Energy Audit
Prepared For:
Middle Township
Public Schools
Ms. Diane Fox
Business Administrator /
Board Secretary
Prepared By:
Dome-Tech, Inc.
Prepared Under the Guidelines of the State of NJ Local Government Energy Audit Program
December, 2012
![Page 2: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/2.jpg)
(Page left blank intentionally)
![Page 3: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/3.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
MIDDLE TOWNSHIP SCHOOL DISTRICT
ENERGY AUDIT REPORT TABLE OF CONTENTS
1. Executive Summary
2. ECM Summary By Payback
3. Energy Audit Report
Energy Audit Purpose & Scope
Historic Energy Consumption
Facility Description
Greenhouse Gas Emissions Reduction
Energy Conservation Measures
Renewable/Distributed Energy Measures
Energy Procurement
Next Steps
Notes and Assumptions
4. Appendix
Portfolio Manager/Energy Star
Facilities Total Annual Energy Use
Equipment & Lighting Inventory Lists
ECM Lists
ECM Costs & Calculations
Renewables Calculations
![Page 4: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/4.jpg)
(Page left blank intentionally)
![Page 5: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/5.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
December 21, 2012 Ms. Diane Fox Business Administrator / Board Secretary Middle Township Board of Education 216 South Main Street Cape May Court House, NJ 08210 Re: EXECUTIVE SUMMARY FOR MIDDLE TOWNSHIP BOARD OF EDUCATION STATE OF NEW JERSEY LOCAL GOVERNMENT ENERGY AUDIT OUR PROJECT NUMBER D12308 Dear Ms. Diane Fox: Dome-Tech was retained by the Middle Township Board of Education, as a pre-qualified participant in the Local Government Energy Audit Program, to perform an energy audit. The objectives of the energy audit were to evaluate the District’s energy consumption, establish baselines for energy efficiency, and identify opportunities to reduce the amount of energy used and/or its cost. The scope of the audit is standardized under the Program, and consisted of the following:
Benchmarking historic energy consumption utilizing EPA Energy Star’s Portfolio Manager;
Characterizing building use, occupancy, size, and construction;
Providing a detailed equipment list including estimated service life and efficiency;
Identifying and quantifying Energy Conservation Measures (ECMs);
Evaluating the economic viability of various renewable/distributed energy technologies;
Performing a utility tariff analysis and assessing savings potential from energy procurement strategies;
Providing the method of analyses. Based upon data received for the twelve (12) month period August 2011 – July 2012, for the facilities included in this study, the District had an annual expenditure of:
Electricity: 4,451,312 kWh at a total cost of approximately $541,554
Natural Gas: 199,364 therms at a total cost of approximately $195,797 The following five (5) buildings were evaluated under this study:
Facility Name Total Floor Area (sq ft)
Middle Township High School 205,270
Middle Township Middle School 88,639
Elementary School #2 87,674
Elementary School #1 84,220
Administration Building 5,950
Total Floor Area 471,753
![Page 6: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/6.jpg)
Ms. Diane Fox December 21, 2012 Middle Township Board of Education - D12308 Page 2 of 3
Please refer to Section 2 of this report for a detailed list of identified Energy Conservation Measures (ECMs), along with a summary of their preliminary economics (estimated project cost, estimated annual energy savings, applicable rebate(s), etc.). In this report, all identified ECMs are ranked and presented according to their simple payback; however, please note that the master ECM table can also be sorted by building, by measure type, etc. If all identified ECMs were to be implemented, they would provide the following estimated benefits to the Middle Township Public School District:
Total annual electrical savings: approximately 492,245 kilowatt-hours of electric consumption; 11% overall savings
Total annual natural gas savings: approximately 12,140 therms of natural gas consumption; 6% overall savings
Total annual cost savings: approximately $67,480 of utility cost; 9.2% overall savings
Total annual CO2 emissions reduction: 234 tons
Total net estimated implementation cost: approximately $454,650
Total overall simple payback: 6.7 years A summary of the projects that are recommended for implementation includes the following:
Computer power management;
HVAC time of day optimization;
Vending machine power management systems;
Upgrade exterior door weather stripping;
Demand controlled ventilation;
Day lighting;
Walk-in cooler power management controls;
Lighting upgrades and occupancy sensors; Please see the report for a full list of recommended ECMs. Distributed/Renewable Energy Systems were also reviewed with the following conclusions:
Dome-Tech considered three different types of wind turbine technologies that consisted of both building-mounted and traditional ground-mounted variety. Ground-mounted is not feasible for a majority of these sites due to space constraints and the surrounding buildings. The building-mounted wind turbine projects appear to be the only technically viable options. Should the District decide to pursue a wind turbine project, Dome-Tech recommends commissioning a more detailed study.
A roof-mounted photovoltaic system of approximately 361 kW dc, could provide approximately 82% of the annual energy consumption at the Middle School. Sections of the roof at the Middle School are nearing the end of its life and repairs are likely needed prior to mounting a photovoltaic system.
CHP (combined heat and power), fuel cells, and micro-turbines were also considered and not recommended for any of the buildings due to a lack of significant year-round thermal loads.
![Page 7: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/7.jpg)
Ms. Diane Fox December 21, 2012 Middle Township Board of Education - D12308 Page 3 of 3
The District’s data was entered into the US EPA ENERGY STAR’s Portfolio Manager database program. Buildings with scores of 75 or higher may qualify for the ENERGY STAR Building Label. The District’s buildings’ scores ranged from 16 and 71. Regarding the procurement of utilities, Dome-Tech understands that the District’s facilities in this study are served by Atlantic City Electric Company for electric delivery and South Jersey Gas for gas delivery under a variety of rate classes. The District is currently participating in Electric Choice and is receiving third party supply of electricity at a fixed rate through a contract signed with South Jersey Energy. Hess Corporation is supplying third party gas at a floating rate. Contracts were not provided therefore Dome-Tech was unable to determine further details about retail energy supply contract structure such as contract start and end terms and other product details.
During the development of this audit, Dome-Tech was assisted by many facility personnel, who were both knowledgeable and very helpful to our efforts. We would like to acknowledge and thank those individuals. Sincerely, Alexander Hild, PE, CEM Energy Engineer
![Page 8: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/8.jpg)
![Page 9: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/9.jpg)
Middle Township BOE, NJ - 1 - FINAL Energy Audit Report, December 2012
Table of Contents
Energy Audit Purpose & Scope …..............................................................................................................2
Historic Energy Consumption .…..……………………………………………………………………….……3-5
Facility Information …............................................................................................................................6-19
Energy Conservation Measures (ECM’s) ……….…………………………………………………………20-36
Renewable/Distributed Energy Measures ….……..….………………………………………………………37
Renewable Energy Technologies:
Wind………………………………………………………………………………………………………. 38-39
Solar Photovoltaic…………………………………………………………………………..………….37-39
CHP/Cogeneration …..…..…………………………………………………………………………………43
Retail Energy Purchasing: Recommendations ….…….……………………………………………………44
Utility Tariff and Rate Review:
Electricity ….……..………………………………………………………………………………………….45
Natural Gas …..…..…..…..…………………………………………………………………………………46
Utility Deregulation in NJ ….…………………………………………………………………………………47-49
Retail Energy Suppliers ….………………………………………………………………………………………50
Historical Energy Futures Settlement Prices …..........………………………………………………………51
Potential Project Funding Sources ……..….………………………………………………………………52-54
Next Steps …..…….………………………………………………………………………………………………..55
![Page 10: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/10.jpg)
Middle Township BOE, NJ - 2 - FINAL Energy Audit Report, December 2012
Energy Audit Purpose & Scope
Purpose:
The objectives of the energy audit are to evaluate each site’s energy consumption,
establish baselines for energy efficiency and identify opportunities to reduce the
amount of energy used and/or its cost.
Scope:
I. Historic Energy Consumption: Benchmark energy use using Energy Star Portfolio
Manager
II. Facility Description: Characterize building usage, occupancy, size and construction.
III. Equipment Inventory: Detailed equipment list including useful life and efficiency.
IV. Energy Conservation Measures: Identify and evaluate opportunities for cost savings
and economic returns.
V. Renewable/Distributed Energy Measures: Evaluate economic viability of various
renewable/distributed energy technologies.
VI. Energy Purchasing and Procurement Strategies: Perform utility tariff analysis and
assess potential for savings from energy procurement strategies.
VII. Method of Analysis: Appendices
![Page 11: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/11.jpg)
Middle Township BOE, NJ - 3 - FINAL Energy Audit Report, December 2012
Historic Energy Consumption
Utility Usage and Costs Summary Time-period: Aug 2011 – July 2012
Please see Appendix for full utility data and consumption profiles for each School.
Note: Bus Depot is included in Elementary School #2 electrical meter
![Page 12: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/12.jpg)
Middle Township BOE, NJ - 4 - FINAL Energy Audit Report, December 2012
Historic Energy Consumption
ENERGY STAR SCORES
Energy Star Score is calculated to establish a facility-specific energy intensity baseline.
Energy Star can be used to compare energy consumption to other similar facilities and to
gauge the success of energy conservation and cost containment efforts.
Buildings with an Energy Star rating/score of 75, or above, are eligible to apply for an
official Energy Star Building label.
Facility Name Total Floor Area
(sqft) Energy Star Score
Eligible to Apply
for ENERGY STAR
Current Site
Energy Intensity
(kBtu/sqft)
Current Source
Energy Intensity
(kBtu/sqft)
Administration
Building 5,950 66 No 89 198
Elementary
School #1 84,220 63 No 66 144
Elementary
School #2 87,674 16 No 62 144
Middle School 88,639 71 No 85 145
High School 205,270 34 No 76 148
Note: Bus Depot is included in Elementary School #2 electrical meter, reducing its Energy Star score.
![Page 13: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/13.jpg)
Middle Township BOE, NJ - 5 - FINAL Energy Audit Report, December 2012
Historic Energy Consumption (continued)
Portfolio Manager Sign - In
An account has been created for Middle Township BOE in Portfolio Manager. You will
have received an email to notify you of the generation of this account and shared
access with Dome-Tech. Please use this to read your facility information. Please feel
free to alter this information when the report is finalized. We would ask that you leave
the sign-in information alone until then. Your school’s information is currently shared as
read only.
When the report is finalized the shared access will be changed so that you can use /
edit the information and change as you wish.
Website link to sign-in: https://www.energystar.gov/istar/pmpam/index.cfm?fuseaction=login.Login
![Page 14: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/14.jpg)
Middle Township BOE, NJ - 6 - FINAL Energy Audit Report, December 2012
Facility Information
Building Name: Administration Building
Address: 216 South Main Street
Cape May Court House, NJ 08210
Gross Floor Area: 5,950 sq ft
Year Built: 1978
1958,1968,1992, and 2005
# Occupants: Approximately 20 staff members
Building Usage: The building contains offices and a large conference room. It is operated M-F
for approximately 10 hours/day; closed weekends and holidays.
Construction Features: Façade: One story, brick façade, in good condition.
Roof Type: Pitched light brown shingled roof in good condition. Approximately half the
roof is covered with photovoltaic (PV) panels.
Windows: Covering approximately 20% of façade, single pane, single hung windows,
in poor condition. Windows are original to the building (~34 years old).
Exterior Doors: Approximately 5, metal frame with single pane glass, in good to poor
condition.
![Page 15: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/15.jpg)
Middle Township BOE, NJ - 7 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Administration Building
Air Handling / Ventilation Systems
HVAC at the Administration Building is handled by approximately ten (10) office heat pumps, two (2) split
AC systems and seven (7) cabinet unit heaters. One (1) split AC system serves the Board Room and the
other serves the interior office space. The heat pumps serve perimeter offices and have local controls at
the unit. Cabinet unit heaters are located in the hallways, stairwell and bathrooms. Exhaust fans are
located in the bathrooms.
Boilers
There is one (1) Weil McLain hot water cast iron sectional boiler that uses natural gas. It is rated for a
maximum output of 230 MBH. The hot water is circulated to the cabinet unit heater’s hot water coils by
one (1) set of two ¼ HP pumps.
Domestic Hot Water
Domestic hot water (DHW) is provided by one (1) 50 gallon electric Ruud hot water heater. It is rated for
1,200 Watts and serves all the bathrooms in the building.
Controls
The split AC systems are controlled by local thermostats in the building. They automatically shut off at
night by a BMS time of day schedule. The heat pumps operate with local controls that are located at
each unit. Hallway lighting uses manual toggle switches and the majority of the offices contain
occupancy sensors. Exterior lights are controlled by a local time clock located in the basement.
![Page 16: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/16.jpg)
Middle Township BOE, NJ - 8 - FINAL Energy Audit Report, December 2012
Building Name: Elementary School #1
Address: 215 Eldredge Road
Cape May Court House, NJ 08210
Gross Floor Area: 84,220 sq ft
Year Built: 1951 with an addition in 1967
# Occupants: Approximately 750 students and staff
members
Building Usage: Elementary #1 is a Pre-K to 2nd grade building. It is operated M-F for
approximately 10 hours/day; closed weekends and holidays. There are also
two (2) modular buildings at the north side of the school that house five (5)
preschool classrooms.
Construction Features: Façade: One story, brick façade, in good condition.
Roof Type: Flat, metal deck, built up, black in color, in good condition. A majority of the
roof is covered with photovoltaic (PV) panels.
Windows: Covering approximately 25% of façade, double pane, picture with awning
windows, with shades, in good condition.
Exterior Doors: Approximately 23, metal frame with glass, in good condition.
Facility Information
![Page 17: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/17.jpg)
Middle Township BOE, NJ - 9 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Elementary School #1
Air Handlers / AC Systems / Ventilation Systems
Air handling at Elementary School #1 is handled by six (6) roof top units (RTUs) and approximately thirty-
six (36) unit ventilators (UVs). All RTUs and UVs are constant volume systems. The RTUs serve large
spaces such as the library, gym and the administration area, while the UVs serve classrooms. All RTUs
use Dx cooling, except for the Modine unit, which is a non-cooling unit. All UVs use Dx cooling except for
the UVs in classrooms 26-35, which use chilled water. The two MOD buildings contain a total of five (5)
classrooms. Each classroom utilizes one (1) heat pump for heating and cooling.
Chillers
There is one (1) 80 ton air cooled Trane chiller that produces chilled water for the UVs in classrooms 26-
35. It is located on the ground at the back of the building. The chilled water is circulated to the coils by
two (2) chilled water pumps, which are connected in parallel.
Boilers
There are two (2) boiler rooms that contain four (4) hot water boilers at Elementary School #1. The main
boiler room contains two (2) PK Thermific natural gas fired watertube boilers that are rated for a
maximum output of 1,700 MBH. These boilers use two (2) 7.5HP hot water pumps to circulate the hot
water throughout the building for heating. The main boiler room also contains one (1) Smith natural gas
fired cast iron boiler that is rated for a maximum output of 359 MBH. This Smith boiler is original to the
building. This boiler use two (2) 1.5HP hot water pumps to circulate the hot water throughout the building
for heating. The boiler room near the kitchen contains one (1) Smith natural gas fired cast iron boiler
rated for a maximum output of 1,014 MBH. This boiler uses two (2) 5HP hot water pumps to circulate the
hot water throughout the building for heating.
![Page 18: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/18.jpg)
Middle Township BOE, NJ - 10 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Elementary School #1
Domestic Hot Water
The main boiler room contains one (1) Ruud domestic hot water (DHW). The water heater has a 78
gallon capacity and is rated for a maximum input of 200 MBH. The boiler room near the kitchen contains
one (1) AO Smith domestic hot water (DHW). The water heater has a 86 gallon capacity and is rated for
a maximum input of 140 MBH. Both water heaters are natural gas fired.
Controls
Most of the UVs, the PK Thermific boilers and the chiller are controlled by the Niagra Building
Management System (BMS). The set point and time of day schedule for these units can be adjusted
through the BMS. The six (6) RTUs, exhaust fans, the UVs serving classrooms 1-7 and the kindergarten
court are not connected to the BMS and operate 24/7.
