Fundy Ocean Research Center for Energy

Environmental Effects Monitoring Programs Fundy Ocean Research Center for Energy (FORCE)

March 2016

ii

Executive Summary

TheFundyOceanResearchCenterforEnergy(FORCE)isCanada’sleadingresearchcentreforthedemonstrationandevaluationoftidalin-streamenergyconversion(TISEC)technology.TISECtechnology(commonlyreferredtoas“tidalenergyturbines”),isdesignedtogeneraterenewableenergyfromtidalresourcesitesacrossCanadaandtheglobe.FundamentaltoFORCE’smandateisthemonitoringandreportingofanyenvironmentaleffectsfromtidalturbinesattheFORCEsite.

FORCEisademonstrationproject,withberthsitesgrantedtoanumberoftechnologydevelopers(orberthholders)includingAtlantisOperationsCanada,DPEnergy,BlackRockTidalPower,CapeSharpTidalVentures,andMinasEnergy,ThegovernmentofNovaScotiahasgranted22.5megawatts(MW)ofTISECcapacityatFORCE,undertheprovince’sdevelopmentalfeed-intariffprogram.ThisrepresentsthedeploymentofapproximatelytwotothreeTISECturbinesbyeachdeveloperattheirberthsite.Asthesedeploymentsareexpectedtobephasedinoverthenextseveralyears,FORCEandregulatorswillhaveopportunitytoadaptenvironmentalmonitoringapproachesovertime,bothtobetterunderstandwhateffectsturbinesmayhaveontheenvironment,andtoreportonthemonitoringresultsandanyidentifiedeffectstothepublic.

EnvironmentalmonitoringhasbeenongoingatFORCEsince2007whenbackgroundstudieswereinitiatedfortheprojectEnvironmentalAssessment(EA).WhentheinitialEAwasapprovedbythefederalandprovincialgovernmentsin2009,thedevelopmentandimplementationofenvironmentaleffectsmonitoringprograms(EEMPs)werestipulatedintheTermsandConditionsofEAApproval.Inresponse,FORCEcompleted20monitoringstudiesbetween2009andlate2013,includingfishcharacterization,seabirds,marinemammals,lobstertracking,marinenoise,benthichabitat,electromagneticfields,andmore.TheresultsofthestudiesundertakentodatealongwiththeoriginalEAareavailableontheFORCEwebsite:http://fundyforce.ca/environment/.

AturbinewasoperationalattheFORCEsiteforashorttimein2009.Sinceremovalofthisunitin2010,notidalturbineshavebeenpresentattheFORCEsite.Consequently,theenvironmentalstudiesconductedbetween2009and2015havelargelyfocusedonthecollectionofbackgrounddata,ratherthanonmonitoringtheeffectsofturbines.Thissituationwillchangewiththeplanneddeploymentoftwocable-connectedturbinesin2016followedbyadditionaldeploymentsinsubsequentyears.

ThisreportdescribesnewEEMPsbasedondataandlessonslearnedfromtheenvironmentalstudiesconductedtodate.TheEEMPsaredesignedtosupplementbackgrounddatasetswhereneededbutareprimarilyaimedatverifyingpredictionsmadeintheEAandatmonitoringtheenvironmentaleffectsofoperatingturbines.TheEEMPsareintendedtomonitorpotentialeffectsfromtheinitialdemonstrationscaleproject,ratherthanfromapotentialcommercialscaleprojectthatmayoccurinthefuture.Tothisend,theEEMPsarelimitedtoeffectswithintheFORCECrownLeaseArea(CLA),anddonotattempttomeasureeffectsinthemuchlargerBayofFundy.

Monitoringprogramshavebeendevelopedforfivesubjectareas:Lobsters,Fish,MarineMammals,MarineSeabirdsandAcoustics(marinenoise).TheEEMPsareintendedtocoverinitialturbinedeploymentsoverthetimeperiod2016-2021.Theprogramsaredesignedtoaccommodateunforeseenchangesinturbinedeploymentschedulesandareadaptivetoinitialmonitoringresults.Itisalsoexpectedthatthedesignand/ormethodsofcertainprogramsmaybeupdatedinlateryearsonceearlyresultsareknown.WithintheCLAmeasuring1.0x1.6km,FORCEleasestoeachberthholderadedicatedberthsome200mindiameter.Theberthholderinturnwilldeploy,operateandtesttheirturbinetechnologies,whichwillbeconnectedtotheelectricalgridthroughdedicatedsubseacables.Giventheseoverlappingareas

iii

ofresponsibility,theberthholdersareresponsibleformonitoringwithina100mradiusoftheirturbines(theso-called“nearfield”effects),whileFORCEwillberesponsibleformonitoringoutsideofthiszonewithintheCLA(theso-called“midfield”effects).Berthholder-generatedEEMPswillbeavailabletoprovideacomprehensivepictureofallmonitoringthatwillbeundertakenwithintheCLA.FORCEwill:

• reportresultsfromboththeFORCEandberthholderEEMPstoregulators;and• makeallEEMPreportsavailabletothepublic.

TheFORCEEEMPsareintendedtobepractical,achievableusingavailabletechnologies,anddemonstrativeofnegativeornulleffects.Themonitoringapproachesalsoreflectthedifficultyinoperatinginthishighenergyenvironmentandcertaintechnologicallimitationsinherentinsomeoftheequipmentthatwillbeemployed.However,throughtheseEEMPs,FORCEintendstoprogressivelyverifytheenvironmentaleffectpredictionsmadeintheoriginalEAoverthenextfiveyears.Asummaryoftheprogramsispresentedinthetableattheendofthisreport.

FORCE March 2016 Environmental Effects Monitoring Program

FORCE iv

TABLEOFCONTENTS

INTRODUCTION ...................................................................................................................... 61.0 FORCE .......................................................................................................................... 61.1 Context ......................................................................................................................... 91.2

1.2.1 FORCE’sEAApproval ........................................................................................... 91.2.1 EEMPDevelopment ............................................................................................. 9

Objectives ................................................................................................................... 111.3 BerthHolderEEMPs ..................................................................................................... 121.4 EMACRecommendations ............................................................................................. 121.5 RegulatorReview ........................................................................................................ 121.6

SECTION2:LOBSTERS ............................................................................................................ 132.0 Objectives ................................................................................................................... 132.1 Methodology .............................................................................................................. 132.2

2.2.1 Overview .......................................................................................................... 132.2.2 MidFieldStudyDesign ....................................................................................... 132.2.3 MultipleTurbines ............................................................................................... 14

2.3Discussion ...................................................................................................................... 15 SECTION3:FISH .................................................................................................................... 173.0

Introduction ................................................................................................................ 173.1 Objectives ................................................................................................................... 173.2 MonitoredVariables .................................................................................................... 183.3 Methodology .............................................................................................................. 193.4

3.4.1 BoatPlatformandAcousticSurveySystem .......................................................... 193.4.2 SurveyDescription ............................................................................................. 193.4.3 Schedule ........................................................................................................... 213.4.4 DataProcessing ................................................................................................. 223.4.5 DataAnalysis .................................................................................................... 22

SECTION4:MARINEMAMMALS ............................................................................................. 244.0 Introduction ................................................................................................................ 244.1 EEMPContext ............................................................................................................. 244.2 EEMPObjectives ......................................................................................................... 254.3 Methodology .............................................................................................................. 264.4

SECTION5:ACOUSTICS(MARINENOISE) ................................................................................. 335.0 Introduction ................................................................................................................ 335.1 Objectives ................................................................................................................... 345.2 Methodology .............................................................................................................. 355.3

SECTION6:MARINESEABIRDS ............................................................................................... 376.0 Introduction ................................................................................................................ 376.1 Objectives ................................................................................................................... 376.2 Methodology .............................................................................................................. 376.3

6.3.1 MonitoringApproach ......................................................................................... 376.3.2 StudyDesign ..................................................................................................... 386.3.3 SamplingFrequency ........................................................................................... 386.3.4 EEMPFieldSurveys ............................................................................................ 396.3.5 ShoreBasedSurveys .......................................................................................... 39

FORCE March 2016 Environmental Effects Monitoring Program

FORCE v

6.3.6 DataAnalysis .................................................................................................... 41 SECTION7:SUMMARY .......................................................................................................... 427.0 SECTION8:REFERENCES ........................................................................................................ 458.0

LISTOFACRONYMS

CLA CrownLeaseArea

CSAS CanadianScienceAdvisorySecretariat

DFO FisheriesandOceansCanada(formerlytheDepartmentofFisheriesandOceans)

EA EnvironmentalAssessment

EC EnvironmentCanada

EEMP EnvironmentalEffectsMonitoringProgram

EMF ElectromagneticField

EMAC EnvironmentalMonitoringAdvisoryCommittee

FAST FundyAdvancedSensorTechnology

FORCE FundyOceanResearchCenterforEnergy

MARS MarineAnimalResponseSociety

MW Megawatt

NSE NovaScotiaEnvironment

TISEC TidalIn-StreamEnergyConversion

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 6

INTRODUCTION1.0

FORCE1.1

TheFundyOceanResearchCentreforEnergy(FORCE)isCanada’sleadingresearchfacilityfortidalenergytechnologylocatedintheMinasPassage,BayofFundy.FORCEisaprivate,not-for-profitdemonstrationfacility,withfundingsupportfromtheGovernmentofCanada,theProvinceofNovaScotia,EncanaCorporation,andparticipatingdevelopers.

FORCEwasdesignedtoexplorethepotentialfortidalin-streamenergyconversion(TISEC)technology–resemblinganunderwaterwindmill–tocontributetoNovaScotiaandCanada’srenewableenergysupply,andleveragetheregion’sexistingexpertiseintheoceansciencesector.

FORCEhasfourkeyroles,including:

- Host:Providingdeveloperswithanapprovedoffshoredemonstrationarea,onshoreandoffshoreelectricalequipment,anoperationsfacility,andconnectiontothetransmissiongrid.

- Monitoring:Asmentionedabove,since2009,FORCEhasconductedanindependentlyreviewedenvironmentaleffectsmonitoringprogram(EEMP),andhassharedresultswiththepublic.

- Research:FORCEsupportsnewtoolstocharacterizetheresourceandadvancenewmonitoringtechniques.Thisincludesbothonshoreradarandweatherinformationaswellasoffshoreunderwatermonitoringplatforms–allpartofaprogramcalledFAST(FundyAdvancedSensorTechnology).

- Engagement:FORCEconnectsindustry,government,academiaandthepublicinanefforttoensuredevelopmentactivityintheBayofFundyistransparentandviable.

TheFORCEprojectcurrentlyconsistsoffiveunderseaberthsforTISECsubseaturbinegenerators(tobeinstalled),foursubseapowercablesthatwillconnecttheturbinestoland-basedinfrastructure,anonshoresubstation,andpowerlinesconnectedtotheNorthAmericanpowertransmissionsystem.Themarineportionoftheprojectislocatedinaleasedareafromtheprovince(FORCE’sCrownLeaseArea,orCLA),1.6-kmby1-kminarea,intheMinasPassage,andtheonshorefacilitiesarelocatedapproximately10kmWestofParrsboro,NovaScotia.

Todate,accesstoFORCEberthsiteshasbeenawardedviaaprovincialtenderissuedbytheNovaScotiaDepartmentofEnergy.FORCEdevelopershavereceivedapprovalthroughNovaScotia’sdevelopmentalfeed-intariffprogramforatotalof22.5megawatts(MW)ofelectricity:

·MinasEnergy,4MW

·BlackRockTidalPower,5MW

·AtlantisOperationsCanada,4.5MW

·CapeSharpTidalVenture,4MW

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 7

·DPEnergy,4.5MW

Theapprovalallowsthedeveloperstoenterintoa15-yearpowerpurchaseagreementwithNovaScotiaPower.Figure1showstheFORCEfacilityintheMinasPassage,includingthemarinedemonstrationarea,berthsitesandcablesroutes.

Figure1:FORCESiteincludingberthsandpowercablelocations

(proceedingpage)

Crown Lease Deployment Area

Cable Termination

Cable Termination

Cable Termination

Cable Termination

Main Anchor

Main Anchor

Main AnchorMain

Anchor

Grappling Anchor

Grappling Anchor

Grappling Anchor

Clump Weight

Clump Weight

Hub C

onne

ctor

Hub Connector

Open Hydro Hub

Data CablePower Cable B

Power Cable C

Power Cable D

Power Cable AE

D

A

C

B

64°24'30"W64°25'W64°25'30"W64°26'W64°26'30"W

45°2

2'30"N

45°2

2'N45

°21'3

0"N

387000 387500 388000 388500 389000 389500 39000050

2350

050

2400

050

2450

050

2500

050

2550

0

Bay of Fundy

Minas Basin

Parrsboro

¯

Seaforth Geosurveys Inc.300 Prince Albert Road, Suite 200

Dartmouth, Nova ScotiaCanada B2Y 4J2

Phone: (902)468-3579www.seaforthgeosurveys.com

Rev Date Prepared By Checked By Comments

Prepared By:Job / Proposal #: 612 Doc #: SGI-612-105-A

Title:

Client:

Project:

1:10,000

0 100 200 300 400 500 m

A 02/24/16 AA

Scale:

Datum / Projection: WGS84 UTM 20

Notes: 1) Plan view showing FORCE berths, cables and deployed Open Hydro assets.

2) The Data cable was laid in December, 2013; the power cables were laid in October, 2014; the Open Hydro hub and connectors were deployed in December, 2015.

FORCE

Fundy Tidal Energy Demonstration Project

FORCE POWER CABLES ANDBERTH POSITIONS

Legend

DRAFTGC

Cable FeaturesGround Tackle

Hub To HC ConnectorsCrown Lease Deployment Area

Power Cables And Berth Sites

Berth Site E

Cable & Berth ACable & Berth BCable & Berth C

D, InferredCable & Berth D

Unsurveyed Cable Sections Data Cable

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 9

FollowingapprovaloftheDemonstrationProjectinSeptember2009,thefirstTISECturbine(OpenHydrodesign)wasdeployedonNovember12,2009byNSPIandOpenHydro.TheNSPI/OpenHydroturbinewasretrievedinDecember2010,andsincethennofurthertidaldeviceshavebeendeployedintheFORCEdemonstrationarea.

Context1.2

1.2.1 FORCE’sEAApproval

AnEEMPwasmadeaconditionofEnvironmentalAssessment(EA)ApprovaloftheFORCEtestsitein2009andanumberofbiophysicalstudieshavebeenundertakensincethen(FORCE2011;FORCE2014;FORCE2015).Thesestudiesweredesignedtodocumentpre-developmentconditions,assessinstrumentationanddataretrievaltechniques,andforalimitedtimewhenafunctioningturbinewaspresentin20091,monitorenvironmentaleffectsoncertainbiophysicalcomponents.

