engineering document for seadrain(pp-fr)
TRANSCRIPT
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
1/12
Title Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 1 of 12Approved Quality Manager: Approved Engineering Manager:
SUMMARY
1. PURPOSE ...................................................................................................................... 22. FIELDS OF APPLICATION ............................................................................................ 23. SYSTEM DESCRIPTION AND PHYSICAL CHARACTERISTICS .................................. 24. CERTIFICATION ............................................................................................................ 3
4.1. TYPE APPROVALS .............................................................................................................. 35. SYSTEM COMPONENTS ............................................................................................... 3
5.1. PIPES .................................................................................................................................... 35.2. FITTINGS .............................................................................................................................. 3
6. DESIGN INSTRUCTION ................................................................................................. 66.1.
GENERAL ............................................................................................................................. 6
6.2. COUPLINGS ......................................................................................................................... 76.3. PENETRATIONS ................................................................................................................... 86.4. CLAMPING ............................................................................................................................ 9
7. INSTRUCTIONS FOR PROCESSING AND MOUNTING DETAILS ............................. 107.1. GENERAL ........................................................................................................................... 107.2. PIPE CUTTING ................................................................................................................... 107.3. BENDING ............................................................................................................................ 107.4. INSTRUCTIONS FOR PROCESSING AND MOUNTING DETAILS .................................. 11
8. RESPONSIBILITY ........................................................................................................ 12
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
2/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 2 of 12
1. PURPOSE
Purpose of this procedure is to give information about material, design, working methods, andassembly criteria for GEORG FISCHERs SeaDrain polypropylene pipes and components.
2. FIELDS OF APPLICATION
According to the limits and the requirements of Classification Societies, the SeaDrain systemis applicable for the following non-essential and non-pressure systems:
Black and grey water sanitary drains (internal)
Scuppers and discharges (overboard)
Sounding and air vent for water tanks/dry spaces
The field of application of the system for the specific ship is defined in the Piping Scheduledrawing issued for construction.
3. SYSTEM DESCRIPTION AND PHYSICAL CHARACTERISTICS
Pipes and fittings are made of PPFR1, polypropylene blocks homopolymer with the addition ofCalcium Carbonate and Barium Sulphate fillers, of commercial production conforming toASTM F1412 standard specifications.
Material characteristics:
Mechanical
Properties Unit Value ASTM Test
Density at 23C gr/cm3 26.02 ASTM D792
Tensile Strength at 23C (yield) PSI 4500 ASTM D638
Elongation at Break % 200 ASTM D638
Flexural Strength at 23C PSI 200000 ASTM D790
Izod Impact at 23C Newton 53.4 ASTM D256
Relative Hardness at 23CRockwell"R" 80 ASTM D785
ASTM Cell Classification B63153 ASTM D3350
Thermodynamics
Properties Unit Value ASTM Test
Coefficient of Thermal Linear Expansion per C m/m/C 10.98 x 10-5 ASTM D694
Maximum Operating Temperature (peak) C 100 -
Heat Distortion Temperature at 264 PSI C 80 ASTM D648
Flammability & Smoke
Properties Unit Value ASTM Test
FlammabilityHB
(self-extinguishing) UL94
Flammability: Average Time of Burning sec >5 (actual 2.7) ASTM D635
Flammability: Average Extent of Burning mm >5 (actual 1.8) ASTM D635
Smoke Density : Maximum % 88.7 ASTM D2843Smoke Density : Rating % 67.8 ASTM D2843
1PPFR = Polypropylene Fire Retardant
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
3/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 3 of 12
4. CERTIFICATION
4.1. TYPE APPROVALS
The FUSEAL SEA DRAIN system is certified by the following Classification Societies:
LR n 05/60003(E1) validity: 05.10.2014
GL n 24910-05HH validity 02.02.2010
ABS n 05-HS118095A-PDA validity 14.10.2010
DNV n K-5008 validity 30.06.2016
5. SYSTEM COMPONENTS
5.1. PIPES
NOMINALDIAMETER mm
EXTERNALDIAMETER mm
THICKNESSmm
STANDARDDRAWING
40 48.3 3.7
375511
50 60.3 3.9
80 88.9 5.5
100 114.3 6.0
150 168.3 7.1
5.2. FITTINGS
Fittings used in the piping system described in the present standard are specified in thefollowing prospect.
