Energy Storage Safety at CPUC 2010-2017
The Energy Storage Safety ForumFebruary 22-24, 2017
Arthur O’Donnell - Supervisor, Risk Assessment & Safety AdvisorySafety & Enforcement Division
-
2
AGENDA CPUC’s 1.3 GW Energy
Storage Initiative Background
2013 Decision – Storage
Targets
Current State of Market
Customer-Side Systems –
Local Permitting
Safety Considerations in
Procurement – Grid Scale
Utility Owned -- Inspection
Guidelines
-
3
1,325 MW in operation by 2024
-
Summary of AB 2514 (2010 Skinner)
• Directed CPUC to open a proceeding to:– Adopt procurement targets, if appropriate, for each LSE to procure
viable & cost-effective energy storage• To be achieved by EOY 2015 & EOY 2020
– Consider policies to encourage deployment of energy storage
• Deadline for CPUC decision by October 2013
• CPUC to re-evaluate its determinations every three years
4
-
Storage OIR R.10-12-007• Established framework of storage applications/Use
Cases– 21 end uses – Distinct types of storage to consider from policy
perspective• Identified regulatory barriers to storage deployment• Recognized distinct storage flexibility benefits• Developed specific Use Case descriptions• Preliminary cost-effectiveness analysis of selected use
cases by EPRI & DNV KEMA
5
-
Goals & Objectives• Goal: To begin integrating energy storage into the
power grid in support of statewide strategies to reduce carbon emissions– Drive storage market transformation – Eliminate or reduce regulatory, commercial, and financial
barriers to storage deployment – Gain development and operational experience
• Storage projects must address at least one policy objective:– Integration of renewable energy sources– Grid optimization (peak reduction, reliability needs or T&D deferment)– Reduction of GHG emission
6
-
7
Category Storage “End Use”
Independent System Operator /Wholesale Market
• Frequency regulation• Spin/non-spin/replacement reserves• Ramp• Black start• Real time energy balancing• Energy price arbitrage• Resource adequacy
Renewables Integration
• Intermittent resource integration: wind (ramp/voltage support)• Intermittent resource integration: photovoltaic (time shift, voltage
sag)• Supply firming
Transmission &Distribution (Grid Operation)
• Peak shaving: off-to-on peak energy shifting (operational)• Transmission peak capacity support (upgrade deferral)• Transmission operation (short duration performance, inertia, system reliability)• Transmission congestion relief• Distribution peak capacity support (upgrade deferral)• Distribution operation (Voltage Support/VAR Support)• Outage mitigation: micro-grid
Customer Use • Time-of-use /demand charge bill management (load shift)• Power quality• Peak shaving (demand response), Back-up power
-
Energy Storage Systems
8
Bulk Generation Xmission Distribution Behind-the-Meter
Renewable–Sited
Storage
Transmission
ConnectedBulk
Storage
TransmissionGrid Storage
Distribution Grid Storage
Customer-SitedStorage
CSP Wind +
Storage
A/S Peaker Load
following
FERC Jurisdiction
SubstationLevel Storage
DistributedPeaker
Community ES
Bill mgt / PLS Power quality EV charging
== Transmission-Connected ==
-
What Was in the Initial DecisionOn October 17, 2013, the CPUC approved final decision D. 13-10-040 to set storage procurement targets and policies for load-serving entities (utility & non-utility):• Up to 1,325 MW of storage by 2020 in 4 biennial bidding auctions, starting
December 2014; • PG&E 580 MW; SCE 580 MW; SDG&E 165 MW (totals)• Storage for Transmission-connected, Distribution-level and Customer-Side
of the Meter applications;• Up to 50% utility ownership for storage across all categories (except);• Distribution for reliability is utility-owned;• Storage from other solicitations (SGIP, LTPP) may apply to targets;• Non-utility LSEs have later targets ~ 1% of peak load by 2020;• Market Transformation rationale for targets.• Cost-effectiveness needed to be “disproved” by utilities.