Theoriginal2009EAApprovalwasforthree,1MWdemonstrationscaleTISEC2units.TheEARegistrationdocumentandApprovalbothindicatethatFORCE’sprimaryenvironmentalmonitoringmandateisassessingthepotentialeffectsofdemonstrationscaleprojectsattheFORCEsite,ratherthancommercialscaleeffectsorbroaderresearchpriorities.TheEEMPsdescribedherethereforeaddresstheFORCEdemonstrationprojectandpredictionsmadewithrespecttopossibleenvironmentaleffects,andnotlargerscaleresearchissuesinthegreaterBayofFundy.

Atthesametime,datageneratedthroughtheseEEMPsmayeventuallybeusedbyothersformodellingandotherworkintendedtopredictthepotentialimpactsfrom‘scalingup’turbinedeploymentsfromdemonstrationtopotentialfuturecommercialscaledevelopmentsintheProvince.

A2011amendmenttotheEAApprovaladdedafourth,1MWprojecttobelocatedwithinthelimitsoftheCLAattheFORCEdemonstrationsite.InMarch2015,theProvinceofNovaScotiaawardedeachofthefourberthholderstherighttotestdemonstrationscaleturbinearrays,meaningtwoormoreconnectedturbinestotalingupto5MWperberth.SubsequentlyinNovember2015,theProvinceannouncedthatafifthberthwouldbepermittedwithintheFORCECLA.FORCEaccordinglyrequestedasecondamendmenttoitsEAApproval,whichwasreceivedinNovember2015.Thecurrentdemonstrationprojectconsistsoffivegridconnected,4-5MWdemonstrationscaleprojects,eachprojectsituatedwithinadesignatedberthwithintheCLA,witheachberthhostingadifferentturbinetypeandplatformdesign.

1.2.1 EEMPDevelopment

FORCEinNovember2014issuedapublicrequestforproposalsfortheprocurementofservicestosupportthedevelopmentofenhancedmonitoringprogramsinadvanceofturbinedeployment.TheRFPandoverallprojectscopeweredevelopedinconsultationwithFORCE’sEnvironmentalMonitoringAdvisoryCommittee(EMAC).FollowingfurtherconsultationwithFORCE’sEMAC,theworkwasawardedtoaprojectteamofexpertsledbySLRConsulting(Canada)Ltd.andtheirresultingreport

1TheturbinedeployedbyOpenHydroandNovaScotiaPowerInc.waspresentfromNovember2009untilDecember2010butwasonlyoperationalforseveralweeksinNovember2009.2 In this report, the industry term“TISEC”or Tidal In-streamEnergyConversionunit is used interchangeablywith “turbine”,whichismorecommon.HoweveritshouldberecognizedthatnotallTISECsareturbines.

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 10

(“Consultant’sReport”postedhere:fundyforce.ca/environment/monitoring/)formsthebasisfortheFORCEEEMPsdescribedbelow.PleaserefertotheConsultant’sReportformoredetailregardingtheprojectteam,pastresearchstudiesintheBayofFundyandadditionalrationaleforeachstudymethodologysummarizedbelow.

FollowinginitialdiscussionswithFORCEandEMAC,thestudydesignsindraftformwerepresentedtoFisheriesandOceansCanada(DFO),NovaScotiaDepartmentoftheEnvironment(NSE),andthejointfederal-provincial“OneWindow”StandingCommitteeontidalenergy.Concurrently,CapeSharpTidalVenture3presentedtheirEEMPtotheCommittee.

Atthesametime,FORCEupdatedandsoughtinputfromlocalfishersandFirstNationrepresentativeswithrespecttopastmonitoringstudyresultsandprogressontheEEMPmandate.FishersandFirstNationrepresentativesarealsomembersofEMACandattendedEEMPproject-relatedmeetingsandpresentationsrelatedtothedevelopmentofthenewEEMP.

TheEEMPsareprimarilydesignedtoverifytheimpactpredictionsmadeintheEA(AECOM2009;AECOM2010).TheyarebasedonthemonitoringrequirementsfirstdescribedintheTermsandConditionsofEnvironmentalAssessmentApproval(NSE2009),whichrequirethattheEEMPconsider:

• Fishandlobster• Marinebirds• Marinemammals• Acoustics(MarineNoise)• Physicaloceanography• Currentsandwaves• Benthicenvironment

OfthesesubjectareasandbasedoninputbyFORCE’sEMAC,thepresentEEMPislimitedtomonitoringprogramsforfish,lobster,marinemammals,marinebirds(seabirds)andacoustics(marinenoise).Thisisbecause:

• Giventheworkalreadyundertakenonthedifferentphysicaloceanographiccomponents(includingcurrentsandwaves),bothDFOandEMAChaveindicatedthatadditionaloceanographicmeasurementsarenotneededforademonstrationscaleprojectatthistime(DFO2012;EMAC2011).Nevertheless,ongoingmeasurementsofcurrents,tidesandotheroceanographicparameterswillbeundertakenbybothFORCEandtheberthholdersaspartoftheiroperationalactivities.Asanexampleoftheseactivities,FORCEisdeployinganumberofautonomousinstrumentplatformsaspartofitsongoingcommitmenttodevelopinginnovativeresearchandmonitoringtechniquesinhighcurrentenvironments.MoredetailontheFundyAdvancedSenorTechnology(FAST)platformscanbefoundontheFORCEwebsiteathttp://fundyforce.ca/fast/

• FORCEisnotcurrentlyplanningtomonitorthemidfieldbenthic(seabottom)environmentbecauseitisanticipatedthatthemostpronouncedeffects,i.e.scouring,maybeobservedinthenearfieldclosetotheturbines.FORCEwillworkwiththeberthholderstoconductthenearfieldbenthicmonitoring.Additionally,thebenthicbiotaontheexposed,current-scouredseabedwithintheCLA

3 Cape Sharp Tidal Venture is a joint venture between Emera Inc. and OpenHydro, a DCNS Company, formed to deployOpenHydro-designedturbinesattheFORCEsite.

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 11

wascharacterisedduringinitialbackgroundstudiesasrathercommonintheBayofFundy.Thishabitatexhibitslittlebiologicaldiversityorunusualspeciescomposition.Giventhesecharacteristics,anefforttodocumentminimal(ifany)actualchangestothemidfieldbenthicenvironmentwasthoughttobeanunproductiveuseoftheresourcesavailableformonitoring.

TheConsultantdidnotdevelopanEEMPforthesubjectofelectromagneticfields(EMFs).ThepotentialenvironmentaleffectsofEMFsweredescribedasbeingessentiallynegligibleinthe2009EAandsubsequentlywerenotlistedintheConditionsofEAApprovalasrequiringatopic-specificEEMP.Inaddition,adetailedliteraturereviewonthissubjectcommissionedbyFORCEin2012concludedthatinjuryorotheradverseeffectsareunlikelytoeventhemostEMF-sensitivemarineorganisms(Collins2012;seealsoWoodruffetal.2013).AsrecommendedinCollins(2012),FORCEwillcontinuetomonitortheemerginginternationalresearchliteratureregardingtheeffectsofEMFsonmarinebiota.

Objectives1.3

Globally,in-streamtidalenergyprojectsaredevelopingbeyondsingleunitdeploymentstolarger,demonstration(pre-commercial)andcommercialscalearrays,andFORCEisfollowingthedevelopmenttrajectoryofdemonstration(pre-commercial)arrays.Aspartofitsmandate,FORCEistaskedwithmonitoringandevaluatingtheenvironmentaleffectsoftheactivitiesundertakenatitssite,andreportingontheseeffectstothepublic.FORCEisnottaskedwithdeterminingpotentialeffectsfrompossiblefuturecommercialscaleprojects,sinceFORCEisademonstrationprojectandcommercialisationfallsoutsideofFORCE’smandate.Itisalsoimportanttounderlinethatitisunusuallydifficult(andexpensive)todeploy,manageandretrievemonitoringequipmentatthishighenergysite.TheFORCEEEMPsarebasedonpastexperienceinMinasPassageandthebestavailablescientificadviceregardingmonitoringapproachesandinstrumentation.TheEEMPisiterativeandwilllikelychangeasearlyresultssuggestnewapproachesordifferentinstruments.

TheultimateobjectiveistoimplementEEMPsthatwillallowtheassessmentofenvironmentaleffectsoncriticalecosystemswithintheFORCEprojectareaandnearbywatersoverthenextphaseofturbinedeployment.Ingeneral,theseprogramshavebeendesignedforthenextfiveyears,andareresponsivetochangesinturbinedeploymentschedulesandadaptabletotheultimateturbinepositionswithintheFORCECLA.TheoverarchingpurposeofeachEEMPistoverifytheaccuracyoftheenvironmentaleffectpredictionsmadeintheEAandmaintaincompliancewithconditionsofprovincialandfederalapprovals.Incontrasttotheresearch-orientedfocusofpastworkundertakenatFORCEtocharacterisebaselineconditions,theseEEMPsareaimedspecificallyatpost-deploymenteffectsmonitoring.

Asnotedabove,theEEMPsaredesignedtobeflexibleandadaptivetotheTISECdeploymentschedules.Inkeepingwiththe“adaptivemanagement”approachthatwasrecommendedbyregulatorsandFORCEsincethebeginningoftheFORCEproject,modificationstotheEEMPs(ifneeded)canbeimplementedoncedeploymentschedulesarebetterknown.Adaptivemanagementisaniterativeapproachthatapplieslessonslearnedfrompaststudiestoinformthedesignoffutureprograms.Italsoattemptstoincorporatechangingexpectationsexpressedbyregulators,thepublicandtheberthholders.Asmoreturbinesaredeployed,actualeffectsmaydifferfromeffectsmeasuredatsingledevicesandtheEEMPscanbeadjustedtoaccountforthis.

FORCE March 2016 Environmental Effects Monitoring Program 1.0 INTRODUCTION

FORCE 12

BerthHolderEEMPs1.4

Eachberthholderistaskedwithmonitoringwithin100moftheirturbinesandthuswilldeveloptheirownEEMPs.BerthholderEEMPs(oncereviewedbytheregulators)willbemadeavailableinordertoprovideacomprehensivepictureofallmonitoringthatwillbeundertakenwithintheCLA.Thenewberthholder’sEEMPswillbeavailablepriortotheirturbinedeployment.FORCEwill:

a) beresponsibleforreportingtheresultsfromboththeFORCEandberthholderEEMPstoregulators,andsubsequently

b) makethereportsavailabletothepublic.

EMACRecommendations1.5

FORCE’sEMACplayedakeyroleinreviewingandcritiquingdraftmonitoringprogrammethodsandreviewingthefinalEEMPs.EMACismadeupofindependentscientificexpertsandrepresentativesfromFirstNationsandthelocalfishingindustry.TheCommitteeistaskedwithprovidingadviceontheadequacyofthemonitoringprogramsthatFORCEisrequiredtodevelopandimplementundertheEAApproval.AlistofEMACmembers,theCommittee’sTermsofReferenceandtheircommentsregardingtheEEMPareavailableontheFORCEwebsite:fundyforce.ca/about/advisory-committees/

AsindicatedinEMAC’sRecommendationsRegardingtheFORCEEnvironmentalEffectsMonitoringProgram(EEMP)for2016andBeyond,(fundyforce.ca/environment/monitoring/),EMACsupportsthemonitoringapproachesforeachsubjectareaasdescribedinthisreport.EMACrecommendationsorsuggestionsaimedatindividualmonitoringprogramshavebeenincorporatedwhereapplicableintothechaptersbelow.

RegulatorReview1.6

PreliminaryadviceontheConsultant’sReportwasalsoreceivedfromtheNovaScotiaDepartmentofEnvironment(NSE),DFOandEnvironmentCanada(EC),whichhavebeentakenintoconsiderationwhendesigningthemonitoringprogramsdescribedbelow.Furtheradvicewillbeprovidedbytheregulatorsovertime,aspartoftheAdaptiveManagementapproach.

FORCE March 2016 Environmental Effects Monitoring Program 2.0 LOBSTERS

FORCE 13

SECTION2:LOBSTERS2.0

Objectives2.1

AsdescribedintheEA,asignificantadverseeffectisdefinedasonethatcreatesasignificantalterationtoapopulation(oraportionofit)tocauseanunnaturaldeclineorchangeintheabundanceordistributionofthepopulationtoalevelfromwhichrecoveryofthepopulationisuncertain,overonegenerationormore.

Inordertomeasurea“significantalterationinapopulation”sothatanynegativeeffectscanultimatelybedetermined,knowledgeoftheabundanceandmovementoflobstersintheMinasPassageduringvarioustimesoftheyearisneeded.Pastlobstercatchabilitystudiescombinedwithacoustictaggingsurveyshaveprovidedsufficientbackgroundinformationtoestablish,ingeneralterms,relativeabundanceandseasonalmovementpatterns.PleaserefertotheConsultantReportforadetailedreviewofpastworkinMinasPassageonthesubjectoflobster.SincecommercialfishingwastheprimaryconcernidentifiedintheEA,theEEMPbelowisdesignedtoanswerthequestion:doesthepresenceoftheturbineaffectthenumberorweightoflobsterenteringthetraps?

Methodology2.2

2.2.1 Overview

Theprimaryenvironmentaleffectsvariablethatwillbemonitoredisthenumberoflobstercaughtpertrap,combinedwith(assuggestedbyDFO2012)theweightoflobstercaughtpertrap.Asinpastcatchabilitystudiesthatusestandard,baitedcommerciallobstertraps,theprimaryevaluationofeffectswilluseAnalysisofVariancetocomparecatchabilityatdefineddistancesfromtheturbine(s).

DespitethelimitationsanddifficultiesimposedbytheBayofFundymarineenvironment,thepriorlobstercatchabilitystudiesdemonstratedthatasimpleBeforeAfterControlImpact(BACI)studycanprovideusefulenvironmentaleffectsmonitoringdata.Bayley(2010)determinedthenumberofsamples(traps)neededtodetectachangeinlobstercatchabilitywithsufficientstatisticalreliability.Basedonpreliminaryresults,areductionincatchof2lobsterspertrapwasconsideredsignificant.

2.2.2 MidFieldStudyDesign

Thetextbelowdescribesamid-fieldEEMPwithoneturbineatthecenterofthemonitoringprogram.Thestudydesignproposessamplecollectionfromrandomsamplestationslocatedwithintworingsaroundtheturbine:oneringat300-350mfromtheturbine(calledthe“treatmentring”)andoneringat450-500m(calledthe“controlring”).Bothringswouldbedividedintofourquadrats(east,west,northandsouth)andsamplesiteswouldberandomlyassignedineachringwithineachquadrant.Ideally,thequadratsshouldbealignedwiththetidalcurrentdirectionsothatdirectionaleffectsinfrontofandbehindtheturbineinactioncanbecomparedwithresultsinquadratsbesidetheoperatingturbine.

