ENHANCEDOILRECOVERY
SPE 93329
EOR INMALAYSIA: MAKINGITREALITY
Prepared by:
Suhailah Adilah Saarim
Muhd Naqiuddin ZahidMohd Azlan Masri
Nur Khasilah Abdorahman
Muhd Fakhrurrazi Azhar
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
2/60
ABSTRACTA considerable amount of HC resource is estimated to remain in the ground
even after primary and secondary discoveries in the fields.
In 2003, from 47 producing fields in Malaysia:
- Estimated STOIIP = 20.1 bbl/STB
Cumulative production = 4.9 bbl/STBReserves = 2.5 bbl/STB
Remaining = 12.7 bbl/STB 63.2%
In 2000, 72 reservoirs in Malaysia undergoes SCREENING STUDY:- Almost a billion barrels of additional reserves that can be achieved through
EOR.
- Several key EOR technologies that are most applicable in Malaysia; gasinjection, chemical injection, and microbial.
Prime targetfor EOR
projects inMalaysia
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
3/60
ABSTRACT
Factors that plays an important role in planning EORprojects in Malaysia:
FACILITIESCONDITION
SOURCES OFINJECTION GAS
RESERVOIRCHARACTERIZATION
TECHNOLOGY
APPLICABILITY
COMMERCIAL
ASPECTS
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
4/60
OVERVIEW OFMALAYSIAN OIL AND GAS INDUSTRY
July18821910
1950
1954
1962
1968
1971
1973
1974
Today
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
5/60
OPPORTUNITY
SET
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
6/60
As of 1st January 2003, the Malaysian oil reservesfigure stands at 3.5 BSTB and the cumulative oilproduction is 4.9 BSTB, and oil-in-place of 24.9 BSTB
which translate to an average oil recovery factor of34%.
This means that there is still a substantial amount of
remaining petroleum resources in the ground thatcould be recovered through IOR or EOR.
Since 1994, the Malaysian crude oil reserves havebeen on the decline.
Existing fields that are in production are alreadyshowing signs of maturing stage and lead theoperators to find another ways to extending the field
life, beyond the primary and secondary techniques.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
7/60
PETRONAS, as the Resource Manager, has taken thelead to promote EOR in Malaysia through work
commitment terms when extending the duration of theexisting production sharing contract.
These commitments include financial obligation fromthe PSC operators to conduct extensive research andconducting EOR pilot tests in some of the fieldcandidates.
In meeting the nations oil production target,
PETRONAS also has set a target of increasing therecovery factor from the existing 34% up to 45%.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
8/60
EOR INITIATIVES IN MALAYSIA
1985- The earliest feasibility study for EOR in Malaysia wasrecorded with objective to investigate the technical potential of
miscible enriched gas and surfactant flooding in PeninsularMalaysia1986- A screening study was conducted by Shell.The studysuggested the use of thermal EOR in Miri- but did not work2000- PETRONAS endorsed a comprehensive EOR/IOR
screening study- 33 reservoirs from 16 fields in PeninsularMalaysia and 39 reservoirs from 19 fields in East
Malaysia.The outcome of the screening study identified 52
reservoirs that are technically feasible for EOR/IOR
processesConsidering practical limitations- Reduced to 37 reservoirsClassified into four quadrant- Based on remaining oil in placeand expected incremental recovery from EOR processes
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
9/60
To validate the findings- numerical simulation models were
developed for the group which has highest remaining oil
and highest recovery for selected EOR identified in first-
level screening.
