State Project No. 302-008 Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS Engineering Feasibility Report Page 90 May 2011

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 90

May 2011

Page 2: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 91

May 2011

Page 3: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 92

May 2011

Page 4: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 93

May 2011

Page 5: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 94

May 2011

Page 6: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 95

May 2011

Page 7: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 96

May 2011

Page 8: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 97

May 2011

Page 9: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 98

May 2011

Page 10: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 99

May 2011

Page 11: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 100

May 2011

Page 12: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 101

May 2011

Page 13: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 102

May 2011

Page 14: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 103

May 2011

Page 15: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 104

May 2011

Page 16: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 105

May 2011

Page 17: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 106

May 2011

Page 18: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 107

May 2011

Page 19: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 108

May 2011

Page 20: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 109

May 2011

Page 21: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 110

May 2011

Page 22: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 111

May 2011

Page 23: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 112

May 2011

Page 24: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 113

May 2011

Page 25: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 114

May 2011

Page 26: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 115

May 2011

Page 27: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 116

May 2011

Page 28: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 117

May 2011

Page 29: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 118

May 2011

Page 30: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 119

May 2011

Page 31: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 120

May 2011

Page 32: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 121

May 2011

Page 33: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 122

May 2011

Page 34: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 123

May 2011

Page 35: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 124

May 2011

Page 36: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 125

May 2011

Page 37: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 126

May 2011

Page 38: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 127

May 2011

Page 39: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 128

May 2011

Page 40: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 129

May 2011

Page 41: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 130

May 2011

Page 42: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 131

May 2011

Page 43: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 132

May 2011

Page 44: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 133

May 2011

Page 45: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 134

May 2011

Page 46: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 135

May 2011

Page 47: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 136

May 2011

Page 48: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 137

May 2011

Page 49: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 138

May 2011

Page 50: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 139

May 2011

Page 51: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 140

May 2011

Page 52: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 141

May 2011

Page 53: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 142

May 2011

Page 54: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 143

May 2011

Page 55: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 144

May 2011

Page 56: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 145

May 2011

Page 57: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 146

May 2011

Page 58: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 147

May 2011

Page 59: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 148

May 2011

Page 60: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 149

May 2011

Page 61: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 150

May 2011

Page 62: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 151

May 2011

Page 63: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 152

May 2011

Page 64: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 153

May 2011

Page 65: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 154

May 2011

Page 66: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 155

May 2011

Page 67: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 156

May 2011

Page 68: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 157

May 2011

Page 69: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 158

May 2011

Page 70: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 159

May 2011

Page 71: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 160

May 2011

Page 72: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 161

May 2011

Page 73: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 162

May 2011

Page 74: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 163

May 2011

Page 75: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 164

May 2011

Page 76: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 165

May 2011

Page 77: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 166

May 2011

Page 78: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 167

May 2011

Page 79: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 168

May 2011

Page 80: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 169

May 2011

Page 81: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

W

E N G I N E E R I N G E VA LUAT I O N O F A LT E R N AT I V E S

DA N B U R Y B R A N C H I M P R O V E M E N T P R O G R A M

TA S K 7

STATE PROJECT 302-008

FTA ALTERNATIVES ANALYSISDRAFT/FINAL ENVIRONMENTAL IMPACT STATEMENT

Page 82: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 170

May 2011

ENGINEERING EVALUATION OF ALTERNATIVES For each Build Alternative, Table 7 itemizes major work elements and their estimated construction costs (2010$). The costs shown do not include the percentage (118%) for engineering, railroad protection and contingency, nor do the costs equal the total estimate cost for an alternative. The capital cost estimates, including preparation methodology were presented earlier in this report. Unit costs for the various proposed work elements were developed for the present year (2010), based on the CTDOT’s Preliminary Cost Estimating Guidelines (January 2010), recent bids for various projects on the New Haven Line, and estimates prepared for upcoming projects. A comparison of the total capital costs for the alternatives including the construction, engineering, miscellaneous, are shown in Table 8. Percentages have been applied to estimate the costs of engineering and railroad protection services and for unknowns (contingency) at the present conceptual level of engineering. The values are based on past experience with railroad projects and discussion with CTDOT.

