eng ahmed ibrahim 3.4u-reports coordinator-senior data processor cv
TRANSCRIPT
Name : Ahmed Abd ElMonem Mahmoud IbrahimPost : CSWIP 3.4U UNDERWATER INSPECTION
COORDINATOR /REPORTS COORDINATOR/SENIOR DATA PROCESSOR
Nationality : EgyptianBirth Date : 12/05/1984Marital Status : MarriedEmail : [email protected]/Mobile : +20122 2574 585Address : 11 ElMohasba St. from Winghet St., Bolkly, Alexandria, Egypt
Education 2002–2007 Alexandria University / Faculty of Engineering
B.Sc. in Mechanical Power Engineering
Safety Courses
Training Courses
Attended the following HSE training courses in AAST (The Arab Academy for Science and Technology), Alexandria, Egypt:
Personal safety and social responsibilities. Medical first aid. Personal survival techniques, search and rescue on
board offshore units. Fire prevention and fire fighting on board offshore units. Offshore helicopter underwater escape training
(H.U.E.T). OPITO. FOET.
Training courses in: VISUALSOFT SUITE from F-E-T SQL Server. MS Excel Advanced MS Access MS Word Advanced Project management QC standards for Structures Inspection and
Pipelines/Cables Inspection Communication Skills How to deal with a client H2S Course Technical Reporting Professional Email Writing Platforms Inspection Workshop Pipelines Inspection Workshop Qinsy MBES Processing
Training course in MCS ROV Pipeline and Platform Commander software.
Computer Excellent in:
Skills Visual Works Suite (DVR, Archive, Edit Pro, Eventing, Data Logger and Visual GIS)
EIVA Naviedit and Navimodel. AutoCAD 2D and 3D. Wish Software Autochart and Xdata Commander. ArcGIS 10 and Hydro GIS. Microsoft Office applications. Merging events data between WGIM Nexus IC and
Visual works. Mobilisation of visual works system in either pipeline
inspection or structures inspection. MBES Multi beam echo sounder processing. Communicating through clear comms. Task planning and shift by shift scheduling. Professional in subsea inspection commentary. Dealing with Divers and ROV teams. MCS ROV Pipeline Commander Software package for
ROV pipeline inspection i.e. data logging, eventing, digital video recording, offline reviewing, data processing, charting and reporting.
MCS ROV Platform Commander Software package for ROV Structures inspection i.e. data logging, eventing, digital video recording, Offline reviewing and reporting.
Dealing with most of the computer hardware equipment (plotting, scanning, digitizing, external devices…etc).
Working with SQL server and Access as database administrator.
Constructing wireless or wired networks.Very good knowledge in:
GIS applications. Online Eventing softwares. Offline Eventing softwares. Surfer. Qinsy Navigation Pack. Qloud. PMAC CP Applications/Software and callibrations. Ashtead Technologies Marine Growth Ultrasonic Probe
and callibration. GE and Seatronics FMD Ultrasonic probe and
calibration. Total Tide Software. Deep Ocean in-house softwares (DODBMS2,TPDS) Tritech Seaking software. R2Sonic pole mounted MBES software. Dual Reson Seabat 8125 software.
Language Arabic (Mother tongue), English (Excellent) and French (Good)
Skills
Medical Check
Career Overview
- Went through a medical examination according to HSE standards, and passed as FIT TO WORK OFFSHORE.- UKOOA / OGUK Certified and valid.
Approximately SEVEN years experience in offshore industries as a QC and a 3.4U Inspection Coordinator, Reports Coordinator, Senior Data Processor, and Draft man using AutoCAD/AutoChart.
Experience
- From January 2008 till June 2008Working as a QC and Inspection Engineer for SIGMA Petroleum Services.- From June 2008 till September 2012 working as a 3.4U Data Recorder/Inspection engineer, and Senior Data Processor in MCS Free Zone.-From September 2012 till present working as a freelance 3.4U Inspection Coordinator, Reports Coordinator and Senior Data Processor.
