THE ENVIRONMENTAL SOLUTION ALLIANCE Environmental Group, Inc. GREATER CLARK COUNTY SCHOOLS JONATHAN JENNINGS ELEMENTARY SCHOOL AHERA ASBESTOS MANAGEMENT PLAN

Upload: others

Post on 26-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

THE ENVIRONMENTAL SOLUTION

ALLIANCEEnvironmental Group, Inc.

 

 

 

 

 

 

GREATER CLARK COUNTY SCHOOLS 

 

JONATHAN JENNINGS ELEMENTARY SCHOOL  

 

AHERA 

ASBESTOS MANAGEMENT PLAN 

 

 

Page 2: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

Alliance Environmental Group, Inc. AHERA

DESIGNATED PERSON TRUTH AND CORRECT STATEMENT

Local Education Agency – Greater Clark County Schools 2112 Utica-Sellersburg RoadJeffersonville, Indiana 47130

Designated Person - Alliance Environmental Group, Inc. Sandra Shadley 5153 Commerce Square Drive, Suite EIndianapolis, Indiana 46237

This Truth and Correct Statement, as outlined in 40 CFR 763.93(i), certifies that the general, local education agency responsibilities, as stipulated by 40 CFR 763.84, have been or will be met. These responsibilities include:

1. Ensure that the activities of any persons who perform inspections, reinspections, andperiodic surveillance, develop and update management plans, and develop and implementresponse actions, including operations and maintenance, are carried out in accordancewith 40 CFR 763 Subpart E.

2. Ensure all custodial and maintenance employees are properly trained as required by 40CFR 763 Subpart E and other applicable Federal and/or State regulations (e.g., theOccupational Safety and Health Administration Asbestos Standard for Construction, theEPA Worker Protection Rule, or applicable State regulations).

3. Ensure that workers and building occupants, or their legal guardians, are informed at leastonce each school year about inspections, response actions, and post-response actionactivities, including periodic reinspection and surveillance activities that are planned or inprogress.

4. Ensure that short-term workers (e.g., telephone repair workers, utility workers, orexterminators) who may come in contact with asbestos in a school are providedinformation regarding the locations of ACBM and suspected ACBM assumed to be ACM.

5. Ensure that warning labels are posted in accordance with Section 763.95.6. Ensure management plans are available for inspection and notification of such availability

has been provided as specified in the management plan under Section 763.93(g).7. The undersigned person designated by the LEA pursuant to Section 763.84(g) (1) has

received adequate training as stipulated in Section 763.84(g) (2).8. The LEA has and will consider whether any conflict of interest may arise from the

interrelationship among accredited personnel and whether that should influence theselection of accredited personnel to perform activities under Part 763.

Signature: Date: November 6, 2016

Sandra S. Shadley

Page 3: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 4: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 5: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 6: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 7: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 8: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 9: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 10: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 11: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 12: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 13: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 14: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

4/23/2020

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05‐A Floor tile ‐ under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05‐B Floor tile‐ Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building ‐ Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 15: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

1/14/2020

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05‐A Floor tile ‐ under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05‐B Floor tile‐ Green 12" X 12" Unquantified SF Known Principals office and Gym Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building ‐ Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 16: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

5/16/2019

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05-A Floor tile - under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05-B Floor tile- Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building - Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 17: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

11/14/2018

Remaining Materials Report

Jonathan Jennings Elementary School

02 4" & 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05-A Floor tile - under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05-B Floor tile- Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Molding Approx. 3700 LF Assumed Throughout the building - Light Gray, Cafeteria and Gym

O&M

C Cove Base Mastic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 18: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

5/2/2018

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the

building

O&M

05-A Floor tile - under carpet 27000 SF Assumed Classrooms, "D" pod teacher's

storeroom, Media Center, and office

areas (Under

Carpet)

O&M

05-B Floor tile- Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building - Light Gray,

Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 19: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

10/18/2017

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the

building

O&M

05-A Floor tile - under carpet 27000 SF Assumed Classrooms, "D" pod teacher's

storeroom, Media Center, and office

areas (Under

Carpet)

O&M

05-B Floor tile- Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building - Light Gray,

Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 20: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

4/13/2017

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05‐A Floor tile ‐ under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05‐B Floor tile‐ Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building ‐ Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 21: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

11/3/2016

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the

building

O&M

05-A Floor tile - under carpet 27000 SF Assumed Classrooms, "D" pod teacher's

storeroom, Media Center, and office

areas (Under

Carpet)

O&M

05-B Floor tile- Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Molding Approx. 0 LF Assumed Throughout the building - Light Gray,

Cafeteria and Gym

Removed

C Cove Base Mastic 0 SF Assumed Throughout building Removed

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 22: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

4/28/2016

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05‐A Floor tile ‐ under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05‐B Floor tile‐ Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building ‐ Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 23: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

HA ID HA Description Quantity Asbestos HA Location Plannned Response Action

Greater Clark County School Corporation

10/20/2015

Remaining Materials Report

Jonathan Jennings Elementary School

02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

O&M

05‐A Floor tile ‐ under carpet 27000 SF Assumed Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

O&M

05‐B Floor tile‐ Green 12" X 12" Unquantified SF Known Principals office and Breezeway O&M

A Floor Tile Mastic 27000 SF Assumed Throughout building O&M

B Cove Base Moldign Approx. 3700 LF Assumed Throughout the building ‐ Light Gray, Cafeteria and Gym

O&M

C Cove Base Castic Approx. 1200 SF Assumed Throughout building O&M

D Cloth expansion joints 2 Unit(s) Assumed Kitchen storage room O&M

Page 24: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

Greater Clark County Schools

April 22, 2015

HA# Material Planned ActivitiesLocationQuantity

Remaining Materials Report

ACBM Y/A

Jonathan Jennings Elementary

02 O & MLF Boiler room and throughout the building

1564"+ 2" fitting insulation Y

05-A O & MSF Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000Floor tile - under carpet A

05-B O & MSF Principals office and BreezewayUnquantifiedFloor tile- Green 12" X 12" Y

05-C O & MSF Gym FloorUnquantified12"X 12" White Floor tile A

A O & MSF Throughout the building27,000Floor tile mastic A

B O & MLF Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700Cove base molding A

C O & MSF Throughout the buildingApprox. 1,200Cove base mastic A

D O & MEac Kitchen storage room2Cloth expansion joints A

Page 25: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

Greater Clark County Schools

October 22, 2014

HA# Material Planned ActivitiesLocationQuantity

Remaining Materials Report

ACBM Y/A

Jonathan Jennings Elementary

02 O & MLF Boiler room and throughout the building

1564"+ 2" fitting insulation Y

05-A O & MSF Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000Floor tile - under carpet A

05-B O & MSF Principals office and BreezewayUnquantifiedFloor tile- Green 12" X 12" Y

05-C O & MSF Gym FloorUnquantified12"X 12" White Floor tile A

A O & MSF Throughout the building27,000Floor tile mastic A

B O & MLF Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700Cove base molding A

C O & MSF Throughout the buildingApprox. 1,200Cove base mastic A

D O & MEac Kitchen storage room2Cloth expansion joints A

Page 26: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

Greater Clark County Schools

April 21, 2014

HA# Material Planned ActivitiesLocationQuantity

Remaining Materials Report

ACBM Y/A

Jonathan Jennings Elementary

02 O & MLF Boiler room and throughout the building

1564"+ 2" fitting insulation Y

05-A O & MSF Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000Floor tile - under carpet A

05-B O & MSF Principals office and BreezewayUnquantifiedFloor tile- Green 12" X 12" Y

05-C O & MSF Gym FloorUnquantified12"X 12" White Floor tile A

A O & MSF Throughout the building27,000Floor tile mastic A

B O & MLF Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700Cove base molding A

C O & MSF Throughout the buildingApprox. 1,200Cove base mastic A

D O & MEac Kitchen storage room2Cloth expansion joints A

Page 27: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 28: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 29: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 30: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 31: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 32: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 33: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 34: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 35: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 36: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 37: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 38: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 39: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 40: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 41: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 42: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 43: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 44: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 45: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 46: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 47: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 48: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 49: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 50: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 51: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 52: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 53: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 54: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 55: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 56: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 57: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 58: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 59: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 60: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

SURVEILLANCE INFORMATION

PERIODIC SURVEILLANCE PLAN

Records of each re-inspection will be maintained in this binder.

