1 Waste Services Monthly Review > March 2013 Engineering and Commercial Infrastructure - Waste Services Monthly Review - 18 April 2015 to 15 May 2015

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 1  Waste Services Monthly Review > March 2013 

Engineering and Commercial Infrastructure -

Waste Services

Monthly Review -

18 April 2015 to 15 May 2015

Page 2: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 2

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

Overview……………………………………………………………………………....………………3

1.0 Finance........................................................................................................................4

1.1 Community Service Obligations – fee waivers 1.2 Waste Operating Revenue Less Expenditure 1.3 Accrued Waste Operating Revenue Less Expenditure 2.0 Client Service..............................................................................................................6 2.1 Client Requests 2.2 Number of Bin Requests Actioned by Bin Contractors 2.3 Contractor Service Delivery Performance 2.4 Education

2.4.1 Education Program 2.4.2 Waste Education Trailer 2.4.3 Community Composting Workshops

2.5 Voucher implementation 3.0 Asset Management...................................................................................................11

3.1 Hogan’s Pocket Landfill Waste Disposal Tonnages 3.2 Landfill Gas 3.3 Greenwaste Management 3.4 Projects 3.4.1 Sarina Rehabilitation 3.4.2 Hogan's Pocket Cell 1 Capping 3.4.3 Hogan's Pocket Cell 3 Development

3.4.4 Waste Services Contract Development 3.4.5 Bin Audit 3.4.6 MRF Renewal Project Regulatory/Compliance.......................................................................................................15

4.1 Surface Water Discharge Management 4.2 Waste Facility Audits

 

 

Page 3: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 3

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

Overview

This report is for Waste Services activities for March/April 2015. Please note that references to the March to April reporting period covers the period 18 April 2015 to 15 May 2015. Significant items in this period include:

1. Waste and Recycling Collection Services extended into three roads at Seaforth

2. The Water & Waste Advisory Board met on 5 May 2015 with positive feedback being received from the Board on the effort, commitment and attitude of all involved

3. Preparation of the 2015/2016 Budget and Long Term Financial Forecast

Director Engineering & Commercial Infrastructure

Page 4: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 4

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

1.0 Finance

1.1 Community Service Obligations – Fee Waivers

Not for Profit Organisations – Total Waste Disposals as at 15 May 2015

$45,129.27

$62,680.00

$0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000

$ (inc gst)

Budget for 2014/2015 YTD Expenditure 2014/2015

1.2 Waste Operating Revenue Less Expenditure

New financial reports have been included in the report for the first time. The objective is to provide improved tracking of revenue vs expenditure

The following chart shows the actual budget and forecast Earnings before Interest, Taxes and

Amortization (EBITA) based on cash accounting for the 2014/2015 financial year. The saw tooth nature of the graph is reflective of the timing of waste revenue received

-

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15

Rev

enu

e le

ss

Exp

end

itu

re (

Ma

rgin

) $

Budget - Waste Actuals - Waste Proj. Actuals - Waste

 

Page 5: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 5

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

1.3 Accrued Waste Operating Revenue Less Expenditure

The following chart shows the estimation of the accrued revenue less expenditure. The capital revenue has been excluded

-

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

Rev

enu

e le

ss E

xpen

dit

ure

(M

arg

in)

$

Accruals Budget Accruals Actuals Accruals Projected Actuals

Page 6: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 6

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

2.0 Client Service

2.1 Client Requests

Number of Staff Requests by Type for April/May 2015. There are a number of new request types created under the new contract.

4 51 1

28

8

79

3

79

6

11

5

0

10

20

30

40

50

60

70

80

90

Page 7: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 7

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

2.2 Number of Bin Requests Actioned by Bin Contractors

The following graph shows the number of bin requests actioned by Bin Contractors for April/May 2015

10

1

126

41

6

104

120

5

0

20

40

60

80

100

120

140

 

 

2.3 Contractor Service Delivery Performance With the change of contract for the provision of Waste and Recycling Collection Services this review now measures the performance of the new contractor. As part of Waste Services ongoing commitment to improve services, collection services have been extended in the Seaforth area, due to collection run reviews. Waste and recycling collection services have now been extended to Gormley’s Road, Miers Road and Dunwoody’s Road during the reporting period. The following pie chart identifies delivery of requests to the contractor and is applied according to Service Level Agreement (SLA) in the contract. Service Level Agreement target is 3 days. For this reporting period, there are a large number of requests that are outside of SLA. The reasons that, for this reporting period, the performance was not meeting Council’s expectations are:

Page 8: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 8

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

The bedding down of the new administrative processes for the management of client requests.

