environmental impact assessment report for xiangyang …...in may 2010, the proposal for utilizing...
TRANSCRIPT
-
Environmental Impact Assessment Report
for Xiangyang Urban Transportation
Project with World Bank Loan
(FINAL VERSION TO WORLD BANK)
Prepared by : China Railway Siyuan Survey and Design Group Co., Ltd.
Class A: G.H.P.Z.J.Zi No.2605
Construction unit: Xiangyang Construction Investment & Operation Co.,
Ltd.
Nov 2011
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
-
Table of Contents
1.0 General
description……………………………………………………………………………45
1.1 General situation of the project
……………………………………………………………...45
1.2 OBJECTIVE OF ENVIRONMENTAL IMPACT ASSESSMENT …………………………………………..56
1.3 GUIDING IDEOLOGY ………………………………………………………………………….…..67
1.4 ASSESSMENT BASIS ……………………………………………………………………….… …..67
1.5 ASSESSMENT RATING AND SCOPE ………………………………………………….……… …….89
1.6 ASSESSMENT FACTORS
…………………………………………………………………….……1011
1.7 ASSESSMENT STANDARD
………………………………………………………….…………….1011
1.8 ASSESSMENT PREDICTION TIME INTERVAL …………………………………………….……
…..1314
1.9 EMPHASES OF THE ASSESSMENT ……………………………………………………………
…..1314
1.10 ASSESSMENT TECHNICAL METHOD ………………………………………………………
……1415
1.11 IDENTIFICATION OF THE CONSTRUCTION PROJECT IMPACT ELEMENTS
…………………………1415
1.12 ENVIRONMENT PROTECTION OBJECT
…………………………………………………………..1718
2.0 Overview of the project……………………………………………………………………..
.2425
2.1 URBAN ROAD COMPONENT………………………………………………………………………
2526
2.2 PT
COMPONENT…………………………………………………………………………………2728
-
2.3 TRAFFIC MANAGEMENT COMPONENTAS………………………………………………………….
3637
2.4 SUB-PROJECT OF ORGANIZATION DEVELOPMENT AND CAPACITY CONSTRUCTION
………………..3738
2.5 INVESTMENT ESTIMATION AND FINANCING
………………………………………………………3738
2.6 GENERAL IMPLEMENTATION PROGRESS FOR THE PROJECT
……………………………………….3839
2.7 OVERVIEW OF THE PROJECT LAND OCCUPATION………………………………………………….
3940
2.8 THE EARTH WORK
………………………………………………………………………………..3940
2.9 OVERVIEW OF THE INTERIM LAND OCCUPATION ………………………………………………
…4344
3.0 Overview of natural environment and social environment………………………………
4546
3.1 NATURAL ENVIRONMENT OVERVIEW
……………………………………………………………4546
3.2 SOCIAL ENVIRONMENT OVERVIEW
………………………………………………………………4950
3.3 OVERVIEW OF INFRASTRUCTURE DEVELOPMENT IN PROJECT AREA……………………………..
5354
3.4 PROJECT AREA WHERE VARIOUS TYPES OF PROTECTED AREAS AND PROTECTION OF HISTORICAL
AND CULTURAL OVERVIEW…………………………………………………………………………..
7071
4.0 Survey and assessment of existing environment
…………………………………………...7475
4.1 SURVEY AND ASSESSMENT OF EXISTING ECOLOGICAL ENVIRONMENT
……………………….…..7475
4.2 SURVEY AND ASSESSMENT OF EXISTING ACOUSTIC ENVIRONMENT
-
……………………………...7677
4.3 SURVEY AND ASSESSMENT OF EXISTING WATER ENVIRONMENT
…………………………………7879
4.4 SURVEY AND ANALYSIS OF EXISTING AMBIENT AIR
………………………………………………8081
5.0 Scheme comparison and selection
…………………………………………………………..8384
5.1 ZERO-SCHEME COMPARISON
…………………………………………………………………….8485
5.2 ROAD CROSS SECTION COMPARISON AND SELECTION
………………………………………….8586
5.3 COMPARISON AND SELECTION FOR ROAD STRIKE
………………………………………………..9394
5.4 BUS YARD SITE COMPARISON AND SELECTION
………………………………………………….9495
6.0 Environmental Impact Assessment
…………………………………………………………9798
6.1 ENVIRONMENTAL IMPACT ANALYSIS DURING CONSTRUCTION PERIOD
………………………….9798
6.2 ANALYSIS OF ENVIRONMENTAL IMPACT DURING OPERATION PERIOD
………………………….106107
6.3 ANALYSIS OF IMPACT ON WATER AND SOIL LOSS
……………………………………………….126127
6.4 IMPACT ON TRAVEL AND LIVING QUALITY OF THE RESIDENTS ALONG THE ROAD
………………132133
6.5 ANALYSIS OF DEMOLITION AND RESETTLEMENT OF THE PROJECT
……………………………..133134
6.6 ACCIDENT RISK ANALYSIS……………………………………………………………………..
135136
6.7 ANALYSIS OF WASTEWATER DISCHARGE ABILITY IN PANGGONG DISTRICT DURING OPERATION
-
PERIOD…………………………………………………………………………………………….
139140
6.8 APPLICATION OF ENVIRONMENT, HEALTH AND SAFTY GUIDE LINES………………………… 140141
7.0 Public Consultations and Information Publicity
…………………………………………142143
7.1 PURPOSE AND SIGNIFICANCE…………………………………………………………………..
142143
7.2 SURVEY SCOPE AND MODES……………………………………………………………………
142143
7.3 SURVEY RESULTS
……………………………………………………………………………….151152
8.0 Environmental Management Plan………………………………………………………...
159160
9.0 Overall Conclusions
………………………………………………………………………..159160
1.0 General description
1.1 General situation of the project
1.1.1 Name of the project
Xiangyang Urban Transportation Project with Loan of World Bank
1.1.2 Composition of the project
Xiangyang Urban Transportation Project with Loan of World Bank, according to the
different administration and implementation organizations, is divided into 4 sub-
projects of PT component,urban road component,traffic management componentas
well as the organization development and capability construction sub-project.
1.1.3 Location of the project
All contents of the project are distributed within the scope of Xiangyang urban area,
the newly built roads of the Urban road component in civil works are located at
PangGong new zone of Xiangcheng District of Xiangyang; In the PT component, the
improvement project of 13 public transport corridors will cross Fancheng District and
Xiangcheng District,, newly built Xianshan parking and service yard is located within
-
Panggong new zone of Xiangcheng district, newly built Xiangyang Economic
Development Zone parking and service yard is inside Shenzhen Industrial Park of
Xiangzhou district. Details refer to the diagram of its geographic location.
1.1.4 Construction unit
Xiangyang Urban Investment & Operation Co., Ltd.
1.1.5 Background of the project
Along with the drawing up of the national strategy of “the growing up of Central
China”, Xiangyang as a sub-central city in Hubei, the most important metropolis in
northwest of Hubei has met with unprecedented development opportunities. Resort to
its unique geographical location and convenient traffic conditions, Xiangyang shall
enjoy with the stronger external radiation and industrial cohesion. At present, the
traffic construction of Xiangyang is faced with austere challenges, the location
advantage shall be changed into the economic advantage only by taking the traffic or
communication as a bridge, and embodying the urban fascination and enhancing the
urban comprehensive competitive power needs to construct a modernized urban
traffic system. In order to improve the urban traffic and urban functions, boost the
construction of the experiment zone reform test of state level of Xiangyang urban
circle, at the same time, it’s necessary to further increase the force or the traffic
construction and meet the traffic demand of continuous development.
In July 2009, at the loan project meeting jointly held by National Development and
Reform Commission and Ministry of Finance, World Bank agreed to the draft
resolution of USD 100,000,000 loan to Xiangfan urban traffic project. At the meeting,
each party planned to submit the project to be built to the board of director of World
Bank for approval, in order to be included into World Bank 2012 financial loan
program.
From Nov. 5~6, 2009, World Bank dispatched the first delegation to Xiangfan for
conducting the preliminary communication for this project.
In May 2010, the Proposal for Utilizing World Bank Loan by Xiangfan Urban Project
Construction by Xiangfan city, Hubei Province was completed.
In Dec. 2010, World Bank further promoted conducting the feasibility study on
Xiangyang Urban Transportation Project with loan of World Bank by Xiangyang,
perfecting the road network system of Panggong area, boosting the construction on
the parking lots and public traffic stations. Greatly implement the strategy of “public
-
traffic preference”, enhance the public traffic service level. Strengthen the traffic
control and get done with the traffic jam removal and smooth traffic protection work.