DATE PLANNED DATE COMPLETED COMPLETED BY

October 2014

April 2015

October 2015

April 2016 RE-INSPECTION

October 2016

April 2017

October 2017

April 2018

October 2018

April 2019 RE-INSPECTION

October 2019

April 2020

October 2020

GREATER CLARK COUNTY SCHOOLSThe ACBM in this building will be periodically inspected to determine any change in the condition of the materials for aslong as the material remain in the building, as required by the Asbestos Hazard Emergency Response Act (AHERA).This periodic surveillance shall be conducted on a semi-annual basis as required by law.

Z:\Pub\Doc\DP\New DP Books\New DP Book\DP Surveillance Sign Off Sheet

Field 2
Text Box
October 22, 2014
Field 2
Ben Hood
Field 2
Text Box
April 22, 2015
Field 2
Ben Hood
Field 2
Ben Hood
Field 2
Text Box
October 20, 2016
Field 2
Ben Hood
Field 2
Text Box
November 3, 2016
Field 2
Text Box
April 13, 2017
Field 2
Text Box
October 18, 2017
Field 2
Text Box
May 2, 2018
Field 2
Ben Hood
Field 2
Text Box
November 14, 2018
Field 2
Text Box
Janaury 14, 2020
Field 2
Text Box
April 23, 2020
Page 61: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

SURVEILLANCE INFORMATION

PERIODIC SURVEILLANCE PLAN

Records of each re-inspection will be maintained in this binder.

April 2021

October 2021

April 2022 RE-INSPECTION

October 2022

April 2023

October 2023

April 2024

October 2024

April 2025 RE-INSPECTION

October 2025

April 2026

October 2026

GREATER CLARK COUNTY SCHOOLSThe ACBM in this building will be periodically inspected to determine any change in the condition of the materials for aslong as the material remain in the building, as required by the Asbestos Hazard Emergency Response Act (AHERA).This periodic surveillance shall be conducted on a semi-annual basis as required by law.

Z:\Pub\Doc\DP\New DP Books\New DP Book\DP Surveillance Sign Off Sheet

Page 62: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 63: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 64: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 65: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A‐1 have visible fittings; small amount of debris found in kitchen storage.  Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/23/2020

Planned Response Action O&M

Page 66: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State INAccreditation Number 19A007304

Page 67: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐A

HA Description Floor tile ‐ under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 68: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐B

HA Description Floor tile‐ Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 69: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 70: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building ‐ Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 71: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 72: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 4/23/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 73: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A‐1 have visible fittings; small amount of debris found in kitchen storage.  Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 1/14/2020

Planned Response Action O&M

Page 74: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State INAccreditation Number 19A007304

Page 75: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐A

HA Description Floor tile ‐ under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 76: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐B

HA Description Floor tile‐ Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Gym Breezeway

Quantity Unquantified SF

Comments Where visible, this material was not in poor condition. The principals office has been carpeted.

Asbestos Known

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 77: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 78: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building ‐ Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 79: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 80: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Michael J. Ardis

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 1/14/2020

State INAccreditation Number 19A007304

Planned Response Action O&M

Page 81: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4" & 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A-1 have visible fittings; small amount of debris found in kitchen storage. Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all locations.

Asbestos Known

Friable Yes

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 11/14/2018

Planned Response Action O&M

Page 82: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State INAccreditation Number 19A001039

Page 83: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-A

HA Description Floor tile - under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 84: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-B

HA Description Floor tile- Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 85: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 86: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Molding

HA Type Miscellaneous Material

HA Location Throughout the building - Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 87: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 88: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 11/14/2018

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 89: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends and

custodial closet by room A-1 have visible fittings; small amount of debris found

in kitchen storage. Minor patch and repair needed. Material is also located in

hallways

above ceilings. There is no access to pipe chases. This material needs asbestos

labels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 5/2/2018

Planned Response Action O&M

Page 90: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State IN

Accreditation Number 19A001039

Page 91: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-A

HA Description Floor tile - under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under

Carpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 92: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-B

HA Description Floor tile- Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 93: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was

added

on to building.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 94: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building - Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 95: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 96: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to

the

management plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 5/2/2018

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 97: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends and

custodial closet by room A-1 have visible fittings; small amount of debris found

in kitchen storage. Minor patch and repair needed. Material is also located in

hallways

above ceilings. There is no access to pipe chases. This material needs asbestos

labels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 10/18/2017

Planned Response Action O&M

Page 98: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State IN

Accreditation Number 19A007194

Page 99: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-A

HA Description Floor tile - under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under

Carpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 100: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-B

HA Description Floor tile- Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 101: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was

added

on to building.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 102: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building - Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 103: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 104: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to the

management plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 10/18/2017

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 105: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A‐1 have visible fittings; small amount of debris found in kitchen storage.  Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/13/2017

Planned Response Action O&M

Page 106: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State IndianaAccreditation Number 19A007179

Page 107: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐A

HA Description Floor tile ‐ under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 108: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐B

HA Description Floor tile‐ Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 109: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 110: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building ‐ Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 111: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 112: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Jamie Hosier

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 4/13/2017

State IndianaAccreditation Number 19A007179

Planned Response Action O&M

Page 113: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends and

custodial closet by room A-1 have visible fittings; small amount of debris found

in kitchen storage. Minor patch and repair needed. Material is also located in

hallways

above ceilings. There is no access to pipe chases. This material needs asbestos

labels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 11/3/2016

Planned Response Action O&M

Page 114: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State IN

Accreditation Number 19A007194

Page 115: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-A

HA Description Floor tile - under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under

Carpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 116: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-B

HA Description Floor tile- Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 117: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was

added

on to building.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 118: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Molding

HA Type Miscellaneous Material

HA Location Throughout the building - Light Gray, Cafeteria and Gym

Quantity Approx. 0 LF

Comments During the November 2016 inspection they inspector noticed that this material

had been removed per the facilitiy respresentitive, during the 2016 summer

renovations.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action Removed

Page 119: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 0 SF

Comments During the November 2016 inspection they inspector noticed that this material

had been removed per the facilitiy respresentitive, during the 2016 summer

renovations.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action Removed

Page 120: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to

the

management plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Dustin Hawkins

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 11/3/2016

State IN

Accreditation Number 19A007194

Planned Response Action O&M

Page 121: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A‐1 have visible fittings; small amount of debris found in kitchen storage.  Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 10/20/2015

Planned Response Action O&M

Page 122: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State INAccreditation Number 19A001039

Page 123: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐A

HA Description Floor tile ‐ under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 124: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐B

HA Description Floor tile‐ Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 125: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 126: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building ‐ Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 127: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 128: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Periodic Surveillance

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 10/20/2015

State INAccreditation Number 19A001039

Planned Response Action O&M

Page 129: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 02

Type of Material Thermal Material

Quantity of Material

Material Location

Boiler room and throughout the building

156 LF

Material Description

4"+ 2" fitting insulation

Comments

This material was not in poor condition overall. Kitchen storage stage ends and custodial closet by room A-1 have visible fittings. Material is also located in hallways above ceilings. There is no access to pipe chases. This material needs asbestos labels on all of the locations.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 130: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000 SF

Material Description

Floor tile - under carpet

Comments

The material was under carpet therefore not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 4/22/2015

Current Assessment Rating Not ApplicableNA

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 131: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Principals office and Breezeway

Unquantified SF

Material Description

Floor tile- Green 12" X 12"

Comments

This material was not in poor condition.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 132: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Gym Floor

Unquantified SF

Material Description

12"X 12" White Floor tile

Comments

This material was not in poor condition. It was installed in 1987 when Gym was added on to building.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 133: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

27,000 SF

Material Description

Floor tile mastic

Comments

No mastic was exposed to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 134: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700 LF

Material Description

Cove base molding

Comments

This material has minor scrapes, but was not in poor condition overall.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 135: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

