energy & emissions strategic plan ewa’s roadmap to energy independence

17
Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Upload: cleopatra-blair

Post on 26-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Energy & Emissions Strategic Plan

EWA’s Roadmap to Energy Independence

Page 2: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Objectives

Describe EWA

Set the context for EWA’s planning process

Discuss the importance of Board leadership

Planning Goals, Process, Results\

Big Picture Outcomes

Q&A?

15 minutes

Page 3: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Encina Wastewater Authority

Carlsbad, California

Joint Powers Agency

350,000 Residents

125 Sq. Mile Service Area

$350M Asset Value

Encina Water Pollution Control Facility

Contract O & M

Regional Source Control

Regional Laboratory

Page 4: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Encina Water Pollution Control Facility

Page 5: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Context

High energy demand

High energy costs

Unfavorable tariff environment

Future energy markets unstable beyond local control

Early investment & adoption

WASTEWATER

Page 6: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Legacy Cogeneration Investment

Investment

Engines

Generators Blowers Digester Heat

Phase III 5 3-350 kWh 2-350kWh 100%

Phase IV 5 3-350 kWh 2-350 kWh 100%

Phase V 4 4-750 kWh 5 – In Array 100%

Page 7: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Board Strategic Policy

MissionAs an environmental leader, EWA provides

sustainable and fiscally responsible wastewater services to the communities it serves while maximizing the use of alternative and renewable resources.

Key IssueAdditional resource recovery and investment

creates the opportunity for energy independence mitigate impacts arising from unstable energy markets.

Page 8: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Goals

1. Energy Efficiency Goal Review existing energy consumption and evaluate

alternative methods to reduce consumption

2. Energy Production Goal ID and evaluate technologies for increasing on-site

energy production fueled by alternative or renewable fuels

3. Emissions Permitting Goal Evaluate alternative emissions and permitting models in

the context of energy demand & production strategies

4. Planning Goal Recommend specific actions.

Page 9: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Process

Current and projected future baseline

Identify energy efficiency measures (EEM)

Comprehensive technology scan & comparison

Rank technologies using defined evaluative criteria

Develop an implementation plan

Page 10: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Results

Energy Efficiency Goal: Review existing energy consumption and evaluate alternative methods to reduce consumption

Baseline annual electric demand 17,500,000 kWh

Secondary Treatment process = 43% of electric demand, Target: 9 EEMs, 2,000,000 kWh annual demand reduction Aeration Header Repair Turbo Blowers Process Operation Changes Variable Speed Fans & Pumps

Page 11: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Results

Electrical Energy Production Goal: ID and evaluate technologies for increasing on-site energy production fueled by alternative or renewable fuels.

Screened In IC Engines, Fuel Cells, PV Solar

Screened Out Wind Turbines, Microturbines, Water Flow Energy

Capture

Page 12: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Results

Bio-Gas Energy Production Goal: ID and evaluate technologies for increasing on-site energy production fueled by alternative or renewable fuels.

Screened In Alternative Fuels, Cell Lysis, Digester Enhancements,

Bio-Gas Treatment

Screened Out Sludge Heating, Bio-Gas Storage

Page 13: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Results

Waste-Heat Energy Production Goal: ID and evaluate technologies for increasing on-site energy production fueled by alternative or renewable fuels.

Screened In Absorption & Adsorption Chiller, Organic Rankine Cycle

Screened Out Steam Turbines, Solids Pyrolysis

Page 14: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Results

Emissions Permitting Goal: Evaluate alternative emissions and permitting models in the context of energy demand & production strategies

Screened In Synthetic Minor

Screened Out Title V

Page 15: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Recommended Project Summary

Element Est. $ ROI in Yrs

Priority

EEMs 2.3M 0.2-25 1/1

Alternative Fuel 2.0M 2.5 3/2

Gas Treatment & Exhaust Catalysts

3.0M 2.5 2/3

5th IC Engine 1.0M 2.8 4/4

Renewable Fuel Chiller 1.4M 6.4 5/5

6th IC Engine 3.1M 24 6/6

Page 16: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Planning Outcomes

Appropriate response to public’s growing recognition of the water-energy nexus

Good planning is a condition precedent to investment

Energy efficiency is nearly universally viewed as the most appropriate 1st investment

Sustained Board of Director’s commitment to energy independence since 2008

Value of thoughtful resource deployment and branded communication

Page 17: Energy & Emissions Strategic Plan EWA’s Roadmap to Energy Independence

Questions?

Kevin M. HardyGeneral ManagerEncina Wastewater [email protected]