    noise

    Zhakou

    Road 19

    Jinyu Corp. Siji

    apartment

    K0+020�K0+070

    20.4 0.4 0 Right

    side

    Existing

    Panggong

    Road,

    existing

    Zhakou

    Road

    70 50 0 Right

    side

    2000, 7fl, 1 building, brick

    and concrete structure., 70

    households

    Road traffic

    noise, social

    life noise.

    Zhakou

    Road 20

    Cement works

    family yard

    K0+120�K0+220

    21.3 1.3 0 Left side

    1980s to now, 5-8fl, 5

    buildings, brick and

    concrete structure.,230

    households

    Social life

    noise

    Zhakou

    Road 21

    Jiancai

    Xiangyang

    residential

    quarter

    K0+180�K0+230

    30.5 10.5 0 Right

    side

    1990s, 7-8fl, 2 buildings,

    brick and concrete

    structure.,92 households

    Social life

    noise

    Zhakou

    Road 22

    Hepanlinyu,

    Hexie residential

    quarter

    K0+270�K0+510

    26.9 6.9 0 Right

    side

    2000, 6-7fl, 13 buildings,

    brick and concrete

    structure, 720 households

    Social life

    noise

    Zhakou

    Road 23

    No.1 Light

    Industry Corp.

    family yard

    K0+300�K0+450

    68 48 0 Left side

    1990s, 5-7fl, 4 buildings,

    brick and concrete

    structure, 98 households

    Social life

    noise

    Zhakou

    Road 24

    Agricultural

    Research

    Institute family

    yard

    K0+370�K0+450

    22.5 2.5 0 Left side

    1990s, 3-5fl, 3 buildings,

    brick and concrete

    structure, 32 households

    Social life

    noise

    Zhakou

    Road 25

    Farm Machinery

    Corp.family yard

    K0+450�K0+550

    89.5 69.5 0 Left side

    2011, 17fl, 1 building,

    frame structure; 3-5fl,

    2buildings, brick and

    concrete structure,136

    households

    Social life

    noise

    Zhakou

    Road 26

    Sanjiayuan

    group 3

    K0+470�K0+660

    20.5 0.5 0 Right

    side

    1990s to now,2-3fl, brick

    and concrete structure, 67

    households

    Social life

    noise

    Zhakou

    Road 27

    Sanjiayuan

    group 4

    K0+870�K0+920

    72 52 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 9

    households

    Social life

    noise

  • households

    Zhakou

    Road 28

    Hongmiao

    Village group 4

    K1+450�K1+600

    38.8 18.8 0 Left side Jianghua

    Road 86 66 0

    Left

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 39

    households

    Social life

    noise

    Zhakou

    Road 29

    Hexin Village

    group 7

    K1+770�K1+900

    44.1 24.1 0 Left side Jianghua

    Road 77 57 0

    Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 25

    households

    Social life

    noise

    Zhakou

    Road 30

    Hexin Village

    group 5

    K2+170�K2+360

    23.9 3.9 0 2 sides Inner ring

    road 31 1 0

    Left

    side

    1990s to now,2-3fl, brick

    and concrete structure,40

    households

    Social life

    noise

    Zhakou

    Road 31

    Roulianchang

    family yard

    K2+750�K2+800

    23.5 3.5 0 Right

    side

    1990s, 5fl, 2 buildings,

    brick and concrete

    structure, 80 households

    Social life

    noise

    Zhakou

    Road 32

    Zhijiamiao

    group 5

    K2+850�K3+060

    29.7 9.7 0 Left side Xiangyang

    Road 25 5 0

    Left

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 120

    households

    Social life

    noise

    Xingguang

    Avenue 33

    Wangjiawa

    residnetial

    quarter

    K0+950�K1+000

    45 20 0 Right

    side

    2005, 8fl, 2 buildings, brick

    and concrete structure, total

    160 households

    Social life

    noise

    Xingguang

    Avenue 34

    Dongcheng

    Yijing pahse 1

    K1+000�K1+150

    33.5 8.5 0 Right

    side

    2010, 8fl, 7 buildings, brick

    and concrete structure,196

    households

    Social life

    noise

    Xingguang

    Avenue 35

    Dongcheng

    Yijing phase 2

    K0+900�K1+070

    35 10 0 Left side

    2010, 7fl, 5 buildings, brick

    and concrete structure, 140

    households

    Social life

    noise

    Xingguang

    Avenue 36

    Wangjiawa

    Primary School

    teachers

    dormitory

    K1+160�K1+200

    25 0 0 Left side

    2000, 5fl, 1 building, brick

    and concrete structure, 20

    households

    Social life

    noise

    Xingguang

    Avenue 37

    Wangjiawa

    group 7

    K1+150�K1+500

    26.5 1.5 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 70

    households

    Social life

    noise

    Xingguang

    Avenue 38

    Wangjiawa

    group 5

    K1+540�K1+700

    31.7 6.7 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure, 44

    households

    Social life

    noise

    Xingguang

