ensembles work package 6.2 meeting, helsinki, finland, 26-27 april 2007 ensembles in helsinki...
TRANSCRIPT
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
ENSEMBLES in Helsinki
WELCOME / TERVETULOA!
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
SYKE support (or lack, thereof)
Travel, communications, accommodation, logistics: Maria Vuorinen has all the answers!
Presentations and computer-related issues: Contact Stefan Fronzek
Unfortunately SYKE can’t offer wireless facilities or internet access – obviously it’s because we’re a government institute doing top secret work on climate change
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
ENSEMBLES Work Package 6.2
Linking impact models to probabilistic representations of climate change: objectives of the Helsinki meeting
WP Participants (Helsinki absentees underlined):DJF (formerly DIAS), DISAT, FMI, FUB, LUND, NOA, PAS, SMHI, SYKE, UEA, UNIK, UREADMM
Timothy CarterFinnish Environment Institute (SYKE)
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
WP 6.2 Linking impact models to probabilistic scenarios of climate change
Modelling behaviour of systems or activities in different environments developed, tested and applied under European conditions for evaluating the potential impacts of climate change.
Task 6.2.a Response surfaces and impact thresholds
Task 6.2.b Scenario impacts and risk assessment
Task 6.2.c Evaluating the impacts of extreme events
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Impact models, sectors and scales of analysis
Palsa mires
/fires
DJF
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Objectives of this meeting
1. Report recent impacts research in WP 6.2 based on ”surrogate” climate information
2. Compare progress to date against milestones and deliverables
3. Discuss methodological issues regarding the provision and application of climate data in impact studies
4. Liaise with RT 1 regarding preliminary GCM-based data5. Liaise with RT 2B regarding overall delivery of data and
scenarios6. Consider WP 6.2 in the broader ENSEMBLES context7. Allocate Partner responsibilities and agree on a
workplan for achieving milestones and deliverables
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Task 6.2.1: Preparation of impact models for scenario analysis (DJF, DISAT, FUB, SMHI, UREADMM) (Completed)
Task 6.2.2: Collection of data for the calibration and testing of impact models and as reference data for model input (DISAT, FUB, ULUND, UREADMM) (Completed)
Task 6.2.3: Design of sensitivity analyses based on existing climate projections and some initial performance tests (FUB, SYKE, ULUND, UNIK) (Completed)
Task 6.2.4: Estimation of critical impacts thresholds for water resources based on historical drought and flood events (SMHI, UNIK) (Completed)
Task 6.2.5: Development of models for understanding and evaluating the impacts of extremes. These models will operate within a probabilistic framework, incorporating where possible effects of adaptation and acclimatisation to climate change (FUB, NOA, UEA, ULUND) (Ongoing)
Task 6.2.6: Analyses of arrival times of extremes based on long observed records (UEA) (Ongoing) Task 6.2.7: Development of a GIS environment within which impacts models will be developed and analyzed.
(Completed) Task 6.2.8: Construction of impact response surfaces for selected impact models of crops, soil carbon and
nitrogen, and water resources (DJF, DISAT, SMHI, SYKE, UNIK) (Ongoing) Task 6.2.9: Preliminary scenario impacts and risk assessment from available climate projections for selected
models of crops, runoff, permafrost, soils (DJF, DISAT, FMI, SMHI, SYKE) (Ongoing) Task 6.2.10: Preliminary evaluation of the impacts of extreme events using selected impact models for crops,
human health, forest fire, forest damage, intense precipitation, drought, wind and temperature extremes from available climate projections (DISAT, FMI, FUB, NOA, PAS, UEA, ULUND, UREADMM) (Ongoing)
New Task 6.2.11: Application of preliminary results from the Ensembles Prediction System to impact models for estimating risks of extremes and risks of impacts (All partners) (Ongoing)
WP 6.2 Tasks: Progress to date
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Deliverables (completed)
Deliverable 6.2: First-phase impact models to predict damage to human activities, the environment and tropical annual crops from climate extremes: e.g. wind storm, drought, flood and heat stressDue Feb 2006; Delivered October 2006 (UEA and Partners)
Deliverable 6.3: Calibrated and tested crop, forest, hydrology and energy impact models; baseline data and scenarios for constructing impact response surfacesDue Feb 2006; Delivered April 2006 (SYKE and Partners)
Deliverable 6.9: Report on an intercomparison study of modelled, Europe-wide forest fire risk for present day conditionsDue Aug 2006; Delivered September 2006 (NOA and FMI)
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Deliverables (work in progress)
Deliverable 6.7: Preliminary report on a comparative study of response surface and multiple scenario approaches to assessing risks of impacts using selected impact models Due Feb 2007 + 3 months (Month 33) (SYKE and Partners)
Deliverable 6.8: Preliminary report on changes in climate extremes and their relation to flood risk, agriculture, forest and property damage and human health Due Feb 2007 + 3 months (Month 33) (UEA and Partners)
New Deliverable 6.13: Methodological report on the linking of preliminary probabilistic projections from the Ensemble Prediction System to impact modelsDue Feb 2008 (Month 42) (SYKE? and all Partners plus RT2B?)
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Milestones (attained)
Milestone 6.3: Preliminary definitions of impact thresholds for development of probabilistic impacts assessments, taking into account responses to mean and extreme perturbationsDue Feb 2006; Delivered Apr 2006 (SYKE and Partners)
Milestone 6.4: Completion of preparation of most impact modelsDue Feb 2006; Delivered Apr 2006 (SYKE and Partners)
Milestone 6.6: Sensitivity analysis and construction of preliminary impact response surfaces for selected impact modelsDue Aug 2006; Delivered October 2006 (SYKE and Partners)
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
Milestones (in sight)
Milestone 6.12: Work Package 6.2 meeting to report progress in applying probabilistic information to impact models and to agree on common approaches and reporting of results (location to be arranged)Due April 2007 (Month 32) (All Partners – SYKE to arrange)
Milestone 6.13: Preparation of protocol for determining probabilistic information from the Ensembles Prediction System (RT 2B) and applying it to calibrated impact models (in line with Major milestones 6.1 and 6.2)Due Aug 2007 (Month 36) (SYKE? and all Partners plus RT2B)
New Milestone 6.14: Completion of preliminary probabilistic assessments of climate change impacts using calibrated impact modelsDue Feb 2008 (Month 42) (SYKE and all Partners)
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007
ENSEMBLES Work Package 6.2 Meeting, Helsinki, Finland, 26-27 April 2007