The issue is likely to be addressed in implementing further improvement with enhanced Pathway facilitating upload from the contractors’ database, thus streamlining administrative process. Improvement is noted since the last period as 35% of actions were over SLA, whilst this period is 21%. Waste Services are confident that for the next reporting period the contractor will be approaching the expected SLAs.

87

326

Bin ContractorBreach

Bin ContractorWithin SLA

  

The following graph identifies the number of service delivery requests achieved according to number of days. Service Level Agreement target is 3 days.

33

96

183

77

18

3 1 2

0

20

40

60

80

100

120

140

160

180

200

1 2 3 4 5 6 7 8

Days to Action

Total Requests

Page 9: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

 Page 9

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

In addition to the table, the following chart illustrates the trend service reliability through missed services. This covers the four week period of the report. Of approximately 73,000 services conducted, 79 general waste and 42 recycle collections were missed. Waste Services continues to work with the contractor to improve reliability.

0

5

10

15

20

25

30

1 2 3 4

Missed ServiceGeneral

Missed Service Recycle

2.4 Education

Environmental Education Performance

2.4.1 Education Program MRF visits are unavailable from March to June during the refurbishment of the site by the new contractors,

Recycling Design and Technologies (Aust.) Pty. Ltd. Recycling education sessions given at Pioneer Community Kindergarten, Eimeo Kindergarten and

Goodstart Early Learning West Mackay. Waste minimisation and Worm Farming Education Sessions conducted with Bucasia State School Year 4

students, Mackay Positive Learning Centre high school students and Andergrove State School Year 4 students.

Composting & Worm Farming Education given at Marian Kindergarten Waste Education Program information session given to adult early childhood students at Central

Queensland (CQ) Technical and Further Education (TAFE).

2.4.2 Waste Education Trailer

Visited ‘Ag.Trade Life’, two day event on 1st and 2nd May as an exhibitor. This event attracted more than 3000 visitors with a constant stream of people visiting the Waste Education Trailer. The public had an opportunity to enter a worm farm competition with a local Kuttabul family winning this sought after prize.

Visited St Francis Catholic School and delivered recycling and worm farming education to the Prep students.

2.4.3 Community Composting Workshops

Sponsored a free composting workshop for Friends of the Gardens volunteers to celebrate ‘Year of Soils’ on Saturday 18 April at the Community Gardens.

Sponsored a free community composting workshop at the Mackay Community Gardens on Saturday 9 May.

Page 10: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

  Page 10

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

2.5 Voucher Implementation

Client Services

Voucher TrialThe Voucher implementation continues to be adopted by the community. Voucher usage for the reporting period is as follows: Total number of Vouchers issued to residents for the First Rating Period – 145,344 Total number of Vouchers issued to residents for the Second Rating Period – 146,313 Total number of First Rating Period Vouchers presented across all sites (Aug ’14 to end Mar ’15) – 34,693 The redemption rate for the First Rating Period Vouchers – 23.9%

Total Vouchers presented for the reported period 18 April 2015 to 15 May 2015 – 4,463 Total number of Second Rating Period Vouchers presented YTD – 13,502 The redemption rate YTD for the Second Rating Period Vouchers – 9.2% Total actual value of Vouchers presented during the reporting period - $32,250 Total actual value of Vouchers presented to date – $370,561

The second round of Dump Vouchers were issued with Rates Notices in February 2015 and were available for use by residents from date of receipt.

0

10000

20000

30000

40000

50000

60000

Jul 14‐Aug 14

Aug 14‐Sept 14

Sept 14‐Oct 14

Oct 14‐Nov 14

Nov 14‐Dec 14

Dec 14‐Jan15

Jan 15‐Feb 15

Feb 15‐Mar 15

Mar 15‐Apr 15

Apr 15‐May 15

Dump Voucher Usage

Green Waste  Trans. Using Vouchers General Waste Trans. Using Vouchers

No. Voucher presented across all sites YTD

 As the above graph illustrates there was a surge in the use of Vouchers for Feb/Mar and Mar/Apr. This is due to the overlap of the two rating period Vouchers and it is expected that the redemption rate will trend downwards for the rest of the financial year.

Page 11: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

  Page 11

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

3.0 Asset Management 3.1 Hogan’s Pocket Landfill Waste Disposal Tonnages

The above chart represents the monthly tonnes disposed of at Hogan's Pocket Landfill. This chart shows that tonnes this financial year have been down when compared with previous financial years.