From January 13 to January 16, 2011, feasibility study consultants did a 12-hour
traffic volume survey of Changhong Bridge, No.1 Han River Bridge, and so as the on-
site reconnaissance of Panggong road network. Then they made a full communication
with Project Office of Xiangyang Construction Investment Co. Ltd.
From March 30 to April 1, 2011, a delegation of World Bank experts went to
Xiangyang. They gave a preliminary discussion of the program, made the feasibility
study of the component report .
From April 25 to April 28, 2011, World Bank experts were in conjunction with
Project Office of Xiangyang Urban Construction Investment Co., Ltd., once again
clarify the urban road component job content and scope of work.
From June 13 to June 18, 2011, a delegation of World Bank experts was in
conjunction with Yangyang Public Transport Company and Xiangyang City traffic
police detachment on items pre-assessment of the road sub and proposed
improvement measures for specific projects.
1.2 Objective of environmental impact assessment
The construction and operation of the project shall have certain impact on the
environment of the area for building the project, on basis of investigation on the
current situation of the project area, through analysis on its pollution, the assessment
intends to predict the impact of the project construction on the environment, put
forward the feasible measures for controlling the pollution and alleviating the impact,
in order to provide reference to the decision making for the project, guide the design
for its environment protection and the environment management for its construction
period and operation period, enable the construction of the project to reach the
unification of economic benefit, social benefit and environment benefit.
1.3 Guiding ideology
The guiding ideology of the assessment is based on the detailed project analysis, in
accordance with the requirement of Technical Guidance Rules for Environmental
Impact Assessment (HJ/T2.1-93, HJ/T2.3-93, HJ/T2.2-2008, HJ/T2.4-1995, HJ19-
2011) and Environmental Impact Assessment Codes for Highway Construction
Works(trial) (JTJ 005-96), fully utilized the current basic information and use for
reference the related highway construction works assessment results, reasonably
determined the assessment scope, monitoring items. And according to the
characteristics of the project, selected the most representative monitoring locations,
-
monitoring factors and predictive models. The conclusion would be maximally
scientific, objective, just, clear and reliable.
1.4 Assessment basis
1.4.1 Laws, rules and regulations and policies of the country
(1) Environmental Protection Law of the People’s Republic of China, implemented on
Dev. 26, 1989;
(2) Law of the People’s Republic of China on Environmental Impact Assessment,
implemented on Sept 1, 2003;
(3) Law of the People's Republic of China on the Prevention and Control of
Atmospheric Pollution, implemented on Sept 1, 2000;
(4) Law of the People's Republic of China on Prevention and Control of Pollution
from Environmental Noise, implemented on March 1, 1997;
(5) Law of the People's Republic of China on Prevention and Control of Water
Pollution, revised on Feb. 28, 2008;
(6) Law of the People’s Republic of China on the Prevention and Control of
Environmental Pollution, implemented on April 1, 2005;
(7) Urban and Rural Planning Law of the People’s Republic of China, implemented
on Jan. 1, 2008;
(8) Law of the People's Republic of China on Land Management, implemented on
August 28, 2004;
(9) Law of the People's Republic of China on Water and Soil Conservation,
implemented on June 29, 1991;
(10) The People's Republic of China- State Council (1998) No. 253 order for
Regulations for Environmental Protection Management for the Construction Works,
implemented on Dec. 12, 1998;
(11) Document of State Environmental Protection Administrative Bureau H.F.[2003]
No.94: Notification Relating to Environmental Noise in the Environmental Impact
Assessment for highway, railway (include light railway) and other construction
works;
(12) State Environmental Protection Administrative Bureau H.F. 2006[No. 28]
Tentative Procedure for the Public Participating the Environmental Impact
Assessment; implemented on March 18, 2006.
1.4.2 Local rules, policies and documents
(1) Environmental Protection Regulations of Hubei revised), Hubei Provincial
People’s Standing Commission, implemented on Jan.1, 1998;
(2) Regulations for Atmosphere Pollution Control in Hubei, Hubei Provincial
People’s Congress Standing Commission, implemented on Dec. 3, 1997;
-
(3) Regulations for Hubei Urban Environmental Noise Control, Hubei Provincial
People’s Congress Standing Commission, implemented on April 1, 1987;
(4) Procedure for Hubei to Implement the People’s Republic of China Water
Pollution Control Law, implemented on Jan. 1, 2001;
(5) Implementation Procedures for Xiangfan Urban Construction Wastes Control,
X.F.Z.F[2005] No.36;
(6) Procedure for Controlling Xiangyang Urban Hightime Construction, Xiangyang
People’s Government ordinance No. 16.
1.4.3 Relevant documents of World Bank
(1) World Bank OP/BP4.01 and appendixes (environmental assessment), Jan. 1999;
(2) World Bank OP/ (environmental assessment), Jan. 1999;
(3) Documents assembly of World Bank environmental impact assessment.
�4�General guidelines on environment, health and safety, World Bank/IFC, 2008�
1.4.4 Documents related to the planning and environmental function division
(1) Xiangfan Urban Master Plan (2008—2020);
(2) Xiangfan Overall Planning of Land Uses (1997—2010);
(3) Xiangfan Comprehensive Urban Traffic Planning (2007);
(4) Xiangfan Urban Public Traffic Planning(2007�2020);
(5) Xiangcheng district Planning for Ancient City Protection (2007);
(6) Panggong New Zone Planning (2010);
(7) Xiangfan environmental function division;
(8) Xiangfan statistical yearbook and related statistics bulletin in past years.
1.4.5 The project design information
(1) The Feasibility Study Report on Xiangyang Urban Transportation Project with
World Bank Loan (general report) 2011.10;
(2) The Feasibility Study Report on Xiangyang Urban Transportation Project with
World Bank Loan (PT component) 2011.10;
(3) The Feasibility Study Report on Xiangyang Urban Transportation Project with
World Bank Loan (urban road component) 2011.10;
(4) The Feasibility Study Report on Xiangyang Urban Transportation Project with
World Bank Loan (traffic management componentas) 2011.10.
1.4.6 Technical codes for environmental impact assessment
(1) The People’s Republic of China environmental protection industry standard
HJ/T2.1-93 Environmental Impact Assessment Technical Guide Rules-General
Principles;
-
(2) The People’s Republic of China environmental protection industry standard
HJ2.2-2008 Environmental Impact Assessment Technical Guide Rules-Atmosphere
environment;
(3) The People’s Republic of China environmental protection industry standard
HJ/T2.3-93 Environmental Impact Assessment Technical Guide Rules-surface water
environment;
(4) The People’s Republic of China environmental protection industry standard
HJ/T2.4-2009 Environmental Impact Assessment Technical Guide Rules·-acoustic
environment;
(5) The People's Republic of China environmental protection industry standard HJ19-
2011 Environmental Impact Assessment Technical Guide Rules-ecological impact;
(6) The People’s Republic of China industrial standard-code for Highway
Construction Environment Impact Assessment (JTG B03-2006).
1.4.7 Standard letters of affirmation
Letters of Xiangyang Environmental Protection Bureau Relating to Environmental
Impact Assessment Implementation Standard for Xiangyang Urban Transportation
Project with World Bank Loan (X.H.P[2011]No.25).
1.5 Assessment rating and scope
1.5.1 The division method stipulated by World Bank OP4.01
According to the division method stipulated by World Bank business handbook—
Environmental Impact Assessment (OP4.01), the assessment type is divided as type
B.
1.5.2 Work class of domestic environmental impact assessment
Work class of domestic environmental impact assessment is different to that of World
Bank, according to technical guide rules of environmental impact assessment of
China, the assessment work classes are divided into 3 classes. According to the
characteristics and the local environmental characteristics of the sub-project to be
constructed, in accordance to the technical guide rules of environmental impact
assessment and code for highway environmental impact assessment on the topic of
each sub-project assessment and the assessment work class, the determined results
refer to table 1-1.
Table 1-1 Assessment topic and assessment work class division
Name of sub-
project
Assessment
topic Rating Rating determination basis
-
Ecology Class 1
Impact scope
-
Air Public traffic station project scope and its construction possible
involved area.
Water
environment
Not divide the assessment scope, only conduct the discharge
standard qualification analysis.
1.6 Assessment factors
According to the pollution characteristics of the project, through selection and
identification, environmental impact assessment factors of each assessment topic refer
to Table 1-3.
Table 1-3 Summary table for main factors of environmental impact assessment
Assess main factors Assessment
elements Construction period Operation period
Acoustic
environment
Equivalent continuous acoustic
level A Equivalent continuous acoustic level A
Vibration
environment VLzmax VLz10
Water
environment SS, COD, oil, etc.