Thedouble-ring-and-quadratapproachisproposedtoaccountforpossibledirectionaleffectsduetowatercurrentsandnoisefromtheturbine,andtoallowforcurrent-inducedtrapmovement.

Regardingthetotalnumberofsamplestations,Bayley(2010)suggestsitisimportanttohaveasufficientnumberofback-upsamplestoensureasbalancedadesignaspossible.Atotalof24randomizedsample

FORCE March 2016 Environmental Effects Monitoring Program 2.0 LOBSTERS

FORCE 14

stations,12ineachring,isproposed.Withtworings(oneat300-350mandoneat450-500m),thismeanssixstationsineachquadrant.

Itisfurtherproposedthatallstationsaresampledthreetimestocompleteonesurvey.Bayley(2010)notesthatthreereplicationsandsixstationsperquadrat“wouldprovidegoodinsuranceforsinglelossesinlocationsorsitereplications,andstillretaintemporalandspatialreplication…”

Ifallsamplescouldbecompleted,thetotalsamplespersurveywouldbe72(24stationssampled3times),meaning36samplesforthe“treatmentring”and36samplesforthe“controlring,which,Bayleynotes,providesgoodpowerforthemaintreatment/controleffect.Abalanceddesignof72samplespersurveywillprovidedatatoevaluate:

1. Differencesincatchabilitywithdistancefromtheturbine(“distanceeffects”);2. Differencesincatchabilityinfront/behindvsbesidetheturbine(“directionaleffects”);3. Allowanceforlossofsamples(traps);and4. Comparabilitywithexistingdata.

Iftheresultsofthisstudydonotdetectastaticallysignificantchangeinlobstercatchability,ortheeffectsofadetectedchangearesolowastoensurethatnosignificanteffectsonthecommercialharvestwillbefelt,thentheEEMPcanbediscontinuedafteraminimumofthreesurveys.Afullthreesurveysareproposedtocaptureprogressivedevicedeploymentsovertime.Theactualnumberofsurveyscompletedwilldependonthedeploymentscheduleandinitialresults.

CEF(2010)reportsthatapproximately15stationscanbesampledroutinelyinatypicalday.Morestationscanbesampledatloweramplitudetidesbecausethesurveyvesselcanspendmoretimeinthewaterandtrapsremainclosertotheirsetlocation.Atextremehightides,buoysmayremainatthesurfaceforlessthan30minutesateachslacktide,allowingrecoveryofrelativelyfewtraps.Thisexperienceimpliesthatallstationscanbesampledoverthecourseoftwodays,andthatasinglesurveyconsistingofthreereplicateswouldrequireatotalof6days,notincludingpreparation,trapsettinganddataanalysis.

Giventhattwoturbineswillbeinstalledin2016withinBerthD,thestudydesignproposedabovecanbeeasilymodifiedtoaccommodatetwoturbineswithinasingleberth,asisproposedforBerthD.Thetwoturbineswillbelocatedwithin200mofeachothersincetheberthdiameteris200m,andsocanbetreatedasasingleunit.Oncetheexactplacementoftheturbinesisknown,theringdistancecanbeadjustedtoincludeandeffectivelyrepresentbothturbines.AswiththeotherEEMPs,studytimingwilldependontheturbinedeploymentschedule.

2.2.3 MultipleTurbines

Secondinpriorityisthequestionoffar-fieldeffects.AsBayley(2010)observes:aretherelargerscaleconsequences(i.e.,outsideof500mfromtheturbine)oftheturbinepresence?

Itisunlikelythatsignificanteffectsinthefarfieldwillbedetectedwithonlyoneortwoturbinesinstalled.Giventhis,FORCEproposestodeferanyfar-fieldstudiesuntilthreeormoreturbinesaredeployed,asrecommendedintheConsultant’sReport.Oncethreeormoreturbinesareinstalled,thestudycanbeexpandedasperDesignBintheConsultantReport,ifdeemedappropriate.

Atthistime,itappearsthefirsttwoturbineswillbedeployedin2016inBerthDandthenextturbineswillbedeployedin2017inBerthB,over1000maway.Thegreatdistanceseparatingthesetwoturbine

FORCE March 2016 Environmental Effects Monitoring Program 2.0 LOBSTERS

FORCE 15

berthssuggeststherewillbelimitedinterferenceoroverlapinenvironmentaleffectsbetweenthem.Giventhis,theyarebestmonitoredasseparateinstallations;themidfieldstudydesigncanbeappliedtotheBerthBturbines.Whenthenextberthisoccupied,studydesignsmaybemodifiedtoaccountforthepotentialcumulativeeffectsfrommultipledevices.

Oncethreeberthsareoccupied,thejointeffectofmultipleturbinescanbeassessed.Insteadofdistinguishingdistancefromturbineonacategoricalbasis(treatment/control),asimpliedbytheringsinthemidfielddesign,onecantakeacontinuousapproachbylabellingsamplesfromeachsiteintermsoftheirdistancefromoneormoreturbines(Bayley2010).Toaccomplishthis,asufficientnumberofrandomlyselectedsamplestationswouldbeselectedatdifferentdistancesfromtheturbinesandaccountingforvaryingwaterdepths.

Giventheuncertaintyregardingthetimingoffuturedeployments,planningforfuturestudiesdesignedtoaddressmultipleturbineswillbedeferreduntilshort-termstudyresultsareknownanddeploymentschedulesarefurtherdefined.

2.3Discussion

ThesestudydesignsincludesuggestionsproposedinDFO(2012):

• Thenumberofreplicatesamples(traps)isdescribed(threereplicatesformonesurvey).

• Themonitoringprogramisdesignedtoassesseffectsoncatchabilitywhiletheturbinesareinoperation.

• CatchratesexpressedasKg/traphauledwillalsoberecordedandevaluated.

• Monitoringactivitieswillbeconductedduringtheout-of-fishingseason.

Sincethenumberoflobsterscaughtpertrap-setisnotnormallydistributed4,Bayley(2010)recommendsthatfuturestatisticalanalysesofstudyresultsuseGeneralizedLinearModels(GLM)withanegativebinomialdistributionratherthanthestandardlog(count+1)transformationthatistypicallyappliedtodatathatisnormallydistributed.

Thisproposeddesignrequiresnewstationstoberandomlyselected.Sincedepthisknowntobeasignificantvariable,CEF(2012)suggestssomestratificationbydepthbeintroducedintothestationselectiontoensurethatanadequatebalanceofdepthsissampled.

Toincreasestudyefficiencyandwiththeintentionofreducingcurrent-inducedtrapmovement,certainstationsduringpastsurveysweresampledwithpairsoftrapsconnectedbya60mrope.Statisticalanalysisindicatestheresultsfromthepairedsamplesarenotcomparabletothenon-pairedsamples(Bayley2010).Thereviewerrecommendeddiscontinuingtheuseofpairedtrapsinfuturesurveys.ThisalsoreducestheentanglementsafetyhazardidentifiedinCEF2010.The2009-2010trappairdatacanstillbeusedinfutureanalyses:resultsforoneofthetwotrapsfromeachpaircanberandomlychosen,pooledandthenusedinstatisticalanalyses.

4“normal”distributionisastatisticaltermusedtodescribedatathattendstoclusteraroundacentralormeanvalue.

FORCE March 2016 Environmental Effects Monitoring Program 2.0 LOBSTERS

FORCE 16

Difficultieswereencounteredduetotheshorttimeoverwhichthetrapscouldbesetandrecovered(lessthananhouroverslacktide)andthetime(andexpense)requiredatseabecauseoflowwaterlevelsatthewharf.Inaddition,thestrongcurrentsoftenmovedtrapsfromtheirinitialdeploymentlocation,typicallyapproximately100mfrominitialdeploymentlocation(butupto1.0km).Duringthefirstfall2009survey,3of51trapswerelost.Duringthesecondfall2009survey,7of48trapswerelost.Duringthespring2010survey5of28trapswerelost.Analysisofresultsmusttakeintoaccountbothtraplossandtrapmovement.Planningandcostestimatesshouldfactorina15%traplossrate.

Itshouldalsobenotedthatlobsterpopulations(i.e.,abundance)arenoticeablyaffectedbycommercialfishingpressures.Noiseandvibrationeffectsoffourorfiveturbinesmaybeverydifficulttomeasureincomparison.Giventhis,thestudywillbedesignedtominimizetheeffectsofthecommercialharvestonstudyresultsi.e.lobsterfishingseasons.

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 17

SECTION3:FISH3.0

Introduction3.1

Thefollowingparagraphdescribesthepredicteddemonstrationscaleimpactsonfish(AECOM2009):

ItisanticipatedthatmarinefishpresentormigratingthroughtheProjectareamayexperienceverylimitedbehaviouralchangessuchasavoidanceandaversion,aswellaslimitedmortalityandhabitatdisruption.Theextentoftheseeffectsisnotknowngiventhelackofspecificinformationrelatedtonoisegeneratedbytheproposeddevices,andthebackgroundnoiseintheProjectarea.Byfollowingexistingstandardconstructionpractices,availableguidelinesandassociatedmitigationmeasures,ProjectactivitiesandcomponentsarenotlikelytocausesignificantadverseresidualeffectsonmarinefishwithintheProjectareaorvicinity(i.e.,MinasPassageandMinasBasin).Ingeneral,thisisduetotherelativelysmallscaleoftheproject,combinedwiththelimiteddurationandintermittentnatureoftheProjectactivities(AECOM2009).

Possibleinteractionscanoccuratdifferentspatialscalesrelativetothedevices,beginningwiththenear-field.ATISECdevicenearfieldinteractioncouldincludefishcollisions,bladestrikes,and/orpressure-induceddamagetofishresultingfromdevicecavitation.Theseeventsaredifficulttocaptureinrealtime,especiallyinthefield.TherearenofieldstudieswhereobservationofTISECdevicebladestrikehasbeenrecordedbuttherearelaboratorystudiesthathavedocumentedsuchinteractions(Amaraletal.2015).ForthepurposesofthisEEMP,nearfieldinteractionssuchasbladestrikesandcollisionsareassumedtobethesubjectofmonitoringbythedeviceproponents.

Beforeattemptingtoanswerthequestionofwhetherornotthereareactualnearfieldphysicalinteractions(e.g.collisionsorbladestrikes)itisimportanttoaddressthelargerscalequestionofwhetherornotTISECdevicesaffectoverallfishuseofthewatercolumnatrangesfrom10-150mfromthedevice.Atthesedistancesandfarther(i.e.,themidfield),therearepossibleindirectlargescaleeffectsonfishuseofthewatercolumnduetothepresenceofTISECdevices.Forexample,doesfishdensitychangeanddoesfishverticaldistributionwithinthewatercolumnchangeduetothepresenceofaTISECdevice?TheFORCEprojectprovidesauniquesituationofdeployeddevicesandtheabilitytomonitorfishresponsesonthebasisofdensityanddepthdistribution.

Objectives3.2

ThegoalofthisEEMPistodescribeameansofquantifyingfishdistributionalchangesthatreflectbehaviouralresponsestothepresenceofadeployedTISECdevice.Theobjectivesofthisprogramareto:(1)testforindirecteffectsofTISECdevicesonwatercolumnfishdensity;(2)testforindirecteffectsofTISECdevicesonfishverticaldistribution;and(3)estimateprobabilityoffishencounteringadevicebasedonfishdensityproportionsinthewatercolumnrelativetoTISECdevicedepthinthewatercolumn.Theseobjectiveswillbemetusingestablisheddown-lookinghydroacousticmonitoringtechniques,Before-After-Control-Impact(BACI)studydesign,multivariateanalysis(HotellingsT2tests)offishverticaldistributions,andanencounterprobabilitymodel.

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 18

MonitoredVariables3.3

FishDensity:Down-lookinghydroacousticsprovidesrawdatathatcanbeusedtocalculatefishdensitybyscalingmeanvolumebackscatter(Sv)bytheaveragescatteringcrosssection(σbs)oraveragingfishtrackspersampledvolume.Thisvariableisusedtorepresentfishconcentration.

FishVerticalDistribution:Thisvariableisestimatedbydividingthewatercolumnintoequaldepthbins(e.g.1m)andcalculatingtheproportionoffishdensityforeachbin.Thisvariableisusedtorepresentfishdistributionwithinthewatercolumn.

Toaddressthefirstobjective,indirecteffectsofaTISECdeviceonmonthlyfishdensityestimates(themeasuredparameter)willbecomparedusingaBefore-After-Control-Impact(BACI)design.The"before"componentmustbeestimatedfrompreviouslycollecteddatafromMelvinandCochrane(2014).The"after"componentwillbeestimatedfromdown-lookinghydroacousticssurveysfollowingthemethodsdescribedinMethodologybelow.ThiswillprovideastatisticallydefinedchangeinthedensityoffishattheFORCECLAafterdevicesaredeployed,providedthereissuchaneffect.Acontrolwillbeusedtoaccountforpotentialannualvariabilityinfishdensityestimates(Smith2002).ThiswillinformFORCEofanydifferenceinconcentrationbeforeandafterdeviceinstallationwhileaccountingforinter-annualvariability5.

Toaddressthesecondobjective,indirecteffectsofaTISECdeviceonmonthlyverticalfishdistributionsbasedon1mdepthbinsmeasuredupfromtheseafloorwillbecomparedusingaBefore-After-Control-Impact(BACI)design.Thisprovidesfishverticaldistributionby1mincrements(themeasuredparameter).The"before"componentofthestudywillusethedatasetfromMelvinandCochrane(2014).The"after"componentwillbeestimatedfromdown-lookinghydroacousticssurveydataasdescribedinMethodologybelow.Thiswillprovideastatisticallydefinedchangeinuseofthewatercolumn(verticaldistribution)byfishinthemid-fieldattheFORCECLArelativetoacontrolsite,ifinfactthereissuchaneffect(Stainesetal.submittedtoEuropeanWaveandTidalEnergyConference(EWTEC)2015).ThisinturnwillinformFORCEofanychangeinfishverticaldistributionbeforeandafterdeviceinstallationandwillaccountforinter-annualvariabilitywithcontrolsitecomparisons.