    Avenue 39

    Hongmiao

    Village group 5

    K1+810�K1+940

    135 110 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 31

    households

    Social life

    noise

  • Xingguang

    Avenue 40

    Hongmiao

    Village group 2

    K2+250�K2+350

    27.2 2.2 0 Left side

    1990s to now, 2-3fl , brick

    and concrete structure, 30

    households

    Social life

    noise

    Xingguang

    Avenue 41

    Hongmiao

    Village group 3

    K2+300�K2+470

    56 31 0 Right

    side

    Jianghua

    Road 60 40 0

    Left

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 61

    households

    Social life

    noise

    Xingguang

    Avenue 42

    Hexin Village

    group 4

    K2+700�K2+950

    28.8 3.8 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 51

    households

    Social life

    noise

    Xingguang

    Avenue 43

    Hexin Village

    group 3

    K2+750�K3+050

    31.6 6.6 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure, 72

    households

    Social life

    noise

    Xiangyang

    Road 44

    Zhijiaiao groups

    2,3

    K1+150�K1+450

    21.3 1.3 0 Right

    side

    1990s to now,2-3fl, brick

    and concrete structure,140

    households

    Social life

    noise

    Xiangyang

    Road 45

    Zhijiamiao

    Primary School

    K1+250�K1+300

    84 64 0 Right

    side

    208 teachers and students,

    2fl teaching building, 1

    building

    Social life

    noise

    Xiangyang

    Road 46

    Zhijiamiao

    group 1

    K1+450�K1+750

    20.3 0.3 0 Right

    side

    1990s to now,2-3fl, brick

    and concrete structure, 63

    households

    Social life

    noise

    Xiangyang

    Road 47

    Yangjiahe

    Village groups

    6,7,8

    K1+950�K2+450

    36.1 16.1 0 Right

    side

    1990s to now,2-3fl, brick

    and concrete structure, 257

    households

    Social life

    noise

    Xiangyang

    Road 48

    Yangjiahe

    Village1, groups

    3,4

    K2+450�K2+900

    25.1 5.1 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure, 82

    households

    Social life

    noise

    Inner ring

    road

    southeast

    section

    49 Hexin Village

    group 6

    K2+300�K2+450

    49 19 0 Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 32

    households

    Social life

    noise

    Inner ring

    road

    southeast

    section

    50 Sunjiagang

    group 7

    K0+950�K1+100

    56 26 0 Right

    side

    No.13

    road 21.2 1.2 0

    Right

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 35

    households

    Social life

    noise

    Jianghua

    Road 51

    Hongmiao

    Village group 1

    K1+850�K2+250

    29.4 9.4 0 2 sides

    1990s to now, 2-3fl, brick

    and concrete structure,102

    households

    Social life

    noise

  • No.13

    road 52

    Panggongci

    Village group 6

    K0+000�K0+050

    31.5 11.5 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure, 15

    households

    Social life

    noise

    No.13

    road 53 Yaojiawan

    K0+100�K0+500

    22.4 2.4 0 2 sides

    1990s to now, 2-3fl, brick

    and concrete structure, 138

    households

    Social life

    noise

    No.13

    road 54 Yangjiaci

    K0+700�K0+900

    20.8 0.8 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure, 36

    households

    Social life

    noise

    No.13

    road 55

    Tuxiang Village

    groups 2,3

    K1+200�K1+300

    21.3 1.3 0 Left side

    1990s to now, 2-3fl, brick

    and concrete structure,50

    households

    Social life

    noise

    No.13

    road 56

    Sunjiagang

    groups 1,3

    K1+870�K2+200

    20.2 0.2 0 2 sides

    1990s to now, 2-3fl, brick

    and concrete structure, 140

    households

    Social life

    noise

    No.13

    road 57

    Sunjiagang

    group 6

    K2+580�K2+950

    21.7 1.7 0 Left side Inner ring

    road 121 91 0

    Left

    side

    1990s to now, 2-3fl, brick

    and concrete structure, 45

    households

    Social life

    noise

  • 26

    2.0 Overview of the project

    Xiangyang Urban Transportation Project with World Bank loan this time is a

    systematic engineering composed of a number of traffic sub-projects, which includes

    hardware construction, but also covers improvement and perfection of related

    softwares. It may be classified according to nature of each sub-project, which may be

    generalized as 4 major sub-systems, PT component,urban road component,traffic

    management componentas well as the organization development and capability

    construction sub-project. Summary of the contents for Xiangyang Urban

    Transportation Project construction refers to table 2-1.