The above chart currently shows that tonnes of waste received in 2014/2015 continues to be below 2011/2012 levels.

3.2 Landfill Gas

The below chart depicts the monthly tonnes of CO2-e destroyed. In November 2014 there was a step change in production, with the new well field in Cell 2 coming online. The new well field appears to have increased production by approximately 500 tonnes CO2-e per month.

Page 12: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

  Page 12

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

3.3 Greenwaste Management

The above graph illustrates the tonnage rates for greenwaste processed for the period, the cumulative tonnes of greenwaste processed for the year to date and the tonnes of greenwaste projected to be processed linearly. The production of processed greenwaste remains highly variable and the projected totals are a guide only.

Currently due to the drier weather that the region is experiencing the tonnes of greenwaste processed is below forecast.

3.4 Projects

Waste Services undertakes a range of projects across the business. Projects take the form of capital projects, planning, research and investigations.

3.4.1 Sarina Rehabilitation

Program Project%

Complete

WSSarina Rehabilitation 60%

Status Budget Time

Deferred

On 29 April 2015 presented to Council the outcomes of that review and the designs. Decision to use conventional clay capping with approximate $2M saving. Design to commence 2016.

Page 13: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

  Page 13

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

3.4.2 Hogan's Pocket Cell 1 Capping

Complete

100% Project completed.

Hogan's Pocket Cell 1 Capping

Program Budget Time

WS

"Photo Caption"

3.4.3 Hogan’s Pocket Cell 3 Development

 Program Project

Complete

WS

Cell 3 

Construction 5% Design

Status Budget Time

Cell 3 tender was advertised on 31 January 2015 and closed on 12 March 2015. It is anticipated that contract award will occur during late May and works are to commence onsite early July 2015. The 3.9 ha cell will contain approximately 1 million cubic metres of Mackay's future waste.

3.4.4 Waste Services Contract Development

Program Project % Complete

WS Tenders 70% Status Budget Time

In progress

Finalised Tenders o Waste and Recyclables Collection Serviceso Recyclables Processing Serviceso Expression of Interest Development of Construction and Demolition Waste Facilities Currently the following tenders are being evaluated:o Green Waste Processing Serviceso Transfer Stations Site Control Services o MRC 2015-026 Resource Recovery Facility Services and Paget Transfer Station Services The following tenders are being drafted for future release:o Roll on – Roll off bins The focus during the reporting period was on the MRC 2015-026 Resource Recovery Facilities Services and Paget Transfer Station Services tender and the Greenwaste Processing Services tender. It is expected that tender reports wil be provided to Council in late May/ early June 2015 on these tenders. For the next reporting period the focus will be on the roll on - roll off bin tender and the commencment of the landfill services tender.

Page 14: Engineering and Commercial Infrastructure - Waste Services · 2015-06-10 · Page 3 Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015 Overview

 

  Page 14

Engineering & Commercial Infrastructure Monthly Review > 18 April 2015 to 15 May 2015

3.4.5 Bin Audit

Program Project% Complete

WS 240lt Bin Count 99% Status Budget Time

In progressIdentify properties receiving service to ensure council is recovering all rates - 47,700 counted. The audit is currently addressing issues of multiple presentations and verifying data. We are also utilising J-Track data to identify multiple presentations. Figures for this period are; Number of additional services taken up due to the audit - 2Number of bins returned due to the audit - 65 Number of requests raised due to audit - 73 Number of Multiple Bin requests addressed as a result of the audit - 124 Number of outstanding Multiple Bin requests - 76 Number of properties added to rates not previously paying - 7 Totals to date; Number of additional services - 108 Number of bins returned - 718 Number of Multiple Bin requests addressed - 1374 Number of properties added to rates not previously paying - 155

3.4.6 MRF Renewal Project

Program Project%

Complete

WS MRF Renewal 30%

Status Budget Time

In ProgressThis project sees the renewal of plant within the Material Recovery Facility. This is conducted as part of the Design Build Operate contract. Part of this project has received joint funding for plant to crush glass through Australian Packaging Covenant and DEHP. Current risk is commencement of installation due to delay in arrival of plant. Installation to commence in early June. Work currently in progress toward construction of bunker at rear of premises to store crushed glass.

4.0 Regulatory/Compliance

4.1 Surface Water Discharge Management

No matters to report.

4.2 Waste Facility Audits

Internal audits of other MRC Waste Facilities have been ongoing. No significant issues to report for this reporting period.