The main processes studied in screening exercise is
chemical,gas flooding and microbial enhanced oil recovery
The miscible hydrocarbon and carbon dioxide WAG
flooding- most favorable processes.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
10/60
CHALLENGES
AHEAD
-the approach towards EOR in Malaysia has taken a
conservative route
-producing fields in Malaysia are located offshore
-Offshore environment poses a number
of challenges both technical and commercial
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
11/60
-One of the primary concerns is the well spacing foreffective EOR processes
-Average well spacing for the Malaysian fields rangesfrom around 1000 ft3000 ft
-thermal or chemical require much closer well spacing
The required range of the well spacing for an effective
chemical process is around 330 ft470 ft
thermal will be much less than that
The most likely viable EOR process is the gasflooding mechanism.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
12/60
larger spaced wells add another problem to theprocess, and that is the uncertainty of the reservoircharacteristics between the wells that can greatlyimpact the effectiveness of the proposed gas
flooding
Prediction of the recovery will be difficult without adetailed understanding of the reservoiruncertainties.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
13/60
Another complexity of operating EOR in offshoreenvironment is the nature of the wells, which are mostlydeviated or highly deviated, and without a proper floodingpattern.
For conversion of the wells to a pattern injector, somewells may have to be workover or sidetracked in order tooptimize the injection capability.
It will directly increase the cost for EOR implementation
and thus reduce the economic feasibility of EOR projectin Malaysia.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
14/60
Old fields in Malaysia added a new problem to implementEOR I these reservoirs.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
15/60
Ageing platforms/facilities
Large investments may be needed to maintain theexisting platforms
refurbishments may be required for added modules suchas water pumps and/or gas compressors for any EORprojects to be implemented
window of opportunity for EOR implementation is limited
If the EOR projects are to be carried out, they need to beplanned, studied and implemented in the near futurerather than much later in the field life, where higher costof maintenance and development is envisaged.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
16/60
the main challenge for offshore EOR in Malaysia can besummarized as the possible high cost of theimplementation and not about the technology itself
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
17/60
For gas flooding (such as CO2 injection), the averagetotal cost per barrel is around US$1220, which,compared to average unit technical cost in Malaysia, ison the high side.
The actual cost of EOR in Malaysia is yet to bedetermined as there is no full-scale implementation ofany EOR projects to date
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
18/60
CHALLENGEINAPPLYINGEOR INMALAYSIA
Operating environment.
- offshore field
- High reservoir temperature
- Large well spacing
Ageing surface facility which may required facilitiesupgrading.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
19/60
Limited detail assessment, planning and study inthe past.
The lack of technical capability in order to realizethe plan for projects effectively.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
20/60
WAYFORWARD
Focus in monetizing the possible EOR potentialhaving formal structure
Eg: EOR department with dedicated staff
Proposed a Key Performance Indicators reviewed from time to time to monitor the processof projects.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
21/60
All EOR project in Malaysia should be planned earlytoensured smoothness of progress.
Lesson learnt from one particular project will becaptured- to be shared with other staff in different projectprevent multiple mistake.
Clear and transparent work process must be in place to
ensure that all requirement for project assessment aremet.
Right mindset and behavior should be cultivated towarda sustainable EOR growth.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
22/60
CONCLUSION
It is recognized that there is amount of oil reservethat we can get through EOR process in Malaysiaoil field.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
23/60
SPE 95931
EOR INMALAYSIA: MAKINGITREALITY(PART
2)
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
24/60
ABSTRACT
PETRONAS had realized the importance to furtherincrease the recovery factor and so far has beenpersuing EOR implementation in its fieldaggressively.
Full-field WAG application in Dulang field is alreadyat its final stage of implementation.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
25/60
EOR project have also have been planned foranother 10 fields
- Tabu
-
Tapis- Guntung
- Kepung
- Angsi
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
26/60
EASTMALAYSIA/ BORNEO
- Baronia
- West lutong
- St Joseph
- Bokor- Baram
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
27/60
Dulang Tabu
BaroniaWest
Lutong
Tapis
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
28/60
INTRODUCTION
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
29/60
Oil reserves were declining from 1994 to2002 (Figure 1).
But increasing with the discoveries ofdeepwater field. In 2004, Malaysias average oil production
was about 620 thousands barrel per day.
Expected reserves life is only about 19years.PETRONASauthorize the entire oil and
gas in Malaysia (including upstream
exploration and production to downstream ofoil refinery) .