The BMS uses a hot water reset schedule to control the hot water temperature based on the outside air
temperature.
The building interior lighting is controlled by manual light switches.
![Page 19: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/19.jpg)
Middle Township BOE, NJ - 11 - FINAL Energy Audit Report, December 2012
Facility Information
Building Name: Elementary School #2
Address: 101 West Pacific Avenue
Cape May Court House, NJ 08210
Gross Floor Area: 87,674 sq ft
Year Built: 1991
# Occupants: Approximately 600 students and staff
members
Building Usage: Elementary #2 is the 3rd, 4th and 5th grade building. It is operated M-F for
approximately 10 hours/day; closed weekends and holidays.
Construction Features: Façade: One story, brick and stucco façade, generally in good condition. Areas near
the gym contain holes/cracks that are allowing water to enter the building.
Roof Type: Flat, metal deck, built up, 50% black/50% white in color, in good condition. A
majority of the roof is covered with photovoltaic (PV) panels.
Windows: Covering approximately 25% of façade, double pane, casement windows,
with blinds, in good condition.
Exterior Doors: Approximately 20, metal frame with glass, in good condition.
![Page 20: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/20.jpg)
Middle Township BOE, NJ - 12 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Elementary School #2
Air Handlers / AC Systems / Ventilation Systems
Air handling at Elementary School #2 is handled by five (5) roof top units (RTUs), approximately forty-two
(42) unit ventilators (UVs) and approximately six (6) split AC units. All RTUs and UVs are constant volume
systems. The RTUs serve large spaces such as the library, cafeteria and the office complex, while the
UVs serve classrooms. All RTUs use Dx cooling, except for the kitchen make up air unit, which is a non-
cooling unit. All UVs use chilled water. The split systems serve the gym and associated offices.
Chillers
There is one (1) approximately 150 ton air cooled Trane chiller that produces chilled water for the UVs. It
is located on the roof of the building. The chilled water is circulated to the coils by one (1) 20HP chilled
water pump, which are located in the boiler room. The 20HP hot water pump can be used as a back up if
necessary.
Boilers
There are two (2) HB Smith natural gas fired cast iron sectional boilers located in the boiler room. The
boiler is rated for a maximum output of 1,491 MBH. There is one (1) 20HP hot water pump that circulates
the hot water throughout the building for heating. The 20HP chilled water pump can be used as a back up
if necessary.
![Page 21: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/21.jpg)
Middle Township BOE, NJ - 13 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Elementary School #2
Domestic Hot Water
The mechanical room near the kitchen contains two (2) AO Smith domestic hot water (DHW). The water
heater has a 100 gallon capacity and is rated for a maximum input of 270 MBH. Both water heaters are
natural gas fired.
Controls
All HVAC systems are controlled by the Niagra Building Management System (BMS). The set point and
time of day schedule for these units can be adjusted through the BMS. A separate Trane BMS system
controls all the reheat coils in the ductwork when dehumidification is needed. The Trane BMS controls the
speed of the main hot water pump during dehumidification mode with a VFD.
The building interior lighting is controlled by manual light switches.
![Page 22: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/22.jpg)
Middle Township BOE, NJ - 14 - FINAL Energy Audit Report, December 2012
Facility Information
Building Name: Middle School
Address: 300 East Pacific Avenue
Cape May Court House, NJ 08210
Gross Floor Area: 88,639 sq ft
Year Built: 1972
# Occupants: Approximately 625 students and staff
members
Building Usage: The Middle School is the 6th, 7th and 8th grade building. It is operated M-F for
approximately 10 hours/day; closed weekends and holidays.
Construction Features: Façade: One story, brick and stone façade, in good condition.
Roof Type: Flat, metal deck, built up, black in color, in good condition. Portions of the
roof are made of aluminum and are pitched.
Windows: Covering approximately 25% of façade, single pane, picture with awning
windows, with shades, in good to poor condition. The D-wing uses double
pane windows with interior blinds, which are in good condition.
Exterior Doors: Approximately 15, metal frame with single pane glass, in poor condition.
Approximately 3 exterior doors in the D-wing are metal frame with double
pane glass, in good condition.
![Page 23: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/23.jpg)
Middle Township BOE, NJ - 15 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Middle School
Air Handlers / AC Systems / Ventilation Systems
Air handling at the Middle School is handled by four (4) roof top units (RTUs), approximately forty-five (45)
unit ventilators (UVs), three (3) heating and ventilation units (HVs) and one (1) large split AC unit. All
HVAC units are constant volume systems. The RTUs and HVs serve large spaces such as the cafeteria,
gym and health suite, while the UVs serve classrooms. All RTUs, HVs and UVs use chilled water for
cooling. The split system is Dx cooled and serves the library.
Absorption Chiller
Cooling Mode
There is one (1) 165 ton Broad absorption chiller that produces chilled water for the HVAC unit’s cooling
coils. The chilled water system contains two (2) 15HP chilled water pumps and two (2) 15HP condenser
water pumps. There is a cooling tower on the roof that serves the condenser water loop. The chiller is
natural gas fired.
Heating Mode
The absorption chiller is also used during the heating season to produce hot water. The hot water is
delivered throughout the building via two (2) 10HP pumps.
![Page 24: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/24.jpg)
Middle Township BOE, NJ - 16 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – Middle School
Domestic Hot Water
There is a 1,300 gallon hot water heat in the chiller room. It produces hot water by use of an internal heat
exchanger. There is also a domestic water heater in the receiving room. This unit is an electric water
heater with an 80 gallon capacity and a maximum input power of 4,500 Watts.
Controls
All the HVAC equipment in the Middle School is controlled by the Niagra Building Management System
(BMS). The set points and time of day schedules for these units can be adjusted through the BMS. The
UVs and AHUs are programmed with unoccupied set points to ensure the spaces do not become
excessively hot or cold when the building is not occupied.
The building interior lighting is controlled by manual light switches.
![Page 25: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/25.jpg)
Middle Township BOE, NJ - 17 - FINAL Energy Audit Report, December 2012
Facility Information
Building Name: High School
Address: 300 East Atlantic Avenue
Cape May Court House, NJ 08210
Gross Floor Area: 205,270 sq ft
Year Built: 1961, PAC 1992, back addition/gym 2003
# Occupants: Approximately 980 students and staff
members
Building Usage: The High School is a 9th through 12th grade building. It is operated M-F for
approximately 10 hours/day; open on weekends and holidays for sports and
other extracurricular activities. The Performing Arts Center (PAC), which is
attached to the back of the building is used throughout the year for large
events.
Construction Features: Façade: One story, stone, brick and stucco façade, in good condition.
Roof Type: Flat, metal deck, built up, black in color, in good condition. Portions of the
roof are made of aluminum and are pitched. A majority of the roof is covered
with photovoltaic (PV) panels.
Windows: Covering approximately 25% of façade, with multiple types of double pane
windows, with blinds, in good condition.
Exterior Doors: Approximately 43, metal frame with glass, in good condition.
![Page 26: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/26.jpg)
Middle Township BOE, NJ - 18 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – High School
Air Handlers / AC Systems / Ventilation Systems
Air handling at the High School and Performing Arts Center (PAC) is handled by eighteen (18) roof top
units (RTUs) and air handlers (AHUs), nine (9) Heating and Ventilating Units (HVs), approximately sixty-
three (63) unit ventilators (UVs) and split AC units. All RTUs and UVs are constant volume systems. The
RTUs and AHUs that serve the High School use chilled water for cooling, while the units that serve the
PAC use Dx cooling. The HVs serve the gymnasiums and the UVs serve the classrooms. The split AC
systems serve the offices throughout the High School and PAC.
Absorption Chiller
Cooling Mode
There are two (2) 165 ton Broad absorption chillers that produces chilled water for the HVAC unit’s cooling
coils. The chilled water system contains two (2) 25HP chilled water pumps and two (2) 30HP condenser
water pumps. There is a cooling tower on the roof that serves the condenser water loop. The chiller is
natural gas fired.
Heating Mode
The absorption chiller is also used during the heating season to produce hot water. The hot water is
delivered throughout the building via two (2) 20HP pumps.
![Page 27: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/27.jpg)
Middle Township BOE, NJ - 19 - FINAL Energy Audit Report, December 2012
Facility Information
Major Mechanical Systems – High School
Domestic Hot Water
There is an approximately 1,300 gallon hot water heat in the chiller room. It produces hot water by use of
an internal heat exchanger.
Controls
All the HVAC equipment in the High School is controlled by the Niagra Building Management System
(BMS). All the HVAC equipment in the PAC is controlled by a separate Trane BMS system. The set points
and time of day schedules for all units can be adjusted through the BMS. The HVAC equipment is
programmed with unoccupied set points to ensure the spaces do not become excessively hot or cold
when the building is not occupied.
The building interior lighting is controlled by manual light switches.
![Page 28: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/28.jpg)
Middle Township BOE, NJ - 20 - FINAL Energy Audit Report, December 2012
Energy Conservation Measures (ECMs) Notes and Assumptions
The average CO2 emission rate from power plants serving the facilities within this report
was obtained from the Environmental Protection Agency’s (EPA) eGRID2007 report. It is
stated that power plants within the state of NJ emit 0.66 lbs of CO2 per kWh generated.
The EPA estimates that burning one therm of natural gas emits 11.708 lbs CO2.
The EPA estimates that one car emits 11,560 lbs CO2 per year.
The EPA estimates that reducing CO2 emissions by 7,333 pounds is equivalent to planting an acre
of trees.
The following utility prices provided were used within this study:
School Electric $/kWh Natural Gas $/Therm
Administration Building $0.110 $1.140
Elementary #1 $0.131 $1.012
Elementary #2 $0.107 $0.996
Middle School $0.114 $0.977
High School $0.130 $0.969
Average $0.122 $0.982
![Page 29: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/29.jpg)
Middle Township BOE, NJ - 21 - FINAL Energy Audit Report, December 2012
ECM #1: Computer Power Management Optimization
Computer screen savers were originally developed to prevent the permanent etching of patterns on older monochrome monitors. In this mode, both the computer and monitor consume the same amount of energy as the computer in regular operation, which is approximately 225W for the computer and 75W for the monitor.
Dome-Tech recommends changing the computer settings, to have the computer turn to standby/sleep mode to significantly reduce the computers power consumption. In this mode, the computer and monitor will draw between 1 and 3 Watts each. Additionally, the computer will “wake up” instantaneously when the mouse or button on the keyboard is touched, causing no interruption during daytime use.
Elementary
School #1
Elementary
School #2 TOTAL
Estimated Annual Savings: $520 $530 $1,050
Gross Estimated
Implementation Cost: $210 $80 $290
Approx. NJ Smart Start
Rebate: $0 $0 $0
Net Estimated
Implementation Cost: $210 $80 $290
Simple Payback (years): 0.4 0.2 0.3
Annual Avoided CO2
Emissions (tons): 1.3 1.6 3.0
In Elementary School #1, nine (9) computers in the Library were found to be operating in screensaver mode throughout the day. Also, in Elementary School #2, twenty-five (25) computers in the computer lab (Room E-10) were found operating in screensaver mode during the day.
Computers in screensaver mode in Elementary School #2
![Page 30: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/30.jpg)
Middle Township BOE, NJ - 22 - FINAL Energy Audit Report, December 2012
ECM #2: HVAC Time of Day Optimization
A review of the BMS time of day schedules revealed that the majority of the units operate with appropriate occupied and unoccupied schedules. However, Dome-Tech identified some units that are not connected to the BMS and operate 24/7.
Dome-Tech recommends reducing the occupied operating hours for units that are operating 24/7 to more closely match the actual space occupancy. This will reduce heating and cooling conditioning costs, electrical motor costs and have no impact on the indoor air quality during the school days.
To implement this measure, Dome-Tech recommends controlling the unit operation with “smart breaker” controls. This requires replacement of the existing circuit breakers (for the units that serve units currently operate
24/7) with smart circuit breakers.
The smart breakers will be directly wired to a BMS field control panel and BMS.
Programmed schedules for each unit at the BMS will send a signal at the occupied and unoccupied time to cut off or supply power to the smart breaker and thus the unit.
Dome-Tech also recommends programming the BMS with occupied and unoccupied heating and cooling setpoints using the existing space temperature sensors to turn the units on if the space becomes too hot or cold during unoccupied periods.
Elementary
School #1 Middle School High School TOTAL
Estimated Annual Savings: $22,900 $1,450 $180 $24,530
Gross Estimated Implementation Cost: $15,100 $2,450 $280 $17,830
Approx. NJ Smart Start Rebate: $0 $0 $0 $0
Net Estimated Implementation Cost: $15,100 $2,450 $280 $17,830
Simple Payback (years): 0.7 1.7 1.6 0.7
Annual Avoided CO2 Emissions (tons): 103.7 4.2 1.0 108.9
![Page 31: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/31.jpg)
Middle Township BOE, NJ - 23 - FINAL Energy Audit Report, December 2012
ECM #2: HVAC Time of Day Optimization (continued)
The following chart indicates the existing HVAC systems operating schedules and recommended corrective action to reduce energy consumption.
School Existing Condition Recommendation
Elementary
School #1
UVs in the classrooms 1-7, 4 kindergarten UVs,
all 6 RTUs and exhaust fans operate 24/7. Connect to BMS and install time of day schedules.
Elementary
School #1 MODs
Each of the 5 heat pumps operate with a single
set point controller. Install 7-day programmable digital thermostats.
Middle School The two library splits systems and heating
operates 24/7. Connect to BMS and install time of day schedules.
High School
The make up air unit kitchen hoods were
running at 3pm when the kitchen was
unoccupied.
Reduce the time of day schedule to more closely
match the actual space occupancy.
The operations staff have indicated that they have begun connecting some of these units that have been identified above to the BMS.
![Page 32: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/32.jpg)
Middle Township BOE, NJ - 24 - FINAL Energy Audit Report, December 2012
ECM #3: Upgrade Door Weather Stripping
Exterior door by Room C-9 located at the
Middle School does not have sufficient
weather stripping.
Missing or degraded weather stripping is present on some
exterior doors.
These doors allow outside air to infiltrate the building,
increasing heating and cooling conditioning costs.
Dome-Tech recommends installing new weather stripping on
all exterior doors that allow outside air to enter the space.
This measure assumes implementation by the in-house operations staff.
Administration
Bldg
Elementary
School #1
Elementary
School #2
Middle
School TOTAL
Estimated Annual
Savings: $160 $80 $80 $130 $450
Gross Estimated
Implementation Cost: $280 $90 $90 $280 $740
Approx. NJ Smart
Start Rebate: $0 $0 $0 $0 $0
Net Estimated
Implementation Cost: $280 $90 $90 $280 $740
Simple Payback
(years): 1.8 1.1 1.1 2.2 1.6
Annual Avoided CO2
Emissions (tons): 0.7 0.4 0.4 0.8 2.4
![Page 33: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/33.jpg)
Middle Township BOE, NJ - 25 - FINAL Energy Audit Report, December 2012
ECM #3: Upgrade Door Weather Stripping (continued)
The chart below lists all the exterior doors found by Dome-Tech that contained
missing or deteriorated weather stripping.
School Door Locations
Administration Building Basement door, front door and the side door to the
board office.
Elementary School #1 Doors near classroom 35.
Elementary School #2 Hallway door by the kitchen and mechanical room
containing the domestic water heaters.
Middle School Door by classroom C-9 and the front doors.
![Page 34: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/34.jpg)
Middle Township BOE, NJ - 26 - FINAL Energy Audit Report, December 2012
ECM #4: Day Lighting
Based on site walkthroughs at all schools and light level measurements taken, certain areas contained sufficient sunlight entering the space lights through the windows and skylights. However, the interior lighting operates continuously throughout building occupied hours (five days per week, from 6:30 a.m. to 11.00 p.m.).
