eng. sherif kadry c.v.updating april 2016
TRANSCRIPT
1
Sherif kadry Sayed Mohamed Shalaby
Address: Egypt – Cairo - El maadi Home Tel No: +2 - 25236684
Mobile Tel No: +2 01146499920 / +2 01111163737/ +2 01006611095
Email: [email protected]
Skype: lion_heart_ha_sh
Career objective
Seeking a job as a member of your management team where my skills can help your organization to
achieve its goals, I hope to join your team work as an active member.
Personal Information Nationality : Egyptian
Birth date : 1-4-1978
Place of birth : Egypt
Gender : Male
Religion : Muslim
Marital Status : Married and have 3 kids
Military Status : Exempted
Driving License : Available
National ID : 100732
Work Experience
Current Job:
A- Job Title : Principal Quantity surveyor & cost control engineer
POSITION OBJECTIVE: full supervision and cost estimate on the bill of quantities regarding the
construction activities for AMG projects.
Employer : (AMG) Al AMAR CONSULTANTS GROUP. Employer Country : Egypt
From : 23 Feb 2015
To : until now
Owner : SIX OF OCTOBER DEVELOPMENT & INVESTMENT (SODIC)
Projects : SODIC WESTOWN RESIDENCES - BLOOK 4 Project value: 118,800,000 LE (Only four Contracts)
Projects : SODIC WESTOWN RESIDENCES - BLOOK 46 (6 Building) Project value: 32,297,780 LE (Only four Contracts)
2
Contractor:
TALENCO Engineering & Contracting CO.
Conistic & Engineering Company
Job Description
• Review/comment/approve the Quantity survey works of the projects.
• Analyze / study / evaluate the contractors' claims and variation orders of the project as cost
impact.
• Review /comment/ approve the contractor`s invoices.
• Applying the penalty of any found liquidated damages by the contractor according to the
contract.
• Applying safety penalties if any breach is caused by the contractor according to the contract.
• Follow up the cash flow of the project.
• Preparing the cost report of the project.
• Assist in preparing the taking over report of the project.
• Prepare the comparison tables between BOQs` quantities and the final approved quantities.
• Valuing completed work and arranging payments
• Measurement of Quantities/ Checking of Bill of Quantities/ Valuing and preparation of Interim
Payment certificates/ Cost reporting/ Finalization of Accounts
Project Description
The project is a Group divided into Phases (Phase & Block # )
Phase 9 Block 4 : about 6 Duplex Building (Each building contains eight villas(
Phase 9 Block 4 : about 4 Apartment Building (Each building has sixteen apartments)
Phase 10 Block 4 : about 12 Duplex Building (Each building contains eight villas(
Phase 10 Block 4: about 11 Apartment Building (Each building has sixteen apartments)
The new project has been added for awarding me to the previous core project.
Phase 10 Block 46 : about 6 Apartment Building (Each building has Twenty-four apartments)
B- Job Title : Principal Quantity surveyor & cost control engineer
POSITION OBJECTIVE: full supervision and cost estimate on the bill of quantities regarding the
construction activities for AMG projects.
Employer: (AMG) Al AMAR CONSULTANTS GROUP. Employer Country: Egypt
From: 15 May 2014
To : 23 Feb 2015
Owner: EMAAR Misr
P. M : Turner
Projects: MIVIDA Project
Project value: 505, 102, 325.1 LE (Only four Contracts)
Contractor:
DETAC Dar for trading &Construction Company
SIAC Industrial Construction & Engineering Company
Arabian Construction Co.
3
Job Description
• Review/comment/approve the Quantity survey works of the projects.
• Analyze / study / evaluate the contractors' claims and variation orders of the project as cost
impact.
• Review /comment/ approve the contractor`s invoices.
• Applying the penalty of any found liquidated damages caused by the contractor according to the
contract.
• Applying safety penalties if any breach is caused by the contractor according to the contract.
• Follow up the cash flow of the project.
• Preparing the cost report of the project.
• Assist in preparing the taking over report of the project.
• Preparing the comparison tables between BOQs` quantities and the final approved quantities.