Approx. 1,200 SF

Material Description

Cove base mastic

Comments

The material was not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 136: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# D

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Kitchen storage room

2 Each

Material Description

Cloth expansion joints

Comments

This material was not assessed in the original inspection and will be added to the management plan until properly sampled.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 12/15/2011

Current Surveillance Date 4/22/2015

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 137: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 02

Type of Material Thermal Material

Quantity of Material

Material Location

Boiler room and throughout the building

156 LF

Material Description

4"+ 2" fitting insulation

Comments

This material was not in poor condition overall. Kitchen storage stage ends and custodial closet by room A-1 have visible fittings. Material is also located in hallways above ceilings. There is no access to pipe chases. This material needs asbestos labels on all of the locations.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 138: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000 SF

Material Description

Floor tile - under carpet

Comments

The material was under carpet therefore not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 10/22/2014

Current Assessment Rating Not ApplicableNA

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 139: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Principals office and Breezeway

Unquantified SF

Material Description

Floor tile- Green 12" X 12"

Comments

This material was not in poor condition.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 140: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Gym Floor

Unquantified SF

Material Description

12"X 12" White Floor tile

Comments

This material was not in poor condition. It was installed in 1987 when Gym was added on to building.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 141: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

27,000 SF

Material Description

Floor tile mastic

Comments

No mastic was exposed to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 142: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700 LF

Material Description

Cove base molding

Comments

This material has minor scrapes, but was not in poor condition overall.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 143: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

Approx. 1,200 SF

Material Description

Cove base mastic

Comments

The material was not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Ben
Ben
Page 144: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# D

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Kitchen storage room

2 Each

Material Description

Cloth expansion joints

Comments

This material was not assessed in the original inspection and will be added to the management plan until properly sampled.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 12/15/2011

Current Surveillance Date 10/22/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A001039

IndianaState

Benjamin S. Hood

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Ben
Ben
Page 145: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 02

Type of Material Thermal Material

Quantity of Material

Material Location

Boiler room and throughout the building

156 LF

Material Description

4"+ 2" fitting insulation

Comments

This material was not in poor condition overall. Kitchen storage stage ends and custodial closet by room A-1 have visible fittings. Material is also located in hallways above ceilings. There is no access to pipe chases. This material needs asbestos labels on all of the locations.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Field 1
Jeff Rechtin
Page 146: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (Under Carpet)

27,000 SF

Material Description

Floor tile - under carpet

Comments

The material was under carpet therefore not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 4/21/2014

Current Assessment Rating Not ApplicableNA

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Field 1
Jeff Rechtin
Page 147: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Principals office and Breezeway

Unquantified SF

Material Description

Floor tile- Green 12" X 12"

Comments

This material was not in poor condition.

Does Material Contain Asbestos? Yes

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Field 1
Jeff Rechtin
Page 148: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# 05-C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Gym Floor

Unquantified SF

Material Description

12"X 12" White Floor tile

Comments

This material was not in poor condition. It was installed in 1987 when Gym was added on to building.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/27/2011

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Field 1
Jeff Rechtin
Page 149: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# A

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

27,000 SF

Material Description

Floor tile mastic

Comments

No mastic was exposed to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 6/1/1988

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Field 1
Jeff Rechtin
Page 150: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# B

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building - Light Gray, Cafeteria and Gym

Approx. 3,700 LF

Material Description

Cove base molding

Comments

This material has minor scrapes, but was not in poor condition overall.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Field 1
Jeff Rechtin
Page 151: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# C

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Throughout the building

Approx. 1,200 SF

Material Description

Cove base mastic

Comments

The material was not visible to inspect.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 5/31/1996

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

No

Field 1
Jeff Rechtin
Page 152: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

PERIODIC SURVEILLANCE REPORT

LEA Name Greater Clark County Schools

Building Name Jonathan Jennings Elementary

HA# D

Type of Material Miscellaneous Material

Quantity of Material

Material Location

Kitchen storage room

2 Each

Material Description

Cloth expansion joints

Comments

This material was not assessed in the original inspection and will be added to the management plan until properly sampled.