PH,BOD5,COD, animal and vegetable oil, oil type,
ammonia nitrogen
Environment
air TSP NOX(NO2),CO
Solid wastes Construction waste, domestic
waste
Domestic waste of the public traffic station staff and
passenger carried waste.
Ecological
environment
Water and soil loss, urban
greening Landscape, vegetation recovery.
1.7 Assessment standard
1.7.1 Acoustic environment
According to letters of standard affirmation, assessment adopted acoustic
environmental noise refers to Table 1-4.
Table 1-4 Implemented standards for acoustic environment assessment
Standard No. Standard
name
Standard value and
class
(Type)
Scope of application Remarks
Southeast section of inner ring road, Xingguang
Avenue, Jianghua Road, Xiangyang Road,Zhakou
Road,Panggong Road, planned No.13 road, area of
the building facing to one side of the road.
Next to the
road is 3f or
over building
Class 4a area:
Daytime 70dB(A)
Night time
55dB(A) The adjacent is type 2,3 standard applicable area,
respectively area within 35,25m to the road
boundary line
Next to the
road is 3f or
less building
GB3096-2008
Acoustic
environment
quality
standard
Class 3 area:
Day time 65dB(A)
Night time
55dB(A)
Scope of industrial area
-
Class 2 area:
Day time 60dB(A)
Night time
50dB(A)
Other areas and other sensitive points of project
scope
Include
school class
rooms and
hospital
within class 4
area
GB12348-2008
Environment
noise
discharge
standard for
industrial
enterprise
boundary
for industrial
enterprise
boundary
Class 2 area:
Day time 60dB(A)
Night time
50dB(A)
Public traffic station(Xianshan parking and service
yard, Xiangzhou district-Shenzhen Industrial Park
Parking and Service Yard, railway public traffic
hub)1m outside the boundary
GB12523-90
Noise Limits
for
Construction
Site
Earthwork period:
Day time75dB,
Night time 55d B;
Piling period: Day
time 85dB, Night
time no
construction;
Structural period:
Day time
70dB,Night time
55d B;
Decoration period:
Day time 65dB,
Night time 55d B.
With the boundary line of relevant construction site
of sensitive areas
1.7.2 Vibration environment
According to letters of standard affirmation, vibration environment standards refer to
Table 1-5.
Table 1-5 Implemented standards for vibration environment assessment
Standard
No.
Standard
name
Standard value
and class Scope of application
Standard
Selection
basis
Mixed area
standard: Day
time 75dB,
Night time
72dB
Sensitive points located within
noise function division type “2”
area
Industrial area
standard: Day
time75dB, Night
time 72dB
Sensitive points located within
noise function division type “3”
area GB10070-
88
Environment
vibration
standard for
urban area Standard value
for two sides of
primary traffic
road network:
Day time75dB,
Night time
72dB
Sensitive points located within
noise function division type “4a”
area
Determination
for the
standard class
refers to noise
function area
type
-
1.7.3 Water environment
The project is mainly urban road, sewage during construction period and operation
period is sewage pipe network of urban drained sewage, finally entering urban sewage
treatment plant, according to the letter of standard affirmation, sewage discharge
standard is implementing class 3 Standard of sewage comprehensive discharge
standard (GB8978-1996), details refer to Table 1-6.
Table 1-6 Implemented standard for water environment assessment
Standard No. Standard name Standard value
and class Pollutants Standard value(mg/L)
pH 6 9
SS 400
BOD5 300
COD 500
Oil type 20
Animal and
vegetation oil
v���
100
Ammonia nitrogen
/
GB8978-1996
Comprehensive
sewage discharge
standard
Class 3
LAS 20
This project is close to Han River, according to the function division for Xiangyang
earth’s surface water environment, Hanjiang section where the project is located is
type � water body, and the water quality standard refers to Table 1-7.
Table 1-7 Han River water environment quality standard for the project area
Standard No. Standard name
Standard
value and
class
Pollutants Standard value(mg/L)
pH 6~9
SS 0.2
BOD5 4
COD 20
Oil type 0.05
Ammonia nitrogen
1.0
GB3838-2002
Earth’s surface
water
environment
quality standard
Type �
LAS 0.2
-
1.7.4 Atmosphere environment
According to letters of standard affirmation, atmosphere environment quality standard
for the area along the project shall implement class 2 standard of Ambient Air Quality
Standard (GB3095-1996), details refer to Table 1-8.
Table 1-8 Implemented standard for atmosphere environment assessment
Standard No. Standard name
Standard value and class
Pollutants Standard value(mg/cubic
meter)
Annual mean 0.2 TSP
Daily mean 0.3
Annual mean 0.05
Daily mean 0.10 NOX
1h mean 0.15
Annual mean 0.04
Daily mean 0.08 NO2
1h mean 0.12
Daily mean 4.0
GB3095-1996
Embient air quality standard
Class 2
CO
1h mean 10.0
1.8 Assessment prediction time interval
This assessment time intervals are construction period and operation period.
Construction is same to the project construction period; Operation period is consistent
to vehicle flow prediction year. Namely:
Construction period: 2011y~2015y.
Operation period: 2015y~2020y.
1.9 Emphases of the assessment
According to major potential environment impact of the project and the regional
environment sensitive degree, this assessment takes the topic of the following
environmental impact assessment as emphases of the assessment:
(1)Topic on acoustic environmental impact assessment: Stress on assessing the impact
of the project operation on schools, hospitals and concentrated residents quarters at
two sides of the road.
(2)Topic on urban ecological environmental impact assessment: Mainly analyze the
harmony of the road landscape and the surrounding environment.
-
(3)Topic on environment air impact assessment: Stress on assessing the impact of
vehicle tail gas on schools, hospitals and concentrated residents quarters at two sides
of the road.
(4)Public participation: Stress on investigation for units, schools, hospitals and
concentrated residents quarters at two sides of the road.
1.10 Assessment technical method
According to the principle of “based on the point, combining point with the line and
feedback of whole line, it’s adopted mode calculation, analog method and
investigation and research method for conducting assessment.
Ecological environment is adopted the method of data collection and diagnosis; water
environment assessment is adopted analog method; Acoustic and atmosphere
environment assessments are adopted mode calculation method; Social environment is
adopted diagnosis method; Risk analysis is adopted the method of probability analysis
combining with mode prediction.
1.11 Identification of the construction project impact elements
According to the construction project nature and the improvement of the traffic
environment and discharge characteristics of pollutants and others, environment
impact elements identification table for the project impact environment is adopted
for identifying the degree and nature of the project impact element on the
environment, identification results refer to Table 1-9, Table 1-10.
-
Table 1-9 Identification of environment impact element degree of the project
Natural environment Ecological resources Social environment Living quality
Environment
resources Under-
round
hydrolog
y
Undergroun
d
water quality
Surface
hydrology
Surface
Water
quality
Atmospher
e
quality
Noise
environment
Urban
ecology
Fore
st
veg
etat
ion
Wil
d a
nim
al
Aquat
ics
anim
al
Endanger
ed
anim
al
Fis
hin
g
bre
edin
g
Lan
d u
se
Indust
rial
dev
elopm
en
t Agri
cult
ura
l dev
elo
pm
ent
Wat
er
supply
Tra
ffic
Fu
el
stru
cture
Save
ener
gy
Est
het
ics
tour
Hea
lth
safe
ty
So
cial
ec
onom
y
Rec
reat
ion
Cult
ura
l an
tiquit
y
Liv
ing
stan
dar
d
Site clear / / / -1 -1 -1 -1 / / / / / / / / / -1 / / -1 / / / / /
Ground
exc. / / / -1 -2 -2 -1 / / / / / / / / / -1 / / -1 / / / / /
Transp. / / / -1 -1 -1 / / / / / / / / / / -1 / / -1 / / / / /
Install
constr. / / / / / -1 / / / / / / / / / / -1 / / -1 / / / / /
Const
ruct
ion p
erio
d
Material
store / / / -1 -1 / / / / / / / / / / / / / / -1 / / / / /
Sub-total / / / -4 -5 -5 -2 / / / / / / / / / -4 / / -4 / / / / /
Sewage
discharge / / / / / / / / / / / / / / / / / / / / +1 / / / /
Waste
gas
dis-
charge
/ / / / -1 / / / / / / / / / / / / / / / -1 / / / /
Noise / / / / / -1 / / / / / / / / / / / / / / -1 / / / /
Solid dis-
charge / / / / / / / / / / / / / / / / / / / / / / / / /
Product / / / / / / / / / / / / / / / / / / / / / / / / /
Employ-
ment / / / / / / / / / / / / / / / / / / / / / +1 / / +1
House / / / / / / / / / / / / / / / / / / / / / +1 / / +1
Sub-total / / / / -1 -1 / / / / / / / / / / / / / / -1 +2 / / +2
Notes: � 3�Major impact;2�medium impact;1�light impact; “�” indicates favorable impact; “�” indicated unfavorable impact. � Degree of environment impact element by the project operation period includes positive and negative respects, whereas the benefit is bigger than the harm, the
listed in the table are major impacts.