• Valuing completed work and arranging payments
• Measurement of Quantities/ Checking of Bill of Quantities/ Valuing and preparation of Interim
Payment certificates/ Cost reporting/ Finalization of Accounts
Project Description
The project is a Group divided into zones (Parcel & PK #)
Parcel 14 PK#45: about 88 Twins villas Total Contract Value 125,706,993 EGP
Parcel 15 PK#37: about 185 villas Total Contract Value 165,116,952 EGP
Parcel 22 PK#22: about 155 villas Total Contract Value 101,239,976 EGP Parcel 16
PK#28: about 177 villas Total Contract Value 113,038,404.1 EGP
.
C- Job Title : Principal Quantity surveyor & Project control engineer
POSITION OBJECTIVE: full supervision and cost estimate on the bill of quantities regarding the
Construction activities & Develop cost trend estimates and new
techniques to support project cost trend programs and monitor project
execution regarding the cost & time within the time schedule and its
updates.
Employer: (ECG) ENGINEERING CONSULTANTS GROUP. Employer Country : Egypt
From : 14 February 2013
To : 15 May 2014
Owner: DAMAC PROPERTIES FOR DEVELOPMENT S.A.E Projects: GARDEN HEIGHTS PROJECT HYDE PARK
Project value: 8, 000,000,000 LE
Contractor:
DETAC Dar for trading & Construction
Company
SIAC Industrial Construction &
Engineering Company
JET Construction & Remodeling
Middle East construction group MECG
construction management system CMS Egyptian union for
construction EUC
4
Project Controls Engineer Responsibilities and Duties
• Develop and update cost and resource loaded construction schedules.
• Establish and maintain harmonious client relationship to support project delivery and client
satisfaction.
• Submit monthly reports to Project Manager and support internal reports preparation.
• Supervise planning, scheduling and cost engineering.
• Maintain project personnel relationships with individual discipline group leaders.
• Determine schedule, estimates and work scope to execute and complete deliverables within
budget.
• Interact with client counterparts and management to plan and schedule cost presentation.
• Develop and execute measurement systems to process, analyze and identify improvements.
• Analyze data, identify issues and recommend suitably.
• Support cost control as per contractual procedures, objectives and requirements.
• Develop cost trend estimates and new techniques to support project cost trend programs.
• Conduct investigating requirements to estimate and control cost data.
• Support administrative and organizational activities to perform cost analysis and estimation.
• Verify scope trends and estimate costs by using contract terms.
• Execute schedule change management process to approve changes.
• Review/comment/approve the Quantity survey works of the projects.
• Analyze / study / evaluate the contractors' claims and variation orders of the project as cost
impact.
• Review /comment/ approve the contractor`s invoices.
• Follow up the cash flow of the project.
• Payment certificates/ Cost reporting/ Finalization of Accounts
Project Description • The project is a new town that contains:
• 750 Villas with Swimming Pools.
• 5 buildings each consists of 5 floors.
• {Roads –Landscape} between Villas and buildings.
• Commercial buildings (3 malls).
• Social Buildings.
• Mosque buildings.
• Swimming pool buildings.
D- Job Title: Principal Quantity surveyor & cost control engineer
POSITION OBJECTIVE: full supervision and cost estimate on the bill of quantities regarding the
construction activities for ECG projects.
Employer: (ECG) ENGINEERING CONSULTANTS GROUP.
Employer Country: Egypt
From: 15 November 2009
To : 13 February 2013
Owner: Arabian Company for Projects and Urban Development
Projects: 1-Madenty in (new Cairo) Project value: 13 000 000000 LE
SQM Area : 50 km2 (50, 000000 m2Horizontal Square)
Contractor: Alexandria Company for construction (Talat Mustafa group)
Duration : 10 Year (6 phases)
Location : Madinaty CITY
5
Job Description
• Review/comment/approve the Quantity survey works of the projects.
• Analyze / study / evaluate the contractors' claims and variation orders of the project as cost
impact.
• Review /comment/ approve the contractor`s invoices.
• Applying the penalty of any found liquidated damages by the contractor according to the
contract.
• Applying safety penalties if any breach is caused by the contractor according to the contract.
• Follow up the cash flow of the project.
• Preparing the cost report of the project.
• Assist in preparing the taking over report of the project.
• Preparing the comparison tables between BOQs` quantities and the final approved quantities.
• Valuing the completed work and arranging payments.
Project Description
The project is a new town (only first and second phases) which contains:
2250 Villas with Swimming Pool.
1600 buildings each consists of 7 floors.
{Roads –Landscape} between Villas and buildings.
Administration Buildings.