Sample of projects I was involved in are listed below:
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
443.4U Inspection
EngineerM/V Hai
Duong 01PTSC Vietnam
KNOC (Korea National Oil Corporation)
Visual Soft Suite,
Microsoft Office data
sheets
In Water Survey for Subsea Structures and Pipelines 20151*Well head Platform inspection ( WHD), 1*Processing Utilities and accommodation platform inspection (PUQC), 5*Pipeline spools, 2*Subsea PLEM, 6 inches pipelineinspection (2.5KM), 8 inches pipeline inspection (57.5KM), 1*Wye Tie instructure
May 2015
43Reports
Coordinator/ChartingBaku Office
BasedSaipem Asia /
Sonsub UKBP Azerbaijan
Visual Edit Pro, Auto
Cad, Map 3d Auto Chart, Visual GIS, ARC GIS
10,Hydro GIS
IMR Campaign 2014 for BP:-Offline reviewing for As built survey of 9 Flying leads and 3 rigid jumpers.-Final reports for As built survey of 9 Flying leads and 3 rigid jumpers.-Charting for 9 Flying leads and 3 rigid jumpers.-Producing Final Events list for 9 Flying leads and 3 rigid jumpers.-Producing GIS Maps for 9 Flying leads and 3 rigid jumpers.
November -December
2014
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
42Data
Processor/ChartingSurf
RangerISS/Harkand
Andrews SurveyNexen
Visual Edit Pro, EIVA
NAVIMODEL, NAVIEDIT, Auto Cad,
Map 3d Auto Chart
Pipelines and Structures Inspection Campagin 2014 for Nexen Assets.-Approx. 370km of subsea Pipelines inspected including spool pieces and subsea structures as PLEMS, SSIV, CLUSTERS, WELLHEADS, MANIFOLDS, Anchor chains and Christmas trees.-Buzzard, Scott, Rochelle, Ettrick ad Blackbird FPSO, and Telford fields.-Pipeline inspection processing, Charting and embedding Nexus IC events into Visual soft suite.
August – Sept 2014
413.4U Data Reviewer/
ChartingBaku Office
BasedSaipem Asia /
Sonsub UKBP Azerbaijan
Visual Edit Pro, Auto
Cad, Map 3d Auto Chart
IMR Campaign 2014 for BP-Offline Reviewing.-Producing Charts for Spot dives and 3 pipelines in Chirag 1, Oil rocks, Central Azeri, East Azeri, West Azeri and SDA Pipielines.
July 2014
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
403.4U Data
Reviewer/Reports Coordinator
Seabed Supporter
Saipem Asia / Sonsub UK
BP Azerbaijan
Visual Edit Pro, Visual Eventing, AutoCad
IMR Campaign 2014 for BP-Offline Reviewing.-Producing events lists and Field reports.Spot dives and complete pipeline inspection for Chirag 1, Oil rocks, East Azeri, Central Azeri, West Azeri and SDA Pipielines.CP Survey and anomaly spot dives for bare metal and anomalous CP readings locations.
July 2014
393.4U InspectionEngineer/Senior data processor
Office Based
Daniel Survey/SGK/I.O.E.
CP.O.G.C (Iran)
Visual Edit Pro, Visual Eventing,
AutoChart, AutoCad,
Visual Review
113KM pipeline Inspection.As-Laid Survey of Phase 15 Pipeline in South Pars Gas Field, Offshore Iran.1.2KM 4’’ piggyback pipeline As-Laid Survey.Offline Reviewing, pipeline processing, reporting, and Charting.
May-June 2014
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
383.4U InspectionEngineer/Senior data processor
M/V Salam Glory
Daniel Survey/SGK/I.O.E.
CP.O.G.C (Iran)
Visual DVR, Visual
Archive, Visual Edit Pro, Visual Eventing,
Event Config Editor,
AutoCad
113KM pipeline Inspection.As-Laid Survey of Phase 15 Pipeline in South Pars Gas Field, Offshore Iran.PH 16 platform Debris and Hazard Survey.1.2KM 4’’ piggyback pipeline As-Laid Survey.Online Eventing, offline Reviewing, pipeline processing
April – May 2014
373.4U InspectionEngineer(Job Supervisor)
DSV The Odyssey
Dulam SubSea solution / Horizon
SurveyMiddle East
OXY Petroleum(Qatar)
Visual DVR, Visual
Archive, Visual Edit Pro, Visual
Eventing,3D Inspector,
Event Config Editor,
AutoCad
-7 Platforms Inspection. GVI, CVI, UT, CP, Scouring survey, seabed survey, Debris Removal, ACFM, riser face measurements, FMD, riser inspection, clamp inspection and Marine growth Survey.(Air Divers, ROV)-Installation of flange protectors for the Hydra tightened riser flanges and sea line flanges.-SBM Anchor Chains inspection and PLEM Inspection.-Leakage Repair for SBM Cargo hose.
