enterprise projects performance with ecosys -...
TRANSCRIPT
Enterprise Projects Performance with
EcoSys
Carlos Ruiz de Agüero, PMP
EcoSys Business Development Consultant South of Europe
Confidential2 Confidential2
Agenda
• About EcoSys
• What is Enterprise Project Performance?
• The Current State of Projects Performance
• Enterprise Project Performance with EcoSys
• What Our Customers are Saying
• EcoSys Demo
• Summary - EcoSys Differentiators
Confidential3 Confidential3
Market
Leadership
Business
Momentum
Loyal & Growing
Customer Base
• EcoSys founders were the original developers of Primavera P6
• First to market and industry leader in enterprise projects performance
• Deep portfolio & project management expertise
• Largest user adoption in project controls industry
• Global presence –users in 20+ countries
• A Hexagon PPM Company since 2015
• 500+ clients globally
• Strong partnerships: SAP, Oracle, Microsoft, Accenture, IBM, and more
EcoSys Overview
Confidential4 Confidential4
Global Customer Base
• Global Customer Base
Aerospace & Defense Transportation Mining
UtilitiesOil, Gas & ChemicalsEngineering & Construction
What is Enterprise Projects
Performance?
Confidential6 Confidential6
Enterprise Project Performance
• Goes beyond project controls to support the full life
cycle of all projects in an enterprise – from project
portfolio management, to project controls, to contract
management.
• Hexagon PPM enterprise projects performance tools
ensure all of your projects are identified, defined,
delivered, measured, and recycled in one modern, fully
integrated platform.
• EcoSys from Hexagon PPM is the global standard for
Enterprise Projects Performance software.
Confidential7 Confidential7
Enterprise Projects Performance
Expands
PerspectiveDemands
VisibilityCommands
Action
GOAL: Maximize Returns and Margins across Projects Lifecycle
Confidential8 Confidential8
Enterprise Projects Performance
Project Portfolio
ManagementProject Controls
Contract
Management
An Integrated System of Three Disciplines
Confidential9 Confidential9
Enterprise Projects Performance
Project Portfolio
ManagementProject Controls
Contract
Management
An Integrated System of Three Disciplines
The Current State of Projects
Performance
Firms tend to use multiple software
platforms that are manually monitored
and disconnected, which severely
compromises their effectiveness.
Geno Armstrong
International Sector Leader,
Engineering and Construction
KPMG
Confidential12 Confidential12
?
PREDICTABILITY & CONTROL
Estimates Budgets
Procurement
Accounting
$
ENTERPRISE PROJECT CONTROLSForecasts Changes
ProgressSchedule
Engineering/
Construction
Resources
Collaboration
Silos vs Integrated Projects Performance
Confidential13 Confidential13
25
75Yes
No
Access to Real-time Project Data?
27
73Yes
No
Fully Integrated Project Controls
System?
20
80Yes
No
Owners Contractors
21
79
Yes
No
KPMG: Global Construction Survey
Disconnected People & Systems
Confidential14 Confidential14
Costs Schedule
CBS-0
CBS 1
CBS 11 CBS 12
CBS 2
CBS 21
CBS 3
CBS 31
CBS 4
CBS 41
Project P
WBS P.AWBS P.B
WBS P.C
WBS P.C.1
WBS P.C.2
WBS P.C.2.a
WBS P.C.2.b
Disconnected Systems and Manual Processes
Human error
Version Control
Time consuming
Confidential15 Confidential15
The Burden of Low-Value Work
61% Of time utilization
• Fixing ERP issues and Labor coding
• Downloading files and collating
Relying on Manual Processes:
Internal study done by EcoSys client prior to implementation
Confidential16 Confidential16
Schedule Data
Cost Data
Visibility ChallengesDocuments, Contracts
Communications,
Changes
Who
approved this
change and
why?
What do we
expect our final
costs to be?
Which projects
are
underperforming
and why?
Disconnected People & Systems
Confidential17 Confidential17
Disconnected People & Systems
OLD
NEW
$
Can’t identify issues Can’t make adjustments Can’t anticipate needs Can’t plan effectively
Projects Cost More Projects Take Longer
Disconnected People & Systems
Enterprise Projects
Performance with EcoSys
Confidential19 Confidential19
?
PREDICTABILITY & CONTROL
Estimates Budgets
Procurement
Accounting
$
ENTERPRISE PROJECT CONTROLS
INTEGRATED
=
SHARED DATA
Forecasts Changes
ProgressSchedule
Engineering/
Construction
Resources
Collaboration
Silos vs Integrated Projects Performance
Confidential20 Confidential20
• Planning & Controls is the same the world over
• Except when it’s not
• The software has to be flexible to account for:
– Perspective (Owner or Contracting Firm)
– Systems landscape
– Organizational landscape
– Processes and procedures
– Sector & discipline based data/coding structures
– Project size and type
– Contract types
– Company culture
Why is Flexibility Important?