-
Table 1-10 Analysis on the nature of the project impact on the environment
Unfavorable impacts Favorable impacts
Construction period Operation period Construction period Operation period Impact nature
Environment resource Short term
Long term
Reversible Irreversible Local Wide Short term
Long term
Reversible Reversible Local Wide Short term
Long term
Local Wide Short term
Long term
Local Wide
Underground hydrology
Underground water quality Earth’s surface hydrology Earth’s surface water quality √ √ √
Atmosphere quality √ √ √ √ √ √
Natural
resources
Noise environment √ √ √ √ √ √ Urban ecological √ √ √ √ √ Forest animals
Wild animals
Aquatic animals�
Endangered animals
Living
resources
Fishing breeding
Land use √ √ √ √ √ Industrial development √ √ Agricultural development √ √ √ Water supply √ √ √ √ √ Traffic √ √ √ √ √
Social
environment
Fuel structure
Save energy source
Esthetics tour √ √ √ √ √ Health safety
Social economy √ √ √ √ √ Recreation
Cultural antiquity
Living
quality
Living level √ √ √ √ √
-
It’s clear from Table 1-9 and Table 1-10, unfavorable impacts of the project on the
environment are mainly in construction period, mainly manifest in the impact on the
land occupation of the construction section, traffic, social economy, acoustic
environment, environment air and ecological environment, the nature is local, in short
term, but can be reversible; Main unfavorable impact during operation period,
environment elements of the impact include urban ecological, industrial development,
traffic and transport, social economy and living standard along the line, the nature is
wide and long term.
1.12 Environment protection object
1.12.1 Ecological sensitive object
Through investigation, the assessment scope of the project has not involved natural
reserves, scenic spots, forest parks, historical and cultural sites under government
protection, basic farmland protection area and other ecological sensitive objects.
1.12.2 Water environment protection object
Due to Panggong area where the main civil works located having no river water
system at present, at the same time, the project has not involved the scope inside Han
River levee, so the project has not involved water source protection area. But, due to
partial road section of the project road works being close to Han River, in
consideration of the water drainage in construction period and environmental accident
risk in operation period, which may possibly cause impact on Han River, therefore,
Han River is taken as the water environment protection object by this assessment. Han
River water environment function surrounding the project is classified as class III
water quality.
1.12.3 Noise, atmosphere environment protection object
According to the determined assessment scope, its noise and atmosphere environment
protection objects refer to Table 1-11.
-
Table 1-11 Noise and atmosphere environment protection object within the assessment scope
Minimum distance(m) Distance to related roads(m)
Road
name No.
Sensitive
point name Mileage Distance
to road
central
line
Distance
to road
red line
Height
difference
Locatio
n
relation
to road
Related
road
name
Distance
to road
central
line
Distance
to road
red line
Height
differenc
e
Relation
related to
road
location
Overview of sensitive
points
Environmen
t impact
Panggong
Road 1 Yiheyuan K0+000 45.3 19.6 0 End
Existing
Zhakou
Road
25.8 12.3 0 Left
side
Under construction, 10
floors, 6 buildings, in frame
structure, total 240
households
Road traffic
noise, social
life noise.
Panggong
Road 2
Xiangyang
National
Taxation Bureau
yard
K0+010�K0+070
24.5 4.5 0 Left side
Existing
Zhakou
Road
31 17.5 0 Right
side
1990s to now, 2fl.office
building, 1 building, 3fl
office building, 1 building,
7fl resident building, 1
building with 42
households, brick and
concrete structure.
Road traffic
noise, social
life noise.
Panggong
Road 3
Youzhi Corp/
Family yard,
Panggong
Jiayuan, Taixin
Garden
K0+070�K0+200
28.5 8.5 0 Left side
2000, 7-8fl resident
building, 15 buildings with
630 households, brick and
concrete structure.
Road traffic
noise, social
life noise.
Panggong
Road 4
Panggong
Garden
K0+010�K0+110
20 0 0 Right
side
Zhakou
Road 85 65 0
Right
side
2006, 7fl, 5 buildings, total
176 households.
Road traffic
noise, social
life noise.
Panggong
Road 5
Xiangyang No.
23 High School
K0+250�K0+350
53 33 0 Right
side
1700 teachers and students,
3fl teaching building, 1
building, 6fl building, 2
buildings.
Road traffic
noise, social
life noise.
Panggong
Road 6
Hongwei
Chemical Factor
family yard
K0+200�K0+280
22.2 2.2 0 Left side
1990s, 5fl. 2 buildings,
brick and concrete
structure., total 80
households
Road traffic
noise, social
life noise.
Panggong
Road 7
Tihua Textile
Factory family
yard
K0+340�K0+500
41.7 21.7 0 Right
side
1980s, 5fl, 5 buildings,
brick and concrete
structure., total 180
Road traffic
noise, social
life noise.
-
households.
Panggong
Road 8
Hongqi Living
quarter
K0+500�K0+560
51 31 0 Right
side
Xingguang
Avenue 76 36 0
Right
side
1990s, 8fl, 3 buildings,
brick and concrete
structure, total 192
households
Road traffic
noise, social
life noise.
Panggong
Road 9
Meihua
Corp.family
yard
K0+480�K0+570
53 33 0 Left side
2000, 6fl residential
building, 3 buildings, with
132 households, brick and
concrete structure.
Road traffic
noise, social
life noise.
Panggong
Road 10
Wangjiawa
group 7
K0+320�K0+600
24.1 4.1 0 Left side
1990s to now, 2-3 fl, brick
and concrete structure, total
33 households
Road traffic
noise, social
life noise.
Panggong
Road 11
Weather Bureau
family yard
K0+730�K0+800
22.1 2.1 0 Right
side
1980s to now, 4fl
residential building, 1
building, 5fl, 3 buildings,
total 122 households, brick
and concrete structure.
Road traffic
noise, social
life noise.
Panggong
Road 12
Xiangyang
Degong Hospital
K0+710�K0+800
26 6 0 Left side 2fl, 1 building, 30 beds.
Road traffic
noise, social
life noise.
Panggong
Road 13
Xinghuo
Bearing Factory
employees
dormitory
K0+850�K1+000
24 4 0 Right
side
1980s, 7fl residential
building, 2 buildings, 56
households, brick and
concrete structure.
Road traffic
noise, social
life noise.
Panggong
Road 14
Zhongfang
Dingshengyuan
K1+000�K1+270
35 15 0 Right
side
Under construction, brick
and concrete structure.,
frame structure, 6fl, 2
buildings, 14fl, 1 building,
total 120 households
Road traffic
noise, social
life noise.
Panggong
Road 15
Xuemei Corp.
family yard
K1+020�K1+080
27.7 7.7 0 Left side
1990s to now, 6-8fl, brick
and concrete structure., 6fl,
1 building, 8f, l3 buildings,
total 224 households
Road traffic
noise, social
life noise.
Panggong
Road 16
Panggongci
Village group 1
K1+230�K1+360
34.9 14.9 0 Left side
1990s to now, 2-3fl, brick
and concrete structure., 52
households
Road traffic
noise, social
life noise.
Panggong
Road 17
Panggongci
Village group 5
K1+650�K1+840
20.6 0.6 0 2 sides No. 13
road 20.6 0.6 0 End
1990s to now, 2-3fl, brick
and concrete structure., 25
households
Road traffic
noise, social
life noise.
-
households life noise.
Zhakou
Road 18
Sujiayuan
Comunity
K0+010�K0+280
37 17 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure., 100
households
Social life
noise
Zhakou
Road 19
Jinyu Corp. Siji
apartment
K0+020�K0+070
20.4 0.4 0 Right
side
Existing
Panggong
Road,
existing
Zhakou
Road
70 50 0 Right
side
2000, 7fl, 1 building, brick
and concrete structure., 70
households
Road traffic
noise, social
life noise.
