![Page 1: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/1.jpg)
Carlos Santos Silva
2015-2016
Energy Systems Modeling and Economics
Energy Modeling
![Page 2: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/2.jpg)
Reference Energy System
![Page 3: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/3.jpg)
Sustainable Energy System
• To design sustainable energy, several
options must be considered:
• Energy services demand
•Renewable resources
• Energy storage
• Alternative fuels
• To design effectively, the interactions
between the possible options must be
accounted for:
•Consumer behavior
• Intermittency of renewable resources
• Evolution of energy demand/services
• Impact of energy efficiency policies
![Page 4: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/4.jpg)
Planning an energy system
US (2007) US (2025)
![Page 5: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/5.jpg)
Modeling tools for planning
![Page 6: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/6.jpg)
Terminology (1)
•Simulation
• Given sets of data and certain parameters, it simulates the behavior of the system
• Example: How much is the renewables penetration / the cost considering that we have:
• X MW of installed capacity of X1, X2,…XN technologies;
• Y MWh of demand
•Scenarios
• Allows direct comparison between different simulations
•Optimization
• Determines what is the “best” configuration and operation of the system
• Example: What is the installed capacity of X1, X2,…XN technologies, in order to:
• Minimize the cost
• Maximize the renewable penetration
![Page 7: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/7.jpg)
Terminology (2)
•(General) Equilibrium model
• Model that describes the economy by aggregating the behavior of individuals and firms
• In these models, the energy demand is driven by economic variables
• Population evolution, GDP
(Partial) Equilibrium model
• It considers the variation of the price of a single product and the prices of all other products
being held fixed during the analysis
• Only the energy price is varying
![Page 8: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/8.jpg)
Terminology (3)
•Top-down model
• Macro-economic model that describes the interrelationship between labor, capital and
natural resources such as energy.
• The energy demand is driven by economic variables
• Population evolution, GDP
• The interrelationships are modeled with elasticities of substitution.
Bottom-up models
• Detailed technology description (demand and supply), including new technologies
• Energy demand is given or is a function of energy prices and national income (in this case
it will be a partial equilibrium model)
![Page 9: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/9.jpg)
Planning tools @ IST
![Page 10: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/10.jpg)
Analysis of energy planning tools
•Analysis of 84 energy models showed that:
• Simulation and Invesment optimization models are generally used for simulation of
medium and long-term case studies with low resolution
• Operation optimization and Operation and investment optimization models are generally
applied to case studies with higher time-resolution than 1h.
![Page 11: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/11.jpg)
Lack the ability to look
into several years
Modeling gaps
Tools have very different scopes, resolution and algorithms.
Hour Year
Region /Country
House /Neighborhood
Second
Spatial
resolution
Temporal
resolution
Scenarios
Optimization
Methodology
Lack the ability to account
for hourly dynamics
![Page 12: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/12.jpg)
Solution
Hour Year
Region /Country
House /Neighborhood
Second
Spatial
resolution
Temporal
resolution
Scenarios
Optimization
Methodology
![Page 13: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/13.jpg)
Methodological thinking
•In order to reduce the computational complexity of the problem, the proposed
methodology consists in the use of two different tools.