Toaddressthethirdobjective,indirecteffectsoffishwatercolumnuseatthedepthofadeployedTISECdevicewillbeassessedusinganencounterprobabilitymodel.Theprobabilitythatfishwillencounteradeployeddeviceisestimatedfromtwocomponents:1)theproportionoffishbeingatthedevicedepthwhenthedeviceabsent;and2)theproportionoffishbeingatthedevicedepthwhenthedeviceispresent.Theproductofthesetwoestimateswillprovideaprobabilityoffishencounter(Figure3-1).

5Intheirreviewofthisprogram,DFOnotesthattheproposeduseofXandYtransectsis“inadequate”sincefishabundancemid-channelmaynotbewellcorrelatedwithfishabundanceinthenorthendofthegridwheretheturbineswillbedeployed.FORCErecognizesthismaybethecasebutwillproceedontheassumptionthatfishdistributionisrelativelyuniformthroughtheCLA.Monitoringdatacollectedbythisandotherprogramsovertimeshouldhelpdemonstratefishdistribution.

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 19

Figure3-1.DisplayofpartofthewatercolumnofatheoreticallyplannedsiteforTISECdeviceinstallation.Thedashedlinesrepresentthedepthinthewatercolumnofinterestbecauseitiswherethedeviceislocatedandwherepotentialfishinteractionswilloccur.(A)representsthewatercolumnpriortodeviceinstallationandprovidestheparameteroffishproportionbeforeinstallation.(B)representsthewatercolumnafterdeviceinstallationandprovidestheparameteroffishproportionafterinstallation.

Methodology3.4

3.4.1 BoatPlatformandAcousticSurveySystem

Previousmobile,down-lookinghydroacousticsurveyswereperformedusedan18.6msterntrawler(FORCE2015)anda15.4mpassengervessel(MelvinandCochrane2014).ThisEEMPproposestheuseofsimilarsizedvesselsbasedontheprevioussuccessofthesetwosurveys.

A120kHzechosoundersystemconsistingofatransceiverandlaptopcomputerhousedinsidetheboatcabinandtransducerthatispolemountedononesideoftheboatisproposed.Thetransducerwillbemounteddeeperthantheboathulltopreventinterferencewiththekeel.Thetransducerwillbemountedusingapoledesignattachedtothegunwale.AGPSunitwillbeusedtoprovideNationalMarineElectronicsAssociation(NMEA)serialstringdatatoalaptopcomputer.ForcomparabilitytotheMelvinandCochrane(2014)dataset,apingrateof1s-1isproposed.ProperinstrumentcalibrationpriortoeachsurveyisrecommendedaccordingtoFooteetal.(1987).

3.4.2 SurveyDescription

TheFORCECLAsurveyswillconsistof9paralleltransectsspaced100mapart(Table3-1).Eachtransectisapproximately1.8kmlong.Transectsarenumbered0-8startingnearesttoshore.TheparalleltransectswithintheFORCECLAwillbefollowedbythreecontroltransectsthatstartattheeasterlyendoftransect8.TransectY1isacrosstheChannel,andtheboatwilltakeasouthwestbearingacrosstheChannelfromtheeasterlyendoftransect8towardtheoppositeshoreuntilapproximately30mdepthisreached.FromheretransectX1willfollowthe30mcontoureasttothestartoftransectY2which

A B

Proportionoffishbeforeinstallation Proportionoffishafterinstallation

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 20

parallelsY1backacrossthechannelgoingnorthandendingatthewesterlyendoftransect0(Figure3-2).Thissurveydesignisrepeateduntilslacktidetime.

Surveyswillbeperformed,totheextentpossibleatspeedsbetweenfiveandtenknots,althoughspeedsupto12knotsareconsistentwithMelvinandCochrane(2014).

Table3-1.LatitudeandlongitudeindecimaldegreesforproposedMinasChanneltransectsfordown-lookinghydroacousticsurveys.Transectswithanasteriskareforcontrolsamples.ThesetransectlocationsaresimilartoMelvinandCochrane(2014)butareslightlylongerinlengthtoencompassallberthsiteswithintheFORCECLA.

Along-ChannelTransects WestEnd EastEnd Lat Lon Lat Lon0 45.3725 -64.4409 45.3674 -64.41841 45.3717 -64.4414 45.3666 -64.41892 45.3709 -64.4419 45.3657 -64.41933 45.3701 -64.4424 45.3649 -64.41994 45.3692 -64.4430 45.3640 -64.42035 45.3684 -64.4435 45.3631 -64.42076 45.3676 -64.4439 45.3622 -64.42127 45.3667 -64.4444 45.3613 -64.42168 45.3658 -64.4449 45.3605 -64.4221X1* 45.3378 -64.4594 45.3330 -64.4364Across-ChannelTransects NorthEnd Southend Lat Lon Lat LonY1* 45.3658 -64.4449 45.3378 -64.4594Y2* 45.3674 -64.4184 45.3330 -64.4364

Figure3-2.LeftMapshowingapproximatelocationsofalltransectsfordown-lookinghydroacousticsurvey.ReproducedfromMelvinandCochrane(2014);andRight-GoogleEarthviewofMinasPassageshowingproposedsurveytransectlocations,FORCECLA,andTISECdeviceberthsitesA,B,andC.ThegreenrectangleistheFORCECrownLeaseArea.

Y1 Y2

X1

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 21

3.4.3 Schedule

ForthesakeofcomparabilitywiththeMelvinandCochrane(2014)dataset,thisEEMPproposessamplingduringthesamemonthsonneaptides6aswasdonebyMelvinandCochrane(2014):sixsurveyeventsdistributedoversixdifferentmonths.ThemonthsofMay,June,August,September,October,andNovemberwillmatchwiththe2011-12dataset.

NosurveysareproposedforDecemberthroughAprilsincethesemonthslikelycoincidewiththelowestwatertemperaturesandlowestfishbiomass(Viehmanetal.2015;MelvinandCochrane2014).Julyisnotsurveyedbecausethismonthwasalsoskippedinthepreviousstudy.Table3-2listsproposed2016samplingdatesbasedondatesthatcoincidewithneaptides.ThesesamplingdatesmaycapturetheimmigrationandemigrationofmigratoryfishspeciesthatoccurinMinasPassageandMinasBasin.Residentfishspeciesandthoselifestagesofmigratoryspeciesthatusetheprojectareawillalsobecapturedinthesesurveys.

Table3-2.Proposed2016SamplingDatesCoincidingwithNeapTides.StartTimes=HighTideTimes.

Survey Startdate StarttimeADT

1 16May2016 9:28am

2 14June2016 8:49am

3 12August2016 8:20am

4 11September2016 8:38am

5 8October2016 6:14am

6 7November2016 5:35am

Eachsurveyeventwillconsistofafulltidalanddielcycleandthereforelast25hours.Thiscanbebrokenupintofourseparateshiftseacharound6hours.Timebetweentideswhentheflowisdecreasedcanbeusedtochangecrewsandmaintainequipment.Allsurveysshouldbeginonahightidetoensurethattheboatcanmanageentryandexitfromport.Surveyingwillbelimitedtocalmseadaysandifpossible,whenwindislessthan10knotsforsafetyandtomaximizedataquality.

TheEEMPproposesextendingthisstudyforfiveyearsinanattempttocapturemultipledeploymentsthatareplannedintheFORCECLA.Thefirstplannedinstallationwillbetwoopencentreturbinesin2016.

ExtendingthismonitoringprogramoverfiveyearswillimprovetheabilitytodeterminepotentialeffectsonfishuseinandaroundtheFORCECLAintwoways.First,itisimperativetocapturefuturedevicedeploymentstoaddressnotonlypotentialeffectsrelatedtoindividualdevicetypesbutalsotoassesscumulativeeffectsfrommultipledevicesoperatingatthesametime.Second,long-termstudieshaveahigherprobabilityofsuccessbecausetheyarelesslikelytomistakesingle,novelecologicaleventsas

6Thesurveycanbeperformedduringbothneapandspringtidesbutifdataqualityispoorenoughtoprecludeitscollectionduringacertaintidalphasethenitwouldbeadvisabletoavoidthistime.

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 22

representative.Theexistenceofaneffectorlackthereofforseveralyearsofsurveyeddataisstrongerevidencewhencomparedtoasingleyear'sdata.Inotherwords,ifthereisevidenceofatrendforseveralyearsasopposedtoasingleyearthenthattrendislesslikelytohaveoccurredbychancealone.Additionally,long-termdatasetshavetheoptionoftimeseriesanalysisthatcanshowlongtermtrendsandprovideevidenceforforecasting.

EMACsuggeststestingthedownwardlookinghydroacousticprogramassoonaspossible,i.e.priortoturbinedeployment.This‘testrun’willidentifylogisticalissuesandpromoteafamiliaritywiththeinstrumentation,collectionmethodologyanddifficultworkingconditions.

3.4.4 DataProcessing

ThesurveysinMinasPassagewilllikelyhaveamajormanualprocessingcomponenttoseparatethelargeamountsofentrainedairparticulartothisarea.Anestablishedmethodforaddressingentrainedairatthesurfaceistoeliminateacertainamountofwaterdepthfromprocessingandanalysis(e.g.theupper10m)(Viehmanetal.2015).SomeresearchershavehadsuccessremovingentrainedairusingSchoolsDetectionmodulealgorithmsinEchoviewsoftware.

Additionally,whenutilizingsubjectivemanualprocessingtechniques,itisimportanttoincludeaqualityassurance(QA)andqualitycontrol(QC)protocol.Ideally,thequalityassurancecomponentisanadditionalpersonwithhydroacousticsdataprocessingexperiencetotakeasubsampleofprocesseddataandreprocessittocomparetotheresultsofthefirstperson'soutcome.Agoodmethodforqualitycontrolistofindoutliersinthefinalfishdensityestimatesandreferencethemtotheprocesseddatafiles.Oftentimesanoisespikeorothersourceofsignalcontaminationismissedduringmanualprocessingandisthereforeincludedinthefishdensityestimate.TherearenumerousotheravenuesforQA/QCandanythattheresearchershaveconfidenceinshouldbeused.

Hydroacousticsdatacanbeprocessedtoprovidedensityasametric.Fishdensitycanbecalculatedbyscalingthemeanvolumebackscatter(Sv)bytheaveragebackscattercrosssection(σbs)forasampledvolumeofwaterorbydeterminingthenumberofindividualfishtracksforasampledvolumeofwater.Additionally,usingjust(Sv)asametricisalsoeffective(Viehmanetal.2015).UsingSvaloneprovidesbiomassorrelativedensityasametricinsteadofdensity.ForObjective1,Svwillsufficeasametricfortheproposedanalysis.However,forObjectives2and3,researcherswillneedtouseareabackscattercoefficient(Sa)asametricfortheproposedanalyses(Stainesetal.2015).Researcherswithhydroacousticsexperiencewillhaveknowledgeofallofthesemetricsandtheirapplications.

Basedontheobjectivesofthisprogram,fishdensitywillneedtobeintwoseparateformsfortheproposedanalyses.First,overallfishdensityestimatesfor30or60minutetimeintervalsforthewatercolumnarerequiredforthefirstobjectiveofdeterminingseasonalfishdensityattheFORCECLA(hereafterreferredtoastheimpactsite)andcontrolsites.Second,fishdensityestimatesfor30or60minutetimeintervalsdividedinto1mdepthbinsforthewatercolumnarerequiredforthesecondobjectiveofdeterminingseasonalfishverticaldistributionattheimpactsiteandcontrolsites(Viehmanetal.2015).Objective1usesoverallfishdensityofthewatercolumnandobjectives2and3usefishdensityin1mdepthbins.

3.4.5 DataAnalysis

AnalysisforObjective1wouldinvolvea2-wayanalysisofvariance(ANOVA)basedonabefore-after-control-impact(BACI)experimentaldesign(Smith2002).The"before"componentwillbeapreviousdatasetcollectedbyMelvinandCochrane(2014)thattheaforementionedsurveymethodsarebased

FORCE March 2016 Environmental Effects Monitoring Program 3.0 FISH

FORCE 23

on.The"after"componentofthestudycouldpotentiallybeanyyearofsurveysafterTISECdeviceshavebeendeployed.The"control"componentistakenfromthexandytransectsofthesurveydesignwhilethe"impact"componentistakenfromtheparalleltransectsnumbered0-8.Theresultsofa2-wayANOVAanalysiswillprovideaneffectforthebefore/aftercomponent,thecontrol/impactcomponent,andtheinteractionofthetwo.AsignificantinteractioneffectisevidenceoftherebeinganeffectofaTISECdeviceonoverallfishdensityattheimpactsite(Stainesetal.2015).

AnalysisforObjective2shouldincludeusingHotellingsT2permutationteststocomparethedifferencebetweenthefishverticaldistributiondensitiesofcomplimentarymonthsofthe"before"surveytothe"after"surveysforboththecontrolandimpactsites.Forexample,inthe"before"surveyofMelvinandCochrane(2014),themonthofMayin2012wassampled.Assumethereisan"after"surveyperformedinthemonthofMayin2016afterTISECdevicesarepresent.BothoftheseMaysampleswouldbecomplementaryandwouldbetestedfordifferences.Thecomplementarypairfortheimpactsitetransectswouldbetestedandthecomplementarypairforthecontroltransectswouldbetested.Ifboththeimpactsiteandcontrolsitehadnon-significanttestresultsorbothhadsignificanttestresultsthenthatwouldindicatenoevidenceforeffectsfromTISECdevicepresence.However,ifonlyoneortheotherofthecontrolorimpactsitehasasignificanttestresultthenthiswouldindicatepossibleevidenceforTISECdeviceeffectsonfishverticaldistribution.

AnalysisforObjective3willinvolvere-analysisoffishverticaldistributiondatausedinanalysisofObjective2.DeterminingtheprobabilityofencounteroffishwithTISECdevicesattheimpactsitewillrequireseveraldatainputsthatwillallbeavailableafterdeviceinstallationanddown-lookinghydroacousticsurveyshavebeencompleted.ThefirstinputrequiredisthedepthofaparticulardeployedTISECdevice.Knowledgeofthisdepthisimportantbecausethisiswhereexpectedinteractionwilllikelyoccurwithfishmovingintotheimpactsite.Theprobabilitythatfishwouldencounterthedeployeddeviceisestimatedusingtwoprobabilities:1)theprobabilityoffishbeingatthedevicedepthwhenthedeviceisnotpresentattheimpactsite(p1);and2)theprobabilityoffishbeingatthedevicedepthwhenthedeviceispresent(p2).Thereforetheprobabilityoffishencounteringthedevicecanbecalculatedas:

p=p1*p2

Notethattheprobability(p1)offishbeingatthedevicedepthcanbedeterminedfromtheMelvinandCochrane(2015)datasetsincemostofthesedatawerecollectedattheimpactsitewhennodevicewaspresent.Infact,thiswouldbethebestestimateofp1.Usingthecontrolsitetodeterminep1assumesthatthecontrolsiteissimilartotheimpactsite.IfthecontrolsiteistobeusedtodeterminetheprobabilityofencounteritshouldbetestedforpotentialdifferenceswiththeFORCECLA.Thesemethodswouldbestbeundertakenin2017or2018aftersite-specificdatahavebeencollectedandsamplesizesareadequateforconfidentestimates.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 24

SECTION4:MARINEMAMMALS4.0

Introduction4.1

ManyoftheimpactsofTISECdevelopmentsarelikelytobethesameasthoseassociatedwithmoreestablishedmarineindustries,suchasoilandgasexploration,constructionandextraction.However,thereareanumberofpotentialimpactsthatarespecifictothesenewtechnologies.Theseinclude,forexample:

a)deterrenteffectsofnoiseassociatedwithoperationalandinstallationactivities;

b)disruptionofcommunicationasaresultofincreasedunderwaternoise;

c)indirecteffectsthroughchangesinpreydistributionandabundance;and

d)directcollisionorphysicaldynamicinteractionwithTISECdevices.