Zhakou
Road 20
Cement works
family yard
K0+120�K0+220
21.3 1.3 0 Left side
1980s to now, 5-8fl, 5
buildings, brick and
concrete structure.,230
households
Social life
noise
Zhakou
Road 21
Jiancai
Xiangyang
residential
quarter
K0+180�K0+230
30.5 10.5 0 Right
side
1990s, 7-8fl, 2 buildings,
brick and concrete
structure.,92 households
Social life
noise
Zhakou
Road 22
Hepanlinyu,
Hexie residential
quarter
K0+270�K0+510
26.9 6.9 0 Right
side
2000, 6-7fl, 13 buildings,
brick and concrete
structure, 720 households
Social life
noise
Zhakou
Road 23
No.1 Light
Industry Corp.
family yard
K0+300�K0+450
68 48 0 Left side
1990s, 5-7fl, 4 buildings,
brick and concrete
structure, 98 households
Social life
noise
Zhakou
Road 24
Agricultural
Research
Institute family
yard
K0+370�K0+450
22.5 2.5 0 Left side
1990s, 3-5fl, 3 buildings,
brick and concrete
structure, 32 households
Social life
noise
Zhakou
Road 25
Farm Machinery
Corp.family yard
K0+450�K0+550
89.5 69.5 0 Left side
2011, 17fl, 1 building,
frame structure; 3-5fl,
2buildings, brick and
concrete structure,136
households
Social life
noise
Zhakou
Road 26
Sanjiayuan
group 3
K0+470�K0+660
20.5 0.5 0 Right
side
1990s to now,2-3fl, brick
and concrete structure, 67
households
Social life
noise
Zhakou
Road 27
Sanjiayuan
group 4
K0+870�K0+920
72 52 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure, 9
households
Social life
noise
-
households
Zhakou
Road 28
Hongmiao
Village group 4
K1+450�K1+600
38.8 18.8 0 Left side Jianghua
Road 86 66 0
Left
side
1990s to now, 2-3fl, brick
and concrete structure, 39
households
Social life
noise
Zhakou
Road 29
Hexin Village
group 7
K1+770�K1+900
44.1 24.1 0 Left side Jianghua
Road 77 57 0
Right
side
1990s to now, 2-3fl, brick
and concrete structure, 25
households
Social life
noise
Zhakou
Road 30
Hexin Village
group 5
K2+170�K2+360
23.9 3.9 0 2 sides Inner ring
road 31 1 0
Left
side
1990s to now,2-3fl, brick
and concrete structure,40
households
Social life
noise
Zhakou
Road 31
Roulianchang
family yard
K2+750�K2+800
23.5 3.5 0 Right
side
1990s, 5fl, 2 buildings,
brick and concrete
structure, 80 households
Social life
noise
Zhakou
Road 32
Zhijiamiao
group 5
K2+850�K3+060
29.7 9.7 0 Left side Xiangyang
Road 25 5 0
Left
side
1990s to now, 2-3fl, brick
and concrete structure, 120
households
Social life
noise
Xingguang
Avenue 33
Wangjiawa
residnetial
quarter
K0+950�K1+000
45 20 0 Right
side
2005, 8fl, 2 buildings, brick
and concrete structure, total
160 households
Social life
noise
Xingguang
Avenue 34
Dongcheng
Yijing pahse 1
K1+000�K1+150
33.5 8.5 0 Right
side
2010, 8fl, 7 buildings, brick
and concrete structure,196
households
Social life
noise
Xingguang
Avenue 35
Dongcheng
Yijing phase 2
K0+900�K1+070
35 10 0 Left side
2010, 7fl, 5 buildings, brick
and concrete structure, 140
households
Social life
noise
Xingguang
Avenue 36
Wangjiawa
Primary School
teachers
dormitory
K1+160�K1+200
25 0 0 Left side
2000, 5fl, 1 building, brick
and concrete structure, 20
households
Social life
noise
Xingguang
Avenue 37
Wangjiawa
group 7
K1+150�K1+500
26.5 1.5 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure, 70
households
Social life
noise
Xingguang
Avenue 38
Wangjiawa
group 5
K1+540�K1+700
31.7 6.7 0 Left side
1990s to now, 2-3fl, brick
and concrete structure, 44
households
Social life
noise
Xingguang
Avenue 39
Hongmiao
Village group 5
K1+810�K1+940
135 110 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure, 31
households
Social life
noise
-
Xingguang
Avenue 40
Hongmiao
Village group 2
K2+250�K2+350
27.2 2.2 0 Left side
1990s to now, 2-3fl , brick
and concrete structure, 30
households
Social life
noise
Xingguang
Avenue 41
Hongmiao
Village group 3
K2+300�K2+470
56 31 0 Right
side
Jianghua
Road 60 40 0
Left
side
1990s to now, 2-3fl, brick
and concrete structure, 61
households
Social life
noise
Xingguang
Avenue 42
Hexin Village
group 4
K2+700�K2+950
28.8 3.8 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure, 51
households
Social life
noise
Xingguang
Avenue 43
Hexin Village
group 3
K2+750�K3+050
31.6 6.6 0 Left side
1990s to now, 2-3fl, brick
and concrete structure, 72
households
Social life
noise
Xiangyang
Road 44
Zhijiaiao groups
2,3
K1+150�K1+450
21.3 1.3 0 Right
side
1990s to now,2-3fl, brick
and concrete structure,140
households
Social life
noise
Xiangyang
Road 45
Zhijiamiao
Primary School
K1+250�K1+300
84 64 0 Right
side
208 teachers and students,
2fl teaching building, 1
building
Social life
noise
Xiangyang
Road 46
Zhijiamiao
group 1
K1+450�K1+750
20.3 0.3 0 Right
side
1990s to now,2-3fl, brick
and concrete structure, 63
households
Social life
noise
Xiangyang
Road 47
Yangjiahe
Village groups
6,7,8
K1+950�K2+450
36.1 16.1 0 Right
side
1990s to now,2-3fl, brick
and concrete structure, 257
households
Social life
noise
Xiangyang
Road 48
Yangjiahe
Village1, groups
3,4
K2+450�K2+900
25.1 5.1 0 Left side
1990s to now, 2-3fl, brick
and concrete structure, 82
households
Social life
noise
Inner ring
road
southeast
section
49 Hexin Village
group 6
K2+300�K2+450
49 19 0 Right
side
1990s to now, 2-3fl, brick
and concrete structure, 32
households
Social life
noise
Inner ring
road
southeast
section
50 Sunjiagang
group 7
K0+950�K1+100
56 26 0 Right
side
No.13
road 21.2 1.2 0
Right
side
1990s to now, 2-3fl, brick
and concrete structure, 35
households
Social life
noise
Jianghua
Road 51
Hongmiao
Village group 1
K1+850�K2+250
29.4 9.4 0 2 sides
1990s to now, 2-3fl, brick
and concrete structure,102
households
Social life
noise
-
No.13
road 52
Panggongci
Village group 6
K0+000�K0+050
31.5 11.5 0 Left side
1990s to now, 2-3fl, brick
and concrete structure, 15
households
Social life
noise
No.13
road 53 Yaojiawan
K0+100�K0+500
22.4 2.4 0 2 sides
1990s to now, 2-3fl, brick
and concrete structure, 138
households
Social life
noise
No.13
road 54 Yangjiaci
K0+700�K0+900
20.8 0.8 0 Left side
1990s to now, 2-3fl, brick
and concrete structure, 36
households
Social life
noise
No.13
road 55
Tuxiang Village
groups 2,3
K1+200�K1+300
21.3 1.3 0 Left side
1990s to now, 2-3fl, brick
and concrete structure,50
households
Social life
noise
No.13
road 56
Sunjiagang
groups 1,3
K1+870�K2+200
20.2 0.2 0 2 sides
1990s to now, 2-3fl, brick
and concrete structure, 140
households
Social life
noise
No.13
road 57
Sunjiagang
group 6
K2+580�K2+950
21.7 1.7 0 Left side Inner ring
road 121 91 0
Left
side
1990s to now, 2-3fl, brick
and concrete structure, 45
households
Social life
noise
-
26
2.0 Overview of the project
Xiangyang Urban Transportation Project with World Bank loan this time is a
systematic engineering composed of a number of traffic sub-projects, which includes
hardware construction, but also covers improvement and perfection of related
softwares. It may be classified according to nature of each sub-project, which may be
generalized as 4 major sub-systems, PT component,urban road component,traffic
management componentas well as the organization development and capability
construction sub-project. Summary of the contents for Xiangyang Urban
Transportation Project construction refers to table 2-1.
Table 2-1 Summary of the contents for Xiangyang Urban Transportation Project
Construction
Sub-project
name Construction contents
Project
nature
Static
investment(100
million yuan)
urban road
component
Construction for
Panggong new
zone backbone
road network
Southeast section of newly built inner
ring road, Xingguang Avenue,
Panggong Road, Jianghua Road,
Xiangyang Road, Zhakou Road,
planned No.13 road, total length is
17.182km
Hardware
construction 11.19
Set 17 Bus Entrance Lane mprovement of
13 public
transport
corridors
Reconstruction 38 Bus Bays
New 38 Bus Shelters along Route
13, new 62 Bus Shelters in
Panggong
Area
Hardware
construction
Newly built
Xianshan parking
and service yard
Yard total area is30000m2 Hardware
construction
Newly built
Xiangyang
Economic
Development Zone
parking and
service yard
Yard total area is30740m2 Hardware
construction
Reconstruction for
Xiangyang
Railway Station
public traffic hub
Construct sun-shade, slow speed
passage, reconstruct existing
platform.