Dome-Tech recommends installing an interior photocell that will automatically turn off the lights when sufficient sunlight is present. Also, the photocells should be connected to a BMS time of day schedule that will automatically turn off the lights during building unoccupied hours to ensure savings during those hours.
The chart below shows the areas identified, the light level reading taken at each space and the Illuminating Engineer Society’s (IES) recommended light level based on the space type.
Elementary School #1 Middle School TOTAL
Estimated Annual Savings: $320 $110 $430
Gross Estimated Implementation Cost: $400 $400 $800
Approx. NJ Smart Start Rebate: $0 $0 $0
Net Estimated Implementation Cost: $400 $400 $800
Simple Payback (years): 1.3 3.6 1.9
Annual Avoided CO2 Emissions (tons): 0.8 0.3 1.1
School Area Measured Light Level
(foot-candles)
Illuminating Engineer
Society’s (IES) light level
recommendation
Elementary School #1 Kindergarten Court Lobby 30 to 200 fc 20 fc
High School Front Lobby 150 -200 fc 20 fc
![Page 35: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/35.jpg)
Middle Township BOE, NJ - 27 - FINAL Energy Audit Report, December 2012
ECM #4: Day Lighting (continued)
The front entrance lobby with lights on at the High School that has sufficient sunlight entering through the skylight to light the area during building occupied hours.
Kindergarten Court in Elementary School #1 that has sufficient sunlight entering through the windows to light the area during building occupied hours.
![Page 36: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/36.jpg)
Middle Township BOE, NJ - 28 - FINAL Energy Audit Report, December 2012
ECM #5: Vending Machine Power Management
Dome-Tech recommends installing a vending machine power
management device on all snack and soda vending machines.
These devices reduce electrical energy consumption by turning off the
units lights and managing compressor cooling cycles when the
surrounding area is vacant. It automatically re-powers the cooling system
at one to three hour intervals, independent of sales, to ensure that the
product stays cold.
The microcontroller will never power down the machine while the
compressor is running, eliminating compressor short-cycling. In addition,
when the machine is powered up, the cooling cycle is allowed to finish
before again powering down (reduces compressor wear and tear).
This measure can be implemented by the operations staff.
Administration
Building
Elementary
School #1
Elementary
School #2 Middle School High School TOTAL
Estimated Annual Savings: $170 $250 $210 $450 $1,840 $2,920
Gross Estimated
Implementation Cost: $460 $460 $460 $920 $3,650 $5,950
Approx. NJ Smart Start
Rebate: $0 $0 $0 $0 $0 $0
Net Estimated
Implementation Cost: $460 $460 $460 $920 $3,650 $5,950
Simple Payback (years): 2.7 1.8 2.2 2.0 2.0 2.0
Annual Avoided CO2
Emissions (tons): 0.4 0.5 0.5 1.0 3.6 6.0
![Page 37: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/37.jpg)
Middle Township BOE, NJ - 29 - FINAL Energy Audit Report, December 2012
ECM #6: Demand Controlled Ventilation
Building codes require that a minimum amount of fresh air be provided to ensure adequate air quality. To
comply, ventilation systems often operate at a fixed rate based on an assumed occupancy (e.g., 20
CFM/person multiplied by the maximum design occupancy). Since maximum design occupancy is rarely
achieved, this results in excessive fresh air volumes which require costly and unnecessary conditioning.
Demand-controlled ventilation (DCV) controls the amount of outside air being supplied based upon the
CO2 levels generated by building occupants. DCV should be added to any space that is ventilated by a
large quantity of outdoor air, and where occupancy varies dramatically (gymnasiums and libraries).
Because CO2 levels correlate directly with the number of people in an occupied zone, CO2 sensors will
be used to control ventilation rate of outside air supplied to each zone. Reducing the amount of outdoor
air supplied to a zone reduces the energy required to heat and cool that air, while space conditions are
kept in compliance with building codes and standards such as the ASHRAE Indoor Air Quality Standard.
Elementary
School #1
Elementary
School #2
Middle
School High School TOTAL
Estimated Annual Savings: $450 $600 $950 $640 $2,640
Gross Estimated Implementation Cost: $3,970 $3,150 $3,970 $7,750 $18,840
Approx. NJ Smart Start Rebate: $0 $0 $0 $0 $0
Net Estimated Implementation Cost: $3,970 $3,150 $3,970 $7,750 $18,840
Simple Payback (years): 8.8 5.3 4.2 12.1 7.1
Annual Avoided CO2 Emissions (tons): 2.2 3.0 4.7 3.1 12.9
![Page 38: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/38.jpg)
Middle Township BOE, NJ - 30 - FINAL Energy Audit Report, December 2012
ECM #6: Demand Controlled Ventilation (continued)
The chart below indicates the RTUs/areas where the control sequence should be installed:
*Implementation is contingent on connecting these units to the BMS, which is recommended through
the time of day optimization ECM.
Some of the units listed above are past their ASHRAE life and proper functionality is questionable.
Implementation of this measure assumes end of life replacement of units that no longer function or do
not function properly. For those units, Dome-Tech recommends installing the DCV sequence after the
unit is replaced.
Note: The school district should have the CO2 sensors calibrated on a periodic basis (annually or bi-
annually) to ensure the sequence is operating properly and energy savings is realized.
School The RTUs/areas to install DCV sequence
Elementary School #1 *RTUs serving the Library, Gym and Kindergarten Court.
Elementary School #2 RTUs serving the Library and Cafeteria.
Middle School RTUs serving the Cafeteria and Gym 3&4.
High School RTUs serving the Cafeteria.
![Page 39: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/39.jpg)
Middle Township BOE, NJ - 31 - FINAL Energy Audit Report, December 2012
ECM #7: Lighting Upgrade
Dome-Tech, performed an investment grade lighting audit of all five buildings. All buildings utilize standard 32 Watt T-8 fluorescent lamps in classrooms and hallways with a few areas using T12 lighting. There are currently higher efficiency T8 fluorescent lamps and ballasts available. The upgraded light fixtures will reduce electrical consumption and cost while maintaining the minimum lighting output as per state codes.
Some rooms contain occupancy sensors to turn the lights off automatically when the areas become vacant. However, Dome-Tech identified many that were vacant during periods of the day and had the lights on such as bathrooms, copy rooms and teachers lounges. Dome-Tech recommends installing occupancy sensors in all areas with variable occupancy.
Common Lighting Upgrade Recommendations: Relamp and reballast 4ft 32W T8 fixtures with 28W T8 fixtures.
Relamp and reballast 32W T8 U-lamp fixtures with 17W straight lamp T8 fixtures and reflectors.
Replace incandescent lamps with compact fluorescent lamps.
Install occupancy sensors in bathrooms where currently not installed.
Please reference the line-by-line lighting audit spreadsheet for a complete list of replacement fixtures and areas served.
Administration
Building
Elementary
School #1
Elementary
School #2
Middle
School High School TOTAL
Estimated Annual Savings: $797 $4,622 $5,649 $8,967 $13,620 $33,655
Gross Estimated
Implementation Cost: $9,558 $51,920 $79,086 $83,692 $113,355 $337,611
Approx. NJ Smart Start Rebate: $1,360 $4,550 $14,120 $15,755 $22,529 $58,314
Net Estimated Implementation
Cost: $8,198 $47,370 $64,966 $67,937 $90,826 $279,297
Simple Payback (years): 10.3 10.2 11.5 7.6 6.7 8.3
Annual Avoided CO2 Emissions
(tons): 2.1 11.1 17.1 22.3 39.0 91.6
![Page 40: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/40.jpg)
Middle Township BOE, NJ - 32 - FINAL Energy Audit Report, December 2012
ECM #7: Lighting Upgrade
The image below shows a faculty room in the High School that is unoccupied and has the lights on.
Dome-Tech identified other non-lamp replacement lighting energy reduction opportunities, which are listed below. The operations staff indicated that some of the D-wing hallway lights in Elementary School #1 are left
operating 24/7 due to a faulty light switch that makes it difficult for the staff to turn on the lights. Dome-Tech recommends repairing or replacing the switch, which is located at the hallway entrance to the Kindergarten Court.
Exterior lights at the Middle School, Elementary School #1 and #2 were found operating throughout the day. Dome-Tech recommends repairing or replacing the lighting controls to ensure they only operate at night as intended.
![Page 41: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/41.jpg)
Middle Township BOE, NJ - 33 - FINAL Energy Audit Report, December 2012
ECM #8: Walk-In Cooler Controllers
In the most common applications (those that use single-phase power), motors for the fans are typically shaded-pole or permanent-split-capacitor types, both of which are very inefficient.
Inexpensive controllers are currently available that slow these fans when full-speed operation is unnecessary.
Reducing the operating speed reduces the energy consumption of the fan. In addition, the motor produces less heat at slower speeds, which means that the compressor has less heat to remove from the refrigerated compartment.
Typically the walk-in cooler evaporator fans run continuously. However, full airflow is only required approximately 50% of the runtime.
Image displaying walk-in cooler controls that
have been installed on an evaporator fan
Elementary
School #1
Elementary
School #2
Middle
School High School TOTAL
Estimated Annual Savings: $100 $120 $120 $210 $550
Gross Estimated Implementation Cost: $1,450 $1,450 $1,450 $1,450 $5,800
Approx. NJ Smart Start Rebate: $150 $150 $150 $150 $600
Net Estimated Implementation Cost: $1,300 $1,300 $1,300 $1,300 $5,200
Simple Payback (years): 13.0 10.8 10.8 6.2 9.5
Annual Avoided CO2 Emissions (tons): 0.3 0.4 0.4 0.5 1.5
![Page 42: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/42.jpg)
Middle Township BOE, NJ - 34 - FINAL Energy Audit Report, December 2012
ECM #9: Window Replacement
All windows in the Administration Building (except for two in the back of the building)
are single pane windows. These windows are approximately 34 years old and are
original to the building. Also, the majority of the windows in the Middle School are
single pane and in poor condition. These windows are approximately 40 years old
(original to the building).
Administration
Building Middle School TOTAL
Estimated Annual Savings: $570 $700 $1,270
Gross Estimated Implementation Cost: $16,700 $109,000 $125,700
Approx. NJ Smart Start Rebate: $0 $0 $0
Net Estimated Implementation Cost: $16,700 $109,000 $125,700
Simple Payback (years): 29.3 155.7 99.0
Annual Avoided CO2 Emissions (tons): 0 0 0
Single pane windows in the
Administration Building
Single pane windows provide minimal insulation. Double pane windows contain two panes with a cushion of air in
between, which acts as a layer of insulation. This keeping warm and cool air inside the building, reducing heating
and cooling conditioning costs. Furthermore, the window replacement should eliminate cold drafts, which would
improve occupant comfort.
Based on a field inspection and conversations with the operations staff, most of the windows appear to be in poor
condition and allow outside air to infiltrate around the seals.
While economics alone may not justify a window replacement project, this measure could be implemented as an
end of life strategy/capital improvement measure.
![Page 43: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/43.jpg)
Middle Township BOE, NJ - 35 - FINAL Energy Audit Report, December 2012
HVAC Replacement at End of Life
The packaged roof top units at some of the schools were in poor operating condition. Based on nameplate data many of the units are between 15-25 years old, which is past their estimated end of equipment service life (EESL) of 15 years as per ASHRAE standards.
Dome-Tech recommends replacing these RTU’s with new higher efficiency units, which will reduce annual energy and maintenance costs.
While energy savings will be realized, replacement cannot be justified on economics alone. As a result Dome-Tech recommends RTU replacement at the end of the equipment service life and when maintenance costs become excessive.
The high efficiency RTUs should be equipped with an economizer sequence for energy savings, which utilizes outside air for free cooling instead of mechanical cooling when outside weather conditions permit.
Most RTUs at Elementary School #1 did not have an economizer sequence.
The RTU serving the Library at Elementary School #1
is passed its ASHRAE service life and has a non-
functional and disconnected damper.
A differential enthalpy economizer sequence should be highly considered due to the high humidity in the Middle Township region. This sequence compares the return and outside air temperature and humidity (enthalpy) and utilizes the lower cost air stream.
The air cooled chiller at Elementary School #1 is approximately 21 years old and approaching its ASHRAE EESL of 23 years. Dome-Tech also recommends for Middle Township to replace it with a new higher efficiency unit at the end of its service life.
New Jersey SmartStart offers rebates that usually pay for the incremental cost to upgrade to higher efficient units.
![Page 44: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/44.jpg)
Middle Township BOE, NJ - 36 - FINAL Energy Audit Report, December 2012
Absorption Chiller Replacement
The High School uses two (2) and the Middle School uses one (1) 165 ton natural gas fired absorption chiller for heating and cooling.
Based on conversations with the operations staff, the chillers have been extremely problematic during operations. The chillers are approximately 10 years old (well below its expected operating life); however, they have experienced major functionality issues that have resulted in annual maintenance costs typically ranging from $20,000 to over $100,000 annually. Middle Township also pays a service contract fee of approximately $12,000/chiller annually.
There are multiple replacement options for this chiller system; however, economics alone due not justify replacement. Including maintenance savings (approximating $30,000 annually), the economic simple payback is still not favorable due to the high implementation cost of installing a new chiller and boiler system. However, Middle Township may want to consider this measure for reliability reasons.
The natural gas absorption chiller located in the Middle School
If Middle Township is considering replacing these chiller systems, Dome-Tech first recommends a detailed study. The study should involve a field analysis of the existing condition of the chillers, analysis of the historic maintenance costs, operating and implementation costs of the replacement equipment options and service requirements for each type of replacement equipment.
Depending on the type of chiller and boiler system installed, the annual operating cost may be less than or greater than the cost to operate the absorption chiller.
Chiller efficiencies at full load vary between approximately 20.8 and 9.6 EER depending on the size and type (i.e. water cooled or air cooled). Boiler system efficiencies typically vary between approximately 80% and 90% depending on the type and size (i.e. fire tube or condensing boiler).
![Page 45: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/45.jpg)
Middle Township BOE, NJ - 37 - FINAL Energy Audit Report, December 2012
Renewable/Distributed Energy Measures
Distributed Generation & Renewable Energy
Distributed Generation (on-site generation) generates electricity from many
small energy sources. These sources can be renewable (solar/wind/ geothermal) or can be small scale power generation technologies (CHP, fuel cells, microturbines).
Renewable energy is energy generated from natural resources (sunlight, wind, and underground geothermal heat) which are naturally replenished.
Photovoltaics (solar) are particularly popular in Germany and Spain and growing in popularity in the U.S.
Wind power is growing as well, mostly in Europe and the U.S.
![Page 46: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/46.jpg)
Middle Township BOE, NJ - 38 - FINAL Energy Audit Report, December 2012
Renewable Energy Technologies: Wind
Wind turbines generate electricity by harnessing a wind stream's kinetic energy as it spins the turbine airfoils. As with most renewable energy sources, wind
energy is subject to intermittent performance due to the unpredictability of wind resources.
Middle Township, NJ Wind Speed
As previously stated, wind speed is critical to the successful wind turbine installation. According to average wind data from NASA’s Surface Meteorology and
Solar Energy records, the average annual wind speed for the Middle Township area is 6.9 meters per second at 50 meters above the surface of the earth.
Ideal wind speeds for a successful project should average over 6 meters per second.
For Middle Township BOE, Dome-Tech considered three (3) types of wind turbine technologies; building integrated wind turbines (1 kW each) and traditional
ground mounted wind turbines (5 kW & 50 kW).
Building Integrated Wind Turbines
Model: AeroVironment AVX1000
Height: 8.5’
Rotor Diameter: 6’
Weight: 130 lbs.
Cut-In Wind Speed: 2.2 m/s
Maximum Generating Capacity: 1 kW
5 kW Ground Mount
Model: WES5 Tulipo
Height: 40’
Rotor Diameter: 16’
Weight: 1,900 lbs.
Cut-In Wind Speed: 3.0 m/s
Maximum Generating Capacity: 5.2 kW
50 kW Ground Mount
Model: Entegrity EW50
Height: 102’
Rotor Diameter: 50’
Weight: 21,000 lbs.