IndividualTISECdeviceshavearelativelysmallphysicalfootprintsoitisunlikelythatthepresenceofsingledevicesorsmallarrayswillposeasignificanthabitatexclusionriskatalevellikelytoresultinmeasureableimpacts.

Environmentaleffectsfromcontinuousnoisesourcesarerelatedtosoundintensity,signaltonoiseratios,spectralfrequencyandtheexposureperiod,butalsocontextualfactorslikethenoveltyofthesoundsource(Southalletal.2007;Ellisonetal.2012).Harbourporpoise(Phocoenaphocoena),thekeymarinemammalspeciesinMinasPassage,usehighfrequencyecholocationclickstohuntandcommunicate(Kasteleinetal.2002)andareknowntobeverysusceptibletopulsednoisedisturbance(Tougaardetal.2009),butfewstudieshavefocusedonexposuretocontinuous(non-pulsed)periodsoflowfrequencynoisesourcessuchasthoseemittedbytidalturbines.

EEMPContext4.2

BaselinedatacollectedtodatecoupledwithhistoricalinformationindicatesthatonlyonemarinemammalspeciesispresentinsufficientnumberstotestEA-relateddistributionoravoidancepredictions,namelyHarbourporpoise.Lowsightingratesofharbourandgreyseals,white-sideddolphinsandsporadicsightingsoflargerwhales(mainlylong-finpilot,minkeandhumpbackwhale)resultinalackofstatisticalpowertorobustlyassesschangeinabundanceordistributionsorindeedavoidancebythesespecies,evenifcurrentbaselinemonitoringstudieswerecontinuedorexpanded.

RecognizingthatonlyasmallportionoftheBayofFundyHarbourporpoisepopulationutilizesMinasPassage,thisEEMPfocusesonthemoreobtainable‘sub-population’levelEApredictions.TheoverallgoalistoassesschangeinmidfieldareausebyHarbourporpoise,includingpermanentorlargescaleavoidance/attractionoftheFORCECLAandsurroundingmidfieldstudyarea.

MarinemammalEApredictionsweredevelopedforaminimumofonegeneration.ForHarbourporpoise,thisisconsideredtobesevenyears,therebyrequiringanEEMPthatextendsoverthisperiod.Logically,monitoringstudiescanbestaggeredtoallowtimeforsitedevelopmentofmultipleturbinesandlong-termoperationsinordertomaximizethevalueoftheEEMP.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 25

Effortwillbedirectedtowardsgatheringmonitoringdatainthenearandmidfieldaroundindividualturbines.Givensafetyconsiderationsnearoperationalturbines,immediatenearfieldmonitoring(consideredtobewithin100m)isbestundertakenbydeviceowners,ratherthanthroughthedeploymentofmoveableequipmentfromsurfacebyindependentmonitoringentities.

TheproposedfocusofthemarinemammalEEMPistoassesslong-termeffectsoftwokeystressorsonHarbourporpoise:

1) Directeffectsofoperationalturbinenoise.Specifically,Harbourporpoisesmayrespondtotheacousticstressorsthroughattractionoravoidance.

2) Indirecteffectsduetochangesinpreydistributionandabundance.Duetodynamicinteractions,preyaggregationsornear-fieldavoidancebyfishduetoacousticeffects,Harbourporpoisemayrespondtolocalstudyareascalepreyaggregationsthroughattractionoravoidance.

Theassessmentofbothdirectandindirectstressorsisachievableconcurrently,asbotharepotentiallymonitoredthroughrelativechangesinporpoiseactivityandrelativesiteuse.

TurbinedeploymentattheFORCECLAisanincrementalprocessthatwilloccuroveranumberofyears.ThisEEMPproposalhasassumedthattwoturbineswillbedeployedatBerthDin2016,withdeploymentofadditional(anddifferent)turbinesintheotherberthsoccurringinsubsequentyears.

EEMPObjectives4.3

TheprimaryobjectivesofthemarinemammalEEMParetoassessthefollowingeffects:

1) Permanentavoidanceofthemidfieldstudyareaduringturbineoperations.

2) Changeinthedistributionofaportionofthepopulation,specificallylargescale(~50%)decreasesorincreasesinrelativeoccurrence(echolocationactivitylevels)acrossthemidfieldstudyarea.

ThesecondaryobjectivesofthemarinemammalEEMPareto;

1) MonitortheregionalfrequencyofstrandedcarcassesinconjunctionwiththeMarineAnimalResponseSociety(MARS)programandassesscauseofdeathwherepossibleandmaintainanadaptivemanagementapproachtonewinformationoncollisionriskandfromC-PODmonitoringstudies.

2) ProviderecommendationsonthepotentialapplicationsfortheFORCEFASTPlatformandpotentialresearchthemesthatwouldincreasescientificunderstandingofthescaleofturbine-marinemammalinteractions.

TheseobjectivesareslightlyreducedfromthosedescribedintheConsultant’sReport.Uponfurtherdiscussionwiththereportauthors,itwasdecidedtowaitfortheresultsofstudiescurrentlyunderwaybeforedecidingiftheuseofthepassiveacousticAMARisjustifiedinMinasPassage.Similarly,theyear1programwillnowbeundertakenpost-turbinedeploymentandsoithasbeenreducedfromfiveCPODs(whichwereproposedtocollectadditionalbutnon-criticalbaselinedata)tothreeCPODs(todetectbehaviouralchangesrelatedtoturbinepresence).

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 26

Methodology4.4

ThisEEMPproposesthecontinueduseofC-PODs(housedinSUB-buoys)whichareconsideredsufficienttodetectavoidanceandlargescalechangesin“midfieldrelativeoccurrence”(specificallyviamonitoringlong-termratesofecholocationactivity).TheEEMPhasahighprobabilityofsuccessatdetectingavoidanceandamoderate-highprobabilityofsuccessindetectingchangesinmidfieldoccurrenceratesexceeding50%.

Ataminimum,theEEMPproposesmidfieldareamonitoringusingC-PODsat2standardizedreferencesitesinyears1,3and7(Figure4-1),butthismonitoringintensityisadaptivebeyondyear3(i.e.,afterthis‘Phase1’datahasbeenanalysed).Inaddition,oneC-PODwillbeassignedtoeachberthastheturbinesaredeployedandwillmonitoreachberthat100-150mdistanceforfixedperiodsoftime.AllC-PODsaredeployedforthreemonthsinthespring,retrievedanddeployedagainforthreemonthsinthefalltocaptureperiodsofpeakseasonaloccurrenceidentifiedin2011-2014(Porskampetal.2015).

Inadditiontothesedeployments,theEEMPproposesathree-yearcollationofstrandedmarinemammalreportsthroughco-ordinationwithNovaScotiaMarineAnimalResponseSociety(MARS).AdetailedrationaleandmethodologyaredetailedbelowandalsosummarizedinTables4-1&4-2.Insummary,foreachyeartheproposedEEMPplansto:

Year1(2016):

a) Deploy2calibratedC-PODsattwoofthefiveavailablemidfieldreferencesites(Figure4-1)inspringandfalltoprovideanimprovedporpoiseoccurrencebaselinedatasetatmultiplesitesinthespring,aswellasacomparative‘after’datasetfollowingturbinedeploymentatBerthD.

b) Deploy1calibratedC-PODwithin100-150mofBerthD(Figure4-1)infalltoprovideaberth-focusedmidfieldporpoiseoccurrencedataset(assumessummer-fall2016turbinedeploymentinBerthD).

c) Initiatelong-termcollaborationwithNovaScotiaMarineAnimalResponseSocietyandlocalveterinarypathologist.Assessifdynamicinteractionadaptivemanagementtriggershavebeenreached(seeTable4-2).

d) AssessmidfieldareaC-PODdatatodetermineifadaptivemanagementtriggers(avoidanceorlargescalereductioninactivity)havebeenreached(SeeTable4-2).

Year2(2017):

a) Deploy1calibratedC-PODwithin100-150mofBerthD(Figure4-1)inspringtoprovideafocusednear-fieldturbineporpoiseactivitydata-set.

b) Deploy1calibratedC-PODwithin100-150mofBerthBandeachofBerthsAandC(ifoccupied)infalltoprovideaberth-focusedmidfieldporpoiseactivitydata-set(assumessummer2017turbinedeployments).

c) ContinuecollaborationwithNovaScotiaMarineAnimalResponseSociety.Assessifdynamicinteractionadaptivemanagementtriggershavebeenreached.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 27

d) AssessmidfieldC-PODdatatodetermineifadaptivemanagementtriggers(avoidanceorlargescalereductioninactivity)havebeenreached.

Year3(2018):

a) Deploy5calibratedC-PODsat5midfieldareareferencesites(Figure4-1)inspringandfalltoprovide‘after’porpoiseactivitybaselinedata-set.IdenticalC-PODswouldbelocatedatthesamesitesasinyear1.ExactsiteslocationsforWest1andEast1shouldconsiderfinalturbineandnear-fieldC-PODplacementlocationsandassociatedcablings,aimingtodeploy>400mawayinsimilarwaterdepth.

b) Deploy1calibratedC-PODwithin100-150mofBerthBandA/C(Figure4-1)inspringtoprovideturbineberth-focusedmidfieldporpoiseactivitydata-set(assumessummer2017turbinedeployments).

c) Continuelong-termcollaborationwithNovaScotiaMarineAnimalResponseSociety.Assessifdynamicinteractionadaptivemanagementtriggershavebeenreached.

d) AssessmidfieldC-PODdatatodetermineifadaptivemanagementtriggers(avoidanceorlargescalereductioninactivity)havebeenreached.

Years4-6(2019-2021):

a) Monitoringintensityandmethodsdependentonresultsfromyears1-3andfromotherTISECprojectsworldwide(e.g.,adaptivemanagementapproach).

Year7(2022):

a) Deploy5calibratedC-PODsat5midfieldreferencesites(Figure4-1)inspringandfalltoprovide‘after’porpoiseactivitydata-setattimescaleofoneporpoisegeneration.IdenticalC-PODswouldbelocatedatthesamesitesasinyear1.ExactsiteslocationsforWest1andEast1shouldconsiderfinalturbineandnear-fieldC-PODplacementlocationsandassociatedcablings,aimingtodeploy>400mawayinsimilarwaterdepth.

b) Assessiffurtherenvironmentaleffectsmonitoringrequired.

Asrecommended,FORCEwillassesstheapplicationofshorelinemammalcarcasssurveysasanadditionalmonitoringtoolandindicatorpotentialofmammalsstrikesbyaturbine.Carcassstrandingfrequenciesintheregionarebelievedtobelow,butdatafrompre-installationperiodsmaybeusefulincomparisonwithfrequenciespost-installation.Thismethodprovidesacost-effectivemeanstopotentiallydetectlethalcollisionsbyspeciesofconservationandpublicconcern,FORCEwillcontactMARSonaroutinebasistoobtainupdatesonanymammalsstrandingsormortalitiesreportedintheMinasChannelarea.

Inaddition,FORCEwillcontinuetopublicizeitsemergencyresponsenumber(1-888-850-4625)numbersothatanymariners,fishers,andgeneralpublicwhoobserveanyunusualoccurrencesintheareaofCLA(i.e.,usualseabirdactivity,fishkills,injuredordeadmarinemammals)canquicklyreportthisinformationtoFORCE.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 28

BaselineandEEMPsites

Rejectedbaselinesites

Legend

TurbineBerths(A-D)W2 E1W1

N1

S2

S1

E2

Figure4-1:Locationofpastbaseline(redandgreentriangles)andproposedEEMPC-PODmonitoringsitesinthemidfieldarea(redtriangles).

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 29

Table4-1.SummaryofProposedEEMPsMethodologyPhase/Duration MethodSummary Rationale/Reliability

Phase1:3years(2016-2018)Phase2:4years(2018-2021)DurationandscaledependentonPhase1results,notingasaminimumtoincludeyear7(2022),additionalC-PODdeploymentacrosslocalareaasperPhase1

C-PODcalibration:Pre-deploymentseachyear.C-PODGLMtrendanalysis:a) TwoC-PODsdeployedinthemidfieldstudyarea(red

symbolsinFigure4-1),onceinthespringandonceinthefallforthreemonthseachdeployment,2016,expandedto5C-PODsfor2018and2022ifwarrantedbynewdeployments.

b) OneC-PODdeployed>100mfromBerthDandone>100mfromanyotheroccupiedBerth,onceinthespringandonceinthefallforthreemonthseachdeployment,2016,2017&2018asnecessary.

Strandingprogram:Co-ordinationwithNovaScotiaMarineAnimalResponseSociety,initially2016,2017&2018.

• Avoidanceeffectsandlargescalereductions/increasesinrelativeusebyporpoisesisdetectable,

• C-PODdeployments(housedinSUB-buoys)providecomparablebefore-afterdata,

• Intermittentannualcoveragebutcoverskeytimeperiods,

• BaselinereferencesitesatEast2andNorth1excludedasconsideredsub-optimal.

• Adequateareacoverage,butlow-moderateriskofC-PODfailureorloss

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 30

Table4-2.BreakdownofProposedEEMPMethodologyandAdaptiveManagementOptions

Objective SummaryofMethodology Rationale ProbabilityofSuccessandChallenges

1)Detectchangeinberth-specificporpoiseprobabilityofoccurrence(echolocationactivity)

Variables:Changeinoccurrence(e.g.,GLMecholocationactivitytrendsinJulianDayandDay-NightDPM/10min).

Method:1C-PODdeployedsafely(100-150m)nexttoaminimumof3turbines(siteideallysouthofeachturbine).

Duration:2deploymentsApril15-July15andSeptember15-December15.

