energy, nuclear & sustainable power: stuart klosinski, furness economic development forum
TRANSCRIPT
ENERGY IN SOUTH CUMBRIASTRATEGIC NATIONAL
INVESTMENT
FURNESS ECONOMIC
DEVELOPMENT FORUM
WWW.FEDF.CO.UK AND CUMBRIA GROWTH
HUBWWW.FEDF.CO.UK
WWW FEDF CO UK ACCOMMODATION-HUB CO UKTWITTER@FEDFSUPPLYCHAIN
GROWTH HUB SUPPLIER GATEWAYhttp://www.cumbriagrowthhub.co.uk/supply-chain-gateway/supply-chain-gatewayStability to 2030s,
10% of all Northern Powerhouse Growth in Furness, Capitalise on
Dreadnought class build, diversification, Need for huge commitment to
infrastructure, skills, entrepreneurship
FURNESS ECONOMIC DEVELOPMENT FORUM
OUR FOCUS• INFRASTRUCTURE• EDUCATION EMPLOYMENT SKILLS• BUSINESS ENGAGEMENT• SUPPLY CHAIN STRENGTHENING• QUALITY OF LIFE
• Influencing Cumbria LEP Strategy, BEIS: Building an industrial strategy Hooked into Northern Powerhouse Strategy.
FEEDBACK FROM SUPPLIERSWhat you need from us• 88% information on
emerging contracts• 76% discover who to
contact• 52% how to pre-
qualify
2nd priorities• 36% How to do business with
large firms• Address tender complexity• 60% Access to finance• 92% will share contact details• 88% willing to help with directory
Energy Opportunities
•5 WIND FARM O AND M BASES, HELICOPTER BASE •CIVIL AND DEFENCE NUCLEAR: DESIGN, BUILD •WORLDS LARGEST BATTERY STORAGE FACILITY•GAS PROCESSING / EXPLORATION•ONSHORE WIND,SOLAR ,HYDRO •ENERGY MANUFACTURING: GSK POWER•GLOBAL PRESENCE OF MANUFACTURERS •SUPPORTING port, logistics, design, manufacturing, test commissioning
Defence Nuclear
• The Defence Nuclear Programme forms a critical 25% of the total current UK demand for nuclear and nuclear related skills, there are a number of significant differences with respect to the civil sector
• Defence nuclear capability has a large programme of planned construction and ongoing operations.
• The power source for nuclear submarines is a unique application of a complex and safety critical technology. Space is severely constrained, safety systems need to respond to the operational status of the vessel and refuelling needs to be minimised
• 15,000 personnel in defence nuclear workforce• More people are employed in the energy production in the defence
sector than the civil.
Civil and Defence Workforce Skills
BAE SYSTEMS FOUNDATIONS FOR FUTURE
CENTRAL YARD COMPLEX & PAINT FACILITY
MORGAN SINDALLConstruction line http://www.constructionline.co.uk/staticSee http://construction.morgansindall.com/supply-chain To apply to join supply chain see http://www.buildersprofile.co.uk/BP/mc-msg.html and use http://shop.bsigroup.com/en/Navigate-by/PAS/PAS-91-2013/SEVERFIELDNORTHERN CLADDINGROBERT MCALPINE PAINT [email protected]
SUBMARINE ENTERPRISENEW BERTH/SUPPORT
• ARTISTS IMPRESSION
BAE SYSTEMS QUAYS, NUCLEAR BERTH SUPPORT JACOBS, Project Manager: P Harney
http://www.barrowbc.gov.uk/papps/temp_blobs/PLAN_2016_0666_DESIGN_1.pdf
MOD SUBMARINE ENTERPRISE Largest public sector investment of this and the next parliament: [email protected]
13
BAE Systems Supplier Forum Hierarchy
Submarine Supplier ForumContinuous Improvement
ForumGeneral Forum
SUBMARINE SUPPLIERS NETWORKS
WATERFRONT Barrow BUSINESS PARK SERVING BAE AND PORT – PHASE 1 COMPLETED, PHASE
2 IN BUILDRichard Hargreaves, Project Manager [email protected] 01226 320150
Huge demand for Quarried Stone
WIND FARM BASES: UP TO 400 JOBS
GSK ULVERSTON Energy Centre
NATIONAL GRID https://www.competefor.com/nationalgrid/national-grid/working-with-our-supply-
chain/
MAIN WORKS CONTRACTS
400kV overhead line;400kV
undergrounding;Substation works;
Tunnel construction (Morecambe Bay); and
DNO works.
COMPETE FORNational Grid will be requiring
Tier 1 contractors to use CompeteFor in tendering for sub-contractor supplies and services
http://www.northwestcoastconnections.com
/docs/RouteAlignmentDocs/Volume%202%20-%20Preliminary
%20Environmental%20Information/Volume
%202.7_Technical_Appendices/Chapter%2017_Socio-economics/
Volume_2.7_Appendix_17F_Draft_Employment_and_Skills_Framework.pdf
Tunnel Constructiona substantial civil engineering
project in its own right a large relatively stable
workforce Located at each of the two tunnel
heads for most of the tunnel construction period, estimated to
be about 6 years in totalallowing for enabling works
(including construction of shafts), cable installation and
commissioning.
NATIONAL GRIDIt is National Grid’s policy to procure goods and services competitively, economically, ethically and efficiently National Grid utilises the Achilles Utilities Vendor Database (UVDB) of suppliers when compiling lists of potential vendors for its goods and services requirements.
Construction service Chris Hickey Services to support gas and electricity construction Engineering services Sara Tibbatts Asset maintenance and repairs Global information systems (IS) services Tam CurranTunnels Andy Smith Substation construction Ben Adams Substation alliances and contracts Professional services (General management) Dan Goodchild Consultancy legal Switchgear Cathy Knight Switchgear contracts
NATIONAL GRID - OUR ASK
• “maximising opportunity locally” • A 400kv power supply from Moorside
to Roosecote gives scope to attract large energy users into the Furness area after 2024/5.
• tunnelling and underground construction academy
• work with FEDF skills/employment group and Furness Education Skill Partnership to promote skills opportunities.
• Supply chain strengthening• accommodation strategy response
network and an Accommodation Hub at www.fedf.co.uk/accommodation-hub/ in 2016 to help individuals and firms be aware of accommodation demand and supply
• Legacy A595 improvement and multi-modal facility
• Spoil re-use
ACCOMMODATION HUB• WEBSITE• COMMITTED PARTNERS• RESEARCH BRIEFINGS• WELCOME TOURSOPTIONS• FIND YOUR OWN• BLOCK BOOKINGS• PROVIDER PARTNERSHIPS• WORKCAMPS • FLOATING SOLUTIONS• NEW DEVELOPMENTS
HIGH LEVEL SUMMARY TO 2045 OF MAJOR INVESTMENT
Notes* Foundations for the