Cut-In Wind Speed: 4.0 m/s
Maximum Generating Capacity: 50 kW
![Page 47: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/47.jpg)
Middle Township BOE, NJ - 39 - FINAL Energy Audit Report, December 2012
Wind Turbine Pros & Cons
Pros Cons
Annual reduction in energy
spend and use can be potentially
reduced by almost $20,00 (3.7%
reduction).
Typical equipment life span is
15-30 years.
Reduction of annual
greenhouse gas emissions by
57 tons per year.
A wind turbine project could be
incorporated into science and
other curriculums to raise
student awareness of energy
alternatives.
High visible “green” project.
Payback period is at least
12.5 years.
Average area wind speed is
just above minimum
requirements.
Prone to lighting strikes.
Bird collisions are likely, but
may be reduced with avian
guard (building integrate
only).
Zoning may be an issue.
Check with local zoning
regulations.
Wind turbines do create
noise, although below 50 dB
(a typical car ride is over 80
dB).
The project economics and wind turbine pros and cons are presented in the following tables:
Due to a payback of approximately 12.5 years and high potential for energy reduction, the 50 kilowatt ground mounted wind turbine project appears to be the most attractive option. Should the Middle Township school district decide to pursue a wind turbine project, Dome-Tech recommends commissioning a more detailed study.
The New Jersey State Clean Energy Program does not currently provide rebates for small wind system projects.
Renewable Energy Technologies: Wind
![Page 48: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/48.jpg)
Middle Township BOE, NJ - 40 - FINAL Energy Audit Report, December 2012
Renewable Energy Technologies: Solar Photovoltaic
Solar Photovoltaic
Sunlight can be converted into electricity using photovoltaics (PV).
A solar cell or photovoltaic cell is a device that converts sunlight directly into electricity.
Photons in sunlight hit the solar panel and are absorbed by semiconducting materials, such as silicon. Electrons are knocked loose from their atoms, allowing them to flow through the material to produce electricity.
Solar cells are often electrically connected and encapsulated as a module, in series, creating an additive voltage. The modules are connected in an array. The power output of an array is measured in watts or kilowatts, and typical energy needs are measured in kilowatt-hours.
Can be recommended in this application for placement on additional schools / areas.
![Page 49: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/49.jpg)
Middle Township BOE, NJ - 41 - FINAL Energy Audit Report, December 2012
Renewable Energy Technologies: Solar Photovoltaic
Solar Photovoltaic Systems for the Middle School
![Page 50: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/50.jpg)
Middle Township BOE, NJ - 42 - FINAL Energy Audit Report, December 2012
Solar Photo Voltaic System
Non-Financial Benefits of Solar PV The implementation of solar PV projects at
Middle Township would place your facilities at
the forefront of renewable energy utilization.
This allows the Middle Township School
District the opportunity to not only gain
experience with this energy technology, but
also to win recognition as an environmentally
sensitive, socially conscience institution.
Additionally, these projects could be
incorporated into science education and
additional curriculums to raise awareness of
current energy alternatives to the younger
generations.
![Page 51: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/51.jpg)
Middle Township BOE, NJ - 43 - FINAL Energy Audit Report, December 2012
Renewable Energy Technologies: CHP/Cogeneration
CHP (combined heat and power) or cogeneration is the use of a heat engine to simultaneously generate both electricity and useful heat.
Fuel Cells are electrochemical conversion devices that operate by catalysis, separation the protons and the electrons of the reactant fuel, and forcing the electrons to travel through a circuit to produce electricity. The catalyst is typically a platinum group metal or alloy. Another catalytic process takes the electrons back in, combining them with the protons and oxidant, producing waste products (usually water and carbon dioxide).
Microturbines are rotary engines that extract energy from a flow of combustion gas. They can be used with absorption chillers to provide cooling through waste heat rather than electricity. Microturbines are best suited for facilities with year-round thermal and/or cooling loads.
Not recommended for Middle Township due to the lack of thermal requirements in the summertime.
![Page 52: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/52.jpg)
Middle Township BOE, NJ - 44 - FINAL Energy Audit Report, December 2012
Retail Energy Purchasing: Recommendations
Electric
For the period studied, Middle Township BOE was utilizing South Jersey Energy as a Third Party Supplier for
electricity. The Fixed Rate was dependent on the rate class for the account. Lighting accounts were served at
a fixed rate of $0.0735 per kWh. Facility accounts were served at a fixed rate of either $0.0909 or $0.0928
depending on the specific rate class. Details about rate classes are explained further in the report. Supplier
contracts were not provided therefore Dome-Tech is unable to include contract details in this report.
Dome-Tech recommends the District continue with their electric procurement strategy.
Natural Gas
For the period studies, Middle Township BOE was utilizing Hess Corporation as third party supplier for natural
gas at a floating rate that varied every month. A supplier floating rate is similar to a utility floating rate that is
subject to the Basic Generation Gas Service rules.
If the District is seeking budget certainty or would like to reduce their market exposure for Natural Gas, the
District should consider a fixed price contract with their supplier. Further details are outlines in subsequent
slides in this report.
Energy Purchasing Co-Operatives
Many public entities participate in various energy aggregation buying groups. Sometimes, an entity will have
multiple options to choose from. These might include purchasing through a County co-operative, or
purchasing through a trade-type association like ACES. Co-operative purchasing may not necessarily get you
the lowest rates; however, there is often substantial volume, and it can represent a good alternative for
entities with limited energy consumption who can have a difficult time getting energy suppliers to respond to
them on a direct, singular basis.
![Page 53: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/53.jpg)
Middle Township BOE, NJ - 45 - FINAL Energy Audit Report, December 2012
Utility Tariff and Rate Review: Electricity
Accounts and Rate Class: In this study, the District has five (5) facilities with ten (10) electric
accounts served by Atlantic City Electric under rate classes Annual General Service or
Monthly General Service. All accounts are considered BGS-Fixed Price Secondary accounts
by the utility.
Electric Consumption and Cost: Based on the one-year period studied, the total annual
electric expenditure for the District is about $541,000 and the total annual consumption is
about 4,451,000 kilowatt-hours (kWh).
Average/Effective Rate per kWh: For the one year period studied, the District’s average
monthly cost per kilowatt-hour ranged from 10.73 ¢/kWh to 27.31 ¢/kWh, inclusive of utility
delivery charges. The District’s overall, average cost per kilowatt-hour during this period was
12.17 ¢/kWh (Supplier bills were not provided, therefore actual costs my vary).
o Note that these average electric rates are “all–inclusive”; that is, they include all supply service
(generation and commodity-related) charges, as well as all delivery service charges. The supply
service charges typically represent the majority (60-80%) of the total monthly bill. It is the supply
portion of your bill that is deregulated, which is discussed on subsequent slides in this section.
![Page 54: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/54.jpg)
Middle Township BOE, NJ - 46 - FINAL Energy Audit Report, December 2012
Utility Tariff and Rate Review: Natural Gas
Accounts and Rate Class: In this study, the District’s five (5) facilities have five (5) natural gas
accounts served by South Jersey Gas company under the rate class Firm Transportation.
Natural Gas Consumption and Cost: Based on the one-year period studied, the total annual
natural gas expenditure for the District is about $195,000 and the total annual consumption is
about 199,000 therms. Natural Gas is used mostly in the winter period for heating purposes.
Average/Effective Rate per Therm: For the one year period studied, the District’s overall,
average cost per gallon during this period was $0.982 per therm.
o Note that these average rates are “all–inclusive”; that is, they include all supply service
(interstate transportation and commodity-related) charges, as well as all delivery service
charges. The supply service charges typically represent the majority (60-80%) of the total
monthly bill. It is the supply portion of your bill that is deregulated, which is discussed on
subsequent slides in this section.
![Page 55: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/55.jpg)
Middle Township BOE, NJ - 47 - FINAL Energy Audit Report, December 2012
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing
In August 2003, per the Electric Discount and Energy Competition Act [N.J.S.A. 48:3-49], the
State of New Jersey deregulated its electric marketplace thus making it possible for customers
to shop for a third-party (someone other than the utility) supplier of retail electricity.
Per this process, every single electric account for every customer in New Jersey was placed
into one of two categories: BGS-FP or BGS-CIEP. BGS-FP stands for Basic Generation
Service-Fixed Price; BGS-CIEP stands for Basic Generation Service-Commercial and Industrial
Energy Pricing.
At its first pass, this categorization of accounts was based on rate class. The largest electric
accounts in the State (those served under a Primary or a Transmission-level rate class) were
moved into BGS-CIEP pricing. All other accounts (the vast majority of accounts in the State of
New Jersey, including residential) were placed in the BGS-FP category, receiving default
electric supply service from the utility.
The New Jersey Board of Public Utilities (NJBPU) has continued to move new large energy
users from the BGS-FP category into the BGS-CIEP category by lowering the demand (kW)
threshold for electric accounts receiving Secondary service. Several years ago, this threshold
started at 1,500kW; now, it has come down to 1,000 kW. So, if an account’s “peak load share”
(as assigned by the utility) is less than 1,000 kW, then that facility/account is in the BGS-FP
category. If you are unsure, you may contact Dome-Tech for assistance.
![Page 56: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/56.jpg)
Middle Township BOE, NJ - 48 - FINAL Energy Audit Report, December 2012
There are at least 3 important differentiating factors to note about each rate category:
1. The rate structure for BGS-FP accounts and for BGS-CIEP accounts varies.
2. The “do-nothing” option (i.e., what happens when you don’t shop for retail energy) varies.
3. The decision about whether, and why, to shop for a retail provider varies.
Secondary (small to medium) Electric Accounts:
BGS-FP rate schedules for all utilities are set, and re-set, each year. Per the results of our State’s BGS
Auction process, held each February, new utility default rates go into effect every year on June 1st. The BGS-
FP rates become each customer’s default rates, and they dictate a customer’s “Price to Compare”
(benchmark) for shopping purposes. To learn more about the BGS Auction process, please go to www.bgs-
auction.com.
A customer’s decision about whether to buy energy from a retail energy supplier is, therefore, dependent
upon whether a supplier can offer rates that are lower than the utility’s (default) Price to Compare. In 2009,
and for the first time in several years, many BGS-FP customers have “switched” from the utility to a retail
energy supplier because there have been savings. This may be the same case in 2012.
Primary (large) Electric Accounts:
The BGS-CIEP category is quite different. There are two main features to note about BGS-CIEP accounts
that do not switch to a retail supplier for service. The first is that they pay an hourly market rate for energy;
the second is that these accounts also pay a “retail margin adder” of $0.0053/kWh. For these large accounts,
this retail adder can amount to tens of thousands of dollars. The adder is eliminated when a customer
switches to a retail supplier for service.
For BGS-CIEP accounts, the retail adder makes a customer’s decision about whether to switch relatively
simple. However, the process of setting forth a buying strategy can be complex, which is why many public
entities seek professional assistance when shopping for energy.
For more information concerning hourly electric market prices for our region, please refer to www.pjm.com.
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing
![Page 57: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/57.jpg)
Middle Township BOE, NJ - 49 - FINAL Energy Audit Report, December 2012
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing
Natural Gas Accounts:
The natural gas market in New Jersey is also deregulated. Unlike the electric market, there
are no “penalties”, or “adders”, for not shopping for natural gas. Most customers that remain
with the utility for natural gas service pay rates that are market-based and that fluctuate on a
monthly basis. While natural gas is a commodity that is exceptionally volatile and that is traded
minute-by-minute during open trading sessions, market rates are “settled” each month, 3
business days prior to the subsequent month (this is called the “prompt month”). Customers
that do not shop for a natural gas supplier will typically pay this monthly settlement rate to the
utility, plus other costs that are necessary to bring gas from Louisiana up to New Jersey and
ultimately to your facility.
For additional information about natural gas trading and current market futures rates for
various commodities, you can refer to www.nymex.com.
A customer’s decision about whether to buy natural gas from a retail supplier is typically
dependent upon whether a customer seeks budget certainty and/or longer-term rate stability.
Customers can secure longer-term fixed prices by enlisting a retail natural gas supplier. Many
larger natural gas customers also seek the assistance of a professional consultant to assist in
their procurement process.
![Page 58: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/58.jpg)
Middle Township BOE, NJ - 50 - FINAL Energy Audit Report, December 2012
Retail Energy Suppliers
To learn more about energy deregulation, visit the New Jersey Board of Public Utilities website:
www.bpu.state.nj.us
For more information about the retail energy supply companies that are licensed and registered to serve
customers in New Jersey, visit the following website for more information:
http://www.bpu.state.nj.us/bpu/commercial/shopping.html
Provided below is a list of NJ BPU-licensed retail energy suppliers:
Company Electricity Natural Gas Website
Hess X X hess.com
Sprague X X spragueenergy.com
UGI X X ugienergyservices.com
South Jersey Energy X X southjerseyenergy.com
Direct X X directenergy.com
Global X X globalp.com
Liberty X libertpowercorp.com
Reliant X reliant.com
First Energy X fes.com
ConEd Solutions X conedsolutions.com
Constellation X X newenergy.com
Glacial X glacialenergy.com
Integrys X integrysenergy.com
Suez X suezenergyresources.com
Sempra X semprasolutions.com
Woodruff X woodruffenergy.com
NextEra X mxenergy.com
Hudson X hudsonenergyservices.com
Great Eastern X greateasterngas.com
*Note: Not every Supplier serves customers in all utility territories within New Jersey.
![Page 59: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/59.jpg)
Middle Township BOE, NJ - 51 - FINAL Energy Audit Report, December 2012
Historical Energy Futures Settlement Prices
Below please find graphs that show the last several years’ worth of market settlement prices for both natural
gas and electricity. Each of these graphs shows the average closing prices of a rolling 12-month period of
energy futures prices. The graphs are representative of the commodity, alone; they do not include any of the
additional components (capacity, transmission, ancillary services, etc.) that comprise a retail energy price.
They are meant to provide an indication of the level of pricing that a particular customer might expect to see,
but the graphs do not account for the specific load profile of any individual energy user.
Natural Gas Electricity
![Page 60: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/60.jpg)
Middle Township BOE, NJ - 52 - FINAL Energy Audit Report, December 2012
Potential Project Funding Sources
Through the NJ Clean Energy program, the New Jersey Board of Public Utilities currently
offers a variety of subsidies or rebates for many of the project types outlined in this report.
More detailed information can be found at: www.njcleanenergy.com
NJ Smart Start Buildings – Equipment Rebates noted in ECMs where available. Equipment Rebates - Water Heaters, Lighting, Lighting Controls/Sensors, Chillers, Boilers, Heat pumps,
Air conditioners, Energy Mgmt. Systems/Building Controls, Motors, Motor-ASDs/VSDs, Custom/Others
http://www.njcleanenergy.com/commercial-industrial/programs/nj-smartstart-buildings/nj-smartstart-
buildings
Pay for Performance Program – Performance-Based Incentives for installations.
Provides up to 50% of total project costs. Based on findings in this study, up to $285,000 in incentives
for project implementation could be provided under this program. A minimum reduction target of
15% compared to baseline must be achieved. Energy modeling of building and systems and energy
reduction plan is required (incentives provided to pay for part of study costs.)