9
-
Procurement Targets:by Year and Utility
10
-
Additional Directives in the CPUC Decision• Every two years, utility procurement applications due March 1,
followed by a solicitation on December 1
• Ownership– Utility-owned storage limited to 50% of cumulative targets– IOU allowed to own storage assets on customer-premise– IOU could contract with either Customer or third party-owned assets
• Pumped Storage >50 MW not eligible
• Target Flexibility
• Project Eligibility
• Other Guidelines– Program Evaluation– Cost Effectiveness Evaluation
11
-
Procurement Targets: Current Status
Utility Total MW Goal
By 2024
Total Procured to
Date
NewAB 2868 Goals
Proposed for 2016 RFO
Southern California Edison
580 537.7 ~167 20
Pacific Gas & Electric 580 94 ~167 115.3
San Diego Gas & Electric 165 116.6 ~167 144
Total 1,325 749 500 279.3
12
-
Any technology has its problems, especially an emerging technology
-
Installed by Technology 2013-2015Technology Types
Lithium IonSodium SulferLead AcidFlowOther
Lithium Ion remains dominant with ~98% of 2016 installations – GTM Research
-
Flywheel Storage Device Blast Poway, California
June 10, 2015
15
-
Kahuku Wind Facility Fire, 2012
16
"The fire had spread through some of the batteries and was now in front of the door so the use of the dry chemical was not sufficient to knock down the fire to the point where we could extinguish,"
-- Capt. Terry Seelig, Honolulu Fire Department
-
Storage Safety in California ProceedingsCustomer-Side Systems
In 2014, Commission was determining energy storage eligibility for net energy metering (NEM) program and sought to incorporate safety as a program criterion.
However, CPUC does not have jurisdiction over local permitting for residential and small commercial units under our Rule 21 interconnection process.
In D.14-05-033 Commission staff were directed to work with State Fire Marshall, Governor’s Office of Planning & Research and others to “develop a set of comprehensive standards and practices to improve permitting and inspection by local authorities….” and to promulgate them on Commission web site and help promote them statewide.
17
-
Storage Safety in California ProceedingsCustomer-Side Systems
-
19
Interconnection of storage battery systemsField Inspection Guidelines for interconnected residential battery storage systems
• Multiple references to National Electrical Code 690.71, etc. & UL 1741
• A system maintenance plan shall be submitted to the building inspection office at time of permit application in order to ensure the homeowner is aware of the system maintenance requirements.
• Energy storage systems shall be listed to UL 1989 or 9540 as applicable.
• Applicant must provide a letter from the serving utility indicating they have been notified of the proposed battery/ energy storage system installation.
• Any field modifications to the electrical service, or line side connections are subject to field inspector approval and may require accredited third party field evaluation.
-
All appropriate signage must be installed in accordance with NEC (see Santa Clara County interconnected power system signage guidelines).• Signs Shall Be Weatherproof and Suitable for the Environment they are
Installed.
• Lettering Shall Be a Minimum Letter Height of 3/8” Permanently Affixed.
• A Permanent Plaque or Directory, Denoting All Electric Power Sources on or in the Promises Shall Be Installed at Each Service Equipment Location and at Locations of all Power Sources Capable of Being Interconnected.
20
-
21
SANTA CLARA COUNTY BUILDING INSPECTION OFFICE
TYPICAL RESIDENTIAL INTERCONNECTED STORAGE BATTERY SYSTEM REQUIRED SIGNAGE
SIGNS SHALL BE WEATHERPROOF AND SUITABLE FOR THE ENVIRONMENT THEY ARE INSTALLED
LETTERING SHALL BE A MINIMUM LETTER HEIGHT OF 3/8” PERMANENTLY AFFIXED.
Label Main Service: CEC 705.12(D)(4)
Label on POI breaker if OCPDs exceed 100% of bus rating CEC 705.12 (D) (7)
To be applied at exterior of building in readily visible location. A directory needs to be installed when utility service disconnect and
PV system disconnect are not in the same location. Must be at the location of the photovoltaic system disconnecting means.
NEC 705.10
WARNING INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS OVERCURRENT DEVICE
CAUTION STORAGE BATTERY SYSTEM CONNECTED
A PERMANENT PLAQUE OR DIRECTORY, DENOTING
ALL ELECTRIC POWER SOURCES ON OR IN THE PROMISES SHALL BE INSTALLED AT EACH SERVICE
EQUIPMENT LOCATION AND AT LOCATIONS OF ALL POWER SOURCES CAPABLE OF BEING
INTERCONNECTED
SANTA CLARA COUNTY BUILDING INSPECTION OFFICE
TYPICAL RESIDENTIAL INTERCONNECTED STORAGE BATTERY SYSTEM REQUIRED SIGNAGE
SIGNS SHALL BE WEATHERPROOF AND SUITABLE FOR THE ENVIRONMENT THEY ARE INSTALLED
LETTERING SHALL BE A MINIMUM LETTER HEIGHT OF 3/8” PERMANENTLY AFFIXED.
Label Main Service: CEC 705.12(D)(4)
Label on POI breaker if OCPDs exceed 100% of bus rating CEC 705.12 (D) (7)
To be applied at exterior of building in readily visible location.
A directory needs to be installed when utility service disconnect and
PV system disconnect are not in the same location.
Must be at the location of the photovoltaic system disconnecting means.