    Table 2-1 Summary of the contents for Xiangyang Urban Transportation Project

    Construction

    Sub-project

    name Construction contents

    Project

    nature

    Static

    investment(100

    million yuan)

    urban road

    component

    Construction for

    Panggong new

    zone backbone

    road network

    Southeast section of newly built inner

    ring road, Xingguang Avenue,

    Panggong Road, Jianghua Road,

    Xiangyang Road, Zhakou Road,

    planned No.13 road, total length is

    17.182km

    Hardware

    construction 11.19

    Set 17 Bus Entrance Lane mprovement of

    13 public

    transport

    corridors

    Reconstruction 38 Bus Bays

    New 38 Bus Shelters along Route

    13, new 62 Bus Shelters in

    Panggong

    Area

    Hardware

    construction

    Newly built

    Xianshan parking

    and service yard

    Yard total area is30000m2 Hardware

    construction

    Newly built

    Xiangyang

    Economic

    Development Zone

    parking and

    service yard

    Yard total area is30740m2 Hardware

    construction

    Reconstruction for

    Xiangyang

    Railway Station

    public traffic hub

    Construct sun-shade, slow speed

    passage, reconstruct existing

    platform.

    Hardware

    construction

    1Improvement of traffic engineering facilities and bay-type

    bus stops of 13 priority public transport corridors and

    procurement of high-performance vehicles

    Software

    improvement

    and

    perfection

    PT

    component

    GPS dispatch service system

    Software

    improvement

    and

    perfection

    1.28

    traffic

    management

    componentas

    Traffic organization and improvement

    Software

    improvement

    and

    perfection

    0.76

  • 27

    Public traffic preference

    Software

    improvement

    and

    perfection

    Road channeling design

    Software

    improvement

    and

    perfection

    ATC system design

    Software

    improvement

    and

    perfection

    Road user propaganda and education

    Software

    improvement

    and

    perfection

    Sub-project of

    organization

    development and

    capacity

    construction

    Include its smooth implementation and normal operation

    management later on, sustainable development of urban

    traffic construction, provide the topic study, training and

    investigation, consultation services, urban traffic strategy

    planning matching and construction for the organization

    capacity, etc.

    Software

    improvement

    and

    perfection

    0.26

    2.1 Urban road component

    Urban road component mainly aims at relieving the traffic jam of central urban area,

    reducing river cross traffic pressure, strengthening the traffic contact between central

    urban area with the surrounding clusters or groups, at the same time, in cooperation

    with Han River No. 5 Bridge being constructed recently, main study area of this sub-

    project is the road network planning for Xiangcheng district Panggong new zone in

    Xiangyang while covering the new construction for the backbone road(southeast

    section of inner ring road, Xingguang Avenue, Panggong Road, Jianghua Road,

    Xiangyang Road, Zhakou Road, planned No.13 road), total length is 17.182km,

    construction and installation costs reach 601 million yuan. Recommended scheme for

    road network of Panggong area this time refers to Table 2-2, Fig. 2-1.

    Table 2-2 Recommendation for designing the construction of road network of

    Panggong area

    Road No. Name of recently

    constructed roads

    Road

    nature

    Red line

    width(m)

    �Green line width(m)

    Road length

    (m)

    1 Southeast section of

    inner ring road

    Primary

    road 60 / 2046.8

    2 Xingguang Avenue Primary

    road 50 80 3187

    Jianghua Road(east of

    Zhakou Road)

    Primary

    road 40 50 1694

    3 Jianghua Road(west of

    Zhakou Road)

    Primary

    road 30 / 259

    4 Panggong Road(east of

    Zhakou Road)

    Primary

    road 40 50 1820

  • 28

    Panggong Road(west of

    Zhakou Road)

    Primary

    road 30 / 215

    5 Xiangyang Road Primary

    road 40 / 1798

    6 Zhakou Road Primary

    road 40 / 3081

    7 Planned No. 13 road Primary

    road 40 / 3081

    Total 17181.8

    Notes:�Green line width means the control line of green land at 2 sides of the road, it’s road red line plus the

    width of green land of 2 sides.

  • 29

    Fig. 2-1 Recommended scheme for Panggong area road construction

    2.2 Public Transport component

    PT component is composed of priority public transport corridor project, bus stations

    and yards project and intelligent public transport dispatch project.

    Priority public transport corridor project mainly includes: civil works arising from the

    improvement of 13 public transport and general public transport engineering facilities

    such as signs, marked lines, signal lights, bay stations and bus shelters. It also

  • 30

    includes the ancillary facilities for public traffic on the newly-built roads in Panggong

    area: setting 62 integrated bus stops. It also includes the procurement of buses:

    purchasing 40 high-capacity, high-performance and low-chassis 12.0m-long CNG

    buses with air-conditioning.