Medium-term model
•Multi-year optimization of investments in renewable energies
•Some hourly dynamics
•Detailed description of energy consumption:
•Across different sectors
•Different types of energy carriers
•Capable of understanding the evolution of the system:
•Economic growth
•Fuel prices
•Energy demand
Short-term model
•Hourly optimization of electricity production for one year, taking into account:
•Start-up costs and efficiencies for thermal engines
•Variability of renewable resources
•Solar
•Wind
•Hydro
•Fuel prices
•Demand profiles
•Dynamic demand options (EVs, others)
•Optimization of use of energy storage systems
Test feasibility
of the results,
one year at a
time
Introduction of
restrictions for
optimization of
investments
![Page 14: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/14.jpg)
Results for São Miguel, Azores
HybridTraditional
![Page 15: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/15.jpg)
Results for Portugal
HybridTraditional
![Page 16: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/16.jpg)
Modeling energy systems
Choose planning tool and evaluate the results
Define reference energy system and calibrate model
Define scenarios that describe possible system evolution
Iterate scenarios to achieve goals, make a sensitivity analysis, make a reality check of the goals
Define policy goals that we want to achieve
![Page 17: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/17.jpg)
FINAL PROJECT
![Page 18: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/18.jpg)
Design a energy policy plan for an energy system
•Contribute to the energy policy for one island of Azores for 2020 to achieve
• 75% of renewable electricity
• 40% of renewable energy on primary energy (considering fossil fuel
substitution)
Topic Island
Electrification of gas consumption São Miguel
Electrification of gas consumption
Pump-storage
Terceira
Interconnection Faial
São Jorge
Pico
Santa Maria
Graciosa
Flores
Pump-storage
Demand response
Corvo
![Page 19: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/19.jpg)
Working projects
•Azores
• Terceira Island pump-storage
•Portugal
• Impact of solar PV self-consumption
• Buildings Retrofit Strategy
•West Lisbon
• Buildings retrofit
![Page 20: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/20.jpg)
EXAMPLE
![Page 21: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/21.jpg)
Project Corvo
![Page 22: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/22.jpg)
December 30th, 2009
Winter 2009/2010
•7 weeks without LPG supply
Winter supply shortages
•Fuel
•Food
![Page 23: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/23.jpg)
Corvo Island, Azores
Land area: 17 km2
Population (2008): 488
Primary energy consumption (TJ): 21
Renewables penetration in electricity: 0%
Number of vehicles: 93 (40 LDV+22 Pick Ups)
Number of households: 145
Electricity customers: 248
![Page 24: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/24.jpg)
Corvo Energy Outlook
•Fuel transport is very difficult in winter
• Supply disruption every year (butane and diesel for vehicles)
• Butane offset
•Annual Government support
• GPL: 39 000 €
• Diesel: 30 000 € electricity / 12 000 € transport
![Page 25: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/25.jpg)
Electricity Consumption
•Diesel Power Plant
• 4 diesel units (536 kW)
• Peak in 2009 (243 kW)
• Off-peak in 2009 (96kW)
•Residential sector represents 40%
• Detailed survey
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1994 1996 1998 2000 2002 2004 2006 2008
GWh
Losses
Residential
Public Services
Commerce
Industry
Agriculture
Road Transportation
![Page 26: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/26.jpg)
Electricity Consumption Dynamics (Season)
![Page 27: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/27.jpg)
Residential Energy Consumption (Electricity)
![Page 28: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/28.jpg)
Towards 100% renewable (energy)
Butane Offset (residential and commerce)
Solar thermal for Hot Water
Electrify stoves and ovens
Diesel and gasoline Offset (road transportation)
Electric Vehicles
Diesel Offset (Power generation)
Renewables + storage facility
![Page 29: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/29.jpg)
DWH model
Pressupostos
Nº Casas: 150
Nº sistemas: 90 ST (60%) + 60 HP (40%)
Nº de ocupantes por casa: 3
Consumo total aqs /dia/ casa: 120 litros
Solar Collector Storage Tank
