enhance transparency in the existing processing of application

43
Online Consent Management & Monitoring System (OCMMS) for State Pollution Control Boards By NIC, New Delhi

Upload: pillan

Post on 04-Jan-2016

30 views

Category:

Documents


1 download

DESCRIPTION

Online Consent Management & Monitoring System (OCMMS) for State Pollution Control Boards By NIC, New Delhi. Objective. Enhance transparency in the existing processing of application. Reduce the processing time of application and related paper work - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Enhance transparency in the existing processing of application

Online Consent Management & Monitoring System (OCMMS)for State Pollution Control Boards

By

NIC, New Delhi

Page 2: Enhance transparency in the existing processing of application

Enhance transparency in the existing processing of application.

Reduce the processing time of application and related paper work

System will overall improve the functioning and performance of the SPCB

Citizen Centric

Objective

Page 3: Enhance transparency in the existing processing of application

Application Features

A highly interactive menu driven, user friendly customized package for non specialist end users at local level

Online Industry Registration

Online Submission of Application, Approval, Clarification and other activities for CTE/CTO for all category of Industries/Institutions

Online Scheme Monitoring and Evaluation System

User management at all level, reviewers and approvals

Online Workflow Management

Decision Support System – Guidelines, Alert/Notifications, Issues and Risk Management

Reports / Query

Download Facility – Forms, Documents etc.

Multi level Security Enabled System

Role based application access

State Specific Customization

Page 4: Enhance transparency in the existing processing of application

Modules/Sub-Systems

Consent Management- Consent To Establish for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/

Hospitals for Small, Medium and Large size industries.

- Consent To Operate for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries.

Waste Management System (BMW, HWM, MSW)

CESS Administration System

Laboratory Management System

Monitoring & Evaluation System

Delivery System

- Information, Alert and Notification through eMail etc.

Advisory System – Bulletin Board, News etc.

Report/Queries

Frequently Asked Questions (FAQ)

Page 5: Enhance transparency in the existing processing of application

Process Diagram - Workflow Management

Select “State->Define Workflow”

Select Industry Category (Red/ Orange/ Green)

Select Industry Type(Small / Medium/ Large)

Select Process Type(CTE/ CTO etc)

Process Type:· Consent to Establish· Consent to Operate· Inspection Process· CESS Management etc

Industry type could be Small/Medium/ Large etc.

Click “Create Workflow” (Sequntial/ Parallel)

· Role will be picked from master list; containing cumulative list of roles applicable to all states·

Assign User profile with the role. (EmailID and Phone

details will be used for alert/notifications)

Email ID and Phone details of user profile will be used by application for alerts and notifications.

Select Role-> Enter Level Sequence for Approval / Rejection / Clarification

Business Process Workflow Management

Page 6: Enhance transparency in the existing processing of application

Technology Stack

Open Source Technology Stack

- Apache/Tomcat 5.5

- Jdk 1.5

- PostGRE SQL8.2

Page 7: Enhance transparency in the existing processing of application

Data Requirement- Organization Structure

- List of Tehsil: District wise

- Roles & Activities: Admin and other roles

- Legacy Industry Data

Configuration

- Create Workflow- Create Profile and Roles

- Assign Activity and Forwarding Rights

- GO LIVE

Application Rollout Requirement

Page 8: Enhance transparency in the existing processing of application

OCMMS Home Page

Page 9: Enhance transparency in the existing processing of application
Page 10: Enhance transparency in the existing processing of application
Page 11: Enhance transparency in the existing processing of application
Page 12: Enhance transparency in the existing processing of application
Page 13: Enhance transparency in the existing processing of application
Page 14: Enhance transparency in the existing processing of application
Page 15: Enhance transparency in the existing processing of application
Page 16: Enhance transparency in the existing processing of application
Page 17: Enhance transparency in the existing processing of application
Page 18: Enhance transparency in the existing processing of application
Page 19: Enhance transparency in the existing processing of application
Page 20: Enhance transparency in the existing processing of application
Page 21: Enhance transparency in the existing processing of application
Page 22: Enhance transparency in the existing processing of application
Page 23: Enhance transparency in the existing processing of application
Page 24: Enhance transparency in the existing processing of application
Page 25: Enhance transparency in the existing processing of application
Page 26: Enhance transparency in the existing processing of application
Page 27: Enhance transparency in the existing processing of application
Page 28: Enhance transparency in the existing processing of application
Page 29: Enhance transparency in the existing processing of application
Page 30: Enhance transparency in the existing processing of application
Page 31: Enhance transparency in the existing processing of application
Page 32: Enhance transparency in the existing processing of application
Page 33: Enhance transparency in the existing processing of application
Page 34: Enhance transparency in the existing processing of application
Page 35: Enhance transparency in the existing processing of application
Page 36: Enhance transparency in the existing processing of application
Page 37: Enhance transparency in the existing processing of application
Page 38: Enhance transparency in the existing processing of application
Page 39: Enhance transparency in the existing processing of application
Page 40: Enhance transparency in the existing processing of application
Page 41: Enhance transparency in the existing processing of application

Capacity Building

SPCB1

SPCB2

SPCB3

SPCBn

Setup CPM Team at NIC- HQ

Development/ Customization on the

basis of changes required by SPCBs

Deployment of customized OCMMS at

SPCB Server

2 Asst. Programmers to be deployed at

SPCB HQ

Training Provide to the SPCBs staff at State

HQ

Training to the trainer in order to train people

at regional level

Implementation Process

Page 42: Enhance transparency in the existing processing of application

Financial Estimation (per state)

SNo Description Cost (in Rs.)

1 Hardware Cost ( 260000)  

1.1 1 Desktop 35000

1.2 1 UPS 5000

1.3 1 Scanner + Printer + Fax 20000

1.4 Server 200000

2 Network Connectivity Infrastructure Cost ( 275000)  

2.1 At SPCB office, minimum 2 Mbps, Router, Layer 2 Switch - Leaseline 200000

2.2 At RO/Do level, minimum 512Kbps - Broadband 75000

3 OCMMS Customization Cost ( 655250)  

3.1 1 Team Leader five man months@46000/- per man month

230000

3.2 1 Sr. Developer for five months@ 33000/- per month

165000

3.3 2 Programmers for five months @26025/- per man-month

260250

4 Implementation & Training Cost per SPCB(636000)  

4.1

4.2

2 Assistant Programmers at SPCB HQ for 1 year@16000/- per month

1 Assistant Programmer at each RO office for 1 year @16000/- per month

384000

192000/-

4.2 Travel Cost 60000

  Total 1826250

Page 43: Enhance transparency in the existing processing of application

Thanks