NEC 705.10
CAUTION STORAGE BATTERY SYSTEM
CONNECTED
WARNING
INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
A PERMANENT PLAQUE OR DIRECTORY, DENOTING ALL ELECTRIC POWER SOURCES ON OR IN THE PROMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT LOCATIONS OF ALL POWER SOURCES CAPABLE OF BEING INTERCONNECTED
-
Safety in the California Energy Storage Procurement Proceeding
• Decision 16-01-017 requires “all applications to identify all relevant safety considerations implicated by the application.”
• The Commission had been criticized by the legislature for not originally having safety in the energy storage proceeding.
• The 2014 and 2016 applications from the utilities included safety language but to a very mixed degree. Common elements:
– Project Safety Plan;– System specifications, Factory & Site Acceptance Testing standards;– Attestation of performance to safety requirements and Prudent Electrical
Practices, by both Seller and a Licensed Professional Engineer;– Notification of any safety incidents within 5 days;– Shut down in case of serious incidents; utility has to approve restart.
-
Storage Safety in California ProceedingsGrid-Scale Systems
• In August 2015, CPUC SED and Energy Division staff conducted a workshop to review safety and operational experience of utility installed energy storage:
• UL gave an overview of its safety standards for storage, with a particular focus on development of UL 9540 as well as on UL 1973. UL also discussed certification and labeling of energy storage technologies.
• Sandia National Lab presented on behalf of the Energy Storage Integration Council (ESIC) Subgroup on Safety, Draft of “Guide to Safety in Utility Integration of Energy Storage Systems” was presented.
23
-
Storage Safety in California ProceedingsGrid-Scale Systems
California utilities gave presentations on early operations and lessons learned at their own storage facilities:
• PG&E: The 2 MW battery energy storage project at the Vaca-Dixon substation, operational in August 2012 and commenced market operations in August 2014.
• The 4 MW Yerba Buena battery energy storage project near San Jose, operational in May 2013, completed the interconnection process in August 2014, and began market participation in Fall 2015.
24
-
Storage Safety in California ProceedingsGrid-Scale Systems
25
-
Storage Safety in California ProceedingsGrid-Scale Systems
26
-
Storage Safety in California ProceedingsGrid-Scale Systems
27
-
Storage Safety in California ProceedingsGrid-Scale Systems
28
-
Storage Safety in California ProceedingsGrid-Scale Systems
29
-
Storage Safety in California ProceedingsGrid-Scale Systems
What PG&E considers necessary for ensuring NAS battery safety:• 24/7 monitoring by distribution operations with key alerts for fire and
SO2 alarms• 24/7 monitoring by a system integrator • Yearly system inspections• Twice-yearly testing of fire alarm and external SO2 detection
systems• Bi-annual replacement of the internal SO2 detector (inside battery
modules)• Ongoing review of battery performance and temperatures to identify
potential problems early.
30
-
Storage Safety in California ProceedingsGrid-Scale Systems
Lessons from other IOUs not quite so dramatic, but still valuable:
SDG&E – Borrego Springs• Substation storage,
Gen 1: 500 kW/1.5 MWh ESS
Gen 2: 1 MW/3 MWh ESS added
• Community Energy Storage(3) 25 kW/50 kWh ESS
31
-
Storage Safety in California ProceedingsGrid-Scale Systems
SDG&E offered the following Lessons Learned from its integration of energy storage technology:• Safety standards for grid-scale energy storage are largely under-defined:
– Site safety: all applicable OSHA, NEC, and NFPA requirements– Fire: NFPA 704– Operation: IEEE1547/UL1741/UL1642– Enclosure: NEMA 3R– Signage: ANSI Z535– Cybersecurity: NISTIR 7628
Standards development is not at pace with regulatory requirements –and this creates challenges in terms of approvals.
32
-
Storage Safety in California ProceedingsGrid-Scale Systems
SCE Irvine Smart Grid Projects• Residential Energy Storage Unit (RESU)
– 4kW / 10kWh– Installed in 13 homes
• Community Energy Storage (CES)– 25kW / 50kWh– 1 device serving 9 homes
• Electric Vehicle Charging Station with PV and Storage (BESS)– 100kW / 100 kWh– Paired with 20 EV charging stations & 48 kW PV array
• Large Distributed Energy Storage System (DBESS)– 2 MW / 500kWh– Connected to a 12 kV distribution circuit
33
-
Storage Safety in California ProceedingsGrid-Scale Systems
34
Residential Energy Storage Unit (RWSU)
Garage installation required safety brace to protect against vehicle collisions
RESUs experienced multiple issues in the field that required on-site visits to resolve:
Software failuresSystem lockups that could cause battery over discharge. New software versions introduced fixes to improve reliability.