Does Material Contain Asbestos? Assumed

Is it Friable? No

Original Inspection Date 12/15/2011

Current Surveillance Date 4/21/2014

Current Assessment Rating Not RatedNR

Cause of Damage No Damage

Accessible

Accreditation Number 19A003594

IndianaState

Jeffrey P. Rechtin

Inspector

Planned Response Action O & M

NoRemoved

Potential for Damage Low

Yes

Field 1
Jeff Rechtin
Page 153: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 154: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 155: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 156: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 157: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 158: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 159: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 160: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 161: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 162: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 163: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 164: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 165: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 166: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 167: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 168: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 169: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 170: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 171: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 172: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 173: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 174: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 175: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 176: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 177: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 178: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 179: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 180: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 181: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 182: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 183: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 184: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 185: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 186: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 187: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 188: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 189: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 190: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 191: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 192: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 193: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 194: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 195: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 196: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 197: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 198: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 199: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 200: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 201: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 202: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 203: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 204: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 205: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 206: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 207: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 208: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 209: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 210: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 211: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 212: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 213: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 214: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 215: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 216: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 217: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 218: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 219: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 220: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 221: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 222: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 223: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 224: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 225: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 226: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 227: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 228: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 229: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 230: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 231: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 232: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 233: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 234: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 235: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 236: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 237: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 238: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 239: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 240: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 241: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 242: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 243: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 244: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 245: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 246: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 247: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 248: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 249: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 250: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 251: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 252: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 253: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 254: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 255: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 256: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 257: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 258: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 259: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 260: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 261: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 262: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 263: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 264: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 265: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 266: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 267: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 268: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 269: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 270: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 271: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 272: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 273: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 274: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 275: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 276: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 277: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 278: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 279: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 280: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 281: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 282: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 283: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 284: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 285: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 286: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 287: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 288: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 289: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 290: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 291: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 292: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 293: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 294: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 295: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 296: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 297: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 298: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 299: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 300: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 301: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 302: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 303: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 304: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 305: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 306: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 307: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 308: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 309: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 310: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 311: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 312: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 313: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 314: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 315: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 316: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 317: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 318: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 319: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 320: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 321: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 322: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 323: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 324: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 325: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 326: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 327: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 328: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 329: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 330: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 331: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 332: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 333: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 334: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 335: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 336: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 337: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 338: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 339: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 340: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 341: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 342: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 343: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 344: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 345: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 346: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 347: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 348: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 349: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

April 2016

May 2019

Page 350: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 351: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A-1 have visible fittings; small amount of debris found in kitchen storage. Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 5/16/2019

Planned Response Action O&M

Triennial Reinspection

Page 352: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State INAccreditation Number 19A007184

Page 353: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-A

HA Description Floor tile - under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 354: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05-B

HA Description Floor tile- Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 355: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 356: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building - Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 357: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 358: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5 ACBM with potential for damage

Inspector

Sean Stults

Material Assessment

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 5/16/2019

State INAccreditation Number 19A007184

Planned Response Action O&M

Triennial Reinspection

Page 359: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 02

HA Description 4"+ 2" fitting insulation

HA Type Thermal System Insulation (TSI)

HA Location Boiler room and throughout the building

Quantity 156 LF

Comments This material was not in poor condition overall. Kitchen storage stage ends andcustodial closet by room A‐1 have visible fittings; small amount of debris found in kitchen storage.  Minor patch and repair needed. Material is also located in hallwaysabove ceilings. There is no access to pipe chases. This material needs asbestoslabels on all of the locations.

Asbestos Known

Friable Yes

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/27/2016

Planned Response Action O&M

Page 360: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

State IN

Accreditation Number 19A001039

Page 361: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐A

HA Description Floor tile ‐ under carpet

HA Type Miscellaneous Material

HA Location Classrooms, "D" pod teacher's storeroom, Media Center, and office areas (UnderCarpet)

Quantity 27000 SF

Comments The material was under carpet therefore not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 362: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID 05‐B

HA Description Floor tile‐ Green 12" X 12"

HA Type Miscellaneous Material

HA Location Principals office and Breezeway

Quantity Unquantified SF

Comments This material was not in poor condition.

