Annex A The condition survey (Example) System: Heat Distribution Date: Cause 1 Cause 2 Cause 3 Cause 4 …… …… ……. …… ….. Total Points Rating for Location Auditor: Comment No Location/Point 0 1 2 1 0 0 1 1 0 1 Maximum point 1 CEAT 2 Pneumatic 3 Cold TRD 4 Hot TRD 5 Tread Liner 6 Solid Total Points and Overall rating ݒݎ ݎݐ = ݐ ݏݐ× 100 . ݐܫ × ܯݔݑ ݎ # Remark 1 2 3 4 …. ….

Upload: siran-marayo

Post on 16-Jan-2016

8 views

Category:

Documents


0 download

DESCRIPTION

advance condition survey

TRANSCRIPT

Page 1: EnMS ISO50001 Condition survey

Annex A

The condition survey (Example)

System: Heat Distribution

Date:

Cau

se 1

Cau

se 2

Cau

se 3

Cau

se 4

……

……

……

.

……

…..

Tota

l Poi

nts

Rat

ing

for L

ocat

ion

Auditor:

Comment

No Location/Point 0 1 2 1 0 0 1 1 0 1

Maximum point

1 CEAT

2 Pneumatic

3 Cold TRD

4 Hot TRD

5 Tread Liner

6 Solid

Total Points and Overall rating

푂푣푒푟푎푙푙푟푎푡푒 =푇표푡푎푙푝표푖푛푡푠 × 100

푁표. 퐼푡푒푚 ×푀푎푥푖푚푢푚푆푐표푟푒

# Remark 1 2 3 4

…. ….

Page 2: EnMS ISO50001 Condition survey

Annex B

Establish Audit Scope (Example)

Audit to be examined Whole site Individual building (Details)

o R&D Ground floor o R&D 1st floor o Compound o Carbon weighing store etc…

Department/Processing unit (Details)

o TRD o CEAT o Pneumatic etc…

Other ……………………………………………………………………. Individual system

Boiler plant Steam distribution Lighting Process water Other ……………………………………………………………………..

Type of Information

Electricity bill Fuel bill Firewood quantity Other ……………………………………………………………………

Analysis

Internal and external benchmark Correlation with consumption and production Electrical demand Weather Payback analysis Other …………………………………………………………………..