November - December
2013
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
363.4U InspectionEngineer(Shift
Supervisor)
DSV The Odyssey
Dulam SubSea solution / Horizon
SurveyMiddle East
OXY Petroleum(Qatar)
Visual DVR, Visual
Archive, Visual Edit Pro, Visual
Eventing,3D Inspector,
Event Config Editor,
AutoCad
-4 Platforms Inspection. GVI, CVI, UT, CP, Scouring survey, seabed survey, Debris Removal, ACFM, riser face measurements, FMD, riser inspection, clamp inspection and Marine growth Survey.(Air Divers, ROV)-Installation of flange protectors for the Hydra tightened riser flanges and sea line flanges.
September - October
2013
353.4U InspectionEngineer/Data
Processor
Officebased
Dulam SubSea solution / Horizon
SurveyMiddle East
OXY Petroleum(Qatar)
Visual SoftSuite,
AutoCad
-Finalizing 2D and 3D drawings of 23 Platforms.-Preparing Event Config and Numbering system.-Preparations for mobilization.
September 2013
343.4U InspectionEngineer/Data
Processor
Officebased
HorizonSurvey
Middle East
Valentine MarineMiddle East
Visual SoftSuite,
AutoCad
-As-Built surveys and Free span correction surveys.-Preparation of events list and final reports.
August 2013
333.4U Inspection
EngineerOfficebased
Dulam SubSea solution / Horizon
SurveyMiddle East
OXY Petroleum(Qatar)
Visual SoftSuite,
AutoCad
-Platforms Inspection Campaignpreparation of drawings, 3D DWFs, and QC of the 3D models.(20Platforms)-Testing new Visual soft 3Dinspector (Ver. 9.0.45) to meetClient’s requirements and extra types of inspection with contribution of Visual Soft technical manager.
June 2013
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
32
3.4U InspectionEngineer/Senior
DataProcessor
Officebased
HorizonSurvey
Middle East
Valentine MarineMiddle East
Visual SoftSuite
Offline eventing, charting , andreporting of:-Proposed crossing locations GVIand positioning for 3 new proposedpipelines’ routes in Fateh field(approx. 135 proposed crossingslocations).-Interventions positioning and GVIex: Sleepers, Grout bags, andStabilisers.-Proposed spools for the threeroutes GVI.-Riser faces GVI for the threeproposed routes.-Proposed alignment GVI for thethree routes.
May 2013
31
3.4U InspectionEngineer/Senior
DataProcessor
Officebased
Dulam SubSea solution / Horizon
SurveyMiddle East
OXY Petroleum(Qatar)
Visual SoftSuite
Offline reviewing of a pipelineinspection campaign in IDD ElShargiField (Qatar)
April 2013 –May 2013
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
30 Data processorM/V Rem
ForzaDeep Ocean AS BP (Norway)
(Eiva) NaviModel,NaviEdit,TPDS,
DODBMS,Visual Review
Pipeline/Cable inspection offline Processing of the 500m Zone part of the pipelines for fields (Ula, Tambar, Devinick, Ekofisk, Gyda, Etap, Alba, Magnus, Hod, and VallHall.Positioning/Inspection of offshore subsea structures (Gas sampling unit, SSIV, Plets, Plems, Connectors....)(2 ROV)
Multibeam Survey for the as built piplines and spool pieces.
As trenched survey for the SOW pipelines.
