Enhancing QiRePort To Support
On-Line PCS Service Planning
(Update/Status Report)
PCS Regional Provider Training Sessions:
May 5-18, 2015
Attention: The implementation date for the new QiRePort functionality Is June 10, 2015
Today’s Presentation
• Recap of Pilot Project
• Review of QiRePort Functionality To Be Implemented
• Review of Upcoming Training
• Review of Roll-Out
• Review of Available Support
2
Pilot Project Summary
3
Pilot Project Overview
• Fifteen Pilot Sites
• Pilot Period - December 2014 – March 2015
• Approximately 200 Completed Service Plans
• Major Findings
Easy to navigate and use
Average service plan completion time – Around 5-10 minutes
Altered service plan to allow for in-home and residential care
versions of the service plan
Optional functionality – No major changes
• Finalization of Proposed Functionality
• Various small changes to reflect current practices of service provider
(approximately 40 refinements)
Final version of modifications awaiting PCS policy update
4
New QiRePort Functionality To Be Added
• Expanded Home Page Functionality
• On-Line PCS Service Planning – The focus of new features
• Person-Centered Goals
• Beneficiary Profile And Supporting Docs Upload
Designed to support a more comprehensive beneficiary electronic
record
• Aide/Staff Credentialing Documentation
• Reports
5
Let’s look at each of these enhancements >>
New Home Page
6
Updated Left Index
7
On-Line PCS Service Planning
8
Service Planning Functionality
• Sections
Scheduling
Aide Assignment (Optional)
Service Outcomes (Optional)
Aide Instructions (Optional)
Medical Monitoring Parameters (Optional)
Plan Narrative (Optional)
• Two Versions
In-home – With capacity for visit scheduling
Residential care – Assumes 7 day a week schedule
9
PCS Service Planning Functionality
• New Module To Be Added To Current QiRePort Provider
Interface
• No Software to Install Or Maintain On Your Agency Computers
• Provides A Standardized On-line PCS Service Plan Template
• Service Plan Template – Built Around The Independent
Assessment
• Ability To Stop and Resume Service Plan Development
• Includes Built-In Validation of the PCS Service Plan
10
The PCS assessment drives the service plan. Let’s review how >>
QiRePort Extracts the Assessment Information To
Create a PCS Service Plan Template
11
Initiation Of A PCS Service Plan
• Starts With A Service Referral From Liberty Via QiRePort
Each referral is accompanied by a completed assessment and
authorized hours
12
Provider Acceptance Of A Referral
13
When a referral is accepted, QiRePort generates a service plan “template” for the
beneficiary. The new service plan is added to the in-process service plan list.
On-Line PCS Service Plan Completion Tracking
14
When a user selects a beneficiary from the in-process
service plan list, the PCS service plan template will appear.
Let’s review the steps in service plan completion >>
Basic Steps To Develop On-Line Service Plan
• Identifying The Days of The Week The Service Will Be Provided
In-home providers only
• Scheduling ADL/IADL Tasks By Day of Week
• Scheduling Special Assistance Tasks By Day of Week
• Scheduling Delegated Medical Monitoring Tasks By Day of Week
• Finalizing Plan Narrative
• Identification of Service Outcomes (Optional)
• Aide Assignment (Optional)
• Indicating the Plan Is Complete To Trigger Validation
15
Remember, the PCS service plan is populated with the assessment results
for the beneficiary whose service plan you are developing.
Let’s look at the service planning scheduling functionality >>
Entry of Weekly Schedule Into the Service Plan
• The PCS Service Plan Template Is Based On A Typical Week
• Determine The Days Of The Typical Week PCS Will Be Provided
The assessment results identify the need frequency (days/week) for
PCS for each qualifying ADL.
When developing the weekly schedule, the need frequency for all
the qualifying ADLs must be considered.
• Enter “From” and “To” Times For Each Selected Day
• As Appropriate, Designate A Shift
• As You Enter the Days and Times Per Day, QiRePort Calculates
the Following:
Hours of service accounted for by the schedule already entered
Remaining hours to be scheduled based on the authorized hours
16
There are two versions of the service plan scheduling: in-home
provider version and residential care provider version.
17
Select days of the week and the time of
day the PCS service will be provided.
Click here to view the beneficiary’s assessment
As the day and “from” and “to” entries are made,
QiRePort computes remaining weekly hours.