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
30/60
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
31/60
EOR INITIATIVES
National Oil Company endorsed a comprehensive IOR/EOR screeningstudy in year 2000.
Main processes that were considered having the most practical aspects inthe Malaysian oil fields:
- Chemical EOR
- Gas flooding
- Microbial EOR
Dulang field (Immiscible Water-Alternating-Gas, WAG)
- Dulang field Pilot Scheme in the S3 Fault Block- Injection performance
- Production performance of A2L
- Production performance of B5L
- Production performance of B16
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
32/60
SUMMARY FOR DULANG FIELD
PETRONAS believes that sufficient pilot data have beencollected and analyzed to enable fit-for-purposeassessment of Dulang field wide WAG implementation.
Observed pilot results were scaled up statistical method.
P50 (most likely) case showed and incremental of 18.5MMstb.
New compressor were installed.
Minimizing LP gas flaring for WAG re-injection.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
33/60
BARONIA FIELD IMMISCIBLE
SIMULTANEOUS GAS AND
WATER INJECTION)
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
34/60
Baronia RV2 is the third largest producing reservoirin the Baram Delta some 40 km offshore Sarawak.
Field production started since 1972.
The reservoir is of good characteristics, with:- Pi = 3420 psig - k = 70 md
- = 19 % - Swc = 31%- API = 42 - Bo = 1.6 rb/stb- GOR = 1038 scf/stb - = 0.3 cP
Oil production started under natural depletion drive,which saw rapid pressure decline due to weakaquifer support.
In 1994, peripheral water injection commented with
four horizontal injectors (BN-51, 52, 58 and 60).
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
35/60
PILOT STRATEGY FOR
THE BARONIA RV2
Aim is to test the feasibility of employing immisicble gasinjection process in Baronia RV2 reservoir.
The pilot feasibility was carried out using the 2001reservoir simulation model which then converted toEclipse 300 compositional format.
The model predicted that immiscible gas injection withcontinued simultaneous water injection at 3200 psig with5 MMscf/d injection rate could yield 2.7 MMstb
incremental recovery within 20 years.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
36/60
The source gas shall be from the discharge ofBaronia gas re-injection compressor that has a
maximum discharge pressure of 3000 psig.
As the required injection pressure is higher thanwhat the existing re-injection compressor candeliver, it is likely, that a booster compressor isrequired.
Baronia pilot is expected to be a showcase for alarge-scale immiscible gas injection in the BDO
fields.
SHELL estimated that the immiscible process couldgive up to 74 MMstb from four fields in this region.
WEST LUTONG FIELD
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
37/60
WEST LUTONG FIELD
Located at Baram Delta Province 12 km north-west offshoreLutong ,Sarawak
It was discovered in June 1966 with WL-1 and started oilproduction in July 1968- 35 wells has been drilled including16 sidetracks and 33 abandoned
KL and MN sands are the major producing reservoirs in WestLutong
The reservoir MN units have contributed some 40% of theproduction although these two zones have been defined andcharacterized as two seperated zones- M and N reservoirsare modeled as single unit in the pilot study.
The pilot was designed to test the feasibility of miscible gas
injection in Baram Delta Fields- due to large EOR potential
The objective of the pilot is to reduce the uncertainties of key
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
38/60
The objective of the pilot is to reduce the uncertainties of key
reservoir unknown that were identified as follows:
Remaining oil saturation- high recovery in sandstone reservoirs
Vertical sweep efficiency- multiple stacked pay
Areal sweep efficiency- few wells,no pattern,large spacing
Minimum miscibility pressure- aquifer supported or not
Injectivity and need for WAG injection- aquifer,high permeability
streaks,trapping
Th t l i t i l t b ti il t ith
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
39/60
The current plan is to implement an observation pilot program with one
injector and one or two observation well(s) to be drilled 100 feet away
High purity carbon dioxide gas will be used to supply the injectant gas
at miscibility condition- It is expected to run for 3 months at 1500 psi
injection pressure.