Social Buildings.
Golf area and a social club.
Play Ground Buildings
Mosque buildings.
Swimming pool buildings.
Mall Buildings
University building
Hospitals
E-Job Title : Principal technical office (Quantity surveyor& Estimation Cost) engineer
POSITION OBJECTIVE: Quantity survey works & preparing the projects budget, control the BOQ
and estimate the cost of construction activities for SAAD Projects.
Employer: SAAD COMPANY GROUPS (SAUDI ARABIA)
Employer Country: Saudi Arabia
From: November2006
To : 11 November 2009
Job Description
• Review/comment/approve the Quantity survey works of the projects.
• Analyze / study / evaluate the contractors' claims and variation orders of the project as cost
impact.
• Preparing budget at any project’s stage & estimate prices B.O.Q for all works.
• Review /comment/ approve the contractor`s invoices.
• Applying the penalty of any found liquidated damages by the contractor according to the
contract.
• Supporting monthly progress report with providing updates for commitments, actual and
forecasts in order to properly control costs.
6
• Assisting Procurement department in preparing and implementing contract unit rate and
estimate prices of all items in variation orders toward payments.
• Assisting Design department by providing estimate price for various options for systems which
help design team to select the most practical option.
• Updating the company’s cash flow and revised it each 6 months.
• Applying safety penalties if any breach is caused by the contractor according to the contract.
• Prepare the comparison tables between BOQs` quantities and the final approved quantities.
Valuing completed work and arranging payments
Project Description
The company has more than one activity and all of the activities have their own entity of buildings and facilities:
Saad Trading & Contracting
Saad Specialist Hospital
Group Schools Saad
Saad Group residential
groves Saad Residential
Company nostalgia for Medical Services
Farms Saad
the airline
And the company implementation of the construction or reconstruction of any facility of Termimuthtaib
Facilities Saad.
Capital of the company: More than 250 million U.S. dollars
Location : Khoper - Eastern Region
F-Job title : Senior technical office (Quantity surveyor) engineer & coordinator
POSITION OBJECTIVE: Review Quantity survey works and completing assays of drawings of the
projects and then deliver them to the contractors.
Employer : Space office for engineering consultation (Dr. ARCH.MEDHAT DORA)
Employer Country: Egypt
From: February 2006
To: November 2006
Owner: marsa el soded for the development of tourism and real estate co.
Job Description
Quantities survey - Tender studying and price analysis, preparing invoices, variation orders
&claims.
Review requirements and technical specifications, and drawings, according to the contract.
Matching the architectural drawings and construction drawings electromechanical
Completion of the coordination between the team of each section and matching graphics
architecture with construction drawings.
Project Description
The project is a hotel and tourist village that has 60 villas and a hotel of three stories that contains 250
rooms and a number of 3 restaurants, a health club and a gym.
7
G-Job title senior technical office (Quantity surveyor) engineer
POSITION OBJECTIVE: Review quantity survey works and completing the assays of drawings of the
projects and deliver them to the contractors.
Employer: Space office for engineering consultation (Dr. ARCH.MEDHAT DORA)
Employer Country: Egypt
From: June 2005
To: November 2006
Owner school U.S. : AIS & Al-Futtaim
Owner Narmer school:
Job Description
• Writing reports on the position of the business project and the percentage of completion to the
contractor in accordance with the work of the schedule of the project.
• Quantities survey - Shop drawing - Tender studying and price analysis, preparing invoices,
variation orders & claims.
Project Description
• American School is a coordinating project between (AIS), the school administration, and the U.S.
(Al Futtaim) the owner of the land of the project. The first has the right to use it for a period of
ten years and the second has the right to use the buildings and facilities after this period.
• The project is a major building that contains the school's administration, library, laboratories and
classrooms which consist of three floors and a basement.
• The second building is the theater (AUD) which consists of a ground floor by the Square Theatre
(theater seating) and Part II contains the stage and the role of another Upper.
• The third building is a Gymnasium Building, Ground floor & Basement (GYM) that contains a large
hall for games (football Quintet - Volleyball - Handball - basketball), and another hall for the
covered swimming pool and dressing rooms.
• External space is divided into a large stadium Olympian that contains some of the stands and
wonder to run and some small stadiums and a parking lot.