    Bus stations and yards project includes newly-built Xianshan bus parking and

    maintenance station, newly-built Xiangyang Economic Development District bus

    parking and maintenance station and reconstructed railway railway station hub.

    Intelligent public transport GPS dispatch service project includes vehicle-mounted

    GPS terminal unit, dispatch center, computer room equipment, dispatch management

    software system etc.

  • 31

    See Figure 2-2 for the location of PT component projects.

    Figure 2-2 Overall Location Map of PT Component

    2.2.1 Design scheme of exclusive priority public transport corridors

    In this project, 13 public transport corridors are chosen to be example roads of

    improvement project. The details about the improvement scheme of 13 priority

    public transport corridors mainly involve the setting of peak hour bus exclusive

    entrance lanes. The standard cross-sections of the road sections will remain

  • 32

    unchanged in this scheme. The bus stops along these 13 lines will be built into

    bay station of the same width as a bus. In addition, in the design scope of 13

    corridors (13.1km), the entrance line of key junctions will be re-channelized.

    Bus exclusive entrance lanes (mainly existing through lanes) will be added. It

    will be the second lane from the yellow line after channelization. For details

    refer to Table 2-3, Fig. 2-3.

    Figure2-3 Concept of the Peak hour Bus Exclusive Entrance Lane

    According to the design scheme, bus exclusive entrance lanes will be provided

    at Shengli Street-Huancheng South road, Zhongyuan Road-Chunyuan Road,

    Xijie Street-Nanjie Street among the 13 public transport lines, totaling 17 bus

    exclusive entrance lanes to be set at 11 junctions. For details see Figure 2-4.

    Other junctions and road sections basically remain unchanged.~

    Table 2-3 PT Priority Scheme and Location of Junction

    No. Junction Names Directions

    1 Shengli Street/Huancheng South Road North and South entrance of Shengli Street

    2 West Street/ South Street Entrance of South Street

    3 Changhong Road/Jianshe Road North and South entrance of Changhong

    Road

    4 Changhong Road/Renmin Road North and South entrance of Changhong

    Road

    5 Changhong Road/Songhe Road North and South entrance of Changhong

    Road

    6 Changhong Road/Jianhua Road North and South entrance of Changhong

    Road

    7 Changhong Road/ChunYuan Road East entrance of ChunYuan Road

    8 Xinhua Road/ChunYuan Road South entrance of ChunYuan Road

  • 33

    9 Qilihe Road/Xinhua Road North entrance of Qilihe Road

    10 Qilihe Road/ZhongYuan Road West entrance of ZhongYuan Road

    11 ChunYuan Road/ZhongYuan Road East and West entrance of ZhongYuan Road

    Figure 2-4 Overall Location Map of Bus Pirority’s Junction

    The bay-station improvement scheme of 13 public transport corridors is to newly build or re-build

    21 30m-long bay stations and to newly build 4 40m-long bay stations and 13 60m-long bay

    stations, totaling 38 bay stations. All the stations will be provided with new integrated bus

    shelters. Meanwhile, light-box stop boards and electronic stop boards will be provided as

    hardware support of intelligent public transport GPS system.

    There are 62 short-term bus stops (31 pairs) in Panggong area. So, it needs to provide 62 sets of

  • 34

    new integrated bus shelters as ancillary facilities.

    2.2.2 Design scheme for the public traffic terminal yard

    The construction for the public traffic terminal yard of the project mainly covering: newly built

    Xianshan parking and service yard and Xiangyang Economic Development Zone parking and

    service yard, reconstructing the exiting railway station public traffic hub. Details for the

    construction of public traffic terminal station refer to Table 2-4.

    Table 2-4 Schedule for the content composition of newly built public traffic terminal yard

    works

    Terminal yard name Works contents Works quantity

    Plane layout

    The parking area is 22180 m2, and the number of parking space is

    190, the pink square representative the night parking space only; Set

    one exit, two entrances, Entrance 1 located near the prime road, and

    Entrance 2 for night only. Build bus maintenance 70m long with 14

    maintenance space, the field in front of maintenance is used for night

    parking and automatic washing, the building area is 910 m2;

    Vehicles are parked vertically, with each parking space covering

    13.0m×3.5m (in consideration that there is the green belt sufficiently

    wide behind the parking spaces and the tail of a bus may enter into

    the belt, the length of each parking space is adjustable); Build a

    three-floor comprehensive office building, the building area is 560

    m2; Build one cash room with two cash-receiving lanes, the function

    of the room is receiving cash box only, counting work should be in

    office building. The area of cash room is 16 m2. Details refer to

    Fig.2-5. Subgrade

    pavement

    Parking lot is adopted 20cm C30 cement concrete pavement and

    30cm thick cement stabilized crushed stone base.