SCE described a need for coordination with local officials, regional officials, state-level officials, “time consuming but worthwhile.”
-
CPUC SED Working Group in Action at the Vaca-Dixon Substation
-
CPUC Safety & Enforcement DivisionEnergy Storage Inspection Guidelines
• CPUC had no precedent in developing protocols;
• For Utility-Scale, Grid-Connected Storage Co-located at Utility Substations and other sites;
• Participation from PG&E, SCE, SDG&E, NGK, NEC, CESA, ESRB, Amber Kinetics;
• CPUC has determined no need to revise General Order 174 (Substations) but SED inspectors are beginning to use the list;
• Application to non-IOU facilities pending.
-
Guidelines for SED Inspectorsfor Energy Storage Facilities (Page 1)
• Is an overall safety plan in place?– Does the facility have a safety plan documented?– Does it address manmade and natural disasters like wildfire, earthquake, flood, chemical
spill, toxic gas release, explosion, terrorism, etc.?– Does it include outreach to first responders and local authorities? i.e. conduct periodic drill
with fire, police, hazmat, etc.– Does it include training?– Are signage and safety placards compliant with American National Standards Institute,
National Fire Protection Association, and other applicable standards?– Does the facility have a monthly in-service inspections and maintenance checklist?
• Storage management system (fire monitors, SO2 monitors, wind sock, log book, smoke detectors, etc.)
• Fire plan box (on substation fence)• Equipment (generators, transformers, switch gear and control cabinet, battery towers,
etc.)– Does the facility have maintenance records, such as a preventative maintenance log? – Does the facility have an appropriate access protocol?
-
Guidelines for SED Inspectorsfor Energy Storage Facilities (Page 2)
• Is the facility inspected regularly by the company or utility per manufacturer’s recommendations?
– Battery Modules. • Inspection of cables and wiring.• Torque check of bolted connections (when applicable) • Insulation resistance measurement (per industry standards)• Heater resistance. • Battery residence.
– Cable run. • IR or Ultrasound inspection of terminals• Insulation resistance measurement (per industry standards)
– SO2 detector if applicable.– Control cabinet.
• Inspection of cables and wiring.– Total system.
• Protection relay test.
38
-
Guidelines for SED Inspectorsfor Energy Storage Facilities (Page 3)
• Is the facility inspected regularly by the company or utility, per manufacturer’s recommendations? (flywheels only)
– At commissioning, are flywheel units properly installed, with civil design per manufacturer specification?
– Inspection of cables and wiring.– Insulation resistance measurement of cables.– Run automated control system test. Verifies control connectivity, functionality of internal
sensors within each flywheel unit – voltage, current, vibration sensing, and vacuum system state. Test carried out from control center.
• SED inspectors examine the following (both visual and records review)– Interconnection equipment– Storage facility– Battery enclosure– Battery module (varies by technology)– Hazardous materials policy and management program if applicable
Because energy storage technology will evolve over time, this checklist will also need to evolve over time.
39
-
Vaca-Dixon Sodium Sulfur BatteryFire Extinguisher
Do not pour water on a sodium sulfurBattery.
-
Thank You!
For further information related to Energy Storage & Safety Issues,
please contact:
Arthur O’Donnell [email protected]
415-703-1184
www.cpuc.ca.gov41
http://www.cpuc.ca.gov/
Slide Number 1AGENDASlide Number 3Summary of AB 2514 (2010 Skinner)Storage OIR R.10-12-007Goals & ObjectivesSlide Number 7Energy Storage SystemsWhat Was in the Initial DecisionProcurement Targets:�by Year and UtilityAdditional Directives in the CPUC DecisionProcurement Targets: Current StatusAny technology has its problems, especially an emerging technologyInstalled by Technology 2013-2015�Flywheel Storage Device Blast �Poway, California�June 10, 2015Kahuku Wind Facility Fire, 2012Storage Safety in California Proceedings�Customer-Side SystemsStorage Safety in California Proceedings�Customer-Side SystemsSlide Number 19Slide Number 20Slide Number 21Safety in the California �Energy Storage Procurement ProceedingStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsStorage Safety in California Proceedings�Grid-Scale SystemsCPUC SED Working Group in Action at the Vaca-Dixon SubstationCPUC Safety & Enforcement Division�Energy Storage Inspection GuidelinesGuidelines for SED Inspectors�for Energy Storage Facilities (Page 1)Guidelines for SED Inspectors�for Energy Storage Facilities (Page 2)Guidelines for SED Inspectors�for Energy Storage Facilities (Page 3)Vaca-Dixon Sodium Sulfur Battery�Fire ExtinguisherThank You!