December 2012-
January 2013
29Inspection
Engineer/Shift Supervisor
M/V Jaya Centurion
Fugro Survey Middle East (FSME)
/ (MCS) Modern Computing Services
RASGAS (Qatar)MCS ROV
Pipeline Commander
Pipelines/Cables inspection Processing, charting and reporting in the North Field Qatar (ROV)
July-September
2012
28Inspection
Engineer/Senior Data Processor
M/V Jaya Centurion
Fugro Survey Middle East (FSME)
/ (MCS) Modern Computing Services
RASGAS (Qatar)MCS Platform Commander
Platforms Inspection. GVI, CVI, CP, Scouring survey, seabed survey, Debris Removal, riser inspection, Welds CVI and Marine growth Survey.Anomalies Investigations and immediate Anomaly Reporting in North field Qatar (2 ROV)
May-July 2012
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
27Senior Data
Processor/ReporterOffice based
PTSC Vietnam / (MCS) Modern
Computing Services
CUULONG (Vietnam)
MCS Platform CommanderMCS ROV
Pipeline Commander
Pipelines, Cables, Structures, and Platforms Reporting for Su Tu field.
March-April 2012
26Senior Data
Processor/ReporterOffice based
NPCC / (MCS) Modern Computing
ServicesTechnip (UAE)
MCS ROV Pipeline
CommanderPipeline inspection Reporting March 2012
25Senior Data
Processor/QCOffice based
NPCC / (MCS) Modern Computing
Services
ADMA OPCO (UAE)
MCS ROV Pipeline
Commander
Pipeline inspection offline processing/QC for Zakum Field and Umm Shaif Field.
January-February
2012
24Data
Recorder/Senior Data Processor
M/V Topaz Khalidya
Fugro Survey Middle East (FSME)
/ (MCS) Modern Computing Services
RASGAS (Qatar)MCS ROV
Pipeline Commander
Pipelines/Cables inspection Processing, charting and reporting in the North Field Qatar.(ROV)
December 2011-
January 2012
23Senior Data Processor
Office based
NPCC / (MCS) Modern Computing
Services
Dubai Petroleum (UAE)
MCS ROV Pipeline
Commander
Pipeline inspection Processing, charting and reporting for El Fateh Field.
November 2011
22 Shift Sup.DSV Dulam Responder
Dulam SubSea solution / (MCS)
Modern Computing Services
OXY Petroleum (Qatar)
MCS Platform Commander
Platforms Inspection. GVI, CVI, UT, CP, Scouring survey, seabed survey, Debris Removal, ACFM, riser face measurements, FMD, riser inspection and Marine growth Survey.(Divers, ROV)
September-October
2011
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
21Data
Recorder/Senior Data Processor
DSV The Providence
Dulam SubSea solution / (MCS)
Modern Computing Services
OXY Petroleum (Qatar)
MCS Platform CommanderMCS ROV
Pipeline Commander
Platforms, Pipelines, and coil tubing Inspection. GVI, CVI, UT, CP, Scouring survey, seabed survey, ACFM, FMD, Debris Removal, riser face measurements, Conductor measurements, riser inspection and Marine growth Survey.Anodes Installation on low CP readings pipelines.(Divers, ROV)
June-September
2011
20Shift Sup./ Senior Data Processor
M/V DP Geo
J-Ray McDermott / (MCS) Modern
Computing ServicesShell (Qatar)
MCS ROV Pipeline
Commander
Pearl GTL Pipelines (OOS Survey) Processing, charting and reporting. (ROV)
January-March 2011
19 Software TesterOffice based
(MCS) Modern Computing Services
(MCS) Modern Computing Services
MCS Package
Testing the new Version of MCS inhouse software package which will be submitted to Subsea 7 UK with Shell UK Pipeline Inspection Project.
November-December
2010
18Data
Processor/Drafts Man
Office based
NPCC / (MCS) Modern Computing
Services
Dubai Petroleum (UAE)
MCS ROV Pipeline
Commander
Pipeline inspection Processing, charting and reporting for El Fateh Field.
October-November
2010
17Data
Processor/Drafts Man
Office based
J-Ray McDermott / (MCS) Modern
Computing ServicesShell (Qatar)
MCS ROV Pipeline
CommanderQinsy
Pearl GTL Pipelines/Cables inspection (OOS Survey) Processing, charting and reporting.
September 2010
16 Shift Sup.M/V DP
Geo
J-Ray McDermott / (MCS) Modern
Computing ServicesShell (Qatar)
MCS ROV Pipeline
CommanderQinsy
Pearl GTL Pipelines/Cables inspection (OOS Survey) Processing, charting and reporting. (ROV)
June-September
2010
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
15 Team LeaderOffice based
Neptune Geomatics / (MCS) Modern
Computing ServicesQatar Gas (Qatar)
MCS Platform Commander
Platforms Inspection Processing and Reporting GVI, CVI, MPI, UT, CP, Scouring survey, seabed survey, and Marine growth Survey in North Field Bravo.
