2

Entering

T E-4 5 into C M S

1s t SC R EEN

SC R EEN L A Y O U T(Sample Screen)

3

Entering

TE-45 into CMS

1ST SCREEN

INSTRUCTIONS(Sample Screen)

1A ct: AE nter an A h ere to creat a new s ample, an U to u pd ate an ex is ting u n-au th o riz eds ample.

2Sample o rig in: 0 2E nter D is trict nu mb er as tw o d ig it nu mb er.

3P ers o nnel ID :E nter So cial Secu rity nu mb er o f s ampler.

4N b r o f M u lt Smpl:N o t u s ed .

5T y pe Ins p: C T LE nter C T L fo r co ntro l ins pectio n. N o o th er co d e is v alid fo r T E -4 5 .

6D ate Sampled : d d /mm/y yE nter D ate th at cy lind ers w h ere tak en, els e po u r d ate. If mo re th en o ne po u r b eingrepo rted th en d ate o f b ig g es t o r las t po u r.

7R elated Sample ID :Q C /Q A

8T es t C o d e:Sy s tem g enerated info rmatio n.

9N b r o f P ro j/P O R ef:Sy s tem g enerated info rmatio n

4

Entering

TE-45 into CMS1ST SCREEN

INSTRUCTIONS(Sample Screen)

aP/S Cd:Concrete Producer P/S code.

BMix Plant:Concrete Producer P/S code. Enter on both lines.

cMatl Code:Material code for class of concrete being reported. One class of concrete per report.

Note: The following fields are not used for a TE-45: Unit:, B rand Name:, Desc 1 :, Desc2:, Desc 3 :, Nbr of Items:, Proj Assign Qty:, Non-Proj Assign Qty: & Mfg Control Nbr:.

DUnit:System G enerated.

EM/E Ind:M = MetricE = English

FB rand Name/Desc 1 :Not used.

gRep Qty:Total cubic yards of concrete, report is to represent. Amount must eq ual to or greatthan amount assigned to references.

HCosign To:Optional field, use as needed. Ref. No.

ISampled F rom:Enter project number here. Report concrete pour locations on second screen or inremarks.

5

JResp Loc:Enter 02 here to create report.After all design and test data has been entered on 2nd & 3rd screen, return here.If report is to be authorized at project level (no cylinders) do not change this field.If cylinders have been made and are to shipped to Central Lab,change this field to TL after you have completely finished all entries, on all screens.

6

Entering

TE-45 into CMS1ST SCREEN

INSTRUCTIONS(Sample Screen)

kLab:Enter DI here to create report.After all design and test data has been entered on 2nd & 3rd screen, then,if report is to be authorized at project level (no cylinders) do not change this field.If cylinders have been made and are to be shipped to Central lab,change this field to PC after you have completely finished all entries, on all screens.

W ARNING ! AFTER Y OU H AV E CH ANGED TH E ABOV E TW O FIELDS TO “TL” & “PC” AND LEFT TH E SCREEN, Y OU NO LONGER H AV E CONTROL OV ERTH E REPORT. Y OU CANNOT MAK E ANY CH ANGES.

LDate Shipped:Date cylinders where shipped to District Lab. No cylinders...no date. (4 d a y s a fter

field c u re)

moDate Received:, Test Start: & Est Compl:These fields are for Lab use and are never filled out at the project level.

NActual Compl:If report is to be authorized at the project level, email SMPL ID to PE/PS . A date mustbe entered here. If cylinders are to be shipped to Central Lab, leave a blank.

qTest Result:– Entered by PE/PSIf report to be authorized at project level, enter by PE/PS. If cylinders are to be shippedto Central Lab, leave blank.

7

Entering

TE-45 into CMS1ST SCREEN

INSTRUCTIONS(Sample Screen)

pAuthorized:After all design and test data h as b een entered on 2nd & 3 rd screen, th en if report is

to be authorized at project level enter Y and press Enter.

If cylinders are to be shipped to Central Lab, leave b lank .

Note. Present policy is that if a set of cylinders have a low break, control of report isreturned to District/Project for approval/disapproval & authorization, else Central Lab willapprove and authorize.

RFree Form Ind:Place a Y here if a TE-30 is being created instead of a TE-45. See instruction forreporting concrete on a TE-30. SMQ.

8

9

10

On the first pass thru this screen, fill out all information then press enter. If allinformation has been provided and is correct, CMS will generate a SAMPLE ID (SID)number. Place this SID number on your worksheet for future reference.

Then press F11 key to enter test results.

11

Entering

TE-45 into CMS2nd SCREEN

SCREEN LAYOUT(PCC Inspectors Daily Report)

12

Entering

TE-45 into CMS2nd SCREEN

SCREEN LAYOUT(PCC Inspectors Daily Report)

Enter J MF number here.

Enter location of pour here, such as bridge number, or stations of the limits ofpaving operation.

Enter CY of concrete poured at this location

For AEA enter material code number 42001 and Brand name i.e. Micro Air.For other admixtures, enter material code for type of admixture & brandname.

Enter OZ of admixture used per CY, for each admixture.

Total Mixing water FM moisture water per CY.

Time of test taken. This is a required field. Time must be entered using the24 hour system. 1:00PM = 13:00

13

Lbs of cement used in 1 CY.

14

Entering

TE-45 into CMS2nd SCREEN

SCREEN LAYOUT(PCC Inspectors Daily Report)

Pounds of fine/coarse aggregate in 1 cubic yard ofconcrete at SSD. First line will be for starting design forthis pour. Addition lines for adjustment made, and/or newmoisture taken.

Percent free moisture from moisture tests.

Batch weight of each aggregate corrected for moisture.

Water add at mixer and at site in lbs.

Water add at mixer and at site in gals (8 .32 lbs to the gal)

When you are finished entering the above;

A) Press F5 key if you have test results to enter.

15

Entering

TE-45 into CMS3rd SCREEN

SCREEN LAYOUT(PCC/SLUMP/YIELD/STRENGTH TEST)

16

Entering

TE-45 into CMS3RD SCREEN

SCREEN LAYOUT(PCC/SLUMP/YIELD/STRENGTH TEST)

Time test was taken using 24 hour system.

Concrete temperature.

Station or part of structure test taken at.

Weight per Cubic Foot, obtained from yield test.

Weight of 1 Cubic Yard of concrete as actually batched. This should be fore theload that was tested.

Slump obtained from slump test in inches. Nearest 1/4"Fractions of an inch must be entered in decimals.

17

Percent Air obtained from air test.

18

Entering

TE-45 into CMS3RD SCREEN

SCREEN LAYOUT(PCC/SLUMP/YIELD/STRENGTH TEST)

Enter APPR (approved), or NAPP (not approved) or INF (information).

Enter a Y here if you have cylinders.

Beams

Enter cylinders numbers here, example 1A 1B

If you have additional test results to enter, press F6 for a new screen.

When finished entering test results press ESC. To return to 2nd screen.