Weekly Schedule / In-Home Provider Version
18
Weekly Schedule / Residential Care Version
Entry Of Task Completion Schedule
• Required Tasks Are Populated In The PCS Service Plan From
the Assessment
Each qualifying ADL’s ADL tasks
Each qualifying ADL’s IADL tasks
Each required special assistance task
Each required medical monitoring task
• Providers Identify Which Days of the Week Each Required Task
Will Be Completed (Taking into account assessment findings)
• Shift Designations Are Supported To Simplify Entry
19
Let’s look at the template used to schedule tasks by day of week >>
Task Schedule Functionality
20
The needs/task list, frequency/weekend indicator and assistance
level information are populated from the beneficiary’s assessment.
Select which days of
the week the task will
be performed.
Optional Service Planning Functionality
• PCS Service Outcomes
• Aide Assignment
• Aide Instructions – Sent to the aide task plan
• Monitoring Parameters Specification
• Plan Narrative
21
Plan Completion
• As The PCS Service Plan Is Entered, QiRePort Will Supply To
The User Various Reminders/Warnings
• Example Warnings
Warning: You do not have a time entry for all of the days within the
shift(s) selected.
Warning: You have selected less days than the assessment need
frequency indicates.
22
Generation of Aide Task Schedules (Optional)
• Once A Service Plan Is Completed, Users Can Generate Aide
Task Schedules
• Each Task Schedule Is Beneficiary-Specific and Aide-Specific
• The Task Schedules Reflect the Completed Service Plan
Organized By ADL and special task categories
Show tasks to be performed by day of week
• The Task Schedules Allow For Documentation of Tasks
Performed On The Same Form
• The Task Schedules Allow For Attestation By the Beneficiary
23
Let’s look at the Aide Task Schedule format >>
Sample Weekly Aide Schedule Form (Top)
24
QiRePort generates an aide task sheet based on entered
schedules and tasks.
The Aide Task Schedule allows for documentation of aide
tasks performed (Status column).
Customized for each
beneficiary and each week
Weekly Aide Schedule Form (Bottom)
25
Form is also designed to document beneficiary and
employee (aide) attestations of tasks performed.
Aide Task Sheet Generation – Shift Selection
26
Users can run the weekly aide task schedules by shift as well.
Generation of Prior Approvals
• Prior Approvals Will Continue To Be Based On the Completed
Independent Assessment
• Prior Approvals Will Not be Forwarded To NCTracks Until The
PCS Service Plan Is Completed.
Completion means that the service plan is deemed complete by the
service provider and the service plan also passes validation
27
Additional Functionality To Be Included In
QiRePort
28
Companion Functionality To Be Available
• Beneficiary Profile
• Person-Centered Goals
• Supporting Documents Upload
• Reports
29
Each of the above features is optional. Individual service providers can elect to
use some or none of the above functionality based on their own documentation
needs or system capacities.
The upcoming Webinar training sessions on service planning will address how
service providers can use these additional features of QiRePort.
Initial Orientation and Training
30
Training and Orientation Plan
• Step 1. Today’s Regional Training Session
Update and overview of functionality
Update of implementation and roll-out
• Step 2. Place On-line Orientation Materials In QiRePort
Look for the training and orientation materials – on 5/19
Get a head start on learning about the new functionality
• Step 3. Training Webinars -- Based on Final Design
Twelve sessions
Five sessions for in-home providers
Seven sessions for residential care providers
31
On-Line Instructional Materials
• Videos – Three separate videos
See how service plans are entered (separate version for in-home
providers and residential care providers)
See how aide task sheets are generated
• Written User Instructions and Guides
Easy to follow
• Related Materials
FAQs
Getting started instructions
32
Webinar Dates
In-Home Providers
• May 27th
• June 1st
• June 4th
• June 8th
Residential Providers
• May 27th
• May 28th
• June 1st
• June 3rd
• June 4th
• June 8th
• June 9th
33
Check the QiRePort home page for Webinar times and specifics!
Implementation and Support
34
Implementation Steps
• Roll-Out Date – June 10th
• No Manual Referrals – Only Through QiRePort
• All Referrals Posted As Of June 10th Require A Service Plan
• Some Providers May Not Receive A Referral For Awhile
Keep watching for referrals
Remember, service plans need to be completed in 3 days of the
referral
Additional time will be allowed for completion of EPSDT plans
• Prior Approval Generation Roll-out
35
Continuing Support
• Ask A Question --- Go to Home Page – Website Help
Type in your question
• On-line Instruction and Guidance Materials
• QiRePort Support Center
1-888-705-0970
36