Otherconsiderations:CalibrationofnewC-PODsrequired.C-PODIDshouldbeconsistentacrosssites,oraimtomaintainconsistentsensitivity.

• Long-termC-PODbaselineoccurrencerateswithinFORCECLAshouldallowdetectionoflargechangesinactivity(occurrence)inthevicinityofeachberth.

• Goodsuccessindetectinglargescalechangesduetooperatingturbines,relatedtonumberofturbinesmonitored.

• Collaborationwithdeveloperrequired.• C-PODfailure/lossandnearturbinedeployment

potentialrisk

2)Detectchangeinporpoiseprobabilityofoccurrence(echolocationactivity)inthemidfieldarea

Variables:Changeinoccurrence(e.g.,GLMecholocationactivitytrendsinJulianDayandDay-NightDPM/10min).

Method:2-5C-PODsdeployedatkeymidfieldreferencesitesasin2011-2014gradientbaselinestudyarea(seeredsymbolsinFigure4-1).

Duration:2deploymentsinyears1and3.April15-July15andSeptember15-December15

Otherconsiderations:CalibrationofpreviouslyusedandnewC-PODsrequired.C-PODIDshouldbeconsistentacrosssites,oraimtomaintainconsistentsensitivity.

• Increasedbaselinestudyareacoverageinyear1.

• Long-termC-PODbaselineratesshouldallowdetectionoflargescalechangesinmidfieldactivity(occurrence).

• Year2gapinmonitoringprogramtopermitincreasedsitedevelopment.

• Goodsuccessindetectinglargescalechanges.• Lackofmonitoringinyear2reduceseffectsreporting

andprobabilityofdetectingeffect.• C-PODfailure/losspotentialrisk.• Assumesrobustbaselinecoverageachievedinyear1.• Considerationofturbinedeploymentlocationsand

cablinginplacementofC-PODSwithinFORCECLAinyears3and7.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 31

Objective SummaryofMethodology Rationale ProbabilityofSuccessandChallenges

3)Assessifanyincreaseinincidenceofmortalityeventsofmarinemammalsintheregioncanbeattributedtocollision

Variables:Frequencyofregionalcarcassstrandingsandcauseofdeathassessment.

MethodOpportunisticcollectionofstrandedmarinemammalsthroughco-ordinationwithNovaScotiaMarineAnimalResponseSociety.Pathologicalinterpretationofcauseofdeathofcarcass.

Duration:3years(continuous).

• Lowincidenceofstrandedmarinemammalstodate.

• Abilitytodetectunusualmortalityeventsiftheyoccur.

• Lowchanceofsuccess,dependingonpublicinvolvementandassumingpredictedlowlikelihoodofeventsoccurring.

• Inabilitytodeterminecauseofdeath(C.O.D.)isarisk.• Adaptivetriggersshouldideallybepre-definedif

C.O.D.identifiedasstrike.

4)Possibleadaptivemanagementtrigger1:Largescalechangeinporpoisenear-fieldoccurrence

ExtendC-PODmonitoringdurationbyoneyearandconsider2ndC-PODdeployment400mawayfromturbine.

• AdaptivemanagementtriggerbasedonPhase1analysiswithincreaseinmonitoringintensity

• Definitionofbiologicallymeaningful(large-scalechange)triggerpoint.

• Unknowncostofmonitoringplan.

5)Possibleadaptivemanagementtrigger2:Largescalechangeatmultiplesitesinporpoisestudyareaoccurrence

ExtendC-PODmonitoringdurationbyoneyearandconsiderenlargingstudyareacoveragefocussedonareaofchange

• AdaptivemanagementtriggerbasedonPhase1analysiswithincreaseinmonitoringintensity

• Definitionofbiologicallymeaningful(large-scalechange)triggerpoint.

• Unknowncostofmonitoringplan.

6)Possibleadaptivemanagementtrigger3:CODconsidered

EMAC/Regulatorreviewofinformationrequired.

Reviewefficacyandfuturedeploymentofcurrentlyavailablemonitoringsystems(includingAAM)toassessnear-fielddynamicinteractions.

• Adaptivemanagementtriggerifdynamicinteractionstressorriskidentified

• Definitionofbiologicallymeaningfultriggerpointandcurrentlevelsofacceptablerisk.

• Unknowncostofmonitoringplan.

FORCE March 2016 Environmental Effects Monitoring Program 4.0 MARINE MAMMALS

FORCE 32

Objective SummaryofMethodology Rationale ProbabilityofSuccessandChallengesprobablestrikeon1endangeredspeciesorregulatordefinednumberofotherspecies

Consideruseofacousticalarmsdeployedonturbines(Wilsonetal.2013).

7)Possibleadaptivemanagementtrigger4:ExternalandrelevantEEMPstudiesprovideempiricalevidenceofsignificantrisktoporpoises(orotherkeymarinemammalsfoundinthestudyarea)

EMAC/Regulatorreviewofinformationrequired.

Acousticeffects:

ExtendC-PODstudyareamonitoringdurationandincreasecoverageofmidfieldstudyareaifwide-scaleeffectsdocumented.

Near-fielddynamiceffects:

Reviewefficacyandfuturedeploymentofcurrentlyavailablemonitoringsystems(includingAAM)toassessnear-fielddynamicinteractions.

Consideruseofacousticalarmsdeployedonturbines(Wilsonetal.2013).

• Adaptivemanagementtriggerifturbinestressorriskidentifiedandriskconsideredsignificant

• Definitionofbiologicallymeaningfultriggerpointandcurrentlevelsofacceptablerisk.

• Issuesidentifiedinotherstudiesmaybesitespecificorturbinespecific.

FORCE March 2016 Environmental Effects Monitoring Program 5.0 ACOUSTICS

FORCE 33

SECTION5:ACOUSTICS(MARINENOISE)5.0

Introduction5.1

Ithasbeenestablishedthatunderwaternoisemayaffectcertainbenthicorganisms,fish,cetaceansandothermarinemammals,althoughthetypeandintensityofnoisegeneratedbythedifferenttidalenergydevicesisnotwellunderstood(Cadaetal.2007).Thisisduetothelackofin-wateroperatinghoursonmostdevicesandarelatedlackofconcentratedefforttodeterminetheiracousticcharacteristics.Thenoisegeneratedbyagivendevicehasthepotentialtoinducebehaviouralchangesonmarinewildlifeinthenear-andmid-fieldmarineenvironment.

Marinemammalsandfish,particularlythosewithswimbladders,maybesensitivetoincreasednoiselevels(Table5-1).Fishrelyonsoundstocommunicate,forage,findamate,anddefendthemselves.Eggsandlarvaemaybemoresusceptibletonoisesourcessincetheyhavenoavoidancecapabilities(Degraeretal.2013).

Table5-1:NoiseSensitivitiesofSelectMarineBiota

Organism NoiseThreshold Source

Fish

•192dB(1μPa)–transientstunning;

•200dB(1μPa)–internalinjuries;

•220dB(1μPa)–egg/larvaldamage

•230–240dB(1μPa)–fishmortality

TurnpennyandNedwell1994

Harbourporpoise Avoidancedisplayedatnoiselevelsexceeding140dBre1µPa(broadband)

Southalletal2007

CetaceansandPinnipeds

120dB(re1μPa)isconsideredLevelBharassmentundertheUSFederalMarineMammalProtectionAct

PUD2012

Lobsters NoneNERC2013

PUD2012

Seabirds Nodata

RPS2011

LeopoldandImares2009.

TurnpennyandNedwell1994

ThetidalturbinesproposedforinstallationattheFORCEdemonstrationsitehavelarge,movingpartsandwillnaturallygeneratenoise.Additionalnoisewillbegeneratedduringinstallation,maintenanceandretrieval.Installationinparticularpresentsthepossibilityofsignificant(buttemporary)noiselevelsduringtheplacementofgravitybasefoundations,mooringsandespeciallymonopiles(Degraeretal.

FORCE March 2016 Environmental Effects Monitoring Program 5.0 ACOUSTICS

FORCE 34

2013).Whilenomonopilesareplannedatthistime,itispossiblethatsuchfoundationswillbeusedinthefuturedeploymentofarraysofcertainTISECdevices.

Withinthe2009EA,nospecificnoiselevelwasidentifiedasexcessiveorlikelytocausesignificantimpact.Instead,“significantimpacts”withrespecttonoisearedefinedinrelationtoavoidanceby,orinjuryto,marinebirds,marinemammals,benthosandfish(AECOM2009).Nevertheless,anEEMPtoaddressnoiseisrequiredasaconditionofprovincialandfederalapprovalofthe2009EA.TheapprovalrequiresthattheEEMP“identifyappropriateenvironmentaleffectsindicators…and…considerprojecteffectson(amongothersubjects)acoustics.”

Tocomparenoiselevelsbetweendevicesandpredicteffectsonmarinebiota,twocriticaldatasetsareneeded:(a)thespatialandtemporaldistributionofambientnoiseand(b)turbinedevicenoiselevels,oftenreferredtoasthedevice“noiseprofile”or“sourcelevels”.Theselevelscanbeassessedbyconductingmeasurementsofambientnoiseanddevicebroadbandandnarrowbandsourcelevels.Thedevicedeveloperswillbeprovidinginformationontheirdevicenoiseprofilesinordertocomparenoiselevelsbetweendevicesandpredicteffectsonmarinebiota.

AttheFORCEsiteitisimpracticaltomeasuresoundlevelsatalllocationsanddepths.Moreover,hydrophonesdeployedontheseabottommeasurenoiseatasingle,nearbottompoint,whichmaynotprovidesufficientinformationtocharacterisesoundconditionsatdepthsfrequentedbyfishandmarinemammals.Toovercometheselimitations,acousticmodellingcanbeusedoverthelongertermtopredictsoundlevelsatalllocations,whichinturnareverifiedbytargetedpointmeasurementsundertakentovalidatethemodelpredictions.

Noiseisparticularlyamenabletonumericalmodellinggivenadequatedatarelatedtophysicaloceanography,baselinenoiselevels,andturbineacousticcharacteristics.Acousticimpactmodelshavebeensuccessfullydevelopedatothermarineenergysitesandusedtoretirerisksassociatedwithnoise(Ward2014).

Whileitisnotanticipatedthatthenoisegeneratedbytheinitialdemonstration-typeturbinedeploymentsattheFORCEsitewillhavesignificantimpactonmarinebiotaduetotheirlimitedscale(AECOM2009),noisedatacollectedatthedemonstrationstagewillprovideinformationthatcanbeusedtopredicteffectsonmarinebiota,furtherrefinethefishandmarinemammalEEMPs,andsupportanacousticmodeloverthelongerterm.AfixedautonomousrecorderwithashelteredinternalhydrophoneasdevelopedbyMartinandVallarta(2012)appearsabletodifferentiateturbinesourcenoisefromambientsounds.TheAMARequippedSmallFASTPlatformcanalsopotentiallybeusedtocollectpre-andpost-deploymentnoisedata,althoughitsdeploymentscheduleandoverallresearchobjectiveshavenotyetbeenestablished.

Theprimarydatagapsrelatedtonoisearethelimitedambientnoisedatacollectedtodate,thelackofoperatingturbinesthatcanbesubjectedtonoiseassessment,anddevicespecific“noiseprofiles”thatmustbeprovidedbythedevicedevelopers.

Objectives5.2

Giventhepresentlackofturbine“sourcenoiseprofiles”foruseinanacousticmodel,andbasedonthesummarypresentedintheConsultant’sReport,additionalfieldresearchisneededtodefinethemostsuccessfulmodelingapproachandmonitoringinstrumentationforuseintheMinasPassage.

FORCE March 2016 Environmental Effects Monitoring Program 5.0 ACOUSTICS

FORCE 35

SincetheConsultant’sReportwascompleted,theglobalperspectiveoncollectingnoisedatasuggeststhattheuseofdriftinghydrophonesisthepreferredapproach(Norrisetal.,2014).Incontrasttofixedinstrumentswherewaterflowingoverthemicrophonecombinedwiththemovementcobblesandpebblesalongtheseafloorcombinestocausesignificantnoisethatcanobscurethenoisefromturbines,driftinghydrophonesmovewiththecurrentandfloatabovetheseafloor.Thesecharacteristicspreventinterferencefromboththesoundofflowoverthehydrophoneandthesoundofrockmovementalongtheseafloor.

Overtheshortterm,thereisaneedto:

• Determinethemostappropriateacousticmodelandrelatedinputdatarequirements;

• Testdifferentinstrumentationcurrentlyunderdevelopmentbylocalacousticengineeringfirmsforbothdriftingandbottommounteddevices;

• Conductadriftinghydrophonetestsurvey;

• Testtheperformanceofoff-the-shelfacousticinstrumentsandnoiseshieldingtechniquesontheFORCE-ownedFASTplatformsinordertomorefullyestablishbaselineconditions.

• Usingoneormoreoftheinstrumentsaboveand/oradriftinghydrophoneapproach,collectadditionalnoisedatawiththeCLA;and

• UsethenoisedatatoeventuallyverifytheEApredictionsthatsuggestnoisefromoperationalturbineswillnotnegativelyaffectmarinebiota.

ForthepurposesofthisEEMP,weassumetheacousticcharacteristicsofspecificdevices,includingabsolutebroadbandandnarrowbandsourcelevelsacrosstheiroperatingrange,willbemeasuredordeterminedbythedeviceownersandthisinformationwillbesharedwithFORCE.

Methodology5.3

Ingeneral,adriftinghydrophonethatisacousticallyisolatedfromitsconveyancewillprovidebetterqualitydatathanahydrophonemooredontheseabedorrigidlyattachedtoastructuresuchasaturbine.Logistically,however,thedeploymentandcollectionofdriftinghydrophonesoverasufficienttimeperiodtoadequatelycharacterisetheacousticenvironmentishighlylabourintensiveandthismethodrequiresadditionalefforttoprocessmeasurements(Schmittetal.2015).Together,thesefactorscanmakedriftingprogramsdesignedtoestablishbaselineconditionsandfullycharacterisethenoiseprofileofanoperatingturbinemoreexpensivethanmooredprograms.Giventhis,mooredhydrophonesareinitiallyproposedinthisEEMPbutdriftinghydrophonesaresuggestedasalongertermmeanstoverifyandvalidatedatacollectedbyamooredsystem.

Ingeneral,locatingthehydrophoneclosetothedevicewillimprovethequalityofmeasurementsbyincreasingthemeasurementsignaltonoiseratioandsimplifyingrequirementsforacousticchannelmodelling.Safetyisthecriticalfactorindetermininghowcloseahydrophonecanbedeployedtoanoperatingturbine.Deploymentofafixedhydrophonewithin100mofanoperatingturbineisoptimal.Thisnear-fieldmonitoringwithin100moftheturbineistheresponsibilityoftheberthholder.