Asbestos Known

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/1/1988

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 363: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID A

HA Description Floor Tile Mastic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity 27000 SF

Comments This material was not in poor condition. It was installed in 1987 when Gym was addedon to building.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 6/27/2011

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 364: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID B

HA Description Cove Base Moldign

HA Type Miscellaneous Material

HA Location Throughout the building ‐ Light Gray, Cafeteria and Gym

Quantity Approx. 3700 LF

Comments This material has minor scrapes, but was not in poor condition overall.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 365: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID C

HA Description Cove Base Castic

HA Type Miscellaneous Material

HA Location Throughout building

Quantity Approx. 1200 SF

Comments The material was not visible to inspect.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 5/31/1996

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 366: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

LEA Name Greater Clark County School Corporation

Building Name Jonathan Jennings Elementary School

Building Number 09

HA ID D

HA Description Cloth expansion joints

HA Type Miscellaneous Material

HA Location Kitchen storage room

Quantity 2 Unit(s)

Comments This material was not assessed in the original inspection and will be added to themanagement plan until properly sampled.

Asbestos Assumed

Friable No

Assessment Rating 5  ACBM with potential for damage

Inspector

Benjamin S. Hood

Material Assessment

Triennial Reinspection

Physical Contact

Low/None

Vibration

Low/None

Air

Low/None

Percent Damaged Good Condition

Damage Assessment and Potential for Damage

%

Original Inspection 12/15/2011

Current Inspection 4/27/2016

State IN

Accreditation Number 19A001039

Planned Response Action O&M

Page 367: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 368: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 369: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 370: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 371: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 372: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 373: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 374: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 375: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 376: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 377: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 378: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 379: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 380: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 381: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 382: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 383: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 384: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 385: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 386: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 387: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 388: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 389: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 390: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 391: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 392: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 393: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 394: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 395: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 396: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 397: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 398: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 399: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 400: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 401: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 402: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 403: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 404: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 405: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 406: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 407: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 408: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 409: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 410: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 411: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 412: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 413: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Field 2
Accepted
Field 2
Accepted
Page 414: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 415: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

March 2015 AHERA ANNUAL NOTICE

GREATER CLARK COUNTY SCHOOLS This information is being published to comply with the requirements of 40 CFR 763, Subpart E, Asbestos Containing Materials in Schools. This regulation, commonly known as the "AHERA" rule, requires local education agencies, such as this one, to perform certain tasks in regards to the presence and control of asbestos containing materials in the buildings under the jurisdiction of the local education agency. These include but are not limited to: 1. Developing an asbestos management plan which is designed to outline procedures and guidelines for

the initial inspection, triennial reinspections, and 6 month periodic surveillance of asbestos-containing materials that are present in the buildings.

2. Provide awareness training and additional training to selected school employees. 3. Periodically notify all workers and occupants, or their local guardians, parent teacher organizations,

and collective bargaining organizations of the availability of asbestos management plans, the location of same and the times that the plans may be reviewed.

This notification is to advise all patrons, occupants, or their legal guardians, collective bargaining organizations, and parent-teachers organizations, that the asbestos management plans required under this act are available for review upon request. The plans can be viewed by any person during normal business hours of the particular school. Interested parties wishing to inquire about the plans should contact the individual school office. Master copies of the plans for all buildings under the jurisdiction of this local education agency are available in the Auxiliary Services at River Valley Middle School, which is located at 2220 Veteran’s Parkway, Jeffersonville, Indiana 47130; telephone number (812) 288-4821. Inquiries regarding any facet of the regulation or the management plans should be directed to Mr. Steve Hobgood at the above telephone number during regular business hours. Greater Clark County Schools, school facilities, and buildings which contain asbestos-containing materials (ACMs) and must comply with the 40 CFR 763, Subpart E (AHERA) regulations include: Jeffersonville, Charlestown and New Washington High Schools; Parkview, River Valley and Charlestown Middle Schools; Wilson, Thomas Jefferson, Northaven, New Washington, Jonathan Jennings, Bridgepoint, Maple, Spring Hill, and Parkwood Elementary Schools, Service Center, Corden Porter Storage, Auto Tech Program- Witten Property, and Corden Porter Center with Gym. Listed is a brief description of asbestos projects currently ongoing and completed at our facilities this past school year, as well as activities currently scheduled for the 2015/2016 school year. Detailed reports of each activity will become a part of each school's asbestos management plan and may be reviewed in the school office. * The required triennial re-inspection will be performed in April 2016. * The required six month periodic surveillance was performed in October 2014. * The required six month periodic surveillance activities are scheduled for April and October each year. School facilities and buildings that are asbestos free and require no surveillance or reinspection are: Pleasant Ridge Elementary School, Utica Elementary School, Cordon Porter former Options Building and the Administration Building