Contractor: Company Intrade International Trade and Alquaolat
Location : New Cairo - El Tag moa el Khams
Extra work during the same period:
Employer : Space office for engineering consultation (Dr. ARCH.MEDHAT DORA)
Owner school Narmer: A group of investors
Job Description
Assignment for two months to form an integrated team of Technical Office within the site and link it to
the engineers overseeing the project, and the training team working on the functioning of the weekly
required reports to the Project Manager
Project Description
8
The Narmer School Is a project that consists of one building that consists of two parts and an external
driving range.
Part I is a (administration - the classroom - coefficient for students - library)
The second part is a (theater school - gym covered - covered Pool)
Contractor: Company DETAC for Trading & Construction
Location : New Cairo – Fifth Settlement
H-Job title Direct Support for Project Management engineer
POSITION OBJECTIVE: Assist the Project Manager in the delivery of construction companies, work
sites for the project & to manage and control the team work which inspects the site activities and
Coordinates between owner's request and contractor's performance.
Employer : Space Office for Engineering Consultation (Dr. ARCH.MEDHAT DORA)
Employer Country: Egypt
From : March 2004 To : October 2005
Owner : The Ministry of Health and the Population
Contractor:
wade el Nile Contracting Co.
El namer contract group
El Giza General Contracting
Location : The province of Menoufia
Job Description
• Substitute the manager of the project in meetings.
• Managing the Interviews of engineers and contractors.
• Processing sub-office for a team-based work overseeing the implementation.
• Manage meetings with the contractors to lay the foundations of the project’s system.
• Writing follow-up bi-monthly and monthly reports to be send to the owner of the workflow of all
sites.
• Making Follow-up schedules for each of the sites and the work of internal meetings between
contractors, engineers and crew that supervise the implementation.
• Review architectural modifications made for the site according to the circumstances of the
project and the nature of the workplace.
• Monitor, review, comment and report on progress payment, quality control and safety.
• Log and monitor all contractors' submittals. (Correspondence and shop drawings) to assure
timely response and process change and field orders for reviews by construction manager.
• Study and give comments on the contractor's claims.
Project Description
The project is the demolition of dilapidated units and rebuilds 77 and health units in 77 villages in
Menoufia Governorate (about 2543.03 km 2)
• Health units consisting of ground floor and the role of the first range. All the health units are
from 600 m 2 to about 1500 m 2.
• Health units are distributed on the five major contracts, each contract contains from 12 health
units to 15 units. Each contract has the specifications and requirements of it.
• The cost of each health units ranged between 4 million pounds to 7 million Egyptian pounds.
This could range to at least 60 million Egyptian pounds.
• Grant project is a U.S. Department of Health and Population for the establishment of health
units in villages and provinces.
9
I-Job title: Site Engineer and Cost estimating for the BOQ of construction projects.
POSITION OBJECTIVE: Work drawings of the sites of the company and the work detailed.
Drawings of some fixtures to contractors for the site and review abstracts of contractors and
Subcontractors in accordance with the extract of the company for each site separately. My job also
includes Cost estimating for the BOQ of construction projects.
Employer Universe Building & Cons. Co (UBC) Employer Country Egypt From October 2001
To February 2004
Owner : National Postal Authority of Egypt
Telecom Egypt
Supreme Council for Youth and Sports
Sector of Engineering, Ain Shams University
Sector of Engineering, Cairo University
Job Description
• Development of working groups for each project (site) as it needs from supervisors and workers
of the company
• Connectivity between sites and contractors by the terms of the ongoing work Active (and
contractors under contract with the company)
• Work drawings for locations and detailed graphics work, for some actions (such as graphics
marble columns of the entrance in the form of a lotus flower, up 8 meters) and it needs to be
drawn and to number each piece and method of installation.
• Follow up the implementation of certain business locations that need to compress the time of
implementation and installation of several items at one time to achieve the timetable for the
project.
• Review amounts of extracts of work contractors in accordance with the extracts of the company
owner with a consultant for each project.
• Develop solutions to some problems of implementation.
• Submit a plan prior to implementation to the company director of the needs of each of the
materials or equipment provided for the right time in order not to conflict with the needs of the
company's other sites.
Project Description
The company has more than one location by virtue of its contract with several government agencies
including universities. They are responsible for repairing and the annual maintenance within the universities,
student housing. Also they have the access to several tenders such as the National Authority of Post and
Telecom Egypt in order to make renovations to the buildings and finishes, and they prepare every engineer
on the follow-up works for several sites.