Inordertoachievetheobjectivesoutlinedabove,thefollowingactivitiesareproposed:

FORCE March 2016 Environmental Effects Monitoring Program 5.0 ACOUSTICS

FORCE 36

Collectambientmarinenoisedata

• Deployastreamlinedmooredhydrophonesystem..Adeploymentperiodontheorderofonetotwomonthsshouldbeconsideredtocapturenoiseconditionsovermultipletidalcycles.

• Thereissomeevidencetosuggestthatshielded,streamlinedhydrophonesmayinfactunder-measurenoiseduetotheactualshieldingdesignedtoreduceextraneousflownoise.Todeterminetheaccuracyofsuchamooredsystem,simultaneousdriftinghydrophonemeasurementsmaybeundertakenbyFORCEforcomparisonanddatavalidation.Alternatively,thehydrophonecanbereplacedwithadriftingnoisesourceemittingatknownfrequencies.Theaccuracyandsensitivityofthemooredsystemcanthenbeverifiedbasedonthisnoisesource.

• ReviewdatacollectedfromhydrophonesmountedontheturbinessubmittedinthetheberthholderEEMPreportsandintegratethisdatawithfuturenoisemeasurementprogramsandmodels.

• Identifyanappropriateacousticmodeltoaccommodatethedatageneratedbythedifferentinstruments.

FORCE March 2016 Environmental Effects Monitoring Program 6.0 MARINE SEABIRDS

FORCE 37

SECTION6:MARINESEABIRDS6.0

Introduction6.1

TheEEMPformarinebirdshasbeendesignedwithreferencetobirdsurveyspreviouslyundertakenatthesite(FORCE2011;2014;2015),existingguidanceonsurveymethodsandmonitoringprogramsfortidalenergyprojectsthatarecurrentlybeingundertakenbothinCanadianandScottishwaters(seeRPS2010;JacksonandWhitfield2011andRobbins2012).Ultimatelyhoweveranadaptivemanagementapproachthatallowsfor“flexibledecisionmakingthatcanbeadjustedasoutcomesfrommanagementactionsandothereventsbecomebetterunderstood”isproposedforthisprogram(FORCE2015).

Objectives6.2

Todate,marinebirdstudiesatFORCEhavenotbeenundertakeninthepresenceofafunctioningtidalturbine;turbinesareproposedfordeploymentbeginningin2016.Thepotentialfordirectcollisionbymarinedivingbirdswithtidalenergydevices,orharmfuleffectscausedbytheirpresence,includingthepotentialfordisplacementofmarinewildlifefromhabitualwaters,aretheprimaryconsiderationsaddressedinthisEEMP.

ThemainobjectiveofthisEEMPistoobtainrobustsite-specificspeciesabundanceandbehaviourdatawhichcanbeusedtoestablishwhethertheinstallation,presenceandoperationoftidalenergydevicescausesdisplacementofsurface-visiblewildlifefromhabitualwaters,andtoidentifyanydiscerniblechangestowildlifebehaviour.

TheEEMPproposedhereextendspreviousmonitoringprogramsandaimsto:

• ObtainmoredatawithrespecttotheoccurrenceandmovementofbirdspeciesinthevicinityoftheProjectsitetoverifytheexistingfindingsofshoreandboatbasedsurveys;and

• Withintheboundsofthecurrentsurveyprotocols,confirmEApredictionsrelatedtotheavoidanceand/orattractionofbirdstovesselsandtidalturbines.

Methodology6.3

6.3.1 MonitoringApproach

Post-deploymentmonitoringstudiesattheFORCEsitewillaim,wherenecessary,tobemorefocusedthanthepre-constructionbaselinesurveysalreadydescribed.Thefocuswillbeonthosespeciesidentifiedinthepre-deploymentassessmentprocesstobeofconcernalthoughoverall,birddensitiesintheProjectareawerefoundtoberatherlowinthecontextofthebroaderspatialdistributionsofbirdswithintheBayofFundy.

Thecontinuingmonitoringprogramwillaimtoquantifythemagnitudeofanychangesandprovideevidencetodemonstratewhethersuchchanges,shouldtheyarise,canbeattributedtothetidalenergydevelopmentorwhethertheyhaveoccurredforotherreasons.

JacksonandWhitfield(2011)notethatpostdeploymentmonitoringstudiesshouldprovideinformationon:

FORCE March 2016 Environmental Effects Monitoring Program 6.0 MARINE SEABIRDS

FORCE 38

• Changestotheabundance,distributionorbehaviourofspeciesconsideredtobeofhighormediumconservationimportance;

• Theextenttowhichpredictedadverseeffectssuchasdisturbanceandcollisionmortalityarerealised;and

• Theextenttowhich,overtime,speciesaffectedbydisturbanceanddisplacementhabituatetothepresenceofadevelopment.

6.3.2 StudyDesign

Althoughthestudywillneedtoberepeatableyearonyear,adegreeofflexibilityisrequiredastheuseofasitebymarinebirdsisoftenhighlyvariableandthiscanmakeitdifficulttoattributechangestoaparticularcause(suchasasingleturbinedeploymentinthemarineenvironment).Ifscientificallyvalidconclusionsaretobedrawnconcerningtheeffectsofdevelopment,studydesignmusttakeintoaccountnaturalvariationandchangeduetoothercauses.Ifthisisnotdonethenthemonitoringresultsarelikelytobeoflittlevalueastheyarelikelytolackthepowertoeitherdetectchangeoridentifythecauses(JacksonandWhitfield2011).

Thepost-deploymentmonitoringstudywilltargetthedevelopmentsiteandtheappropriatenearbyareasalreadyidentifiedinthebaselinesurveys.Theinclusionofabufferaroundthemainsurveyareawillprovideinformationonthebirdsusingtheareaimmediatelysurroundingadevelopment.

Asthisprojectis‘near-shore’(<4km)and<5km2intotalarea,abufferofatleast1kmisproposed.

6.3.3 SamplingFrequency

Thetimingofshore-basedsurveyvisitswillbeplannedsothattheyareastemporallyrepresentativeaspossible,includingthethreemaintemporalcycles:timeofday,timeofyearandstateofthetide.Althoughtimeofdayisnotgenerallyregardedasacontrollingfactorformarinebirdsurveys,surveyworkwillasfaraspossiblebeevenlydistributedthroughthedayfromdawntoduskwheredaylighthoursallow.

Birdsurveysaregenerallyundertakenatmonthlyintervalsthroughouttheyear.Althoughthereisvariationbetweenspecies,manymarinebirdsfollowabroadlysimilarannualtimetablewithregardtobreeding,moulting,migrationandwintering.Therefore,thesurveytimetablecanreflectthis,dividingtheyearupintoperiodsbasedaroundthemainannualstages,resultinginasurveythatislessthanmonthlyinfrequency(Table6-1).

Table6-1:ExamplePeriodsforMarineBirdSurveys.

YearPeriod Description ApproximateDates

1 Midwinter JanuaryandFebruary

2 Latewinter FebruaryandMarch

3 Earlybreedingseason April–midMay

4 Midbreedingseason MidMay–midJune

FORCE March 2016 Environmental Effects Monitoring Program 6.0 MARINE SEABIRDS

FORCE 39

5 Latebreedingseason MidJune–endJuly

6 Postbreeding/moult AugusttomidSeptember

7 Autumn MidSeptember–October

8 Earlywinter NovemberandDecember

(source:JacksonandWhitfield2011).Note:surveycanbeginatanytimeoftheyearbutallsampleeventsshouldbecompleted.

ForthepostdeploymentseabirdEEMP,monitoringwillbeconductedthroughouttheyear,basedontheyearperiodsdescribedinTable8-2.TheannualprogramisshownonTable6-2.ThefullmethodologiesforshoreandboatbasedsurveysaregiveninFORCE(2011)andwillbecontinuedwhererelevantforconsistencyandrepeatability.

Thebroadersurveyareahasalreadybeencharacterisedintermsofthespatialabundanceofmarinebirds;thesedataaresufficienttoprovidethewidercontextualpictureoftheavifaunasurroundingthedeploymentsite.AssuchnofurtherboatsurveysareproposedatthisstageunlessitisrequiredthatsuchsurveysprovideacontinuouspictureofbirdabundanceanddistributionintheMinasChannel.

6.3.4 EEMPFieldSurveys

Asnotedabove,thecurrentobservationalmonitoringofmarineseabirdshasprovidedacomprehensivefour-year,pre-deploymentdatasetusingstandardizedfieldproceduresanddatainterpretationguidelines.However,noturbineshavesofarbeeninstalledforasufficienttimetomonitoritseffectsonmarineseabirds.TherecommendedEEMPbuildsonthisprogram.

Demonstration-scaletidalturbineswillbedeployedinphasesoverthenextfiveyearsorso.Giventhedifferingdesigns(andhencethepotentialfordifferingeffectsonmarineseabirds)theproposedEEMPisdesignedtobeflexibleandadaptivetodifferentturbineforms,deploymentschedulesandresultsfromearlystudies.

TheproposedEEMPbeginsoncethefirsttwobottom-mountedCapeSharpTidalVentureturbinesareinstalledin2016andextendsthrough2017whenadditionalturbinesareslatedforinstallation.TheEEMPwillseektorepeatandaugmenttheprevioussurveysundertakenbetween2009and2012butwillfocusonthedeploymentareamorespecifically.

6.3.5 ShoreBasedSurveys

Toaccountforthevariabilityinthetemporalspanofshorebasedsurveysbetween2009and2012itisproposedthatfuturepostdeploymentshorebasedsurveysarerepeatableandcarriedoutduringthesamemonthsonayearbyyearbasis.ThesurveyswillmonitortheFORCEProjectareaincludingtheFORCEtestsite,theareabetweenBlackRockandshore(insideBlackRock),andtheMinasPassagebeyondBlackRock(outsideBlackRock)asinpreviousyears.

Thepre-deploymentsurveyshaveidentifiedspecificperiodsofhighabundanceanddiversity(albeitbetweenyears)withsteadyincreasesinabundancefromSpringtoearlySummer(MarchtoJuly)withapeakinJune.AfteraperiodoflowtomoderateabundancebetweenJulyandOctobernumberspeakedagainintheFallinearlyNovemberwhenlocalpopulationsweresupplementedbymigratory

FORCE March 2016 Environmental Effects Monitoring Program 6.0 MARINE SEABIRDS

FORCE 40

movementsthroughthestudyarea.TherewerehoweverdatagapswithlittleinformationforthemonthsofJanuary,February,lateAugust,SeptemberandOctober.

TheEEMPshorebasedsurveyswillbefocussedduringtheperiodsgiveninTable6-1tocoverthewholeannualcyclegivingatotalof90hoursofobservation,orabout16daysannually(Table6-2).Table6-2:MarineSeabirdSurveyScheduleYearPeriod Month NumberofSurveys1 January 1(6hours)1-2 February 1(6hours)2 March 1(6hours)3 April 2(12hours)3-4 May 2(12hours)4-5 June 2(12hours)5 July 1(6hours)6 August 1(6hours)6-7 September 1(6hours)7 October 1(6hours)8 November 2(12hours)8 December 1(6hours)

Note:surveycanbeginatanytimeoftheyearbutallsampleeventsshouldbecompleted.Toensureconsistencywithpaststudiesandallowbefore-and-afterdeploymentdatasetcomparison,shore-basedsurveyswillbeundertakenfromapproximatelyhightidethroughthe6-hourperiodoftheoutgoingtide.ObservationprotocolswillmirrorthosedescribedinCWS(2007)andWilhelmetal.(2008)(updatedbyGjerdrumetal.2012)forconsistencywithpreviouswork.Inadditiontofollowingthemonitoringprotocolsreferencedabove,observerswillbeinstructedtorecordabnormalconcentrationsofseabirdssuggestiveoffishkillsthatmayhaveresultedfromturbineoperation.Itisrecommendedthatthesurveyorstakea30minutebreakafterthefirstthreehourperiodtohelppreventobserverfatigue.Thevantagepointlocationswillremainthesame.Tohelpdiscernchangesinbirdactivitythatmayberelatedtoturbinedeployment,theobserverswillrecordactivityandapproximatedistancesfromtheturbines(i.e.,a‘distancetoimpact’approach).

ApostdeploymenttidalsitemonitoringprogrammehasbeenunderwayattheEMECtidaltestsiteatFallofWarness,EdayintheOrkneyIslandsofScotland.Thesurveyeffortherehasbeenconsiderable,withsome909hoursoflandbasedobservationsundertakenoverthecourseofasingleyear.ThemethodhoweveristriedandtestedanditisprudenttocollectdataisasimilarfashionforthesakeofmaintainingarelativelystandardapproachtoEEMPsatsimilarprojects.Withaviewtoinforminganymodellingapproaches,itisrecommendedthatthebirdsurveymethodsadoptedbyEMEC(2013)areusedhere.

Thefollowinginformationwillberecordedforeveryseabirdsightingmadeduringthescans.Recordsshouldbelimitedtobirdsthatareonthewaterorthatarehoveringdirectlyaboveit(withinafewmetres),ensuringthatthegridsquaretothelocationonthewaterbelowhoveringbirdsisrecorded.Inthiscasethegridadoptedisa500mx500mgridtoensurethatsurveysarecarriedoutinaconsistentandmethodicalfashion,ensuringthewholestudyareaiscovered.

• DATEDateofthewatch.

FORCE March 2016 Environmental Effects Monitoring Program 6.0 MARINE SEABIRDS

FORCE 41

• TIMETimeofthesighting.• SIGHTINGEQUIPMENTTheequipmentusedtosightthebird(s).• GRIDSQUAREThegridsquaretowhichthesightingwasallocated.• NUMBEROFSPECIESAsbirdsoftenformmixedgroups,providethenumberofspecieswithineach

group.• SPECIESThespeciessighted.Asitisoftendifficulttodistinguishbirdstospecieslevels,theoptionis

giventoenter'Unidentified'.FurtherdetailscanbeprovidedintheCOMMENTSsection.• NUMBEREstimatedtotalnumberofbirds(regardlessofspecies)inthegroup.

Detailsofthefollowingbirdbehaviorsshouldalsoberecorded.Anycombinationofthemcanbeincluded.