Table 7: Comparison of Major Work Elements for the Build Alternatives Alternative C Alternative D -

Diesel Alternative D -

Electric Alternative E

Work Type Quantity Cost ($000)

Quantity Cost ($000)

Quantity Cost ($000)

Quantity Cost ($000)

Track New track 4.5 miles $4,951 19.5

miles $21,447 19.5

miles $21,447 1.15

miles $1,261

Track shift 2.08 miles

$831 0 0 0 0 0.78 miles

$311

Turnouts 4 each $400 27 each $2,700 27 each $2,700 4 each $400 Cuts 69105

C.Y. $15,203 0 0 0 0 55480

C.Y. $12,206

Fills 22705 C.Y.

$4,314 12845 C.Y.

$2,441 12845 C.Y.

$2,441 7930 C.Y.

$1,507

Electrification Catenary 25 miles $24,746 NA 0 18.8

miles $18,809 8.07

miles $8,066

Substations 6 each $26,000 NA 0 3 each $14,000 2 each $8,000 RTUs 2 each $1,000 NA 0 0 0 1 each $500

Structures New/

Relocated UG Bridge

6 each $55,635 0 0 0 0 4 $51,505

Rehabilitated UG Bridge

12 each $40,415 6 each $61,630 6 $61,630 3 $11,505

Pedestrian 2 each $880 1 each $480 1 each $480 1 each $480

Page 83: Engineering Feasibility Report Page 90 · 2017-08-30 · Engineering Feasibility Report Page 171 May 2011 . Bridge Raise/Replace OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0 Retaining

State Project No. 302-008

Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS

Engineering Feasibility Report Page 171

May 2011

Bridge Raise/Replace

OH Bridge 1 each $3,516 0 0 7 each $35,626 0 0

Retaining Wall

45444 S.F.

$6,362 0 0 0 0 15950 S.F.

$2,233

C&S New Signal

System 0.78 miles

$1,560 19 miles $38,180 19 miles $38,180 1.33 miles

$ 2,233

Relocate Signal System

9550 L.F.

$2,388 0 0 0 0 1550 L.F.

$388

New Grade Crossing

3 crossings

$750 7 each $1,750 7 each $1,750 1 each $250

Control Ctr. modifications

yes $2,000 yes $2,000 yes $2,000 yes $2,000

Install Cab Signals

0 0 5 HRRC locos

$500 5 HRRC locos

$500 0 0

Stations New Stations 0 0 2 New

Stations $23,985 2 New

Stations $23,985 0 0

Station Upgrades

5 stations

$22,730 0 0 0 0 1 New Station

$12,810

Addl. Parking 535 Included 210 Included 210 Included 200 Included Yard Upgrade Included 1 New Included 1 New Included no 0 Utility Relocation yes $2,593 0 0 0 0 yes $2,243 Property Acquisitions 9.89

acres $4,945 11.74

Acres $5,870 11.74

Acres $5,870 5.9 acres $2,950

Construction Easements

4 each 100 0 0 0 0 2 $50

Table 8: Comparison of Infrastructure Estimated Capital Costs for the Build Alternatives

Alternative C Alternative D – Diesel

Alternative D –Electric Alternative E

Construction cost $185,278,587 161,582,725 230,018,519 110,373,541 Design & Permits 25% 46,319,647 40,395,681 57,504,630 27,593,385 Incidentals 23% 42,614,075 37,164,027 52,904,259 25,385,914 RR Protection 30% 55,583,576 48,474,818 69,005,556 33,112,062 Contingency 40% 74,111,435 64,633,090 92,007,408 44,149,416 Total Capital Cost 403,907,320 352,250,341 501,440,371 240,614,319