Energy Savings Improvement Program (ESIP) Public entities can contract with energy saving
companies in up to 20-year lease purchases enabling public entities to implement energy conservation
measures to their facilities and pay for the costs using the value of energy savings that result from the
improvements. The Energy Saving Companies (ESCO) would assist in bypassing large upfront costs to
the entity.
www.nj.gov/dca/lgs/lfns/09lfns/2009-11.doc
![Page 61: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/61.jpg)
Middle Township BOE, NJ - 53 - FINAL Energy Audit Report, December 2012
Clean Energy Solutions Capital Investment Loan/Grant The EDA offers up to $5 Million in interest-free loans and grants to promote the concept of "going green"
in New Jersey. Under this program, scoring criteria based on the project's environmental and economic
development impact determines the percentage split of loan and grant awarded. Funding can be used to
purchase fixed assets, including real estate and equipment, for an end-use energy efficiency project,
combined heat and power (CHP or cogen) production facility, or new state-of-the-art efficient electric
generation facility, including Class I and Class II renewable Energy.
http://www.njeda.com/web/Aspx_pg/Templates/Npic_Text.aspx?Doc_Id=1078&menuid=1360&topid=722
&levelid=6&midid=1357
Clean Renewable Energy Bonds (CREBs) – For Renewable Energy Projects Federal Loan Program for Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass,
Hydroelectric, Geothermal Electric, Municipal Solid Waste, Hydrokinetic Power, Anaerobic Digestion,
Tidal Energy, Wave Energy, Ocean Thermal.
http://www.irs.gov/irb/2007-14_IRB/ar17.html
Renewable funding for PV & wind, plus federal credits currently available: http://www.njcleanenergy.com/renewable-energy/programs/renewable-energy-incentive-
program/applications-and-e-forms-renewable-ener
Potential Project Funding Sources (continued)
![Page 62: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/62.jpg)
Middle Township BOE, NJ - 54 - FINAL Energy Audit Report, December 2012
Direct Install Program – NJ Clean Energy makes the investment in energy efficiency upgrades by
initially covering 60% of the cost to install the recommended energy efficiency measures. If eligible, the
entity will pay ONLY 40% of the total cost to install the energy efficiency measures.
http://www.njcleanenergy.com/commercial-industrial/programs/direct-install
We encourage you to contact the program directly for further information on this particular program for all
Buildings.
Steps to Participate for Buildings:
1. CONTACT THE PARTICIPATING CONTRACTOR IN YOUR AREA.
Identify the contractor assigned and trained to provide Direct Install services in the county where your project is located. Using the contact
information provided, call or email the Participating Contractor to discuss your project. The contractor will schedule an Energy Assessment
and work with you to complete the Program Application and Participation Agreement. If you are unable to contact the Participating Contractor
or have questions, you may contact us at 866-NJSMART or send an e-mail to [email protected]..
2. REVIEW RESULTS
After the Energy Assessment, the contractor will review results with you, including what measures qualify and your share of the project cost.
3. DECIDE TO MOVE FORWARD
You will sign a Scope of Work document to proceed with implementation of qualifying measures.
4. ARRANGE INSTALLATION
You and the Participating Contractor will set a convenient start date for the installation.
5. CONFIRM INSTALLATION
Once the Participating Contractor completes the installation, you accept the work by signing a Project Completion Form. A program
representative will approve the project as complete.
6. COMPLETE TRANSACTION
You pay the Participating Contractor your share of the project cost and the program pays its share.
Potential Project Funding Sources (continued)
![Page 63: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/63.jpg)
Middle Township BOE, NJ - 55 - FINAL Energy Audit Report, December 2012
Next Steps
The following projects should be considered for implementation:
Computer Power Management
HVAC Time of Day Optimization
Vending Machine Power Management
Upgrade Door Weather Stripping
Demand Controlled Ventilation
Day Lighting
Walk-in Cooler Controls
Lighting Upgrade
Note that additional “Phase 2” engineering may be required to further develop these projects, to
bring them to bidding and implementation.
Consider applying for Pay-For-Performance Program
![Page 64: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/64.jpg)
![Page 65: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/65.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
PORTFOLIO MANAGER / ENERGY STAR
![Page 66: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/66.jpg)
(Page left blank intentionally)
![Page 67: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/67.jpg)
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEMiddle Twp - Admin Building
Building ID: 3337299 For 12-month Period Ending: June 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: November 26, 2012
FacilityMiddle Twp - Admin Building216 South Main StreetCape May Court House, NJ 08210
Facility OwnerMiddle Township216 S. Main Street Cape May Court House, NJ 08210
Primary Contact for this FacilityN/A
Year Built: 1978Gross Floor Area (ft2): 5,950
Energy Performance Rating2 (1-100) 66
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 233,967 Natural Gas (kBtu)4 217,245 Total Energy (kBtu) 451,212
Energy Intensity4 Site (kBtu/ft2/yr) 76 Source (kBtu/ft2/yr) 170 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 45 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 89 National Median Source EUI 198 % Difference from National Median Source EUI -14% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
![Page 68: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/68.jpg)
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityMiddle Twp - Admin Building216 South Main StreetCape May Court House, NJ 08210
Facility OwnerMiddle Township216 S. Main Street Cape May Court House, NJ 08210
Primary Contact for this FacilityN/A
General InformationMiddle Twp - Admin Building
Gross Floor Area Excluding Parking: (ft2) 5,950 Year Built 1978 For 12-month Evaluation Period Ending Date: June 30, 2012
Facility Space Use SummaryMiddle Twp. Admin Building
Space Type K-12 School
Gross Floor Area (ft2) 5,950
Open Weekends? No
Number of PCs 30
Number of walk-in refrigeration/freezerunits 0
Presence of cooking facilities No
Percent Cooled 100
Percent Heated 100
Months o 10
High School? No
School District o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 06/30/2012)
Baseline(Ending Date 06/30/2012) Rating of 75 Target National Median
Energy Performance Rating 66 66 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 76 76 69 N/A 89
Source (kBtu/ft2) 170 170 155 N/A 198
Energy Cost
$/year $ 8,427.94 $ 8,427.94 $ 7,706.62 N/A $ 9,855.01
$/ft2/year $ 1.42 $ 1.42 $ 1.30 N/A $ 1.66
Greenhouse Gas Emissions
MtCO2e/year 45 45 41 N/A 53
kgCO2e/ft2/year 8 8 7 N/A 9
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
![Page 69: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/69.jpg)
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEMiddle Twp - Elementary School #1
Building ID: 3337522 For 12-month Period Ending: June 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: November 26, 2012
FacilityMiddle Twp - Elementary School #1215 Eldredge RoadCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
Year Built: 1951Gross Floor Area (ft2): 84,220
Energy Performance Rating2 (1-100) 63
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 2,450,134 Natural Gas (kBtu)4 2,455,046 Total Energy (kBtu) 4,905,180
Energy Intensity4 Site (kBtu/ft2/yr) 58 Source (kBtu/ft2/yr) 128 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 478 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 66 National Median Source EUI 144 % Difference from National Median Source EUI -11% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
![Page 70: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/70.jpg)
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityMiddle Twp - Elementary School #1215 Eldredge RoadCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
General InformationMiddle Twp - Elementary School #1
Gross Floor Area Excluding Parking: (ft2) 84,220 Year Built 1951 For 12-month Evaluation Period Ending Date: June 30, 2012
Facility Space Use SummaryElementary School #1 - Annex 1-5
Space Type K-12 School
Gross Floor Area (ft2) 84,220
Open Weekends? No
Number of PCs 50
Number of walk-in refrigeration/freezerunits 2
Presence of cooking facilities Yes
Percent Cooled 100
Percent Heated 100
Months o 10
High School? No
School District o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 06/30/2012)
Baseline(Ending Date 06/30/2012) Rating of 75 Target National Median
Energy Performance Rating 63 63 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 58 58 51 N/A 66
Source (kBtu/ft2) 128 128 113 N/A 144
Energy Cost
$/year $ 167,253.66 $ 167,253.66 $ 147,581.83 N/A $ 188,734.73
$/ft2/year $ 1.99 $ 1.99 $ 1.76 N/A $ 2.25
Greenhouse Gas Emissions
MtCO2e/year 478 478 422 N/A 539
kgCO2e/ft2/year 6 6 5 N/A 7
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
![Page 71: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/71.jpg)
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEMiddle Twp Elementary School #2
Building ID: 3337686 For 12-month Period Ending: June 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: November 26, 2012
FacilityMiddle Twp Elementary School #2101 West Pacific AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
Year Built: 1991Gross Floor Area (ft2): 87,674
Energy Performance Rating2 (1-100) 16
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 4,164,194 Natural Gas (kBtu)4 3,408,585 Total Energy (kBtu) 7,572,779
Energy Intensity4 Site (kBtu/ft2/yr) 86 Source (kBtu/ft2/yr) 199 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 771 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 62 National Median Source EUI 144 % Difference from National Median Source EUI 39% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
![Page 72: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/72.jpg)
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityMiddle Twp Elementary School #2101 West Pacific AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
General InformationMiddle Twp Elementary School #2
Gross Floor Area Excluding Parking: (ft2) 87,674 Year Built 1991 For 12-month Evaluation Period Ending Date: June 30, 2012
Facility Space Use SummaryMiddle Twp Elementary School #2
Space Type K-12 School
Gross Floor Area (ft2) 87,674
Open Weekends? No
Number of PCs 60
Number of walk-in refrigeration/freezerunits 2
Presence of cooking facilities Yes
Percent Cooled 100
Percent Heated 100
Months o 10
High School? No
School District o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 06/30/2012)
Baseline(Ending Date 06/30/2012) Rating of 75 Target National Median
Energy Performance Rating 16 16 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 86 86 49 N/A 62
Source (kBtu/ft2) 199 199 112 N/A 144
Energy Cost
$/year $ 140,313.97 $ 140,313.97 $ 79,067.74 N/A $ 101,113.14
$/ft2/year $ 1.60 $ 1.60 $ 0.90 N/A $ 1.15
Greenhouse Gas Emissions
MtCO2e/year 771 771 434 N/A 556
kgCO2e/ft2/year 9 9 5 N/A 6
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
![Page 73: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/73.jpg)
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEMiddle Twp Middle School #4
Building ID: 3337770 For 12-month Period Ending: June 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: November 26, 2012
FacilityMiddle Twp Middle School #4300 East Pacific AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
Year Built: 1972Gross Floor Area (ft2): 88,639
Energy Performance Rating2 (1-100) 71
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 1,779,824 Natural Gas (kBtu)4 4,284,833 Total Energy (kBtu) 6,064,657
Energy Intensity4 Site (kBtu/ft2/yr) 68 Source (kBtu/ft2/yr) 118 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 480 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 85 National Median Source EUI 145 % Difference from National Median Source EUI -19% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
![Page 74: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/74.jpg)
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityMiddle Twp Middle School #4300 East Pacific AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
General InformationMiddle Twp Middle School #4
Gross Floor Area Excluding Parking: (ft2) 88,639 Year Built 1972 For 12-month Evaluation Period Ending Date: June 30, 2012
Facility Space Use SummaryMiddle Twp Middle School #4
Space Type K-12 School
Gross Floor Area (ft2) 88,639
Open Weekends? No
Number of PCs 80
Number of walk-in refrigeration/freezerunits 2
Presence of cooking facilities Yes
Percent Cooled 100
Percent Heated 100
Months o 10
High School? No