    Site vertical and

    drainage

    The site vertical of the service yard shall be controlled according to

    the longitudinal grade vertical to passage direction not over 3%, the

    longitudinal grade parallel to the passage direction not over 1%; Rail

    water, sewage, water supply pipelines and the support facilities shall

    be unified designed according to the situation of site surrounding

    road network drainage facilities, details refer to the table of works

    quantity.

    Xianshan parking

    and service yard

    Greening works

    Greening area is about 6,340m2, greening rate is 21.2%, 4.5m high

    panicled goldrain trees planted at 5m interval to the surrounding

    greening zone are used as protective network for the site surrounding

    areas, the middle has been planted some 4.5m high camphor trees for

    beautifying in order to form the shade tree inside the site, which not

    only increases the greening area, but also plays a role of summer

    shade. The road turning areas inside the site are mainly laid bushes,

    for forming penetration type design, reducing the interference to the

    sight line of the driver to the minimal extent, in consideration of the

    length of the parking space, greening scope of 2m to the parking

    space may only plant vegetation.

  • 35

    Plane layout

    The parking area is 21380 m2, and the number of parking space is

    234; Set one exit, one entrance, exit located near the No.6 South

    Latitude Road, and entrance located near the No.3 South Longitude

    Road Vehicles are parked vertically, with each parking space

    covering 13.0m×3.5m (in consideration that there is the green belt

    sufficiently wide behind the parking spaces and the tail of a bus may

    enter into the belt, the length of each parking space is adjustable);

    The green land under the High-tension Line is included in the total

    area; Build bus maintenance building together with PT office

    upstairs, the maintenance space should be 10, this building contains

    function of apartment, the building area is 804 m2;Build up one gas

    station with 10 gas parking spaces, the building area is 1330 m2

    Build one cash room with two cash-receiving lanes, the function of

    the room is receiving cash box only, counting work should be in

    office building. Thearea of cash room is 54 m2;. Details refer to

    Fig.2-6.

    Subgrade

    pavement

    Parking lot is adopted 20cm C30 cement concrete pavement and

    30cm thick cement stabilized crushed stone base.

    Site vertical and

    drainage

    The site vertical of the service yard shall be controlled according to

    the longitudinal grade vertical to passage direction not over 3%, the

    longitudinal grade parallel to the passage direction not over 1%; Rail

    water, sewage, water supply pipelines and the support facilities shall

    be unified designed according to the situation of site surrounding

    road network drainage facilities

    Xiangyang

    Economic

    Development Zone

    parking and service

    yard

    Greening works

    Greening area is 7136m2(including greening land under high voltage

    line), greening rate is 23.2%. 4.5m high panicled goldrain trees

    planted at 5m interval to the surrounding greening zone are used as

    protective network for the site surrounding areas, the middle has been

    planted some 4.5m high camphor trees for beautifying in order to

    form the shade tree inside the site, which not only increases the

    greening area, but also plays a role of summer shade. The road

    turning areas inside the site are mainly laid bushes, for forming

    penetration type design, reducing the interference to the sight line of

    the driver to the minimal extent, in consideration of the length of the

    parking space, greening scope of 2m to the parking space may only

    plant vegetation.

    Improvement

    The scheme is planning to set vertical platforms in waiting area

    which is on the north part of the terminal, the green roundabout is

    demolished and set up temporary parking space there, the details

    contains:. Details refer to Fig.2-7. Construction works

    for railway public

    traffic hub

    Awnings

    The awnings should be covered the whole terminal (about 4000m2),

    the height can be 7m or more in order to overlap with bus lanes and

    pedestrian walk.

  • 36

    Fig.2-5 Schematic diagram for the layout of Xianshan parking and service yard

  • 37

    Fig.2-6 Schematic diagram for the layout of Xiangyang Economic Development Zone

    public traffic parking and service yard

  • 38

    Fig.2-7 Scheme for improving railway station public traffic hub

    2.3 Traffic management componentas

    Sub-project of traffic safety and control mainly, according to the requirements for the traffic

  • 39

    control and safety put forward in the urban master planning, took“ the corridor” as the object, and

    solved main conflicts, starting from the traffic safety improvement“3E” (Engineering-

    Engineering, safety education-Education, law enforcement-Enforcement), enhanced the safety of

    urban road traffic, maximally improved residents trip environment, thus reducing the impact of the

    traffic growth on the living environment. The construction of the project including: Traffic

    organization and improvement, public traffic preference, road channelizing design, ATC system

    design and road user propaganda and education, etc. Its investment is 76 million yuan.

    2.4 Sub-project of organization development and capacity construction

    Sub-project of organization development and capacity construction includes the

    smooth implementation and normal operation management later on for the project,

    sustainable development of urban traffic construction, providing the topic study,

    training and investigation, consultation service, construction for internal preparation

    of urban traffic strategy planning and organization capacity. Its investment is 26

    million yuan.