Confidential21 Confidential21
Bridging the Systems Gap
WBS & WBS Status
Budget / Planned Costs
Integrated Earned Value Mgmt
Consolidated Performance Reporting
Budgets & Forecasts
Commitments
Change Management
Data Transformations
Historical Snapshots
Transaction/Audit Repository
Projects/WBS
Dates
Resource-loading (units & costs)
- Baseline
- Current
- Remaining
Activities
Resources
Codes (activity, resource, project)
Percent Complete
Projects
WBS/Activity Networks
Actual Costs
Timesheets
Commitments
Estimating / Timesheets / Other Data
Confidential22 Confidential22
EcoSys Enterprise Projects Performance Software
Comprehensive tools and processes for
effective tactical project execution
Controls for strategic planning and
portfolio optimization
Confidential23 Confidential23
EcoSys Enterprise Projects Performance Software
Consistency
Visibility
Alignment
in project planning and execution
into all project data
of enterprise level strategy and day-to-
day execution
Approved Projects
Resources
Budgets
Actuals
Forecasts
Performance
Confidential24 Confidential24
Enterprise Projects Performance
❖ Capital Planning
❖ Funding
❖ Scoring and Prioritization
❖ Stage Gates Workflow
❖ Portfolio Project Selection
❖ Resource Management
❖ Program Management
❖ Benchmarking and Parametric Estimating
❖ Organizational Budgeting
❖ Estimating and Budgeting
❖ Changes and Trends
❖ Commitments and Actuals
❖ Progress and Earned Value
❖ Stage Gates Workflow
❖ Risk Management
❖ Forecasting
❖ Cash Flows
❖ Currency Management
❖ Contract Cost Control
❖ Contract Change Control
❖ Requests for Information (RFIs)
❖ Submittals and Transmittals
❖ Payment Applications
❖ Safety Items
❖ Punch Lists
❖ Meeting Minutes
❖ Lessons Learned
Confidential25 Confidential25
Enterprise Projects Performance
❖ Uniquely, all three EcoSys products are accessed from the same web browser, fully integrated on one database, sharing common features like:
❖ Enterprise Data Structures: portfolios, programs, projects, contracts, WBS, CBS, etc.
❖ Configurable Business Intelligence (BI): dashboards, screens, spreadsheets and charts, each with drill down capabilities
❖ Configurable Processes: screens, spreadsheets, forms and workflows
❖ Flexible Integration APIs and Adapters: supporting data exchange with many ERPs and project systems
❖ Mobile Apps: fully integrated configurable apps for iOS and Android devices
Confidential26 Confidential26
The Impact of Enterprise Projects Performance
Increased Efficiency
Enhanced Visibility
Improved Performance
Confidential27 Confidential27
Enhanced Visibility
Confidential28 Confidential28
Efficiency Gains
Confidential29 Confidential29
Portfolio Optimization
Contract Management
Change Management
“With effective portfolio
management, projects are
36% more likely to deliver
on time and 19% more likely
to deliver on budget.
Project Management Institute
“The View from Above: The Power of
Portfolio Management”
Improved Performance
Confidential30 Confidential30
Portfolio Optimization
Contract Management
Change Management
“Proper structuring,
monitoring and enforcement
of contracts leads to 9%
savings on contract values”
International Association of Contract and
Commercial Management (IACCM)
Improved Performance
Confidential31 Confidential31
Portfolio Optimization
Contract Management
Change Management
With low use of change
management, average cost growth
is 10.2 %
With high use of change
management, average cost growth
is -1.2%
Construction Industry Institute, “CII Best Practices
Guide: Improving Project Performance”
Improved Performance
What Our Customers are
Saying
What Our Customers are Saying
EcoSys Demo
Confidential35 Confidential35
Adoptable
• Easy to use, Excel-like look and feel, users willingly use it
• Looks open and familiar (not a “black box”), tailored to the user’s role
• Drill downs provide “why so” analysis
Adaptable
• Enables best practice, your way (highly configurable)
• Easily plugs into any source systems, bi-directional data exchange
• Can easily change when you change, without programming
Scalable
• Built on modern enterprise web technology
• Supports hundreds of concurrent users and millions of rows of transactional data
• Consolidates many functions, systems and analytics into one enterprise platform
35
Summary - EcoSys Differentiators
Questions?
Confidential37 Confidential37
EcoSys 8: Introducing Enterprise Projects Performance
• http://www.ecosys.net/information-center/post/ecosys-8-introducing-enterprise-projects-
performance/
Projects
• http://www.ecosys.net/information-center/post/ecosys-epc-ensuring-better-project-delivery/
Portfolios
• http://www.ecosys.net/information-center/post/project-portfolio-management-ppm-pulse/
Contracts
• http://www.ecosys.net/information-center/post/contract-managment/
Enterprise Projects Controls at CH2M
• http://www.ecosys.net/information-center/post/enterprise-projects-controls-ch2m/
37
Videos