Page 416: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building

March 2014 AHERA ANNUAL NOTICE

GREATER CLARK COUNTY SCHOOLS This information is being published to comply with the requirements of 40 CFR 763, Subpart E, Asbestos Containing Materials in Schools. This regulation, commonly known as the "AHERA" rule, requires local education agencies, such as this one, to perform certain tasks in regards to the presence and control of asbestos containing materials in the buildings under the jurisdiction of the local education agency. These include but are not limited to: 1. Developing an asbestos management plan which is designed to outline procedures and guidelines for

the initial inspection, triennial reinspections, and 6 month periodic surveillance of asbestos-containing materials that are present in the buildings.

2. Provide awareness training and additional training to selected school employees. 3. Periodically notify all workers and occupants, or their local guardians, parent teacher organizations,

and collective bargaining organizations of the availability of asbestos management plans, the location of same and the times that the plans may be reviewed.

This notification is to advise all patrons, occupants, or their legal guardians, collective bargaining organizations, and parent-teachers organizations, that the asbestos management plans required under this act are available for review upon request. The plans can be viewed by any person during normal business hours of the particular school. Interested parties wishing to inquire about the plans should contact the individual school office. Master copies of the plans for all buildings under the jurisdiction of this local education agency are available in the Auxiliary Services building, which is located at 2220 Veteran’s Parkway, Jeffersonville, Indiana 47130; telephone number (812) 288-4821. Inquiries regarding any facet of the regulation or the management plans should be directed to Mr. Steve Hobgood at the above telephone number during regular business hours. Greater Clark County Schools, school facilities, and buildings which contain asbestos-containing materials (ACMs) and must comply with the 40 CFR 763, Subpart E (AHERA) regulations include: Jeffersonville, Charlestown and New Washington High Schools; Parkview, River Valley and Charlestown Middle Schools; Wilson, Thomas Jefferson, Northaven, New Washington, Jonathan Jennings, Bridgepoint, Maple, Spring Hill, and Parkwood Elementary Schools, the Auxiliary Services Building, Service Center, Corden Porter Storage, and Corden Porter Center with Gym. Listed is a brief description of asbestos projects currently ongoing and completed at our facilities this past school year, as well as activities currently scheduled for the 2014/2015 school year. Detailed reports of each activity will become a part of each school's asbestos management plan and may be reviewed in the school office. * The required triennial re-inspection will be performed in April 2013. * The required six month periodic surveillance was performed in October 2013. * The required six month periodic surveillance activities are scheduled for April and October each year. School facilities and buildings that are asbestos free and require no surveillance or reinspection are: Pleasant Ridge Elementary School, Utica Elementary School, Cordon Porter former Options Building and the Administration Building

Page 417: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 418: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 419: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 420: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 421: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 422: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 423: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 424: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 425: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 426: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 427: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 428: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 429: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 430: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 431: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 432: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 433: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 434: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 435: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 436: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 437: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 438: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 439: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 440: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 441: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 442: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 443: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 444: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 445: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 446: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 447: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 448: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 449: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 450: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 451: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 452: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 453: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 454: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 455: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building
Page 456: Environmental Group, Inc. · 11/3/2016 Remaining Materials Report Jonathan Jennings Elementary School 02 4"+ 2" fitting insulation 156 LF Known Boiler room and throughout the building