    2.5 Investment estimation and financing

    General static investment of the project is 1.349 billion yuan, of which, the project

    construction cost is 761 million yuan, Other project construction expense is 64 million

    yuan, land acquisition and resettlement expense is 0.364 billion yuan, technical

    support expense is 10 million yuan, organizational development and capacity

    development expense is 26 million yuan and emergency reserve is 125 million yuan.

    Composition of the project fund resources: World Bank loan totaling USD 0.1 billion

    (converted to RMB 0.64 billion yuan, exchange rate is 1:6.4), internal fund is 0.709

    billion yuan.

    Internal fund resources: The project capital: 0.34 billion yuan, all resources are from

    the special fund for Xiangyang urban construction and development; Domestic bank

    loan is 0.375 billion yuan, from the loan of Hubei Branch of China Development

    Bank.

    The loan of World Bank and the domestic bank shall be repaid within 20y after the

    completion of the project, namely from 2017y-2036y, repayment per year is in equal

    amount, and interest shall also be paid.

    The loan compensation resource is from the special fund for Xiangyang urban

    construction and development.

  • 40

    2.6 General implementation progress for the project

    Details for general implementation progress for the project refer to Table 2-5.

    Table 2-5 Table for general implementation progress for the project

    2010 2011 2012 2013 2014 2015 2016

    3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12

    Pro

    ject

    pre

    par

    atio

    n

    Pro

    ject

    asse

    ssm

    ent

    Pro

    ject

    neg

    oti

    ati

    on

    Pro

    ject

    des

    ign

    Bid

    ing

    pu

    rch

    ase

    Pro

    ject

    con

    stru

    ctio

    n

    Pro

    ject

    accep

    tan

    ce

  • 41

    Han

    dov

    er f

    or

    use

    2.7 Overview of the project land occupation

    The land occupation types of the project along the line mainly include: arable

    land(paddy field, dry land), woodland(forest land, bush land), housing estate, grass

    land, etc, totaling 88.19hm2, of which, permanent land occupation is 80.59hm

    2,

    interim land occupation is 7.60hm2. Statistics table for land occupation refers to 2-6.

    Table 2-6 Summary table for the project land occupation

    Unit: hm2

    Type of land occupation

    Arable land Forest Housing

    estate

    Land

    occupation

    by traffic

    transport

    Grass

    land Project sub-area

    Irrigable

    land Dry land

    Forest

    land

    Bush

    land Commercial Highway

    Other

    grass

    lands

    Total

    Permanent land occupation 26.59 24.73 / / 9.03 20.24 / 80.59

    Sub-total 26.59 24.73 / / 9.03 20.24 / 80.59

    Excavation waste

    dump / / / 0.27 / / 0.75 1.02

    Earth material yard / / / / / / 0.28 0.28

    Interim earth yard / 2.88 / / / / / 2.88

    Interim construction

    road area / 0.60 0.41 / / / 1.56 2.57

    Interim

    land

    occupation

    Construction

    production and

    living area

    / 0.45 / / / / 0.4 0.85

    Sub-total / 3.93 0.41 0.27 0 0 2.99 7.6

    Total 26.59 28.66 0.41 0.27 9.03 20.24 2.99 88.19

    2.8 The earth work

    According to design data and calculations, the excavation earth work is 387,900m3,

    earth filling work is 344,100m3, the earth utilization is 336,900m

    3, the borrow earth is

    7,200m3, the abandoned earth is 51,000m

    3(of which, 35,800

    3 shall be sent to

    Huanglongguan waste yard, 15,200m3

    construction waste shall be sent to the urban

    refuse site), interim earth is 101,600m3. The balance table for the earthwork refers to

    Table 2-7. The flow direction of the earthwork of the project area refers to Fig.2-6.

  • 42

    Table 2-7 The balance table for the earthwork Unit: 10,000m3

    Project sub-

    area Location

    Exc./

    removal Backfill Use Borrow

    Interim

    earth Abandoned Disposal of abandoned earth

    Removal of

    surface

    building

    1.37

    1.16

    1.16

    0.21 Urban refuse site

    Subgrade 2.28 2.17 2.17 0 0.11 Huanglongguan excavation

    waste dump

    East

    section of

    south

    inner ring

    road Surface soil 1.48 1.48

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Removal of

    surface

    building

    5.00

    4.25

    4.25

    0.75 Urban refuse site

    Subgrade 8.34 5.86 5.86 0 2.48 Huanglongguan excavation

    waste dump

    Xingguang

    Road Surface soil 2.54 0 2.54

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Removal of

    surface

    building

    0.61

    0.52

    0.52

    0.09 Urban refuse site

    Subgrade 1.02 1.49 1.02 0.47 0 Huanglongguan excavation

    waste dump

    Jianghua

    Road Surface soil 0.78 0 0.78

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Removal of

    surface

    building

    0.52

    0.44

    0.44

    0.08 Urban refuse site

    Subgrade 0.87 0.76 0.76 0 0.11 Huanglongguan excavation

    waste dump

    Panggong

    Road Surface soil 0.45 0 0.45

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Zhakou

    Road

    Removal of

    surface

    building

    1.00

    0.85

    0.85

    0.15 Urban refuse site

    Subgrade 1.67 1.92 1.67 0.25 0 Huanglongguan excavation

    waste dump

    Surface soil 1.25 0 1.25 Interim earth site, it shall be

    used as soil for greening

    later on.