Area ᶯ Fluid Volume Uc Power
[m2] % % [l] [W/m2.K] kW
4.2 80 80 Water 200 1,8 2
Sistema solar térmico
Sistema bombas de calor
Heat Pump Storage Tank
COP Power Volume
kW [l]
2.5 1.5 300
Morning
[l]
Evening
[l]
Distributed
[l]
0h-8h 0 0 0
8h-9h 40 0 0
9h-10h 40 20 20
13h-14h 0 0 20
19h-20h 0 40 0
20h-21h 40 40 40
21h-22h 0 20 40
22h- 24h 0 0 0
Perfis de Consumo diário
Caso 1: morning profile (pior caso)
Caso 2: total = distribuição igual de
consumos pelos 3 perfis (33% cada)
(ver tabela abaixo)
![Page 30: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/30.jpg)
Models:
Modelo = Carga de 2012 + (90 casas *Apoio sistema solar) + (50 casas*apoio bomba calor)
• Modelo 1.0 - Carga 2012 + apoio livre
• Modelo 1.1 – Carga 2012+ apoio livre + perdas térmicas nos depósitos
• Modelo 2.0 – Carga 2012 + apoio noite (arranque às 00H)
Capacidade Pico maximo
anual
Diferencial pico
cenário base
Energia anual
consumido
Diferencial anual
energia
Energia media consumida
por dia
kW kW kW MWh MWh kWh/dia
Carga 2012 536 221 0 1372 0 3759
Modelo 1.0 457 236 1508 136 4132Modelo 1.1 471 250 1523 151 4174Modelo 2.0 370 149 1511 139 4141
Capacidade Pico maximo
anual
Diferencial pico
cenário base
Energia anual
consumido
Diferencial anual
energia
Energia media consumida
por dia
kW kW kW MWh MWh kWh/dia
Carga 2012 536 221 0 1372 0 3759
Modelo 1.0 371 151 1508 136 4132
Modelo 1.1 400 179 1520 148 4165
Modelo 2.0 370 149 1519 147 4162
Caso 2: igual distribuição de consumos pelos 3 perfis
Caso 1: perfil de consumo de manhã
![Page 31: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/31.jpg)
Resultados: Semana extrema de Inverno
Pico máximo: 400 kW às 21H
(semana 6)
![Page 32: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/32.jpg)
Resultados: Semanas típica de Primavera
Pico máximo: 265 kW às 22H
(semana 16)
![Page 33: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/33.jpg)
Resultados: Semanas típica de Verão
Pico máximo: 259 kW às 22H
(semana 28)
![Page 34: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/34.jpg)
Resultados: Semanas típica de Outono
Pico máximo: 353 kW às 22H
(semana 48)
![Page 35: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/35.jpg)
Is it possible?
•Is it technologically feasible?
• Which type of renewables?
• How much installed capacity of each?
•Is it economically feasible?
• How much does it cost?
• Positive net present value?
Energy system modeling
HOMER (electricity)
ENERGYPLAN (energy)
![Page 36: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/36.jpg)
Modeling approach
•Build reference case
• Calibrate model with reality
• Use Energy balance data, Demand data, Production data
•Build future reference case
• Forecast of demand, fuels costs
• Implement investment plans already settled
•Scenario analysis
• New technologies / installed capacities
• Different optimization strategies
• Different prices
• Different policies
![Page 38: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/38.jpg)
EnergyPlan RES
![Page 39: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/39.jpg)
Corvo RES
![Page 40: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/40.jpg)
General Overview
•Input
•Cost
•Output
•Settings
![Page 41: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/41.jpg)
Data Files Structure
•Distributions
• Demand
• Renewable Resources
•Data
• RES model
•Cost
![Page 42: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/42.jpg)
Data files
Files describing hourly data from one year
• 8784 hours
• txt files (tab delimited)
Demands
• % of maximum between 0 and 1
Renewables
• capacity factor
![Page 43: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/43.jpg)
SETTINGS
![Page 44: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/44.jpg)
General Overview
•Capacity Unit
• Scale of the system
•Monetary Unit
![Page 45: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/45.jpg)
INPUT
![Page 46: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/46.jpg)
General Overview
•Electricity Demand
•District Heating
• including Power Production from fossil fuels
•Renewable Energy
•Electric Storage
•Cooling
•Individual
• Residential energy needs
•Industry
•Transports
•Waste
•Biomass
![Page 47: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/47.jpg)
Electricity demand
•Electricity demand
• Total in GWh / year
• 1,37
• Change Distribution
• Corvo_demand.txt
•Electric heating /cooling
• 0
•Flexible Demand