Responsible sites by the company during my time:
Renewal of the Bar Association hall (M.P.U) in Cairo (Ramses Street)
Renewal and modernization of Post Office engineers in Giza (the field of Hejaz)
Renewal and modernization of the new post office papillary Cairo (Mohamed Ali Street, Castle)
Renovate labs, Faculty of Science at Cairo University in Giza
Restoration and refurbishment of students, Ain Shams University in Cairo (Diplomatic Quarter)
10
Create and finishing Entrance No. (4) Gateway Eastern Tobacco factory in 6 October (based
administrative area of 80 m 2 was loaded on the six pillars in the form of a lotus flower)
Update and renew the Post Office Call people in Cairo (magles el shape Street in Kasr Al-Aini)
Repair and renovation of the swimming pool dressing room and the Olympic Center in Maadi,
Cairo
Renovation of the Central hostile (1) Street 7, Cairo
Renovation of the Central anti (3) Egypt Helwan Agricultural Road, Cairo
Private work
1. Participate With Expert Center in Construction Management Projects :
Preparing detailed Baseline Schedule and cash flow of golden project "Relocating the (7) Stores
Skeleton, Finishing & MEP" in Sharm El-Sheikh, Egypt.
Preparing detailed Baseline Schedule and cash flow of golden project "STP2,3 AND 4 Skeleton
,MEP and Finishing Works based on TP45 (STP 1)" in Sharm El-Sheikh, Egypt.
2. Quantity surveyor Work all Item Work " Earth Work , Concrete, Finishing …etc. " for Unified
design of the building of the General Directorates of water in Saudi Arabia Project
Years of experience : 15 years
Education University: 6thOctober
Faculty: Engineering Department: Architectural Engineering Depart - Building Technology and Project Management Graduation Year: 2001 Final Grade: Fair
Project Grade: Good High School Degree: Very Good High School Name: Mecca secondary school
Languages Skills
Arabic: Native Language English: Fair written and spoken
Special skills
1. BASIC CONCEPTS OF INFORMATION TECHNOLOGY
2. USING INTERNET
3. MICROSOFT WINDOWS (XP – 7 – 8 )
4. MICROSOFT WORD
5. MICROSOFT POWERPOINT
6. MICROSOFT EXCEL
7. AUTO-CAD 2006, 2011, 2013 ( 2D )
8. PHOTOSHOP 5,6,7,CS3
9. 3D MAX 8
10. Autodesk Revit Architecture 2011
11. Primavera P6 Enterprise Project Portfolio Management (EPPM) Applications
11
Special Certificate
1. OSHA Occupational Safety and Health Administration
(OSHA) USA Department of Labor
2. Training process (basic - specialized) on the work of
interior and exterior paints company Sigma Paints Saudi
Arabia
3. Training Course Entitled Scope/Time Management
4. Time of Value engineering
5. Certificate of merit from the American institute for
development and training
6 Member of the International Organization for International Arbitration (International
Arbitration Organization Adviser)
7 Claims and Disputes Resolution Under FIDIC Conditions
8 Principles of FIDIC
9 Construction Management-Planning & Control (CMPC)
10 The project management Professional PMP
The Professional Program in Project Management (PRMG)
Diploma from (AUC)
• Project Planning & Control Techniques (finished &I got a certificate)
• Management of Project Resources (finished &I got a certificate)
• HR Project Management
• Introduction to Project Management International Standards
• Projects Bids & Contracts
• Risk Management (finished &I got a certificate)
12
The Professional Program in Project Management (PRMG 090)
Certified Cost Professional from (AUC)
Preparation Course for CCP Certificate
Course Outline Cost
Cost estimating
Planning and scheduling
Progress and cost control
Project management
Economic analysis
Statistics and probability
Personal Skills
1. Excellent Communication Skills
2. Hard Worker
3. Active & Dynamic
4. Can work under pressure and manage stress
5. Creative
6. Sociable
7. Calm
8. Ability to discuss and persuade
Hobbies
1. Reading
2. Swimming
3. Traveling
4. Internet Browsing
5. Football
Availability & Job Requested
Availability : I am ready to start work after finishing some tasks related to my previous job
As : Full Time
Job location: any location needs my experience.
* For any more detailed information, please contact me * Sincerely Yours,