FITTING TYPESTANDARD DRAWING
DESCRIPTION REPRESENTATION
COUPLING(SxS)
375551
SLEEVE COUPLING(SxS)
375554
1/4 BEND SHORT SWEEP
(91.2 ELBOW)(SxS) & (SxSPG)
375521
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
4/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 4 of 12
FITTING TYPESTANDARD DRAWING
DESCRIPTION REPRESENTATION
1/4 BEND LONG SWEEP(91.2 ELBOW)(SxS)
NE 375525
1/6 BEND(60 ELBOW)(SxS)
375527
1/8 BEND(45 ELBOW)(SxS) & (SxSPG)
375522
1/12 BEND(30 ELBOW)(SxS) & (SxSPG)
375523
1/16 BEND(22.5 ELBOW)(SxS)
375530
1/24 BEND(15 ELBOW)(SxS) & (SxSPG)
375524
3-Way Ell(Double 91.2 Elbow)
(SxSxS)
NE 375526
45 WYE(SxSxS)
375532
45 WYE DOUBLE(SxSxSxS)
375536
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
5/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 5 of 12
FITTING TYPE
STANDARD DRAWINGDESCRIPTION REPRESENTATION
LONG TURN TEE WYE(91.2)(SxSxS)
375528
COMBO WYE(90)
(SxSxS)
375529
SANITARY TEE(91.2)(SxSxS)
375531
SANITARY TEE - DOUBLE(91.2)(SxSxSxS)
375535
REDUCER & INCREASER(SPGxS) (SxS)
375542
CAP(S)
375571
MALE ADAPTER (ISO)
(SxMT)375572
FEMALE ADAPTER (ISO)(SxFT)
375573
VAN-STONE FLANGE - 150 lb(S)
375581
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
6/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 6 of 12
FITTING TYPE
STANDARDDRAWINGDESCRIPTION REPRESENTATION
VAN-STONE FLANGE - PN16(S)
375580
CLEANOUT TEE w/PLUG(SxSxFT)
375513
CLEANOUT ADPATER w/PLUG(SPGxFT)
375575
Fusion 375588
6. DESIGN INSTRUCTION
6.1. GENERAL
With reference to the adoption of this system in different internal ships areas, there areno limitations thereof. According to Res. A.753(18) for the application of plastic pipeson-board ships, the SeaDrain system can be adopted passing through watertightbulkheads or decks, with the condition that the watertight integrity and strength integrityof the bulkhead or deck shall be maintained. In case the bulkhead or deck is both
watertight and fire division and destruction by fire of the plastic pipes may cause theinflow of liquids from tanks, a metallic shut-off valve operable from above the freeboarddeck should be fitted at the bulkhead or deck.
Application in external areas subject to continuous UV radiations shall be avoided.
Further technical requirements shall be fulfilled if indicated in the followingdocumentation, issued for construction:
Piping Schedule
Pipe, ducts and cable runs deck/bulkhead penetrations drawings
P&I diagrams (Mechanical functional diagrams)
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
7/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 7 of 12
flangedfitting
Fluid conditions for design
Properties Unit Value Notes
Temperature range in operating conditions C 0-80 -
Maximum admissible temperature C 100Peaktemperature
Maximum admissible pressure barg 1,76With safetyfactor 4
Vacuum bar 0,2 80% absolute
6.2. COUPLINGS
6.2.1. Coupling between PPFR pipesThe coupling of SeaDrain system is to be carried out by means of insertion ofpipe ends into sockets and automatic electrical-fusion.
For assembly instructions, see par. 7.
6.2.2. Coupling between PPFR pipes and flanged fittings
Flanged couplings are used for coupling of PPFR with:
pipes of different material
valves or other flanged fittings
PPFR pipes where needed for installation requirements.
PN6 couplings: by means ofPPFR flanged adapter andgalvanized steel loose flange.
PN16 couplings: by means ofPPFR Van Stone flange.
Van StonePPFR flange(NE375574)
PPFR flangeadapter
(NE375574)
Galvanizedsteel loose
flangeNI506211
flangedfitting
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
8/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 8 of 12
6.2.3. Coupling between PPFR pipes and threaded fittings
a) 375572 b) 375573
By means of male a) orfemale b) PPFR threadedsection end, welded to thepipe.
6.3. PENETRATIONS
6.3.1. Fire Class and watertight divisions
Penetrations through Fire Class divisions (A, B divisions) and through watertightdivisions are detailed in the Pipe, ducts and cable deck/bulkhead penetrationsdrawing, issued for construction.
6.3.2. Decks/bulkheads without fire class or watertight prescriptions
Penetrations through decks or bulkheads without fire class or water-tight divisionprescriptions are carried out without special measures (see figures 1 and 2).