School District o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 06/30/2012)
Baseline(Ending Date 06/30/2012) Rating of 75 Target National Median
Energy Performance Rating 71 71 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 68 68 66 N/A 85
Source (kBtu/ft2) 118 118 114 N/A 145
Energy Cost
$/year $ 75,751.73 $ 75,751.73 $ 73,160.98 N/A $ 93,554.83
$/ft2/year $ 0.85 $ 0.85 $ 0.82 N/A $ 1.05
Greenhouse Gas Emissions
MtCO2e/year 480 480 464 N/A 593
kgCO2e/ft2/year 5 5 5 N/A 6
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
![Page 75: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/75.jpg)
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEMiddle Twp High School
Building ID: 3337797 For 12-month Period Ending: June 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: November 26, 2012
FacilityMiddle Twp High School300 East Atlantic AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
Year Built: 1991Gross Floor Area (ft2): 205,270
Energy Performance Rating2 (1-100) 34
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 6,109,049 Natural Gas (kBtu)4 9,546,522 Total Energy (kBtu) 15,655,571
Energy Intensity4 Site (kBtu/ft2/yr) 76 Source (kBtu/ft2/yr) 148 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 1,373 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 67 National Median Source EUI 130 % Difference from National Median Source EUI 14% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
![Page 76: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/76.jpg)
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityMiddle Twp High School300 East Atlantic AvenueCape May Court House, NJ 08210
Facility OwnerN/A
Primary Contact for this FacilityN/A
General InformationMiddle Twp High School
Gross Floor Area Excluding Parking: (ft2) 205,270 Year Built 1991 For 12-month Evaluation Period Ending Date: June 30, 2012
Facility Space Use SummaryMiddle Twp High School
Space Type K-12 School
Gross Floor Area (ft2) 205,270
Open Weekends? No
Number of PCs 120
Number of walk-in refrigeration/freezerunits 2
Presence of cooking facilities Yes
Percent Cooled 100
Percent Heated 100
Months o 10
High School? Yes
School District o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 06/30/2012)
Baseline(Ending Date 06/30/2012) Rating of 75 Target National Median
Energy Performance Rating 34 34 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 76 76 52 N/A 67
Source (kBtu/ft2) 148 148 101 N/A 130
Energy Cost
$/year $ 263,774.64 $ 263,774.64 $ 180,322.67 N/A $ 230,608.27
$/ft2/year $ 1.29 $ 1.29 $ 0.88 N/A $ 1.13
Greenhouse Gas Emissions
MtCO2e/year 1,373 1,373 939 N/A 1,200
kgCO2e/ft2/year 7 7 5 N/A 6
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
![Page 77: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/77.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
FACILITIES TOTAL ANNUAL ENERGY USAGE
![Page 78: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/78.jpg)
(Page left blank intentionally)
![Page 79: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/79.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
$7,614.45 $0.110 $2,340.98 $1.140
$10,300.44 $0.159
$2,818.06 $0.273
$80,179.99 $0.124 $23,604.50 $1.016
$4,241.04 $0.156
Middle Township Elementary School #2 - School & Bus Depot* $136,953.11 $0.107
Middle Township Elementary School #2 $33,124.78 $1.007
Middle Township High School - H.S. / Performing Arts Center $241,869.15 $0.130
Middle Township High School - Parking Lot Lights $1,563.83 $0.222
Middle Township High School $92,996.91 $0.969
Middle Township Middle School #4 $51,344.69 $0.109 $45,996.33 $1.017
Middle Township Middle School #4 - Parking Lot Lights $4,669.69 $0.222
$541,554.45 $0.1217 $198,063.50 $0.993
$0.1073
$0.2731
Facility Name Middle Township School Admin. Building
Address 126 S. Main Street
Cape May Court House, NJ 08210
Account# 0035 5839 9998
Meter # 11568582 (changed to 10734312), 11947401, 10734311
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier
Cost
(SJ Energy)
$/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 27.0 9,424 $500.61 $856.74 $0.14 $0.053 $0.0909
Electricity kWh 8/23/2011 9/23/2011 26.4 6,871 $451.14 $624.64 $0.16 $0.066 $0.0909
Electricity kWh 9/23/2011 10/25/2011 22.5 5,292 $402.41 $481.10 $0.17 $0.076 $0.0909
Electricity kWh 10/25/2011 11/22/2011 15.5 4,322 $343.99 $392.91 $0.17 $0.080 $0.0909
Electricity kWh 11/22/2011* 12/27/2011 24.0 4,502 $407.41 $409.28 $0.18 $0.090 $0.0909
Electricity kWh 12/27/2011 1/24/2012 21.2 3,441 $320.75 $312.82 $0.18 $0.093 $0.0909
Electricity kWh 1/24/2012 2/23/2012 49.0 6,160 $313.83 $229.28 $0.09 $0.051 $0.0372
Electricity kWh 2/23/2012 3/23/2012 53.7 6,485 $286.00 $159.64 $0.07 $0.044 $0.0246
Electricity kWh 3/23/2012 4/24/2012 53.1 4,607 $266.23 $0.00 $0.06 $0.058 $0.0000
Electricity kWh 4/24/2012 5/23/2012 52.8 5,234 $241.27 $0.00 $0.05 $0.046 $0.0000
Electricity kWh 5/23/2012 6/22/2012 52.9 6,140 $292.42 $0.00 $0.05 $0.048 $0.0000
Electricity kWh 6/22/2012 7/25/2012 56.1 6,697 $321.98 $0.00 $0.05 $0.048 $0.0000
454.2 69,175 $4,148.04 $3,466.41 $0.110 $0.060 $0.050
* meter # change
Facility Name Middle Township School Admin. Building
Address 216 S. Main Street, Cape May Court House, NJ 08210
Account# 4 09 54 3994 0 4
Meter # 0516050
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Therms
Delivery Cost
(SJ Gas)
Supplier Cost
(Hess)$/Therm $/Therm $/Therm
Natural Gas Therms 7/22/2011 8/23/2011 0.00 $25.40 $0.00 $0.00 $0.000 $0.000
Natural Gas Therms 8/23/2011 9/24/2011 0.00 $24.60 $0.00 $0.00 $0.000 $0.000
Natural Gas Therms 9/24/2011 10/24/2011 0.00 $24.60 $0.00 $0.00 $0.000 $0.000
Natural Gas Therms 10/24/2011 11/21/2011 280.92 $161.00 $150.21 $1.11 $0.573 $0.535
Natural Gas Therms 11/21/2011 12/22/2011 321.22 $183.20 $173.87 $1.11 $0.570 $0.541
Natural Gas Therms 12/22/2011 1/24/2012 503.13 $272.62 $266.89 $1.07 $0.542 $0.530
Natural Gas Therms 1/24/2012 2/22/2012 420.02 $227.94 $215.89 $1.06 $0.543 $0.514
Natural Gas Therms 2/22/2012 3/22/2012 308.87 $173.72 $155.17 $1.06 $0.562 $0.502
Natural Gas Therms 3/22/2012 4/24/2012 176.13 $112.13 $66.67 $1.02 $0.637 $0.379
Natural Gas Therms 4/24/2012 5/22/2012 43.13 $43.28 $13.79 $1.32 $1.003 $0.320
Natural Gas Therms 5/22/2012 6/21/2012 0.00 $23.81 $0.00 $0.00 $0.000 $0.000
Natural Gas Therms 6/21/2012 7/24/2012 0.00 $26.19 $0.00 $0.00 $0.000 $0.000
2,053 $1,298.49 $1,042.49 $1.140 $0.632 $0.508
Buildings
TOTALTOTAL
0035 5839 9998
0035 5819 9992
1124 3109 9996
0035 5969 9990
0035 5829 9990
1034 6169 9995
1040 1929 9999
0035 7209 9996
0035 6799 9960
0035 6809 9992
Gas - HESS
32,897
95,959
45,219
4 09 54 0103 1 6
4 09 54 0114 0 5
4 10 56 3539 0 1
4 10 56 0610 1 7
21,018
Annual
Consumption
kWh
Electric - ATLANTIC CITY ENERGY
Account Number
1,862,220
7,040
469,040
27,200
1,275,838
$ / therm Annual Cost
64,704
10,317
644,760
4 09 54 3994 0 4
Annual Consumption
Therms
Account Number
69,175 2,053
23,234
Annual Cost $ / kWh
TOTALS / AVERAGE
Middle Township School Admin. Building
Middle Township Elementary School #1 - Annex 2, 4 5
Middle Township Elementary School #1 - Parking Lot Lights (Annex 1 & 3)Middle Township Elementary School #1
Middle Township Elementary School #1 - Annex 1 & 3
4,451,312 199,364
TOTALS/AVERAGE
0.0
10.0
20.0
30.0
40.0
50.0
60.0
kW
Dem
an
d
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP SCHOOL ADMINISTRATION BUILDING ELECTRIC USAGE
(Account #0035 5839 9998)
Electricity
Demand KW
TH
ER
MS
MIDDLE TOWNSHIP SCHOOL ADMINISTRATION BUILDING NATURAL GAS USAGE
(Account #4 90 54 3994 0 4)
Page 1 of 6
![Page 80: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/80.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
Facility Name Middle Township Elementary School #1 - Annex 2, 4 5
Address 122 S. Main Street
Cape May Court House, NJ 08210
Account# 0035 5819 9992
Meter # 83010386
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 14.9 3,702 $239.47 $343.55 $0.157 $0.065 $0.093
Electricity kWh 8/23/2011 9/23/2011 15.0 2,929 $220.90 $271.81 $0.168 $0.075 $0.093
Electricity kWh 9/23/2011 10/25/2011 27.5 3,669 $285.39 $340.48 $0.171 $0.078 $0.093
Electricity kWh 10/25/2011 11/22/2011 29.3 5,488 $373.75 $520.84 $0.163 $0.068 $0.095
Electricity kWh 11/22/2011 12/27/2011 29.6 7,556 $502.43 $701.20 $0.159 $0.066 $0.093
Electricity kWh 12/27/2011 1/24/2012 28.7 9,372 $550.29 $869.72 $0.146 $0.059 $0.0928
Electricity kWh 1/24/2012 2/23/2012 31.7 7,459 $480.33 $692.20 $0.157 $0.064 $0.093
Electricity kWh 2/23/2012 3/23/2012 20.4 5,595 $343.80 $519.22 $0.154 $0.061 $0.093
Electricity kWh 3/23/2012 4/24/2012 22.7 6,309 $395.82 $585.48 $0.156 $0.063 $0.093
Electricity kWh 4/24/2012 5/23/2012 16.1 3,492 $228.43 $0.00 $0.065 $0.065 $0.000
Electricity kWh 5/23/2012 6/22/2012 16.7 4,120 $802.98 $0.00 $0.195 $0.195 $0.000
Electricity kWh 6/22/2012 7/25/2012 13.7 5,013 $1,032.35 $0.00 $0.206 $0.206 $0.000
266 64,704 $5,455.94 $4,844.50 $0.159 $0.084 $0.075
Facility Name Middle Township Elementary School #1 - Parking Lot Lights (Annex 1 & 3)
Address S. Main Street #1 & #3 Annex
Cape May Court House, NJ 08210
Account# 1124 3109 9996
Meter #
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 0 849 $152.44 $62.39 $0.25 $0.180 $0.0735
Electricity kWh 8/23/2011 9/23/2011 0 954 $155.18 $70.11 $0.24 $0.163 $0.0735
Electricity kWh 9/23/2011 10/25/2011 0 1,082 $160.64 $79.52 $0.22 $0.148 $0.0735
Electricity kWh 10/25/2011 11/22/2011 0 1,189 $163.81 $87.38 $0.21 $0.138 $0.0735
Electricity kWh 11/22/2011 12/27/2011 0 1,365 $181.97 $100.31 $0.21 $0.133 $0.0735
Electricity kWh 12/27/2011 1/24/2012 0 1,065 $148.80 $78.27 $0.21 $0.140 $0.0735
Electricity kWh 1/24/2012 2/23/2012 0 1,097 $163.25 $80.62 $0.22 $0.149 $0.0735
Electricity kWh 2/23/2012 3/23/2012 0 979 $155.81 $71.95 $0.23 $0.159 $0.0735
Electricity kWh 3/23/2012 4/24/2012 0 948 $168.69 $69.67 $0.25 $0.178 $0.0735
Electricity kWh 4/24/2012 5/23/2012 0 789 $155.69 $57.98 $0.27 $0.197 $0.0735
Electricity kWh 5/23/2012 6/22/2012 0 0 $208.89 $0.00 $0.00 $0.000 $0.0000
Electricity kWh 6/22/2012 7/25/2012 0 0 $175.46 $69.23 $0.00 $0.000 $0.0000
0 10,317 $1,990.63 $827.43 $0.273 $0.193 $0.080
Facility Name Middle Township Elementary School #1
Address S. Main Street, Apt. 1
Cape May Court House, NJ 08210
Account# 0035 5969 9990
Meter # 91706874; (Meter changed to 78293417); 11536637
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 208.0 74,160 $3,296.10 $6,741.89 $0.14 $0.044 $0.0909
Electricity kWh 8/23/2011 9/23/2011 256.8 68,720 $3,557.65 $6,247.34 $0.14 $0.052 $0.0909
Electricity kWh 9/23/2011 10/25/2011 256.8 52,240 $3,092.16 $4,749.14 $0.15 $0.059 $0.0909
Electricity kWh 10/25/2011 11/22/2011 181.6 41,440 $2,311.81 $3,767.31 $0.15 $0.056 $0.0909
Electricity kWh 11/22/2011 12/27/2011 132.8 44,000 $2,675.93 $4,000.04 $0.15 $0.061 $0.0909
Electricity kWh 12/27/2011 1/24/2012 129.6 38,080 $2,208.39 $3,461.85 $0.15 $0.058 $0.0909
Electricity kWh 1/24/2012 2/23/2012 256.0 42,600 $2,075.61 $2,676.39 $0.11 $0.049 $0.0628
Electricity kWh 2/23/2012 3/23/2012 256.0 42,560 $1,905.00 $2,218.20 $0.10 $0.045 $0.0521
Electricity kWh 3/23/2012 4/24/2012 260.0 42,360 $1,851.49 $1,549.11 $0.08 $0.044 $0.0366
Electricity kWh 4/24/2012 5/23/2012 282.4 41,880 $1,812.78 $1,832.75 $0.09 $0.043 $0.0438
Electricity kWh 5/23/2012 6/22/2012 329.6 71,120 $7,857.87 $0.00 $0.11 $0.110 $0.0000
Electricity kWh 6/22/2012 7/25/2012 311.6 85,600 $10,291.18 $0.00 $0.12 $0.120 $0.0000
2,861 644,760 $42,935.97 $37,244.02 $0.124 $0.067 $0.058 TOTALS / AVERAGE
TOTALS / AVERAGE
TOTALS / AVERAGE
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
kW
De
ma
nd
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 - ANNEX 2, 4, 5 ELECTRIC USAGE
(Account #0035 5819 9992)
Electricity
Demand KW
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
kW
Dem
an
d
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 ELECTRIC USAGE
(Account #0035 5969 9990)
Electricity
Demand KW
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 ELECTRIC USAGE
(Account #1124 3109 9996)
Electricity
Page 2 of 6
![Page 81: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/81.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
Facility Name Middle Township Elementary School #1 - Annex 1 & 3
Address 120 S. Main Street Annex
Cape May Court House, NJ 08210
Account# 0035 5829 9990
Meter # 28114751; 58994235; 78293417
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 8.8 2,360 $160.72 $219.01 $0.16 $0.068 $0.0928
Electricity kWh 8/23/2011 9/23/2011 9.2 1,680 $133.31 $155.90 $0.17 $0.079 $0.0928
Electricity kWh 9/23/2011 10/25/2011 2.4 1,360 $80.05 $126.21 $0.15 $0.059 $0.0928
Electricity kWh 10/25/2011 11/22/2011 2.4 2,040 $109.22 $189.31 $0.15 $0.054 $0.0928
Electricity kWh 11/22/2011 12/27/2011 2.8 2,680 $142.97 $248.70 $0.15 $0.053 $0.0928
Electricity kWh 12/27/2011 1/24/2012 2.4 4,080 $203.59 $378.62 $0.14 $0.050 $0.0928
Electricity kWh 1/24/2012 2/23/2012 2.4 3,600 $181.64 $334.08 $0.14 $0.050 $0.0928
Electricity kWh 2/23/2012 3/23/2012 2.8 2,080 $110.22 $193.02 $0.15 $0.053 $0.0928
Electricity kWh 3/23/2012 4/24/2012 2.8 1,680 $92.91 $155.90 $0.15 $0.055 $0.0928
Electricity kWh 4/24/2012 5/23/2012 2.4 1,360 $76.61 $126.21 $0.15 $0.056 $0.0928