• Energy / Power (1 day / 1 week / 1 month)
• 0
•Fixed Import / Export
• Fixed value
• 0
• Distribution.txt
![Page 48: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/48.jpg)
District Heating
•Distribution of demand
• Distribution.txt
•Distribution of solar thermal
• Distribution.txt
•Group I (no CHP)
• 0
•Group II (small CHP)
• 0
•Group III (large CHP)
• PP2 (560 kWe, 0,3 elect efficiency)
Fossil Fuels
![Page 49: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/49.jpg)
Renewable Energy
•Renewable Energy Source (1 to 4)
• Installed capacity
• Wind (1) – 1000 kW
• Distribution.txt
• Corvo_wind.txt
• Correction factor
• Fine tune capacity factors
•HydroPower
•GeothermalPower
![Page 50: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/50.jpg)
Electric Storage
•Electrolyser
•Electric Storage
(Pump-storage, batteries, Fuel Cell)
• Pump (conversion to potential energy)
• Turbine (conversion to electricity)
• Storage (capacity)
•Advanced CAES
(compressed air energy storage)
![Page 51: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/51.jpg)
Technology evolution
Source: André Pina (PhD MPP-SES)
![Page 52: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/52.jpg)
COSTS
![Page 53: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/53.jpg)
General Overview
•Fuel
•Operation
•Investment
•Additional
![Page 54: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/54.jpg)
Fuel
•Fuel Prices (World Market) € /GJ
• Coal (17.2 /€ bep): 2.8€/GJ
• Oil ( 72 € /bep): 11.8 €/GJ
• Gas ( 47 €/bep): 7.8€/GJ
• Diesel in Corvo: 41 € / GJ
• Use Fuel ENERGYPLAN does not consider diesel power generation plants)
•Handle Costs
•Taxes
•CO2
1 barrel of oil equivalent = 6.1 GJ
![Page 55: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/55.jpg)
Operation
•District Heating
•Power Plants
• PP2: 430 € / MWhe
•Storage
•Individual
![Page 56: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/56.jpg)
Investment
•Wind
• 1.8 M€ /1000 kW
• Period: 25 years
• O&M: 5 %
Solar
• 5M€ /1000kW
• Period:15 years
• O&M: 0
![Page 57: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/57.jpg)
Regulation
![Page 58: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/58.jpg)
General Overview
•Optimization strategy
• Technical
• Market
•Electric Grid Requirement
• Minimum share:0.2
•Critical Excess Electricity Production
• 7 strategies
•External Electricity Market Definition
•External Electricity Market Response
•Transmission line Capacity
• 0
![Page 59: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/59.jpg)
Output
![Page 60: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/60.jpg)
General Overview
•Overview
•Screen
•Graphics
![Page 61: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/61.jpg)
Screen
![Page 62: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/62.jpg)
Graphics
![Page 64: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/64.jpg)
General Overview
Electricity “only”!
![Page 65: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/65.jpg)
Equipment
![Page 66: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/66.jpg)
Designing the system
![Page 67: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/67.jpg)
Generator
![Page 68: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/68.jpg)
Wind Turbine
![Page 69: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/69.jpg)
Solar Power Plant
![Page 70: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/70.jpg)
Primary Load
![Page 71: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/71.jpg)
RESOURCES
![Page 72: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/72.jpg)
Solar
![Page 73: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/73.jpg)
Wind
![Page 74: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/74.jpg)
Diesel
![Page 75: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/75.jpg)
System Control inputs
![Page 76: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/76.jpg)
Constraints
![Page 77: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/77.jpg)
Simulation
![Page 78: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/78.jpg)
Results overview
![Page 79: Energy Systems Modeling and Economics - Técnico Lisboa · PDF fileEnergy Systems Modeling and Economics ... 1994 1996 1998 2000 2002 2004 2006 2008 h Losses Residential Public Services](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa412897f8b9a517d8b5c0d/html5/thumbnails/79.jpg)
Results detail