    Xiangyang

    Road

    Removal of

    surface

    building

    0.67

    0.57

    0.57

    0.10 Urban refuse site

    Subgrade 1.12 0.93 0.93 0 0.19 Huanglongguan excavation

    waste dump

    Surface soil 0.84 0 0.84

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Planned

    road

    Removal of

    surface

    building

    0.94

    0.80

    0.80

    0.14

    Subgrade 1.56 1.38 1.38 0 0.18 Huanglongguan excavation

    waste dump

    Surface soil 1.31 0 1.31

    Interim earth site, it shall be

    used as soil for greening

    later on.

    Sub-total Removal of

    surface

    building

    10.12

    8.60

    8.60

    1.52 Urban refuse site

    Subgrade 16.86 14.51 13.79 0.72 3.07 Huanglongguan excavation

    waste dump

    Maj

    or

    pro

    ject

    are

    a

    Surface soil 8.65 8.65 8.65 0 8.65

    Interim earth site, it shall be

    used as soil for greening

    later on.

  • 43

    Total 35.62 31.75 31.03 0.72 8.65 4.59

    Excavation

    waste dump Surface soil 0.31 0.31 0.31 0.31

    Stack inside the waste yard,

    it shall be returned after end

    of the completion.

    Borrow pit Surface soil 0.08 0.08 0.08 0.08

    Stack in the borrow pit, it

    shall be returned after end of

    the completion.

    Interim

    construction

    road area

    Subgrade 1.15 1.15 1.15

    Interim earth

    area Surface soil 0.86 0.86 0.86 0.86

    Just for interim stacking, it

    shall be returned after end of

    the completion.

    Surface soil 0.26 0.26 0.26 0.26

    Just for interim stacking, it

    shall be returned after end of

    the completion.

    Construction

    Production

    and living

    area Hardening

    layer 0.51 0.51

    Huanglongguan excavation

    waste dump

    Total 38.79 34.41 33.69 0.72 10.16 5.10

  • 44

    /

    1. 37

    12. 0= 35. =0 24. 2= 0. 72

    1. 80 m31. 37 m30. 88 m3

    3. 33 m3

    5. 005. 77 m38. 34 m31. 54 m3

    10. 11 m3

    0. =10. 87 m31. 02 m30. =8 m3

    1. 54 m3

    0. 520. =4 m30. 87 m30. 25 m3

    1. 20 m3

    1. 001. 20 m37 m3

    0. 75 m3

    2. 42 m3

    0. =71. 13 m31. 12 m30. 54 m3

    1. 50 m3

    0. 941. =3 m31. 5= m30. 81 m3

    2. 18 m3

    0. 47 m3

    0. 25 m3

    0. 72

    1. =3 m3 0. 31 m3

    1. =3 m3 0. 08 m3

    1. =3 m3 0. 8= m3

    1. =3 m3 0. 2= m30. 51 m3

    Fig.2-6 The earthwork flow chart for the project

    Abandoned earth Exc./removal Backfill Borrow

  • 45

    2.9 Overview of the interim land occupation

    2.9.1 Excavation waste dump

    According to the need of the project, set up 1 excavation waste dump, the excavation

    waste dump is located at Huanglongguan ravine zone of 8km to the southwest of the

    project area, the dump is now the bush land, with small rain water confluence, and the

    scouring is not obvious, it’s favorable for placing the waste interception measures.

    Through site investigation, the possible area to be used by this bottom land is

    1.53hm2, the waste stacking elevation may be stacked from 112.00m~125.00m, the

    slope of the waste stacking face is even, 15° in average.

    2.9.2 Borrow pit

    This project needs total borrow earth for 7,200m3, according to geological

    investigation, the borrow pit is located between the army oil depot ~cement factory at

    west of Qianying Village Jiaoliu railway to the southwest of the project, it’s borrowed

    from the hill, designed average excavation depth is 2~3m, no impact shall be met

    from underground water at the designed borrow depth. Through investigation, the

    selected borrow pit of the project has not passed the land consolidation area as

    stipulated by the state, earth material nature is clay, it conforms to the earth use

    requirement for the project. This pit is 70m long, 40m wide, with an area of 0.28hm2,

    the type of land occupation is barren grass land, water confluence area is 1.42hm2.