Hardware
construction
1Improvement of traffic engineering facilities and bay-type
bus stops of 13 priority public transport corridors and
procurement of high-performance vehicles
Software
improvement
and
perfection
PT
component
GPS dispatch service system
Software
improvement
and
perfection
1.28
traffic
management
componentas
Traffic organization and improvement
Software
improvement
and
perfection
0.76
-
27
Public traffic preference
Software
improvement
and
perfection
Road channeling design
Software
improvement
and
perfection
ATC system design
Software
improvement
and
perfection
Road user propaganda and education
Software
improvement
and
perfection
Sub-project of
organization
development and
capacity
construction
Include its smooth implementation and normal operation
management later on, sustainable development of urban
traffic construction, provide the topic study, training and
investigation, consultation services, urban traffic strategy
planning matching and construction for the organization
capacity, etc.
Software
improvement
and
perfection
0.26
2.1 Urban road component
Urban road component mainly aims at relieving the traffic jam of central urban area,
reducing river cross traffic pressure, strengthening the traffic contact between central
urban area with the surrounding clusters or groups, at the same time, in cooperation
with Han River No. 5 Bridge being constructed recently, main study area of this sub-
project is the road network planning for Xiangcheng district Panggong new zone in
Xiangyang while covering the new construction for the backbone road(southeast
section of inner ring road, Xingguang Avenue, Panggong Road, Jianghua Road,
Xiangyang Road, Zhakou Road, planned No.13 road), total length is 17.182km,
construction and installation costs reach 601 million yuan. Recommended scheme for
road network of Panggong area this time refers to Table 2-2, Fig. 2-1.
Table 2-2 Recommendation for designing the construction of road network of
Panggong area
Road No. Name of recently
constructed roads
Road
nature
Red line
width(m)
�Green line width(m)
Road length
(m)
1 Southeast section of
inner ring road
Primary
road 60 / 2046.8
2 Xingguang Avenue Primary
road 50 80 3187
Jianghua Road(east of
Zhakou Road)
Primary
road 40 50 1694
3 Jianghua Road(west of
Zhakou Road)
Primary
road 30 / 259
4 Panggong Road(east of
Zhakou Road)
Primary
road 40 50 1820
-
28
Panggong Road(west of
Zhakou Road)
Primary
road 30 / 215
5 Xiangyang Road Primary
road 40 / 1798
6 Zhakou Road Primary
road 40 / 3081
7 Planned No. 13 road Primary
road 40 / 3081
Total 17181.8
Notes:�Green line width means the control line of green land at 2 sides of the road, it’s road red line plus the
width of green land of 2 sides.
-
29
Fig. 2-1 Recommended scheme for Panggong area road construction
2.2 Public Transport component
PT component is composed of priority public transport corridor project, bus stations
and yards project and intelligent public transport dispatch project.
Priority public transport corridor project mainly includes: civil works arising from the
improvement of 13 public transport and general public transport engineering facilities
such as signs, marked lines, signal lights, bay stations and bus shelters. It also
-
30
includes the ancillary facilities for public traffic on the newly-built roads in Panggong
area: setting 62 integrated bus stops. It also includes the procurement of buses:
purchasing 40 high-capacity, high-performance and low-chassis 12.0m-long CNG
buses with air-conditioning.
Bus stations and yards project includes newly-built Xianshan bus parking and
maintenance station, newly-built Xiangyang Economic Development District bus
parking and maintenance station and reconstructed railway railway station hub.
Intelligent public transport GPS dispatch service project includes vehicle-mounted
GPS terminal unit, dispatch center, computer room equipment, dispatch management
software system etc.
-
31
See Figure 2-2 for the location of PT component projects.
Figure 2-2 Overall Location Map of PT Component
2.2.1 Design scheme of exclusive priority public transport corridors
In this project, 13 public transport corridors are chosen to be example roads of
improvement project. The details about the improvement scheme of 13 priority
public transport corridors mainly involve the setting of peak hour bus exclusive
entrance lanes. The standard cross-sections of the road sections will remain
-
32
unchanged in this scheme. The bus stops along these 13 lines will be built into
bay station of the same width as a bus. In addition, in the design scope of 13
corridors (13.1km), the entrance line of key junctions will be re-channelized.
Bus exclusive entrance lanes (mainly existing through lanes) will be added. It
will be the second lane from the yellow line after channelization. For details
refer to Table 2-3, Fig. 2-3.
Figure2-3 Concept of the Peak hour Bus Exclusive Entrance Lane
According to the design scheme, bus exclusive entrance lanes will be provided
at Shengli Street-Huancheng South road, Zhongyuan Road-Chunyuan Road,
Xijie Street-Nanjie Street among the 13 public transport lines, totaling 17 bus
exclusive entrance lanes to be set at 11 junctions. For details see Figure 2-4.
Other junctions and road sections basically remain unchanged.~
Table 2-3 PT Priority Scheme and Location of Junction
No. Junction Names Directions
1 Shengli Street/Huancheng South Road North and South entrance of Shengli Street
2 West Street/ South Street Entrance of South Street
3 Changhong Road/Jianshe Road North and South entrance of Changhong
Road
4 Changhong Road/Renmin Road North and South entrance of Changhong
Road
5 Changhong Road/Songhe Road North and South entrance of Changhong
Road
6 Changhong Road/Jianhua Road North and South entrance of Changhong
Road
7 Changhong Road/ChunYuan Road East entrance of ChunYuan Road
8 Xinhua Road/ChunYuan Road South entrance of ChunYuan Road
-
33
9 Qilihe Road/Xinhua Road North entrance of Qilihe Road
10 Qilihe Road/ZhongYuan Road West entrance of ZhongYuan Road
11 ChunYuan Road/ZhongYuan Road East and West entrance of ZhongYuan Road
Figure 2-4 Overall Location Map of Bus Pirority’s Junction
The bay-station improvement scheme of 13 public transport corridors is to newly build or re-build
21 30m-long bay stations and to newly build 4 40m-long bay stations and 13 60m-long bay
stations, totaling 38 bay stations. All the stations will be provided with new integrated bus
shelters. Meanwhile, light-box stop boards and electronic stop boards will be provided as
hardware support of intelligent public transport GPS system.
There are 62 short-term bus stops (31 pairs) in Panggong area. So, it needs to provide 62 sets of
-
34
new integrated bus shelters as ancillary facilities.
2.2.2 Design scheme for the public traffic terminal yard
The construction for the public traffic terminal yard of the project mainly covering: newly built
Xianshan parking and service yard and Xiangyang Economic Development Zone parking and
service yard, reconstructing the exiting railway station public traffic hub. Details for the
construction of public traffic terminal station refer to Table 2-4.
Table 2-4 Schedule for the content composition of newly built public traffic terminal yard
works
Terminal yard name Works contents Works quantity
Plane layout
The parking area is 22180 m2, and the number of parking space is
190, the pink square representative the night parking space only; Set
one exit, two entrances, Entrance 1 located near the prime road, and
Entrance 2 for night only. Build bus maintenance 70m long with 14
maintenance space, the field in front of maintenance is used for night
parking and automatic washing, the building area is 910 m2;
Vehicles are parked vertically, with each parking space covering
13.0m×3.5m (in consideration that there is the green belt sufficiently
wide behind the parking spaces and the tail of a bus may enter into
the belt, the length of each parking space is adjustable); Build a
three-floor comprehensive office building, the building area is 560
m2; Build one cash room with two cash-receiving lanes, the function
of the room is receiving cash box only, counting work should be in
office building. The area of cash room is 16 m2. Details refer to
Fig.2-5. Subgrade
pavement
Parking lot is adopted 20cm C30 cement concrete pavement and
30cm thick cement stabilized crushed stone base.
Site vertical and
drainage
The site vertical of the service yard shall be controlled according to
the longitudinal grade vertical to passage direction not over 3%, the
longitudinal grade parallel to the passage direction not over 1%; Rail
water, sewage, water supply pipelines and the support facilities shall
be unified designed according to the situation of site surrounding
road network drainage facilities, details refer to the table of works
quantity.