Continuous gas injection is considered due to extremely strong aquifer
Gas chromatography equipment will be required to monitor gas
breakthrough and composition as a function of throughput
Resistivity log must be run monthly to monitor flood front anddesaturation
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
40/60
TAPIS FIELDMISCIBLE OR NEAR MISCIBLE GAS FLOODING
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
41/60
LOCATION
Near southeastern end of Malay basin in the SouthChina Sea.
200 km off the east coast of Peninsular Malaysia inabout 64 km of water.
Tapis field discovered in 1969 by the Tapis.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
42/60
1 exploration well and 3 appraisal wells before
development drilling commenced in 1977. 4 platforms were installed and 90 development wells
were drilled in 1988.
The 5thplatform (Tapis E) was installed in 1998 to
develop the west and southwest fault block of the field. Tapis field is the one of main target field for EOR as
identified by EOR screening in 2000.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
43/60
THEFOCUSINSTUDYISCONCENTRATEDONEASTFAULTBLOCKOFTAPISFIELDSELECTEDBASED
ON:
Potential recovery of bypassed andresidual oil from mature waterflood paterns
in the block.Large remaining oil in place from thereservoir.
Moderately high degree of practicality.Relatively high degree of knowledge.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
44/60
One of the key findings in the element models is theincremental recovery from immiscible vs misciblefloods.
Immiscible floods yielded incremental recovery
between 4% - 7%.
Miscible floods gave higher recovery between 10%- 13%.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
45/60
It must be noted that the recoveries from these elementmodels may not represent the behavior of the same
process in the full field modeldifferent boundaryconditions, well spacing, pressure communication thatare present in the field.
Hence, currently a full-field modeling of the EOR process
is being undertaken to further understand and estimatethe EOR potential from Tapis.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
46/60
TABUFIELD(DOUBLE
DISPLACEMENT)
It is one of the twelve fields drilled and developed by EPMI to date
located in the southeastern part of the Malay Basin, approximately 200
kilometers east of Kerteh
an oval-shaped east-west trending anticline of approximately 26 square
kilometers.
Two major north-south trending normal faults separate the field into
East, Central and West fault blocks.
Water depth at the field is approximately 64 meters.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
47/60
discovered in October 1978 and field development wasinitiated in February 1986 with the commencement of adrilling program from the Tabu-A platform
Tabu-A development drilling was confined to the EastFault Block of the Tabu field
Later, the Tabu-B development drilling programcommenced in November 1995 to develop the West and
Central Fault Blocks as well as the underdevelopedareas of the East Fault Block
T b t f lt bl k (WFB) i th U I i i
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
48/60
Tabu west fault block (WFB) in the Upper I reservoirs isbeing tested for the double displacement process (DDP).
The DDP process is predicted based on the simulation
model generated for the fault block The response is expected to be positive as a result of the
sandwiching of the oil by the two north flank waterinjectors and the other two producers located in the north
At the same time, the up-dip injector forces the gas captowards southwest, thereby countering the aquifer influxand increasing future oil from nearby wells
Prediction runs showed that DDP for the Tabu WFB
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
49/60
Prediction runs showed that DDP for the Tabu WFBUpper I reservoirs alone will give an estimatedincremental of 1.8MMstb
The cost of flowlines, well restoration and surveillance isconsidered to be relatively minimal hence DDP for theTabu WFB Upper I had been designated as an early fieldtrial for the said process
A heightened surveillance program is currently beingundertaken to better understand the DDP performancebefore it is implemented in the full field mode
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
50/60
CHALLENGESAHEAD
Malaysia has seen a more focus and persistenteffort towards EOR
concerted collaboration within the EOR fraternityset up by PETRONAS
The fraternity is lead by EOR unit in PetroleumManagement Unit (PMU) and receives operationalsupport from the EOR unit in PETRONAS Carigaliwhilst PETRONAS Research and Scientific
Services (PRSS) served as one of the key technicalresource centre.
Th h f d t ll EOR
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
51/60
The group has so far managed to ensure all EORprojects identified to be evaluated.
