energylab nordhavn, tokai u, 171122, cgre version...the collective idea and a common grid increased...

19
EnergyLab Nordhavn New Energy Infrastructures and Smart Components in Cities Tokai University 75 years, DTU Christoffer Greisen, November 22, 2017

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

EnergyLab NordhavnNew Energy Infrastructures and Smart Components in Cities

Tokai University 75 years, DTU

Christoffer Greisen, November 22, 2017

Page 2: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

[From www.tvindkraft.dk]

Inspiration

[From www.tvindkraft.dk]

Page 3: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions
Page 4: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Long term goals supported

50% wind in the

grid

Copenhagen CO2

neutral

DK independent of

fossil fuels

2010 2020 2030 2040 2050

DK fossil free

power and heat

40% CO2

reduction

50% RE in DK

energy mix

Page 5: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

One of two major challenges:

Increasing renewable energy in the electricity system

Renewable Energy

production is

increasing

Consumption

Power Plant production

International

interconnectors

Production and consumption

have to be in balance every

second

This means

heavy reliability on flexible

assets in the grid

This means market development

Low price Renewable energy

means less operation time for

power plants = close down of

many power plants

Page 6: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

The major challenges and possibilities for the DSOs are driven

by market developmentsMarket trends

6

DERs, micro grids and

new players challenge the collective idea and

a common grid

Increased and volatile loads challenge quality

of supply

Continued demand for cost reductions in the

sector € + CO2

1980 1985 1990 1995 2000 2005 2010 2015

.. leads to increasing activity is the

distribution grid

Page 7: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Courtesy of Københavns Kommune

Page 8: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Courtesy of Københavns Kommune

Page 9: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Objective

To develop

new methods and solutions for design and operation of the future

cost-effective integrated energy systembased on Nordhavn as a

globally visible real-life laboratory.

Photo: KontraframePhoto: Kontraframe

Page 10: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Partners from multiple sectors

Energy

Infrastructure

Authority and

city development

Industry and

consulting engineers

University and

data infrastructure

2015-2019, Budget 19 M€, Public funding 11 M€ from EUDP

Page 11: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Classic Innovation Process

Technology Push

Basic R&D Technical R&D

and

demonstrations

Market

demonstration

Commerciali-

zation

Market

accumulation

Diffusion

Market Pull

Cooperation with Ph.D, Research

Institutions and Universities

Research focus

Cooperation with suppliers, agents

and other DSOs

Market focusNatural Innovation Proces

Good practice in innovation:

• Involve (external) partners

• Projects on all levels in ‘Push’. Especially Basic R&D

• Remember internal marketing

• Safe space for Innovation. Ultilize disagreements

• More than one R&D project within each focus area

(seen form various angels)

Page 12: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Photo: By & Havn/Ole Malling

Power grid

operation

Storage

flexibility

Smart network

services

Showroom and

visualisation

Flexible

buildings

and users

Flexibility from

heat and cooling grids

Measurements

and data warehouse

Smart charging

infrastructure

Integrated

markets and

control centers

Page 13: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions
Page 14: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Homes will play an active role in our energy

system

PowerLab

Tarif controlledSmartStart

Comfort control, blinds

Smart Building- Electricity- Heating- Water- Hot water- Co2 measurement- Energy storage

Data

Control

Audio, VideoSonos

Apps ”anywhere”

Online room

information

Comfort

Energimonitor, optimering

Internet of thinghs

Page 15: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

FDR

FNR

Radius use of the battery – Overview

0

0,5

1

1,5

2

0

0,2

0,4

0,6

0,8

1

1,2

Grid upgrade deferral Frequency support

0

0,2

0,4

0,6

0,8

1

1,2

MW

SO

C

Hz

SO

C

49,8

49,85

49,9

49,95

50

50,05

Frekvensstyret normaldriftsreserve (FNR)

Frekvensstyret driftsforstyrrelsesreserve (FDR)

Page 16: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Tests in Nordhavn – Peak-shaving + FDR (+FNR)

16

TSO DSO End-User

FNR

(Frequency

continuous reserve)

FDR

(Frequency

interruptions reserve)

Voltage quality

support

SAIDI

(geographically firm

interruption reserves)

SAIDI

(mobile interruption

reserves)

Retail electric

energy time-shift

(Local arbitrage)

Power reliability

(geographically firm

interruption reserves)

End-user peak

shaving

(Reduceret

tilslutningsbidrag)

Power quality

Black start

support

Regulating Power

Market

Transmission

grid upgrade

deferral

Peak-shaving

(Distribution grid

upgrade deferral)

Power markets

(FBA, Retailers)

ELBAS

(intraday-trading

for balancing plans)

ELSPOT

(Day-ahead trading –

Arbitrage)

Production

(PBA)

Renewables

(CO2 reduction)

Curtailment

minimization

Renewable

generation

flexibility

ELBAS

(intraday-trading

for balancing

production-plans)

Commercial activity

Monopoly activity

Source: Based on data from EPRI, IRENA, DOE, and IEA

Page 17: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

In practice in Nordhavn

[Adapted from Pierre Pinson et al, 2017]

Page 18: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

Selected learnings

• Power sector is unbundled – Heat sector is not > conflict of interests and concepts

• Very different interpretation of personal data legislation amongst partners

• Learning about opportunities and limitations for various actors in a flexibility market

• Landscaping of optimal business models

• Demonstration is necessary – also for finding regulatory barriers

• Outlook > Collaboration projects demonstrating and piloting in multiple environments

• Open co-creation methods

Page 19: EnergyLab Nordhavn, Tokai U, 171122, cgre version...the collective idea and a common grid Increased and volatile loads challenge quality of supply Continued demand for cost reductions

19

Christoffer Greisen

[email protected]

+4541390347

Funded by