Xianshan parking
and service yard
Greening works
Greening area is about 6,340m2, greening rate is 21.2%, 4.5m high
panicled goldrain trees planted at 5m interval to the surrounding
greening zone are used as protective network for the site surrounding
areas, the middle has been planted some 4.5m high camphor trees for
beautifying in order to form the shade tree inside the site, which not
only increases the greening area, but also plays a role of summer
shade. The road turning areas inside the site are mainly laid bushes,
for forming penetration type design, reducing the interference to the
sight line of the driver to the minimal extent, in consideration of the
length of the parking space, greening scope of 2m to the parking
space may only plant vegetation.
-
35
Plane layout
The parking area is 21380 m2, and the number of parking space is
234; Set one exit, one entrance, exit located near the No.6 South
Latitude Road, and entrance located near the No.3 South Longitude
Road Vehicles are parked vertically, with each parking space
covering 13.0m×3.5m (in consideration that there is the green belt
sufficiently wide behind the parking spaces and the tail of a bus may
enter into the belt, the length of each parking space is adjustable);
The green land under the High-tension Line is included in the total
area; Build bus maintenance building together with PT office
upstairs, the maintenance space should be 10, this building contains
function of apartment, the building area is 804 m2;Build up one gas
station with 10 gas parking spaces, the building area is 1330 m2
Build one cash room with two cash-receiving lanes, the function of
the room is receiving cash box only, counting work should be in
office building. Thearea of cash room is 54 m2;. Details refer to
Fig.2-6.
Subgrade
pavement
Parking lot is adopted 20cm C30 cement concrete pavement and
30cm thick cement stabilized crushed stone base.
Site vertical and
drainage
The site vertical of the service yard shall be controlled according to
the longitudinal grade vertical to passage direction not over 3%, the
longitudinal grade parallel to the passage direction not over 1%; Rail
water, sewage, water supply pipelines and the support facilities shall
be unified designed according to the situation of site surrounding
road network drainage facilities
Xiangyang
Economic
Development Zone
parking and service
yard
Greening works
Greening area is 7136m2(including greening land under high voltage
line), greening rate is 23.2%. 4.5m high panicled goldrain trees
planted at 5m interval to the surrounding greening zone are used as
protective network for the site surrounding areas, the middle has been
planted some 4.5m high camphor trees for beautifying in order to
form the shade tree inside the site, which not only increases the
greening area, but also plays a role of summer shade. The road
turning areas inside the site are mainly laid bushes, for forming
penetration type design, reducing the interference to the sight line of
the driver to the minimal extent, in consideration of the length of the
parking space, greening scope of 2m to the parking space may only
plant vegetation.
Improvement
The scheme is planning to set vertical platforms in waiting area
which is on the north part of the terminal, the green roundabout is
demolished and set up temporary parking space there, the details
contains:. Details refer to Fig.2-7. Construction works
for railway public
traffic hub
Awnings
The awnings should be covered the whole terminal (about 4000m2),
the height can be 7m or more in order to overlap with bus lanes and
pedestrian walk.
-
36
Fig.2-5 Schematic diagram for the layout of Xianshan parking and service yard
-
37
Fig.2-6 Schematic diagram for the layout of Xiangyang Economic Development Zone
public traffic parking and service yard
-
38
Fig.2-7 Scheme for improving railway station public traffic hub
2.3 Traffic management componentas
Sub-project of traffic safety and control mainly, according to the requirements for the traffic
-
39
control and safety put forward in the urban master planning, took“ the corridor” as the object, and
solved main conflicts, starting from the traffic safety improvement“3E” (Engineering-
Engineering, safety education-Education, law enforcement-Enforcement), enhanced the safety of
urban road traffic, maximally improved residents trip environment, thus reducing the impact of the
traffic growth on the living environment. The construction of the project including: Traffic
organization and improvement, public traffic preference, road channelizing design, ATC system
design and road user propaganda and education, etc. Its investment is 76 million yuan.
2.4 Sub-project of organization development and capacity construction
Sub-project of organization development and capacity construction includes the
smooth implementation and normal operation management later on for the project,
sustainable development of urban traffic construction, providing the topic study,
training and investigation, consultation service, construction for internal preparation
of urban traffic strategy planning and organization capacity. Its investment is 26
million yuan.
2.5 Investment estimation and financing
General static investment of the project is 1.349 billion yuan, of which, the project
construction cost is 761 million yuan, Other project construction expense is 64 million
yuan, land acquisition and resettlement expense is 0.364 billion yuan, technical
support expense is 10 million yuan, organizational development and capacity
development expense is 26 million yuan and emergency reserve is 125 million yuan.
Composition of the project fund resources: World Bank loan totaling USD 0.1 billion
(converted to RMB 0.64 billion yuan, exchange rate is 1:6.4), internal fund is 0.709
billion yuan.
Internal fund resources: The project capital: 0.34 billion yuan, all resources are from
the special fund for Xiangyang urban construction and development; Domestic bank
loan is 0.375 billion yuan, from the loan of Hubei Branch of China Development
Bank.
The loan of World Bank and the domestic bank shall be repaid within 20y after the
completion of the project, namely from 2017y-2036y, repayment per year is in equal
amount, and interest shall also be paid.
The loan compensation resource is from the special fund for Xiangyang urban
construction and development.
-
40
2.6 General implementation progress for the project
Details for general implementation progress for the project refer to Table 2-5.
Table 2-5 Table for general implementation progress for the project
2010 2011 2012 2013 2014 2015 2016
3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12 3 6 9 12
Pro
ject
pre
par
atio
n
Pro
ject
asse
ssm
ent
Pro
ject
neg
oti
ati
on
Pro
ject
des
ign
Bid
ing
pu
rch
ase
Pro
ject
con
stru
ctio
n
Pro
ject
accep
tan
ce
-
41
Han
dov
er f
or
use
2.7 Overview of the project land occupation
The land occupation types of the project along the line mainly include: arable
land(paddy field, dry land), woodland(forest land, bush land), housing estate, grass
land, etc, totaling 88.19hm2, of which, permanent land occupation is 80.59hm
2,
interim land occupation is 7.60hm2. Statistics table for land occupation refers to 2-6.
Table 2-6 Summary table for the project land occupation
Unit: hm2
Type of land occupation
Arable land Forest Housing
estate
Land
occupation
by traffic
transport
Grass
land Project sub-area
Irrigable
land Dry land
Forest
land
Bush
land Commercial Highway
Other
grass
lands
Total
Permanent land occupation 26.59 24.73 / / 9.03 20.24 / 80.59
Sub-total 26.59 24.73 / / 9.03 20.24 / 80.59
Excavation waste
dump / / / 0.27 / / 0.75 1.02
Earth material yard / / / / / / 0.28 0.28
Interim earth yard / 2.88 / / / / / 2.88
Interim construction
road area / 0.60 0.41 / / / 1.56 2.57
Interim
land
occupation
Construction
production and
living area
/ 0.45 / / / / 0.4 0.85
Sub-total / 3.93 0.41 0.27 0 0 2.99 7.6
Total 26.59 28.66 0.41 0.27 9.03 20.24 2.99 88.19
2.8 The earth work
According to design data and calculations, the excavation earth work is 387,900m3,
earth filling work is 344,100m3, the earth utilization is 336,900m
3, the borrow earth is
7,200m3, the abandoned earth is 51,000m
3(of which, 35,800
3 shall be sent to
Huanglongguan waste yard, 15,200m3
construction waste shall be sent to the urban
refuse site), interim earth is 101,600m3. The balance table for the earthwork refers to
Table 2-7. The flow direction of the earthwork of the project area refers to Fig.2-6.
-
42
Table 2-7 The balance table for the earthwork Unit: 10,000m3
Project sub-
area Location
Exc./
removal Backfill Use Borrow
Interim
earth Abandoned Disposal of abandoned earth
Removal of
surface
building
1.37
1.16
1.16
0.21 Urban refuse site
Subgrade 2.28 2.17 2.17 0 0.11 Huanglongguan excavation
waste dump
East
section of
south
inner ring
road Surface soil 1.48 1.48
Interim earth site, it shall be
used as soil for greening
later on.
Removal of
surface
building
5.00
4.25
4.25
0.75 Urban refuse site
Subgrade 8.34 5.86 5.86 0 2.48 Huanglongguan excavation
waste dump
Xingguang
Road Surface soil 2.54 0 2.54
Interim earth site, it shall be
used as soil for greening
later on.
Removal of
surface
building
0.61
0.52
0.52
0.09 Urban refuse site
Subgrade 1.02 1.49 1.02 0.47 0 Huanglongguan excavation
waste dump
Jianghua
Road Surface soil 0.78 0 0.78
Interim earth site, it shall be
used as soil for greening
later on.
Removal of
surface
building
0.52
0.44
0.44
0.08 Urban refuse site
Subgrade 0.87 0.76 0.76 0 0.11 Huanglongguan excavation
waste dump
Panggong
Road Surface soil 0.45 0 0.45
Interim earth site, it shall be
used as soil for greening
later on.