• DIVINGFROMFLIGHTOneormorebirdsdivingunderwaterfromahoveringorflyingposition.• DIVINGFROMWATEROneormorebirdsdivingunderwaterfromapositiononthewatersurface.• SWIMMINGATSURFACEThebirdsaremakingprogressatthesurface.• STATIONARYATSURFACEThebirdsarestationaryatthesurface.• COMMENTSAnyotherrelevantinformationaboutthesightingshouldbeincludedhere.Thismay

includedetailssuchasarecordoftheageorsexclassesofthebirds(i.e.,ifthereareanyrelativelysmallanimalsinthegrouporiftherearepredominantlymalesorfemales),andinteractionswiththeturbines(resting,nesting,collisions,etc.).

6.3.6 DataAnalysis

Inprevioussurveyreportsi.e.FORCE(2011)marinebirddatahasbeenanalysedusingtwowayanalysesofvariance(ANOVA)thatconsideredthedifferenceinmarinebirdabundancebetweensitesandbetweenyearsusingdensityperkm2astheunitofmeasurement.Asimilarmethodisproposedtoassessanypotentialsitespecificeffects,ensuringthatwherecountdataarenotnormallydistributed(asislikely)thenthesedataareeithertransformedtonormalityoranequivalenttoolusedfornon-normallydistributeddata.SuchatoolmayincludeforexampleMood’smediantestoraKruskal-Wallistest.

FORCE March 2016 Environmental Effects Monitoring Program 7.0 SUMMARY

FORCE 42

SECTION7:SUMMARY7.0

EEMPshavebeencreatedforfivesubjectareas,basedonworkconductedtodateandthelessonslearnedduringbaselinedatacollection.

1.Fish;

2.Lobster;

3.MarineBirds;

4.MarineMammals;and

5.Acoustics.

Table7-1tentativelyshowshoweachEEMPwouldbedeployedonayear-to-yearbasis.TheactualscheduleofeachEEMPwilldependonanumberoffactorsincludingweatherconditions,devicedeploymentschedule,vesselavailability,etc.

AsnotedintheIntroduction,theEEMPsaredesignedtobeflexibleandadaptivetotheTISECdeploymentschedules.Inkeepingwiththe“adaptivemanagement”approachusedsincethebeginningoftheFORCEproject,modificationstotheEEMPs(ifneeded)canbeimplementedoncethedeploymentscheduleisbetterknown.Asmoreturbinesaredeployed,actualimpactsmaydifferfromimpactsmeasuredatsingledevicesandtheEEMPscanbeadjustedtoaccountforthis.

FORCE’sexperienceinMinasPassagehasdemonstratedhowchallengingitcanbetoundertakeworkinthishighenergyenvironment.Pastworkhasalsohighlightedlimitationstoequipmenttypesandmonitoringapproaches,andhasdemonstratedwhereadditionalexplorationisneeded.TheEEMPsprovideaninitial,systematicapproachtodetectingenvironmentalchangesthatcanbeattributedtotheturbines.TheresultsofthesestudiescanbeusedbyFORCE,theirEMAC,thegeneralpublic,regulatorsandtheberthholderstofirstmeasureandthenassessthelikelyenvironmentaleffectsoftheirtidalenergydevices.

FORCE March 2016 Environmental Effects Monitoring Program 7.0 SUMMARY

FORCE 43

Table7-1:SummaryofFORCEEEMPScheduling

Subject 2016 2017 2018 2019 2020Comments

Lobsters

WinterorFall:OneSurvey(2-3weeks)

WinterorFall:OneSurvey(2-3weeks)

--

WinterorFall:OneSurvey(2-3weeks)

--• Onesurveyconsistsofsamplingallstationsthreetimes.• Thenumberandtimingofsurveyswilldependonfishing

season,thedeploymentscheduleandinitialresults.

Fish

Sixmonths,beginninginAprilorMay

Sixmonths,beginninginAprilorMaydependingoninitialresultsandprovidednewdevicesaredeployed

Sixmonths,beginninginAprilorMaydependingoninitialresultsandprovidednewdevicesaredeployed

Sixmonths,beginninginAprilorMaydependingoninitialresultsandprovidednewdevicesaredeployed

Sixmonths,beginninginAprilorMayprovidedoninitialresultsandprovidednewdevicesaredeployed

• Eachannualprogramconsistsofsixsurveysdistributedoversixmonths.

• Eachsurveycompletedoverafulltidalanddielcycle(25hours).

• Studydurationoffiveyearstocapturemultipledeployments.

MarineMammals

Spring(3months)Fall(3months)

--

Spring(3months)Fall(3months)

--

2021:Spring(3months)2021:Fall(3months)

• TwoC-PODsatreferencesitesin2016,2018and2020.• Onceinthespringandonceinthefall.• Threemonthseachdeployment

Spring(3months)

TBD–Device

Spring(3months)

TBD–Device

Spring(3months)

• OneC-PODat100+mfromeachoccupiedberth• Onceinthespringandonceinthefall

FORCE March 2016 Environmental Effects Monitoring Program 7.0 SUMMARY

FORCE 44

Subject 2016 2017 2018 2019 2020Comments

Fall(3months)

Dependent Fall(3months)

Dependent Fall(3months)

• Threemonthseachdeployment.

Acoustics(MarineNoise)

FAST:Spring/Summer(1-2months)

Willdependoninitialresults

Willdependonongoingresults

Willdependonongoingresults

Willdependonongoingresults

• Tocaptureambientnoiseconditionsovermultipletidalcycles.

MarineSeabirds Monthly TBD-

Monthly -- TBD-Monthly

• Typically6hoursperobservationalevent;totalof90hoursofobservation;~16daysannually.

• Threeyears;canbeextendedifwarranted

FORCE March 2016 Environmental Effects Monitoring Program 8.0 REFERENCES

FORCE 45

SECTION8:REFERENCES8.0

AECOM.2009.EnvironmentalAssessmentRegistrationDocument–FundytidalEnergyDemonstrationProject(Volume1:EnvironmentalAssessment;Volume2:Appendices).ProjectNumber107405.June2009.

AECOM.2010.EnvironmentalAssessmentAddendumtotheReport:EnvironmentalAssessmentRegistrationDocument–FundytidalEnergyDemonstrationProjectVolumes1and2datedJune10,2009.ProjectNumber60153932July2010.52pp.

Amaral,S.V.,M.S.Bevelhimer,G.F.Cada,D.J.Giza,P.T.Jacobson,B.J.McMahon,andB.M.Pracheil.2015.Evaluationofbehaviorandsurvivaloffishexposedtoanaxial-flowhydrokineticturbine.NorthAmericanJournalofFisheriesManagement35:97-113.

Bayley,P.2010.CommentsontheLobsterMonitoringComponentoftheFundyTidalProject.IncludedasAppendixAofCEF2011(seebelow).

Cada,G.,Ahlgrimm,M.,Bahleda,T.andSale,M.2007.Potentialimpactsofhydrokineticandwaveenergyconversiontechnologiesonaquaticenvironments.Fisheries,vol.32,no4.Pp.174-181.

CEFConsultantsLtd.2010.LobsterCatchMonitoring.AnalysisofResultsfromTwoFallSurveys:September25–October3andNovember5-18,2009.March2010.44pp.

CEFConsultantsLtd.2011.LobsterCatchMonitoring.SummaryofResultsfromThreeSurveyswithRecommendationsforaRevisedSurveyDesign.February2011.44pp.

Collins,N.2012.AssessmentofPotentialEcosystemEffectsfromElectromagneticFields(EMF)AssociatedwithSubseaPowerCablesandTISECDevicesinMinasChannel.PreparedbyCEFConsultantsforFORCE.

CWS:CanadianWildlifeService.2007RecommendedProtocolsforMonitoringImpactsofWindTurbinesonBirds.EnvironmentCanada,CanadianWildlifeService.April2007.33pp.

Degraer,S.,BrabantR,andRumes,B.2013.EnvironmentalImpactsofOffshoreWindFarmsintheBelgianPartoftheNorthSea.LearningfromthePasttoOptimiseFutureMonitoringProgrammes.

DFO:FisheriesandOceansCanada.2012.AppropriatenessofExistingMonitoringStudiesfortheFundyTidalEnergyProjectandConsiderationsforMonitoringCommercialScaleScenarios.DFOCan.Sci.Advis.Sec.Sci.Resp.2012/013.9pp.

EC:EnvironmentCanada.2014BestpracticesforstrandedbirdsencounteredoffshoreAtlanticCanada.Draft2-April2015.

Ellison,W.T.,B.L.Southall,C.W.Clark,andA.S.Frankel2012.Anewcontext-basedapproachtoassessmarinemammalbehavioralresponsestoanthropogenicsounds.Cons.Bio.,26(1):21-28.

EMEC2013FallofWarnessWildlifeObservationsMethodologyGUIDE017-0120130327.

FORCE March 2016 Environmental Effects Monitoring Program 8.0 REFERENCES

FORCE 46

EnvironmentalMonitoringAdvisoryCommittee(EMAC).March2016.EMACRecommendationsRegardingtheFORCEEnvironmentalEffectsMonitoringProgram(EEMP)for2016andBeyond.

Foote,K.G.,H.P.Knudsen,G.Vestnes,D.N.MacLennan,andE.J.Simmonds.1987.Calibrationofacousticinstrumentsfordishdensityestimation:Apracticalguide.ICESCooperativeResearchReport144.

FORCE:FundyOceanResearchCenterforEnergy.2011.EnvironmentalEffectsMonitoringReport.September2009toJanuary2011.October2011.EEMstudiespresentedasAppendixA-K.

FORCE:FundyOceanResearchCenterforEnergy.2014.Research+MonitoringPrograms2008-2013.53pp.

FORCE:FundyOceanResearchCenterforEnergy.2015.EnvironmentalEffectsMonitoringReport.January2011toDecember2013.42pp.

Gjerdrum,C.,FifieldD.A.,andS.Wilhelm2012.EasternCanadaSeabirdsatSea(ECSAS)StandardizedProtocolforPelagicSeabirdSurveysfromMovingandStationaryPlatforms.TechnicalReportSeriesNo.515April2012CanadianWildlifeServiceAtlanticRegion.

Jackson,D.,andWhitfield,P.2011.GuidanceonsurveyandmonitoringinrelationtomarinerenewablesdeploymentsinScotland.Volume4.Birds.UnpublisheddraftreporttoScottishNaturalHeritageandMarineScotland.

Kastelein,R.A.,Au,W.W.,anddeHaan,D.2002.Audiogramofaharbourporpoises(Phocoenaphocoena)measuredwithnarrow-bandfrequency-modulatedsignals.J.Acoust.Soc.Am.112:1334-344.

Martin,B.andJ.Vallarta.2012.AcousticMonitoringintheBayofFundy.JASCODocument00393,Version1.1.TechnicalReportforFORCE.

Melvin,G.D.andN.A.Cochrane.2014.Investigationoftheverticaldistribution,movement,andabundanceoffishinthevicinityofproposedtidalpowerenergyconversiondevices.FinalReportforOffshoreEnergyResearchAssociation,ResearchProject300-170-09-12.

Melvin,G.B.andN.A.Cochrane.2015.Multibeamacousticdetectionoffishandwatercolumntargetsathigh-flowsites.EstuariesandCoasts38:227-240.

Norris,J.Cowan,D.,BristowC.D.MagagnaandJ.Geibhardt.2014.D4.7:BestPracticeReportonEnvironmentalMonitoringandNewStudyTechniques.MarineRenewableInfrastructureNetwork(MARINET).105pp.

NSE:NovaScotiaDepartmentoftheEnvironment.2009.ConditionsofEAApprovalProposedFundyTidalEnergyDemonstrationProject.(September2009)DepartmentoftheEnvironment,OfficeoftheMinister.

Porskamp,P.,Redden,A.M.,Broome,J.,SandersonB.,andWood,J.2015.AssessingmarinemammalpresenceinandneartheFORCELeaseAreaduringwinterandearlyspring–addressingbaselinedatagapsandsensorperformance.FinalReporttotheOffshoreEnergyResearchAssociationandFORCE.ACERTechnicalReportNo121,35pp.

FORCE March 2016 Environmental Effects Monitoring Program 8.0 REFERENCES

FORCE 47

Robbins,A.2012.AnalysisofBirdandMarineMammalDataforFallofWarnessTidalTestSite,Orkney.ScottishNaturalHeritageCommissionedReportNo.614.

RPS.2010.BoatandaerialsurveyprotocolsforseabirdsatwaveandtidalsearchareasinnorthwesternScotland.ScottishNaturalHeritageCommissionedReportNo.623.

Schmitt,P.,Elsaesser,B.,Coffin,M.,Hood,J.,Starzmann,R.2015.Fieldtestingafull-scaletidalturbine.Part3:AcousticCharacteristics.EuropeanWaveandTidalEnergyConference,2015.

Smith,E.2002.BACIdesign.EncyclopediaofEnvironmetrics1:141-148,JohnWileyandSons.

Southall,B.,Bowles,A.,Ellison,W.,Finneran,J.,Gentry,R.,Greene,C.,Kastak,D.,Ketten,D.,Miller,J.,Nachtigall,P.,Richardson,W.,Thomas,J.,andTyack,P.2007.Marinemammalnoiseexposurecriteria:initialscientificrecommendations.AquaticMammals,33(4).Staines,G.,Zydlewski,G.B.,Viehman,H.A.,Shen,H.,andMcCleave,J.D.2015.ChangesinverticalfishdistributionsnearahydrokineticdeviceinCobscookBay,Maine,USA.Proceedingsofthe11thEuropeanWaveandTidalEnergyConference(EWTEC)September6-11,Nantes,France.

Tougaard,J.,Henriksen,O.andMilllerL.2009.UnderwaterNoiseFromThreeTypesOfOffshoreWindTurbines:EstimationOfImpactZonesForHarborPorpoisesAndHarborSeals.AcousticalSocietyofAmerica1266:3766-3773

Viehman,H.A.G.B.Zydlewski,J.D.McCleave,andG.J.Staines.2015.Usinghydroacousticstounderstandfishpresenceandverticaldistributioninatidallydynamicregiontargetedforenergyextraction.EstuariesandCoasts38:215-226.

Wilhelm,S.I.,C.Gjerdrum,andD.A.Fifield.2008.StandardizedprotocolforpelagicseabirdsurveysconductedineasternCanadafrommovingandstationaryplatforms.CanadianWildlifeService,AtlanticRegion,TechnicalReportSeriesNumber(inpress).

Woodruff,D.L.,Cullinan,V.I.,Copping,A.E.,andK.E.Marshall.2013.EffectsofElectromagneticFieldsonFishandInvertebrates.Task2.1.3:EffectsonAquaticOrganismsFiscalYear2012ProgressReport.EnvironmentalEffectsofMarineandHydrokeneticEnergy.PreparedfortheUSDOE.62pp.

FORCE March 2016 Environmental Effects Monitoring Program 8.0 REFERENCES

FORCE 48