The challenge that the fraternity is facing now is how to
bridge the people that are operating the fields to buy inthe idea of implementing EOR that requires them tochange their operation philosophy.
They also faced some difficulties to getting the right
staffing in the current tight manpower situation. Even with the right people and skills, fields in Malaysia
are located in an offshore environment is already achallenge.
EOR i till bj t i M l i
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
52/60
EOR is still a new subject in Malaysia
Thus, most of Malaysia producing fields were developedwithout taking EOR into consideration
more than two-third of existing platform age are morethan 20 years
For EOR to come into the picture and becomes reality,added investment may be needed in form of existing
platforms maintenance refurbishment to add water pumps and/or gas
compressor modules,
a new platform that substantially erodes the EOR
profitability
t i i EOR ti i ff h i t i
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
53/60
most promising EOR option in an offshore environment isgas injection
Source gas in some cases, may not be easy to come by
especially if it involves large quantity. In Peninsular Malaysia, gas supply is critical to the
running of gas pipelines that supply most of thepowerbproducers demand.
In the East Malaysia side, the MLNG plants also havehigh requirement for gas, thanks to the booming of worldLNG demand
In this situation EOR projects that usually shrouded with
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
54/60
In this situation, EOR projects that usually shrouded withuncertainties and lengthy payback is forced to competefor the source gas in comparison to the sales gas
demand that is usually immediate. Malaysia might be very fortunate because CO2 is
naturally in abundance,
work to synchronize these areas with EOR is currently
underway. technology advancement, lab studies and pilot learnings
can eliminate some of the technical hurdles,
But the economics usually hold back the implementation
of EOR
P d ti h i t t (PSC) h li it d
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
55/60
Production sharing contractors (PSC) have limitedproduction period granted by the host government
but the incremental from EOR projects can only be
realized well beyond the PSC expiry In cases, where the contract is nearing its expiry, it is very
difficult to get the PSC to even conduct an EOR feasibilitystudy.
Th h t f d h t t ti t f
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
56/60
The shortage of manpower and short retention rate ofstaff in our industry is also a great challenge with respectto EOR
EOR projects not only need people with deep technicalunderstanding in the field of petroleum engineering
but also have to compete with other initiatives in theCompany for suitable manpower supply and funding
WAY FORWARD
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
57/60
The value creation of EOR in Malaysia- a forward thinking and strategic
frameworks need to be considered
Malaysia is well positioned to implement succesful EOR projects-PETRONAS
Unfortunately,offshore EOR has its technical challenges- need to take some
calculated risk
Pilot initiatives are one way to reduce the risk
To ensure that EOR is being considered even before first production- PETRONAS
revising its FDP
For brown fields,EOR projects will be linked to full-field review (FFR) initiatives for
cost optimization
PETRONAS strives to excel in oil and gas industry
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
58/60
One promising solution that is currently under evaluation is by using carbon dioxide as
source gas in EOR- would not only secure a longterm supply of injectant gas but
also bring aditional gas reserves on stream
EOR projects in Malaysia have become reality partly- PSC
Although PETRONAS will continue to leverage on new signings to fund EOR
feasibility studies- still become reality in Malaysia
PETRONAS also working closely with its education division and Universiti Teknologi
PETRONAS (UTP)supply fresh manpower
Collaboration with another universities- long-term strategy to develop local
expertise
PETRONAS also recruits fresh graduates and leverage on Knowledge Management
(KM)tranfer knowledge to younger staff
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
59/60
CONCLUSIONS
EOR in Malaysia has becoming a reality to a certainextent.
The first case was in Dulang field where it was gearedtowards a full-field WAG implementation.
Tabu field although on smaller scale also shows that EORin certain cases can be implemented immediately atminimal cost.
Malaysia also have seen at least two EOR pilot projectsin Baronia and West Lutong respectively in 2006.
-
7/26/2019 Enhanced Oil Recovery - Group 3 Presentations
60/60
THANK YOU