A securing PVC tape shall be arranged on the portion of pipe crossing thedeck/bulkhead, in order to prevent damages to the PPFR pipe due to possible contactwith the hole steel edges.
A coaming shall be arranged on decks in humid areas, where water leakages mightoccur.
Fig. 1 Fig. 2
bulkhead
deck coaming
PVC tape
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
9/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 9 of 12
6.4. CLAMPING
6.4.1. Anchoring points
The fixed mounting is guaranteed by the manufacturer, with a maximumspacing allowable between anchoring points as defined in the following table.
Note: It is recommended to guarantee the defined span and not to support thesystem in correspondence of each welded coupling or bend.
6.4.2. Clamps
To support the pipes, the clamps shown are in two halves with the insertion ofPVC tape to avoid damages, shall be adopted (see fig. 3).
Fig. 3
Pipe O.D. [mm] 48.26 60.32 88.9 114.3 168.28
Distance between clamps for
horizontal pipes1300 1400 1700 1800 2200
Distance between clamps forvertical pipes
1600 1700 2000 2200 2600
PVC tape
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
10/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 10 of 12
7. INSTRUCTIONS FOR PROCESSING AND MOUNTING DETAILS
7.1. GENERAL
To maintain optimum long-term performance of the SeaDrain PPFR pipes thefollowing indications have to be fulfilled.
Avoid untidy transport if the pipeshave been removed from theiroriginal packaging.
To avoid deformations as timegoes by, the maximum stackingheight must not exceed 2metres, whatever the diameter.
Outdoor storage must be limitedto a maximum of six months andthe pipe should be covered witha light covered tarp to helppreventing UV attack.
The pipes must be laid onsmooth flat surfaces.
Avoid dragging them on theground or rubbing against the
sides of the vehicle.
7.2. PIPE CUTTING
Pipes to be cut at right angle by means of mitre saws or plastic pipe wheel cutters only,NO SHEAR cutters are allowed. An internal deburring can be carried out if necessary.Pipe ends to be then bevelled to facilitate joining.
7.3. BENDING
To be exclusively carried out by moulded fittings (see par. 5.2).
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
11/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 11 of 12
Therefore, pipes shall not be bent.
7.4. INSTRUCTIONS FOR PROCESSING AND MOUNTING DETAILS
Jointing of +GF+ SeaDrain system are made by electro-fusion as described in thefollowing guidelines2.
Cut pipe end square and bevel the pipe end.
Clean the surface & fusion collar (socket) with a lint-freetissue and a GF approved cleaner.
Mark the socket insert depth on the pipe end.
Insert the pipe into the fitting and push it up to the pipestop. The pipe must be fully inserted into the fitting socketto the pipe stop. Rotate the collar in way that the socketdepth mark is visible when looking at the duplexreceptacle.
Verify the continuity of the collar by using the continuitytester provided on the bar code set.
Tighten the clamp.
Proper clamp tightness will result when the fitting cannotbe rotated by hand on the pipe (minimum 2 clicks).
Verify the material setup on the MSA250 Multi to read PP.
Install the welding cable plug into the duplex connector onthe fusion collar.
Scan the bar code for the fusion parameters, verifying thatwe are welding and scanning the correct pipe diameter.
2For further information, refer to +GF+ SeaDrain (1 6) Installation and training manual.
-
7/28/2019 Engineering Document for SeaDrain(PP-FR)
12/12
Titile Yard Number
INSTRUCTIONS FOR THE DESIGN ANDASSEMBLY OF +GF+ SeaDrainSYSTEM PPFR POLYPROPYLENE
PIPING
-
XXX.XXX.XXXDate
12-09-2012
Engineering ManualRevision
A Page 12 of 12
Verify the time on the MSA250 with the bar code card.
Remember, the MSA250 has an internal temperaturesensor and will adjust the fusion time to compensate forhigher or lower ambient temperatures.
Start the fusion cycle by pressing the Green start buttonon the MSA250 Multi, the countdown starts and an audiblealarm sounds when the welding is done.
Allow the joint to cool for at least 10 min before disturbing
8. RESPONSIBILITY
This information is provided as a reference only document and +GF+ is notresponsible for any errors found or misuse of the information provided.
Please review and understand all installation documents for the referenced pipingsystem and each installer must attend a training class and successfully pass an
understanding exam every 12 months.
Please review and understand all technical documents available for the referencedpiping system. These can be found at www.gfpiping.com