    This borrow scheme is adopted two-level borrow mode from the top to bottom, in the

    borrow process, first remove surface soil, the surface soil is placed within the

    expropriated land, no repeated expropriation shall occur, after the end of the borrow,

    it shall be returned to forest land according to local land use policy.

    2.9.3 Interim stack site

    Partial road sections of the project penetrate through arable land, it needs to remove the

    surface cultivated soil and soil with plant roots. The removed surface soil shall be used as

    interim abandoned soil, it shall be concentrated stacked at the interim stack site set up at

    the subgrade side according to the line topographical sections, interim stack site is mainly

    selected the bottomland area at the road side outside the subgrade, for the benefit of use

    for road greening, one interim stack site is set up at each road section of the project,

    totaling 7 places. Through estimation, total newly increased interim land occupation is

    about 2.88hm2. Schedule of interim stack site refers to Table 2-8.

  • 46

    Table 2-8 Schedule of interim stack site

    Interim stack

    site No.

    Waste road

    section

    Interim stack

    site stake

    No.

    Surface soil

    stack

    quantity(10,000

    m3)

    Haul

    distance(m)

    Land

    occupation

    area (hm2)

    Type of land

    occupation

    Average

    stack

    height (m)

    1#

    East section of

    inner loop

    south road

    NH1+000 1.48 1000 0.49 Arable land 3

    2# Xingguang

    Road XG1+500 2.54 1500 0.85 Arable land 3

    3# Jianghua Road JH1+000 0.78 1000 0.26 Arable land 3

    4# Panggong

    Road PG0+800 0.45 800 0.15 Arable land 3

    5# Zhakou Road ZK1+500 1.25 1500 0.42 Arable land 3

    6# Xiangyang

    Road XY1+000 0.84 1000 0.28 Arable land 3

    73 Planned No. 13

    Road GH1+500 1.31 1500 0.44 Arable land 3

    Total 8.65 2.88

    2.9.4 Construction production and living area

    Though the project being severely affected by local work point topographical

    conditions, the layout for construction production and living area is quite difficult,

    yet, most of construction prefab yard, pavement base, asphalt concreting mixing plant

    and others, may be placed by selecting the construction site with better conditions,

    But, interim land occupation shall try to occupy the minimal arable land, pay attention

    to environment protection and exiting the site for the farm. Total 7 construction

    production and living areas, details for construction production and living area refer to

    Table 2-9.

    Table 2-9 Schedules for construction production and living quarter

    No. Road section Center stake No. Size Floor space (hm2)

    Type of land

    occupation

    1

    East section of

    inner loop south

    road

    NH2+000 50*20m 0.10 Barren

    bottomland

    2 Xingguang Road XG1+080 50*30m 0.15 Arable land

    3 Jianghua Road JH1+900 50*20m 0.10 Barren

    bottomland

    4 Panggong Road PG1+800 50*20m 0.10 Barren

    bottomland

    5 Zhakou Road ZK1+800 50*30m 0.15 Arable land

    6 Xiangyang Road XY2+000 50*20m 0.10 Barren

    bottomland

    7 Planned No. 13

    Road GH1+300 50*30m 0.15 Arable land

    Total 0.85

  • 47

    2.9.5 Interim construction road

    The project is constructed in urban area, the existing Xingguang Road, Panggong

    Road, Jianghua Road and others are crisscross, they may be used as construction

    roads. The newly increased construction roads of the project are mainly leading to

    excavation waste dump, borrow pit and road of construction sites. According to

    preliminary estimation in this period, the general length of the interim construction

    road needs to be kept, lay interim construction road areas along the relevant road

    sections of the line, the project needs totally constructing interim road areas reaching

    3.67km, of which, 1.75km road is leading to waste yard, 1.07km road is leading to

    stock yard, 0.85km road is leading to construction site. Expropriation width is 7m,

    pavement width is 3-3.5m, adopting cement consolidated pavement, interim land

    occupation is 2.57hm2, and type of land occupation is arable land and grass land.

    3.0 Overview of natural environment and social environment

    3.1 Natural environment overview

    3.1.1 Climate

    Xiangyang is located in north subtropical monsoon climatic region. It is cold in winter and hot in

    summer. Rain and heat are over the same period. Four seasons are distinct. The average

    temperature of the whole city except high mountains is 15~16�. Frost-free period is 228~249

    days long. The annual precipitation of the whole city is 820~1,100mm. Precipitation in summer is

    400~450mm. The number of rainy days are 107~135 days. Sunshine duration is long. Total annual

    average sunshine duration is 1,800~2,100 hours. The rainy season in Xiangyang region is mainly

    in June and July.

    3.1.2 Topography and landform

    Xiangyang, of diverse landform, lies in the transitional z