Mr. Scott Solid Waste Division ARKANSAS DEPARTMENT OF
ENVIRONMENTAL QUALITY 5301 Northshore Drive North Rock, AR 72118-5317
RE: Engineer Certification Report County Recycling Facility
November 21,2013
Parking Addition Construction Project Arkansas
#0013-SWTP-Rl 35-00317
Dear Me Williams:
Enclosed please find one (1) bound copy and one (1) electronic copy in CD-R format of -'--'U"'"'·"'"'~ Certification Report for the above referenced site. Should you have any questions
or information, please do not hesitate to contact me.
enclosure( s)
cc:
JEFF-8640
s.
Respectfully,
PMI
{32 Brad Wingfiel , Project Manager
e FAX
ENGINEER CERTIFICATION REPORT
JEFFERSON COUNTY RECYCLING FACILITY PARKING ADDITION CONSTRUCTION PROJECT
6700 GRAVEL PIT ROAD WHITE HALL, ARKANSAS
PERMIT # 0013-SWTP-R1
AFIN 35-00317
Prepared by:
Pollution Management, Inc. 3512 S. Shackleford Road
Little Rock, AR 72205-6933
JEFF-8640
TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................... 1
2.0 SUMMARY OF CONSTRUCTION ................................................................................... 1
3.0 SUMMARY OF FINAL SITE VISIT ................................................................................. 2
4.0 PROFESSIONAL ENGINEER’S CERTIFICATION ........................................................ 3
FIGURE: Figure 1: Vicinity Map DRAWINGS: Drawing Number 1: Aerial Site Layout for Parking Addition Drawing Number 2: Grading Plan LIST OF APPENDICIES: Appendix A: ASTM D6270-08 Standard Practice for Use of Scrap Tires in Civil
Engineering Applications Appendix B: Laboratory Testing Results Appendix C: Logs of Field Visits Appendix D: Photographs
Engineer Certification Report Jefferson County Recycling November, 2013
1
1.0 INTRODUCTION
Jefferson County Recycling Facility (JCRF) has completed construction of the parking
addition construction project located in White Hall, Arkansas, see vicinity map, Figure 1. The
construction project used tire derived aggregate (TDA) as fill material.
The parking addition construction project was designed and permitted by Pollution
Management, Inc. (PMI) of Little Rock, Arkansas. The design of the parking addition was
submitted to Arkansas Department of Environmental Quality (ADEQ) for approval. ADEQ
approved the design and issued permit number 0013-SWTP-R1 for the construction project.
JCRF used local county equipment and staff for the construction project, and contracted with
Anderson Engineering Consultants, Inc. of Little Rock, Arkansas for the laboratory and onsite
testing.
PMI provided full time on-site construction observation during the construction of the
project. PMI provided Quality Assurance/Quality Control (QA/QC) for the installation of the
soil and TDA fill material. Anderson Engineering Consultants, Inc. provided QA/QC for the
construction parking addition.
2.0 SUMMARY OF CONSTRUCTION
The general sequence of construction and a description of the design components from
the ground up are as follows:
a. Perform laboratory testing of soil and TDA to obtain Proctor Curve;
b. Install erosion and sedimentation controls around the area to be disturbed and around soil stockpile areas;
c. Strip topsoil and stockpile onsite; d. Excavated remaining soil and stockpile on site separately;
Engineer Certification Report Jefferson County Recycling November, 2013
2
e. Place Type B TDA and compact in place using a maximum of 300 mm lifts; f. Maintain 3H:1V slope along the west, south, and eastern perimeters of the disturbed
area; g. Place and compact lifts until 3 meter thickness of TDA is achieved; h. Cover the TDA with a geotextile and a minimum of 0.5 meters of soil and compact; i. Place BAB in parking area; j. Revegetate all disturbed areas not receiving BAB; k. Maintain erosion and sedimentation controls until final stabilization is achieved;
3.0 SUMMARY OF FINAL SITE VISIT
The parking addition was constructed according to the design plans and specifications.
The onsite materials met the requirements of the design specifications. The final site visit by
PMI personnel occurred on October 11, 2013, at which time, JCRF had completed placing and
compacting all fill material. BAB was placed in the area immediately after all grading activities
were complete. All disturbed surfaces not receiving BAB will be revegetated. All erosion and
sedimentation controls will be maintained until final stabilization is achieved. Listed below in
Table I is the amount of tires used to created the TD A fill material.
FIGURE
DRAWINGS
APPENDIX A
ASTM D6270-08
Standard Practice for Use of Scrap Tires in Civil
Engineering Applications
APPENDIX B
Laboratory Testing Results
APPENDIX C
Log of Field Visits
APPENDIX D
Photographs
1
Engineering Certification Report Jefferson County Recycling Facility
Parking Addition Construction Project
Photograph No. 1
Job Number: JEFF-8640
Date: November 1, 2012
Taken By: Andrew Gertsch
Description: Excavated park-ing area receiving fill in lifts. Picture is looking west.
Photograph No. 2
Job Number: JEFF-8640
Date: November 1, 2012
Taken By: Andrew Gertsch
Description: Excavated park-ing area receiving fill in lifts and compacted with sheepsfoot roller. Picture is looking east.
2
Engineering Certification Report Jefferson County Recycling Facility
Parking Addition Construction Project
Photograph No. 3
Job Number: JEFF-8640
Date: November 1, 2012
Taken By: Andrew Gertsch
Description: Silt fence in-stalled on southern perimeter of area of excavation. Picture is looking east.
Photograph No. 4
Job Number: JEFF-8640
Date: November 1, 2012
Taken By: Andrew Gertsch
Description: Silt fence in-stalled around excavated soil stockpiles. Picture is looking east.
3
Engineering Certification Report Jefferson County Recycling Facility
Parking Addition Construction Project
Photograph No. 5
Job Number: JEFF-8640
Date: October 11, 2013
Taken By: Brad Wingfield
Description: Completed fill and compacted parking area to receive BAB. Picture looking southeast.
Photograph No. 6
Job Number: JEFF-8640
Date: October 11, 2013
Taken By: Brad Wingfield
Description: Completed fill and compacted parking area to receive BAB. Picture is looking southwest.
4
Engineering Certification Report Jefferson County Recycling Facility
Parking Addition Construction Project
Photograph No. 7
Job Number: JEFF-8640
Date: October 11, 2013
Taken By: Brad Wingfield
Description: Silt fence re-maining until final stabiliza-tion is achieved. Picture is looking west along southern perimeter of parking addition.