entering quality results in parent-child plans_spd
TRANSCRIPT
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
1/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Department
Responsibility/Role
File Name 27814112.docRevision
Document Generation Date 19/01/2010 12:21:00
Date Modified 1/19/2010 12:21:00 PM
Last Changed by
Status
Entering Quality Results in Parent-Child Plans
Trigger:
Concept
You can enter, update, and view parent-child quality results within the forms application or from
the Quality Workbench user interface. You can enter quality results directly.
In this topic, you will enter quality results for parent-child collection plans.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/19/2010 12:21:00 PM Page 1
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
2/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Procedure
Step Action
1. Begin by navigating to the Enter Quality Results page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
3/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/19/2010 12:21:00 PM Page 3
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
4/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Enter Quality Results link.
Page 4 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
5/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
5. Use the Organizationspage to select the appropriate organization.
Last changed on: 1/19/2010 12:21:00 PM Page 5
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
6/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
6. Click the M1 list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
7/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
8. Use the Enter Quality Results page to enter the name of the parent collection plan
for which you want to enter quality results.
Last changed on: 1/19/2010 12:21:00 PM Page 7
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
8/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
9. Click in the Collection Plan field.
Step Action
10. Enter the desired information into the Collection Plan field. Enter "IC
COLLECTION PLAN".
Page 8 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
9/24
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
10/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
12. Use the Results region to enter quality results.
You must enter data in the collection elements that you defined as mandatory
during the collection plan set up
Step Action
13. Click in the Item field.
Page 10 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
11/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
14. Enter the desired information into the Item field. Enter "IC2323".
Last changed on: 1/19/2010 12:21:00 PM Page 11
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
12/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
15. Click in the Quantity field.
Step Action
16. Enter the desired information into the Quantity field. Enter "10".
Page 12 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
13/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
17. Click in the Sub field.
Last changed on: 1/19/2010 12:21:00 PM Page 13
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
14/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
18. Enter the desired information into the Sub field. Enter "FGI".
Step Action
19. Click the Save button.
Page 14 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
15/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
20. Click the Child Plan list.
Last changed on: 1/19/2010 12:21:00 PM Page 15
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
16/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
21. Click the IC DISPOSITION PLAN list item.
Step Action
22. Click the Enter button.
Page 16 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
17/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
23. Note that the in the Results region, the quality results you entered for the parent
plan displays in the child plan.
Enter the quality results of the child plan.
Last changed on: 1/19/2010 12:21:00 PM Page 17
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
18/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
24. Click in the Disposition Quantity field.
Step Action
25. Enter the desired information into the Disposition Quantity field. Enter "5".
Page 18 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
19/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
26. Click in the Disposition field.
Last changed on: 1/19/2010 12:21:00 PM Page 19
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
20/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
27. Enter the desired information into the Disposition field. Enter "REPAIR".
Step Action
28. Click in the Disposition Status field.
Page 20 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
21/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
29. Enter the desired information into the Disposition Status field. Enter
"PENDING".
Last changed on: 1/19/2010 12:21:00 PM Page 21
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
22/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
30. Click the Save button.
Step Action
31. Click the OKbutton.
Page 22 Last changed on: 1/19/2010 12:21:00 PM
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
23/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
32. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/19/2010 12:21:00 PM Page 23
-
8/14/2019 Entering Quality Results in Parent-Child Plans_SPD
24/24
System Process DocumentEntering Quality Results in Parent-Child Plans
Step Action
33. Click the Close button.
Step Action
34. You have completed the Entering Quality Results in Parent-Child Plans procedure.End of Procedure.
Page 24 Last changed on: 1/19/2010 12:21:00 PM