Zhakou
Road
Removal of
surface
building
1.00
0.85
0.85
0.15 Urban refuse site
Subgrade 1.67 1.92 1.67 0.25 0 Huanglongguan excavation
waste dump
Surface soil 1.25 0 1.25 Interim earth site, it shall be
used as soil for greening
later on.
Xiangyang
Road
Removal of
surface
building
0.67
0.57
0.57
0.10 Urban refuse site
Subgrade 1.12 0.93 0.93 0 0.19 Huanglongguan excavation
waste dump
Surface soil 0.84 0 0.84
Interim earth site, it shall be
used as soil for greening
later on.
Planned
road
Removal of
surface
building
0.94
0.80
0.80
0.14
Subgrade 1.56 1.38 1.38 0 0.18 Huanglongguan excavation
waste dump
Surface soil 1.31 0 1.31
Interim earth site, it shall be
used as soil for greening
later on.
Sub-total Removal of
surface
building
10.12
8.60
8.60
1.52 Urban refuse site
Subgrade 16.86 14.51 13.79 0.72 3.07 Huanglongguan excavation
waste dump
Maj
or
pro
ject
are
a
Surface soil 8.65 8.65 8.65 0 8.65
Interim earth site, it shall be
used as soil for greening
later on.
-
43
Total 35.62 31.75 31.03 0.72 8.65 4.59
Excavation
waste dump Surface soil 0.31 0.31 0.31 0.31
Stack inside the waste yard,
it shall be returned after end
of the completion.
Borrow pit Surface soil 0.08 0.08 0.08 0.08
Stack in the borrow pit, it
shall be returned after end of
the completion.
Interim
construction
road area
Subgrade 1.15 1.15 1.15
Interim earth
area Surface soil 0.86 0.86 0.86 0.86
Just for interim stacking, it
shall be returned after end of
the completion.
Surface soil 0.26 0.26 0.26 0.26
Just for interim stacking, it
shall be returned after end of
the completion.
Construction
Production
and living
area Hardening
layer 0.51 0.51
Huanglongguan excavation
waste dump
Total 38.79 34.41 33.69 0.72 10.16 5.10
-
44
/
1. 37
12. 0= 35. =0 24. 2= 0. 72
1. 80 m31. 37 m30. 88 m3
3. 33 m3
5. 005. 77 m38. 34 m31. 54 m3
10. 11 m3
0. =10. 87 m31. 02 m30. =8 m3
1. 54 m3
0. 520. =4 m30. 87 m30. 25 m3
1. 20 m3
1. 001. 20 m37 m3
0. 75 m3
2. 42 m3
0. =71. 13 m31. 12 m30. 54 m3
1. 50 m3
0. 941. =3 m31. 5= m30. 81 m3
2. 18 m3
0. 47 m3
0. 25 m3
0. 72
1. =3 m3 0. 31 m3
1. =3 m3 0. 08 m3
1. =3 m3 0. 8= m3
1. =3 m3 0. 2= m30. 51 m3
Fig.2-6 The earthwork flow chart for the project
Abandoned earth Exc./removal Backfill Borrow
-
45
2.9 Overview of the interim land occupation
2.9.1 Excavation waste dump
According to the need of the project, set up 1 excavation waste dump, the excavation
waste dump is located at Huanglongguan ravine zone of 8km to the southwest of the
project area, the dump is now the bush land, with small rain water confluence, and the
scouring is not obvious, it’s favorable for placing the waste interception measures.
Through site investigation, the possible area to be used by this bottom land is
1.53hm2, the waste stacking elevation may be stacked from 112.00m~125.00m, the
slope of the waste stacking face is even, 15° in average.
2.9.2 Borrow pit
This project needs total borrow earth for 7,200m3, according to geological
investigation, the borrow pit is located between the army oil depot ~cement factory at
west of Qianying Village Jiaoliu railway to the southwest of the project, it’s borrowed
from the hill, designed average excavation depth is 2~3m, no impact shall be met
from underground water at the designed borrow depth. Through investigation, the
selected borrow pit of the project has not passed the land consolidation area as
stipulated by the state, earth material nature is clay, it conforms to the earth use
requirement for the project. This pit is 70m long, 40m wide, with an area of 0.28hm2,
the type of land occupation is barren grass land, water confluence area is 1.42hm2.
This borrow scheme is adopted two-level borrow mode from the top to bottom, in the
borrow process, first remove surface soil, the surface soil is placed within the
expropriated land, no repeated expropriation shall occur, after the end of the borrow,
it shall be returned to forest land according to local land use policy.
2.9.3 Interim stack site
Partial road sections of the project penetrate through arable land, it needs to remove the
surface cultivated soil and soil with plant roots. The removed surface soil shall be used as
interim abandoned soil, it shall be concentrated stacked at the interim stack site set up at
the subgrade side according to the line topographical sections, interim stack site is mainly
selected the bottomland area at the road side outside the subgrade, for the benefit of use
for road greening, one interim stack site is set up at each road section of the project,
totaling 7 places. Through estimation, total newly increased interim land occupation is
about 2.88hm2. Schedule of interim stack site refers to Table 2-8.
-
46
Table 2-8 Schedule of interim stack site
Interim stack
site No.
Waste road
section
Interim stack
site stake
No.
Surface soil
stack
quantity(10,000
m3)
Haul
distance(m)
Land
occupation
area (hm2)
Type of land
occupation
Average
stack
height (m)
1#
East section of
inner loop
south road
NH1+000 1.48 1000 0.49 Arable land 3
2# Xingguang
Road XG1+500 2.54 1500 0.85 Arable land 3
3# Jianghua Road JH1+000 0.78 1000 0.26 Arable land 3
4# Panggong
Road PG0+800 0.45 800 0.15 Arable land 3
5# Zhakou Road ZK1+500 1.25 1500 0.42 Arable land 3
6# Xiangyang
Road XY1+000 0.84 1000 0.28 Arable land 3
73 Planned No. 13
Road GH1+500 1.31 1500 0.44 Arable land 3
Total 8.65 2.88
2.9.4 Construction production and living area
Though the project being severely affected by local work point topographical
conditions, the layout for construction production and living area is quite difficult,
yet, most of construction prefab yard, pavement base, asphalt concreting mixing plant
and others, may be placed by selecting the construction site with better conditions,
But, interim land occupation shall try to occupy the minimal arable land, pay attention
to environment protection and exiting the site for the farm. Total 7 construction
production and living areas, details for construction production and living area refer to
Table 2-9.
Table 2-9 Schedules for construction production and living quarter
No. Road section Center stake No. Size Floor space (hm2)
Type of land
occupation
1
East section of
inner loop south
road
NH2+000 50*20m 0.10 Barren
bottomland
2 Xingguang Road XG1+080 50*30m 0.15 Arable land
3 Jianghua Road JH1+900 50*20m 0.10 Barren
bottomland
4 Panggong Road PG1+800 50*20m 0.10 Barren
bottomland
5 Zhakou Road ZK1+800 50*30m 0.15 Arable land
6 Xiangyang Road XY2+000 50*20m 0.10 Barren
bottomland
7 Planned No. 13
Road GH1+300 50*30m 0.15 Arable land
Total 0.85
-
47
2.9.5 Interim construction road
The project is constructed in urban area, the existing Xingguang Road, Panggong
Road, Jianghua Road and others are crisscross, they may be used as construction
roads. The newly increased construction roads of the project are mainly leading to
excavation waste dump, borrow pit and road of construction sites. According to
preliminary estimation in this period, the general length of the interim construction
road needs to be kept, lay interim construction road areas along the relevant road
sections of the line, the project needs totally constructing interim road areas reaching
3.67km, of which, 1.75km road is leading to waste yard, 1.07km road is leading to
stock yard, 0.85km road is leading to construction site. Expropriation width is 7m,
pavement width is 3-3.5m, adopting cement consolidated pavement, interim land
occupation is 2.57hm2, and type of land occupation is arable land and grass land.
3.0 Overview of natural environment and social environment
3.1 Natural environment overview
3.1.1 Climate
Xiangyang is located in north subtropical monsoon climatic region. It is cold in winter and hot in
summer. Rain and heat are over the same period. Four seasons are distinct. The average
temperature of the whole city except high mountains is 15~16�. Frost-free period is 228~249
days long. The annual precipitation of the whole city is 820~1,100mm. Precipitation in summer is
400~450mm. The number of rainy days are 107~135 days. Sunshine duration is long. Total annual
average sunshine duration is 1,800~2,100 hours. The rainy season in Xiangyang region is mainly
in June and July.
3.1.2 Topography and landform
Xiangyang, of diverse landform, lies in the transitional z