May-June 2010
14 Job SuperVisorOffice based
Maridive Projects / (MCS) Modern
Computing Services
Rashpetco (Egypt)
MCS ROV Pipeline
Commander
Pipeline inspection processing, amending client’s comments.
May 2010
13 Shift Sup.DSV
Neptune Trident
Neptune Geomatics / (MCS) Modern
Computing ServicesQatar Gas (Qatar)
MCS Platform Commander
Platforms Inspection.GVI, CVI, MPI, UT, CP, Scouring survey, seabed survey, and Marine growth Survey.(Divers, 2 ROV)
April-May 2010
12Data Recorder/Data
ProcessorM/V
SentinelSaipem / Geolab
SRLSnam Rete Gas
(Italy)
MCS ROV Pipeline
Commander
TDM, As-Laid,and As-Built Pipeline Inspection.Processing, charting and reporting.(ROV)
February-March 2010
11Data
Recorder/Drafts manM/V
SentinelSaipem / Geolab
SRLSnam Rete Gas
(Italy)
MCS ROV Pipeline
CommanderQinsy
Pre-lay GeoPhysical Survey (MultiBeam Echo Sounder, Sub Bottom Profiler, Side Scan Sonar) using Quinsy and CAD Charting, Cables Inspection using Pipe tracker.Laying mattresses on crossings areas.(ROV)
January-February
2010
10 ReporterOffice based
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)
MCS ROV Pipeline
Commander
Pipeline inspection Reporting For Salman field and Resalat field.(ROV)
December 2009
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
9Data Recorder/Data
ProcessorM/V Zakher
Pelican
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)
MCS ROV Pipeline
Commander
Pipeline inspection processing and charting for Salman, Resalat, and Reshadat fields.(ROV)
October-November
2009
8Data Recorder/Data
ProcessorM/V Zakher
Pelican
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)
MCS ROV Pipeline
Commander
Pipeline inspection processing and charting for Resalat, and Reshadat fields.(ROV)
July-September
2009
7 Shift Sup.DPV Sea Worker
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)
MCS ROV Pipeline
Commander
Pipeline inspection processing and charting for Salman field.(ROV)
July 2009
6Data Recorder/Data
Processor
M/V Maridive
519
Fugro Survey Middle East (FSME)
/ (MCS) Modern Computing Services
RASGAS(Qatar)MCS Platform Commander
Platforms Inspection doing GVI, CVI, CP, Scouring Survey, Seabed Survey and FMD.(ROV)
March-June 2009
5Data Recorder/Data
ProcessorDSV Dulam
Trident
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)
MCS ROV Pipeline
Commander
Pipeline inspection processing and charting for Salman, and Abo zar fields.(ROV)
January-February
2009
4 Drafts ManM/V Nor Valliant
Impresub / (MCS) Modern Computing
ServicesPetrobel(Egypt)
AutocadAutoMap 3D
Charting and AutoCAD Drafting.(ROV)
December-January
2009
3Data Recorder/Data
ProcessorM/V Far
SoveriegnSonSub / GeoLab
SRLENAGAS(Spain)
MCS ROV Pipeline
Commander
Cable inspection using cable tracker and then Mattresses Laying on crossings.(ROV)
November-December
2008
ID
Position VesselContractor /
Sub ContractorClient
Software Used
Job Scope Period
2Data
Processor/Drafts Man
Office based
Impresub / (MCS) Modern Computing
ServicesPetrobel(Egypt)
MCS ROV Pipeline
Commander
Pipeline inspection processing and charting
September-08
1Data
Processor/Drafts Man
Office based
Dulam SubSea solution / (MCS)
Modern Computing Services
Iranian Offshore Oil Company
(IOOC)Qinsy
Multi Beam Data Processor for Pipelines in Salman field and Mubarak field in IRAN using Quinsy software.
August-September
2008
- All documents needed and references can be submitted upon request.
- Job scopes are not detailed enough, if needed don’t hesitate to contact me.
- All vessels’ stamps are found in my Seaman’s book for reference.