Electricity kWh 5/23/2012 6/22/2012 2.4 2,040 $357.42 $0.00 $0.18 $0.175 $0.0000
Electricity kWh 6/22/2012 7/25/2012 8.8 2,240 $465.42 $0.00 $0.21 $0.208 $0.0000
50 27,200 $2,114.08 $2,126.96 $0.156 $0.078 $0.078
Facility Name Middle Township Elementary School #1
Address Bennet Road W/S
Cape May Court House, NJ 08210
Account# 4 09 54 0103 1 6
Meter # 0504200
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Therms
Delivery Cost
(SJ Gas)
Supplier Cost
(Hess)$/Therm $/Therm $/Therm
Natural Gas Therms 7/22/2011 8/23/2011 51.85 $51.79 $29.37 $1.57 $0.999 $0.566
Natural Gas Therms 8/23/2011 9/24/2011 83.28 $66.96 $43.77 $1.33 $0.804 $0.526
Natural Gas Therms 9/24/2011 10/24/2011 175.61 $112.03 $88.42 $1.14 $0.638 $0.504
Natural Gas Therms 10/24/2011 11/21/2011 2768.01 $1,389.69 $1,480.16 $1.04 $0.502 $0.535
Natural Gas Therms 11/21/2011 12/22/2011 3836.25 $1,918.95 $2,076.10 $1.04 $0.500 $0.541
Natural Gas Therms 12/22/2011 1/24/2012 5897.32 $2,914.69 $3,128.47 $1.02 $0.494 $0.530
Natural Gas Therms 1/24/2012 2/22/2012 4819.44 $2,374.43 $2,477.32 $1.01 $0.493 $0.514
Natural Gas Therms 2/22/2012 3/22/2012 3202.30 $1,585.42 $1,608.65 $1.00 $0.495 $0.502
Natural Gas Therms 3/22/2012 4/24/2012 2029.10 $1,016.21 $768.22 $0.88 $0.501 $0.379
Natural Gas Therms 4/24/2012 5/22/2012 236.21 $137.47 $75.59 $0.90 $0.582 $0.320
Natural Gas Therms 5/22/2012 6/21/2012 93.33 $69.34 $29.53 $1.06 $0.743 $0.316
Natural Gas Therms 6/21/2012 7/24/2012 41.76 $64.15 $97.77 $3.88 $1.536 $2.341
23,234 $11,701.13 $11,903.37 $1.016 $0.504 $0.512
Facility Name Middle Township Elementary School #2 - School & Bus Depot*
Address 101 W. Pacific Avenue
Cape May Court House, NJ 08210
Account# 1034 6169 9995
Meter # 36135435; 11536607; 74981025
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 312.8 174,800 $6,739.08 $15,891.07 $0.13 $0.039 $0.0909
Electricity kWh 8/23/2011 9/23/2011 348.8 140,800 $6,159.66 $12,800.13 $0.13 $0.044 $0.0909
Electricity kWh 9/23/2011 10/25/2011 348.8 125,680 $5,620.44 $11,425.57 $0.14 $0.045 $0.0909
Electricity kWh 10/25/2011 11/22/2011 250.4 57,840 $3,293.21 $5,258.23 $0.15 $0.057 $0.0909
Electricity kWh 11/22/2011 12/23/2011 160.0 56,640 $3,431.91 $5,149.14 $0.15 $0.061 $0.0909
Electricity kWh 12/23/2011 1/24/2012 398.0 47,758 $3,319.68 $4,341.86 $0.16 $0.070 $0.0909
Electricity kWh 1/24/2012 2/23/2012 636.0 79,920 $3,150.99 $4,087.31 $0.09 $0.039 $0.0511
Electricity kWh 2/23/2012 3/23/2012 519.2 87,040 $2,829.38 $3,534.58 $0.07 $0.033 $0.0406
Electricity kWh 3/23/2012 4/24/2012 526.0 102,320 $2,917.26 $3,096.12 $0.06 $0.029 $0.0303
Electricity kWh 4/24/2012 5/23/2012 532.9 91,040 $2,696.39 $2,945.48 $0.06 $0.030 $0.0324
Electricity kWh 5/23/2012 6/22/2012 614.7 146,640 $12,746.30 $0.00 $0.09 $0.087 $0.0000
Electricity kWh 6/22/2012 7/25/2012 624.2 165,360 $15,519.32 $0.00 $0.09 $0.094 $0.0000
5,272 1,275,838 $68,423.62 $68,529.49 $0.107 $0.054 $0.054
* The Bus Depot will need to be submetered and taken out
TOTALS/AVERAGE
TOTALS / AVERAGE
TOTALS / AVERAGE
TH
ER
MS
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 NATURAL GAS USAGE
(Account 4 09 54 0103 1 6)
Therms
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
kW
Dem
an
d
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 - ANNEX #1 & 3 ELECTRIC USAGE
(Account #0035 5829 9990)
Electricity
Demand KW
0.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
kW
Dem
an
d
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #2 - SCHOOL & BUS DEPOT ELECTRIC USAGE
(Account #1034 6169 9995)
Electricity
Demand KW
Page 3 of 6
![Page 82: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/82.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
Facility Name Middle Township Elementary School #2
Address 101 W. Pacific Avenue
Cape May Court House, NJ 08210
Account# 4 09 54 0114 0 5
Meter # 0341147
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Therms
Delivery Cost
(SJ Gas)
Supplier Cost
(Hess)$/Therm $/Therm $/Therm
Natural Gas Therms 7/22/2011 8/23/2011 2150.74 $1,119.68 $1,216.98 $1.09 $0.521 $0.566
Natural Gas Therms 8/23/2011 9/24/2011 2066.39 $1,075.97 $1,085.94 $1.05 $0.521 $0.526
Natural Gas Therms 9/24/2011 10/24/2011 2871.74 $1,454.38 $1,445.19 $1.01 $0.506 $0.503
Natural Gas Therms 10/24/2011 11/21/2011 2112.54 $1,065.87 $1,129.64 $1.04 $0.505 $0.535
Natural Gas Therms 11/21/2011 12/22/2011 3073.09 $1,542.08 $1,663.08 $1.04 $0.502 $0.541
Natural Gas Therms 12/22/2011 1/24/2012 5626.17 $2,781.88 $2,984.60 $1.02 $0.494 $0.530
Natural Gas Therms 1/24/2012 2/22/2012 5520.17 $2,716.29 $2,837.55 $1.01 $0.492 $0.514
Natural Gas Therms 2/22/2012 3/22/2012 3692.98 $1,824.82 $1,855.15 $1.00 $0.494 $0.502
Natural Gas Therms 3/22/2012 4/24/2012 1930.22 $967.94 $730.77 $0.88 $0.501 $0.379
Natural Gas Therms 4/24/2012 5/22/2012 1356.67 $684.14 $434.23 $0.82 $0.504 $0.320
Natural Gas Therms 5/22/2012 6/21/2012 1526.46 $768.57 $483.12 $0.82 $0.503 $0.316
Natural Gas Therms 6/21/2012 7/24/2012 969.88 $907.85 $349.06 $1.30 $0.936 $0.360
32,897 $16,909.47 $16,215.31 $1.007 $0.514 $0.493
Facility Name Middle Township High School - H.S. / Performing Arts Center
Address 212 Bayberry Drive
Cape May Court House, NJ 08210
Account# 1040 1929 9999
Meter # 36135432; 78293444; 83724312
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(AC Electric) $/kWh $/kWh $/kWh
Electricity kWh 7/23/2011 8/23/2011 510.0 176,700 $7,865.07 $17,231.44 $0.14 $0.045 $0.0975
Electricity kWh 8/23/2011 9/23/2011 510.0 158,700 $7,582.64 $15,661.39 $0.15 $0.048 $0.0987
Electricity kWh 9/23/2011 10/25/2011 510.0 158,400 $7,426.25 $16,408.56 $0.15 $0.047 $0.1036
Electricity kWh 10/25/2011 11/22/2011 450.0 112,200 $5,468.27 $11,845.20 $0.15 $0.049 $0.1056
Electricity kWh 11/22/2011 12/23/2011 399.0 93,000 $5,623.42 $10,204.26 $0.17 $0.060 $0.1097
Electricity kWh 12/23/2011 1/24/2012 448.8 116,100 $5,541.45 $12,096.68 $0.15 $0.048 $0.1042
Electricity kWh 1/24/2012 2/23/2012 710.0 134,540 $5,246.27 $10,319.95 $0.12 $0.039 $0.0767
Electricity kWh 2/23/2012 3/23/2012 930.4 144,900 $5,638.75 $10,067.09 $0.11 $0.039 $0.0695
Electricity kWh 3/23/2012 4/24/2012 1188.8 164,280 $7,197.82 $10,306.13 $0.11 $0.044 $0.0627
Electricity kWh 4/24/2012 5/23/2012 1483.8 167,200 $8,919.51 $12,400.32 $0.13 $0.053 $0.0742
Electricity kWh 5/23/2012 6/22/2012 971.4 188,660 $6,340.56 $13,693.89 $0.11 $0.034 $0.0726
Electricity kWh 6/22/2012 7/25/2012 978.6 247,540 $8,679.89 $20,104.34 $0.12 $0.035 $0.0812
9,091 1,862,220 $81,529.90 $160,339.25 $0.130 $0.044 $0.086
Facility Name Middle Township High School - Parking Lot Lights
Address Bennett Road & Parkway High School
Cape May Court House, NJ 08210
Account# 0035 7209 9996
Meter # N/A
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(AC Electric) $/kWh $/kWh $/kWh
Electricity kWh 7/29/2011 8/31/2011 0.0 500 $94.15 $41.25 $0.27 $0.188 $0.0825
Electricity kWh 8/31/2011 9/30/2011 0.0 506 $82.12 $29.86 $0.22 $0.162 $0.0590
Electricity kWh 9/30/2011 10/30/2011 0.0 569 $83.76 $33.59 $0.21 $0.147 $0.0590
Electricity kWh 10/30/2011 11/30/2011 0.0 646 $86.72 $50.10 $0.21 $0.134 $0.0776
Electricity kWh 11/30/2011 12/30/2011 0.0 710 $88.64 $55.06 $0.20 $0.125 $0.0775
Electricity kWh 12/30/2011 1/4/2012 0.0 814 $98.46 $63.12 $0.20 $0.121 $0.0775
Electricity kWh 1/4/2012 2/4/2012 0.0 636 $80.17 $49.23 $0.20 $0.126 $0.0774
Electricity kWh 2/4/2012 3/2/2012 0.0 610 $81.93 $47.22 $0.21 $0.134 $0.0775
Electricity kWh 3/2/2012 4/1/2012 0.0 583 $83.69 $45.21 $0.22 $0.144 $0.0775
Electricity kWh 4/1/2012 5/2/2012 0.0 565 $90.43 $43.81 $0.24 $0.160 $0.0775
Electricity kWh 5/2/2012 6/1/2012 0.0 471 $83.36 $36.52 $0.25 $0.177 $0.0775
Electricity kWh 6/1/2012 7/1/2012 0.0 430 $79.95 $35.48 $0.27 $0.186 $0.0825
0 7,040 $1,033.38 $530.45 $0.222 $0.147 $0.075
TOTALS/AVERAGE
TOTALS / AVERAGE
TOTALS / AVERAGE
TH
ER
MS
MIDDLE TOWNSHIP ELEMENTARY SCHOOL #1 NATURAL GAS USAGE
(Account 4 09 54 0114 0 5)
Therms
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
kW
Dem
an
d
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP HIGH SCHOOL - H.S. / PERFORMING ARTS CENTER ELECTRIC USAGE (Account #1040 1929 9999)
KWH
Demand KW
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP HIGH SCHOOL - PARKING LOT LIGHTS ELECTRIC USAGE
(Account #0035 7209 9996)
Electricity
Page 4 of 6
![Page 83: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/83.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
Facility Name Middle Township High School
Address Bennett Road
Cape May Court House, NJ 08210
Account# 4 10 56 3539 0 1
Meter # 0405880e; 0431157
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Therms
Delivery Cost
(SJ Gas)
Supplier Cost
(Hess)$/Therm $/Therm $/Therm
Natural Gas Therms 7/22/2011 8/23/2011 8802.06 $3,752.22 $4,980.69 $0.99 $0.426 $0.566
Natural Gas Therms 8/23/2011 9/23/2011 4567.91 $2,402.01 $2,400.52 $1.05 $0.526 $0.526
Natural Gas Therms 9/23/2011 10/24/2011 2932.69 $1,949.80 $1,475.84 $1.17 $0.665 $0.503
Natural Gas Therms 10/24/2011 11/21/2011 5269.51 $2,654.43 $2,817.81 $1.04 $0.504 $0.535
Natural Gas Therms 11/21/2011 12/22/2011 9291.91 $4,097.95 5028.57 $0.98 $0.441 $0.541
Natural Gas Therms 12/22/2011 1/24/2012 15585.63 $6,211.01 $8,267.90 $0.93 $0.399 $0.530
Natural Gas Therms 1/24/2012 2/22/2012 13623.43 $5,408.10 $7,002.84 $0.91 $0.397 $0.514
Natural Gas Therms 2/22/2012 3/22/2012 8579.07 $3,744.98 $4,309.63 $0.94 $0.437 $0.502
Natural Gas Therms 3/22/2012 4/24/2012 6637.32 $3,231.14 $2,512.88 $0.87 $0.487 $0.379
Natural Gas Therms 4/24/2012 5/22/2012 4959.38 $2,519.89 $1,547.84 $0.82 $0.508 $0.312
Natural Gas Therms 5/22/2012 6/21/2012 7531.73 $3,431.24 $2,383.83 $0.77 $0.456 $0.317
Natural Gas Therms 6/21/2012 7/24/2012 8178.70 $7,183.53 $3,682.26 $1.33 $0.878 $0.450
95,959 $46,586.30 $46,410.61 $0.969 $0.485 $0.484
Facility Name Middle Township Middle School #4
Address 300 E. Pacific Avenue, Apt. 4
Cape May Court House, NJ 08210
Account# 0035 6799 9960
Meter # 81777575; 78293416; 11536608
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(SJ Energy) $/kWh $/kWh $/kWh
Electricity kWh 7/25/2011 8/23/2011 116.0 59,200 $2,557.36 $5,381.87 $0.13 $0.043 $0.0909
Electricity kWh 8/23/2011 9/23/2011 198.0 61,400 $2,967.33 $5,581.87 $0.14 $0.048 $0.0909
Electricity kWh 9/23/2011 10/25/2011 196.0 56,000 $2,788.65 $5,090.96 $0.14 $0.050 $0.0909
Electricity kWh 10/25/2011 11/22/2011 164.0 38,000 $1,978.71 $3,454.58 $0.14 $0.052 $0.0909
Electricity kWh 11/22/2011 12/23/2011 158.0 41,800 $2,304.00 $3,800.04 $0.15 $0.055 $0.0909
Electricity kWh 12/23/2011 1/24/2012 164.0 19,600 $1,502.47 $1,781.84 $0.17 $0.077 $0.0909
Electricity kWh 1/24/2012 2/23/2012 428.8 43,600 $1,450.82 $1,345.47 $0.06 $0.033 $0.0309
Electricity kWh 2/23/2012 3/23/2012 444.4 47,320 $1,224.00 $745.46 $0.04 $0.026 $0.0158
Electricity kWh 3/23/2012 4/24/2012 431.6 52,480 $1,120.15 $0.00 $0.02 $0.021 $0.0000
Electricity kWh 4/24/2012 5/23/2012 494.4 40,200 $1,310.64 $563.64 $0.05 $0.033 $0.0140
Electricity kWh 5/23/2012 6/22/2012 206.4 9,360 $2,916.89 $0.00 $0.31 $0.312 $0.0000
Electricity kWh 6/22/2012 7/25/2012 128.4 80 $1,477.94 $0.00 $18.47 $18.474 $0.0000
3,130 469,040 $23,598.96 $27,745.73 $0.109 $0.050 $0.059
Facility Name Middle Township Middle School #4 - Parking Lot Lights
Address E. Pacific Avenue Middle School #4
Cape May Court House, NJ 08210
Account# 0035 6809 9992
Meter # N/A
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Demand KW KWH
Delivery Cost
(AC Electric)
Supplier Cost
(AC Electric) $/kWh $/kWh $/kWh
Electricity kWh 7/31/2011 8/31/2011 0.0 1,501 $249.60 $110.31 $0.24 $0.166 $0.0735
Electricity kWh 8/31/2011 9/30/2011 0.0 1,688 $254.44 $124.05 $0.22 $0.151 $0.0735
Electricity kWh 9/30/2011 10/31/2011 0.0 1,915 $263.43 $140.73 $0.21 $0.138 $0.0735
Electricity kWh 10/31/2011 11/30/2011 0.0 2,105 $269.10 $154.70 $0.20 $0.128 $0.0735
Electricity kWh 11/30/2011 12/31/2011 0.0 2,415 $297.84 $177.48 $0.20 $0.123 $0.0735
Electricity kWh 12/31/2011 1/31/2012 0.0 1,885 $236.19 $138.53 $0.20 $0.125 $0.0735
Electricity kWh 1/31/2012 2/28/2012 0.0 1,943 $258.73 $142.79 $0.21 $0.133 $0.0735
Electricity kWh 2/28/2012 3/30/2012 0.0 1,733 $246.56 $127.36 $0.22 $0.142 $0.0735
Electricity kWh 3/30/2012 4/30/2012 0.0 1,677 $266.29 $123.24 $0.23 $0.159 $0.0735
Electricity kWh 4/30/2012 5/31/2012 0.0 1,397 $245.39 $102.67 $0.25 $0.176 $0.0735
Electricity kWh 5/31/2012 6/29/2012 0.0 1,274 $340.44 $0.00 $0.27 $0.267 $0.0000
Electricity kWh 6/29/2012 7/31/2012 0.0 1,485 $277.29 $122.53 $0.27 $0.187 $0.0825
0 21,018 $3,205.30 $1,464.39 $0.222 $0.153 $0.070 TOTALS / AVERAGE
TOTALS / AVERAGE
TOTALS/AVERAGE
0.0
100.0
200.0
300.0
400.0
500.0
600.0
kW
Dem
an
d
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP HIGH SCHOOL - PARKING LOT LIGHTS ELECTRIC USAGE
(Account #0035 6799 9960)
Electricity
Demand KW
Ele
ctr
ic U
sa
ge
(k
Wh
)
MIDDLE TOWNSHIP HIGH SCHOOL - PARKING LOT LIGHTS ELECTRIC USAGE
(Account #0035 6809 9992)
Electricity
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP HIGH SCHOOL - PARKING LOT LIGHTS ELECTRIC USAGE
(Account #4 10 56 3539 0 1)
Natural Gas
Page 5 of 6
![Page 84: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/84.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION
FACILITIES TOTAL ANNUAL ENERGY USE
Prepared by Dome-Tech, Inc.
Facility Name Middle Township Middle School #4
Address 300 E. Pacific Avenue Middle School #4
Cape May Court House, NJ 08210
Account# 4 10 56 0610 1 7
Meter # 0357003
Delivery Supplier
Energy TypeEnergy
UnitStart Date End Date Therms Delivery Cost Supplier Cost $/Therm $/Therm $/Therm
Natural Gas Therms 7/22/2011 8/23/2011 4152.15 $2,138.01 $2,349.54 $1.08 $0.515 $0.566
Natural Gas Therms 8/23/2011 9/23/2011 2778.43 $1,438.28 $1,460.10 $1.04 $0.518 $0.526
Natural Gas Therms 9/23/2011 10/24/2011 1767.46 $904.59 $889.47 $1.02 $0.512 $0.503
Natural Gas Therms 10/24/2011 11/21/2011 2814.32 $1,412.54 $1,504.92 $1.04 $0.502 $0.535
Natural Gas Therms 11/21/2011 12/22/2011 3988.68 $1,994.19 $2,158.57 $1.04 $0.500 $0.541
Natural Gas Therms 12/22/2011 1/24/2012 4947.77 $2,449.60 $2,624.72 $1.03 $0.495 $0.530
Natural Gas Therms 1/24/2012 2/22/2012 5683.22 $2,795.85 $2,921.34 $1.01 $0.492 $0.514
Natural Gas Therms 2/22/2012 3/22/2012 4264.22 $2,103.51 $2,142.08 $1.00 $0.493 $0.502
Natural Gas Therms 3/22/2012 4/24/2012 2525.56 $1,258.41 $956.19 $0.88 $0.498 $0.379
Natural Gas Therms 4/24/2012 5/22/2012 1481.96 $745.27 $474.33 $0.82 $0.503 $0.320
Natural Gas Therms 5/22/2012 6/21/2012 4074.37 $2,011.71 $1,289.58 $0.81 $0.494 $0.317
Natural Gas Therms 6/21/2012 7/24/2012 6741.11 6153.97 $1,819.56 $1.18 $0.913 $0.270
45,219 $25,405.93 $20,590.40 $1.017 $0.562 $0.455TOTALS/AVERAGE
Ele
ctr
ic U
sag
e (
kW
h)
MIDDLE TOWNSHIP HIGH SCHOOL - PARKING LOT LIGHTS ELECTRIC USAGE
(Account #4 10 56 0610 1 7)
Natural Gas
Page 6 of 6
![Page 85: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/85.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
EQUIPMENT INVENTORY LIST
![Page 86: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/86.jpg)
(Page left blank intentionally)
![Page 87: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/87.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
ADMINISTRATION BUILDING
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Cooling
Capacity
(Tons)
Heating
TechnologyAge
Estimated
Service LifeNote
Admin Building N/A Offices Offices Heat Pumps Friedrich N/A 8 Dx N/A Dx6 months - 5
years15
Admin Building N/A Offices Offices Heat Pumps ITT Nesbitt N/A 2 Dx N/A Dx 34 years 15Units no long
work
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Cooling
Capacity
(Tons)
Heating
TechnologyAge
Estimated
Service LifeNote
Admin Building N/A Outside Board Room Split ACICP
CommercialCAC060HAA 1 Dx N/A N/A < 5 years 15
Admin Building N/A Outside Interior Spaces Split ACICP
CommercialCAC060HAA 1 Dx N/A N/A < 5 years 15
Bldg Tag# Location Area Serving Equipment Mfg Model Quantity Fuel Input (MBH) Output (MBH) AgeEstimated
Service Life
Admin Building N/A Boiler Room Entire BuildingCast Iron
Sectional Boiler
Weil McLain
BoilerBL-476-S-W 1 Natural Gas N/A 230 34 years 35
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP RPM VFD? Efficiency
Estimated
Service LifeAdmin Building N/A Boiler Room HW System Hot Water Pump N/A N/A 2 N/A N/A 1/4 N/A No N/A 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Capacity (Gal)Rating
(Watts)Age
Estimated
Service Life
Admin Building N/A Boiler Room Entire BuildingDomestic Water
Heater1 Ruud N/A Natural Gas 50 1200 34 years 10-15
Bldg Tag# Location Area Serving Equipment Quantity Mfg ModelHeating
TechnologyAge
Estimated
Service Life
Admin Building N/AThroughout
Building
Areas throughout
building
Cabinet unit
heaters7 N/A N/A Hot Water 34 years 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg ModelHeating
TechnologyAge
Estimated
Service Life
Admin Building N/A Basement BasementHot water unit
heaters2 N/A N/A Hot Water 34 years 20
Split AC System
Heat Pumps
Hot Water Unit Heaters
Cabinet Unit Heaters
Heating Hot Water Pumps
Boilers
Domestic Hot Water Heaters
![Page 88: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/88.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
ELEMENTARY SCHOOL #1
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Supply Air
CFMFan HP
Cooling
Capacity
(Tons)
Heating
TechnologyAge
Estimated
Service Life
Elementary School #1 N/A Roof Gym Roof Top Unit RheemRRGF-
200100CKR1 Dx N/A 2 N/A Natural Gas Burner 14 15
Elementary School #1 N/A RoofKindergarden
CourtRoof Top Unit Lennox
GCS20-511-
125-2P1 Dx N/A 0.75 N/A Natural Gas Burner 18 15
Elementary School #1 N/A Roof N/A Make Up Air Unit Modine N/A 1 N/A N/A N/A N/A Natural Gas Burner ~15 15
Elementary School #1 N/A RoofMain Office/
AdministrationRoof Top Unit Lennox
GCS16-651-75-
8P1 Dx N/A 0.75 N/A Natural Gas Burner 18 15
Elementary School #1 N/A RoofMain Office/
AdministrationRoof Top Unit Lennox
GCS16-1353-
270-7G1 Dx N/A 3 N/A Natural Gas Burner 18 15
Elementary School #1 N/A RoofLibrary Media
CenterRoof Top Unit Lennox
GCS16-1603-
270-4Y1 Dx N/A 3 N/A Natural Gas Burner 18 15
Elementary School #1 N/A Classrooms Classrooms Unit Ventilators N/A N/A 36Dx/Chilled
WaterN/A ~0.25 N/A Hot Water ~10 15
MODs N/A Ground Classrooms Heat Pump ArmstrongPHP10C36DB-
3A5 Dx N/A 0.5 N/A Dx 10-15 15
Bldg Tag# Location Area Serving Equipment Mfg Model Number Type Quantity Fuel Input (MBH) Output (MBH) AgeEstimated
Service LifeElementary School #1 B-1 Boiler Room 1 Building Boiler Smith 19-Series 4 Cast Iron 1 Natural Gas N/A 359 ~30 35
Elementary School #1 B-2 Boiler Room 1 Building Boiler PK Thermific N-2000-2 Watertube 1 Natural Gas 2,000 1,700 10 35
Elementary School #1 B-3 Boiler Room 1 Building Boiler PK Thermific N-2000-2 Watertube 1 Natural Gas 2,000 1,700 10 35
Elementary School #1 B-4 Boiler Room 2 Building Boiler Smith 28A-5 Cast Iron 1 Natural Gas N/A 1,014 18 35
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD? Age
Estimated
Service LifeElementary School #1 N/A Boiler Room 1 Building Hot Water Pumps N/A N/A 2 N/A N/A 1 1/2 N/A No ~30 20
Elementary School #1 N/A Boiler Room 1 Building Hot Water Pumps N/A N/A 2 N/A N/A 7 1/2 91.7% No 10 20
Elementary School #1 N/A Boiler Room 2 Building Hot Water Pumps N/A N/A 1 N/A N/A 5 82.5% No 18 20
Elementary School #1 N/A Boiler Room 2 Building Hot Water Pumps N/A N/A 1 N/A N/A 5 87.5% No 18 20
Bldg Tag# Location Area Serving Equipment Type Mfg Quantity Model Tons kW/ton Refrigerant Age Service Life
Elementary School #1 N/A Behind Building Rooms 26 - 35 Chiller Air Cooled Trane 1RTAA080AYM
01A3D2BFGK
N
80 N/A R-22 ~15 23
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD?
Estimated
Service Life
Elementary School #1 N/A By Chillers Rooms 26 - 35Chilled Water
PumpsN/A N/A 2 N/A N/A N/A N/A No 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Input (MBH)Capacity
(Gal)Age
Estimated Service
Life
Elementary School #1 N/A Boiler Room 1Building Domestic
Water
Domestic Water
Heater1 Ruud RF78-200 Natural Gas 200 78 ~30 10-15
Elementary School #1 N/A Boiler Room 2Kitchen Domestic
Water
Domestic Water
Heater1 AO Smith
BTP 139A
880Natural Gas 140 86 ~15 10-15
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Notes AgeEstimated
Service LifeElementary School #1 N/A Boiler Room Pneumatics Air Compressor 1 Curtis 6SH6CD Electric 1.5 HP Mtr 30+ 20
BldgEQUIPMEN
TMODEL #
MANUFACTURE
RQUANTITY
Elementary School #1 Dishwasher Tempstar NB Jackson 1
Elementary School #1 Refrigerator KR 48-1AS Bev Air 1
Elementary School #1Food
WarmerH137UA9C Crescor 1
Elementary School #1 Oven N/A Blodgett 1
Elementary School #1 Stove N/A Garland 1
Elementary School #1 Stove 5-67A Vulcan 1
Elementary School #1 Refrigerator T-49 True 1
Elementary School #1Milk
ContainersN/A Powers 2
Elementary School #1Walk in
FreezerN/A N/A 1
Elementary School #1Walk in
RefrigeratorN/A N/A 1
Elementary School #1
Stove
Exhaust
Hood
N/AElmer Shultz
Services1
Elementary School #1
Dishwasher
Exhaust
Hood
N/AElmer Shultz
Services1
Kitchen Equipment Inventory List
Other Mechanical Equipment
Heating Hot Water Pumps
Chilled Water Pumps
Chillers
Air Handling Units - AHUs
Domestic Hot Water Heaters
Boilers
![Page 89: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/89.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
ELEMENTARY SCHOOL #2
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Supply Air
CFMFan HP
Cooling
Capacity
(Tons)
Heating
TechnologyAge
Estimated
Service LifeNotes
Elementary School #2 N/A Roof Band/Choir Roof Top Unit TraneTCD210A4N0A
A1 Dx N/A 5 N/A Natural Gas Burner 21 15
Elementary School #2 N/A Roof Kitchen Make Up Air Unit Trane N/A 1 N/A N/A ~1 N/A Natural Gas Burner ~20 15
Elementary School #2 N/A Roof Cafeteria Roof Top Unit Trane N/A 1 Dx N/A ~7.5 N/A Natural Gas Burner ~20 15
Elementary School #2 N/A Roof Media Center Roof Top Unit TraneYCD240A4H0A
C1 Dx N/A 5 N/A Natural Gas Burner 21 15
Elementary School #2 N/A Roof Office Complex Roof Top Unit TraneYVD210A4H0A
A1 Dx N/A 5 N/A Natural Gas Burner 21 15
Elementary School #2 N/A Roof Gym Split AC Units Trane TTA072A400A1 4 Dx N/A N/A N/A N/A 23 15
Elementary School #2 N/A Roof Gym Office Split AC Units Trane TTJ718A100BO 2 Dx N/A N/A N/A N/A 22 153 do not
work
Elementary School #2 N/A Classrooms Classrooms Unit Ventilators N/A N/A ~42 Chilled Water N/A N/A N/A Hot Water Heating 22 15
Bldg Tag# Location Area Serving Equipment Mfg Model Number Type Quantity Fuel Input (MBH) Output (MBH) AgeEstimated
Service Life
Elementary School #2 N/A Boiler Room Building Boiler HB Smith 28A-5Cast Iron
Sectional2 Natural Gas 1,014 N/A 21 35
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD? Age
Estimated
Service Life
Elementary School #2 N/A Boiler RoomBuilding Hot
WaterHot Water Pump N/A N/A 1 N/A N/A 20 N/A Yes 21 20
Bldg Tag# Location Area Serving Equipment Type Mfg Quantity Model Tons kW/ton Refrigerant Age Service Life
Elementary School #2 N/A RoofHallways and
ClassroomsChiller Air Cooled Trane 1
CGACD184EHN
MN633CFGHPA
T
N/A N/A R-22 ~20 23
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD? Age
Estimated
Service Life
Elementary School #2 N/A Boiler RoomBuilding Chilled
Water
Chilled Water
PumpN/A N/A 1 N/A N/A 20 88.5% No 21 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Input (MBH)Capacity
(Gal)Age
Estimated Service
Life
Elementary School #2 N/A
DHW
Mechanical
Room
Domestic WaterDomestic Water
Heater2 AO Smith
BT 270A
880Natural Gas 270 100 21 10-15
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Notes AgeEstimated
Service Life
Elementary School #2 N/A Boiler Room Pneumatics Air Compressor 1 Honeywell N/A Electric ~3 HP Mtr 21 20
Bldg EQUIPMENT MODEL #MANUFACTURE
RQUANTITY
Elementary School #2 Stove N/A Garland 1
Elementary School #2 Kettle N/A Market Forge 1
Elementary School #2 Oven N/A Blodgett 1
Elementary School #2 Oven N/A Groen 1
Elementary School #2
Kitchen
Exhaust
Hood
N/A N/A 2
Elementary School #2Food
WarmerN/A Traulsen 2
Elementary School #2 Refrigerator M3R24-1 Turbo Air 1
Elementary School #2 Refrigerator N/A Traulsen 1
Elementary School #2 Dishwasher AD 66-3 Insinger 1
Elementary School #2Ice Cream
ContainerN/A N/A 1
Elementary School #2Milk
ContainerN/A Powers 1
Elementary School #2Drink
RefrigeratorGDM-10 True 2
Elementary School #2Walk in
FreezerN/A N/A 1
Elementary School #2Walk in
RefrigeratorN/A N/A 1
Kitchen Equipment Inventory List
Heating Hot Water Pumps
Air Handling Units - AHUs
Chilled Water Pumps
Other Mechanical Equipment
Chillers
Domestic Hot Water Heaters
Boilers
![Page 90: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/90.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
MIDDLE SCHOOL
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Supply Air
CFMFan HP
Cooling
Capacity
(Tons)
Heating Technology AgeEstimated
Service LifeNotes
Middle School N/A Classrooms Classrooms Unit Ventilators AAF
U.AVV.4.S15.A.
W.66.F.23.AK.2
2.G.B.C.1
~45 Chilled Water N/A 0.25 N/A Hot Water 10 15
Middle School N/AWood Shop
ClosetWood Shop
Heating &
Ventilating UnitN/A N/A 1 N/A N/A ~1 N/A Hot Water ~30 15
Middle School N/ACeiling of Gym
1&2Gym 1&2
Heating &
Ventilating UnitN/A N/A 2 N/A N/A ~3 N/A Hot Water ~30 15
Middle School N/A Roof Gym 3&4 Roof Top Unit McQuay RDS708BY 1 Chilled Water N/A N/A N/A Hot Water ~10 15
Middle School N/A Roof Health Suite Roof Top Unit McQuay RDS708BY 1 Chilled Water N/A N/A N/A Hot Water ~10 15
Middle School N/A Roof Cafeteria Roof Top Unit McQuay RDS708BY 2 Chilled Water N/A N/A N/A Hot Water ~10 15
Middle School N/A Roof Media CenterAir Cooled
Condensing UnitTrane TTA120B 1 DX N/A N/A 10 N/A ~20 15
Middle School N/A Roof Various Exhaust Fans Various Various 50 None N/A N/A N/A N/A Various 15
Bldg Tag# Location Area Serving Equipment Type Mfg Quantity Model Tons Efficiency Refrigerant Heating Capacity Heating GPM Cooling GPM Age Service Life
Middle School N/A Chiller RoomBuilding Heating
and CoolingChiller/Boiler Absorption Broad 1 BZ50N(k) CH4 165 N/A Lithium Bromide 2754 MBH 275 395 10 20-25
Bldg Tag# Location Area Serving Equipment Quantity Mfg Age Qty of Fans Fan HP VFD?Estimated
Service Life
Middle School CT-1 RoofCondenser Water
LoopCooling Tower 1 Reymsa 10 1 N/A Yes 20-25
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD? Age
Estimated
Service Life
Middle School P#5 & P#6 Chiller Room Condenser Water Condenser Pumps Baldor M2513T 2 750 50 15 87.5% No ~10 20
Middle School P#3 & P#4 Chiller Room Chilled WaterChilled Water
PumpsSuper E EM2513T 2 N/A N/A 15 93.0% No ~10 20
Middle School P#1 & P#2 Chiller Room Hot Water Hot Water Pumps Baldor M3313T 2 300 80 10 89.5% No ~10 20
Middle School N/A Chiller Room Domestic HW Inline DHW PumpMarathon
ElectricEVN 1 N/A N/A 2 N/A No ~10 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg Type Input Power Capacity (Gal) AgeEstimated
Service Life
Middle School N/A Chiller Room Domestic WaterDomestic Hot
Water Heater1
Adamson Dura
Pak
Hot Water
Heat
Exchanger
N/A 1300 ~10 N/A
Middle School N/A Receiving Room Domestic WaterDomestic Hot
Water Heater1 State Industries Electric 4500 Watts 80 ~10 10-15
Bldg Tag# Location Area Serving Equipment Quantity Mfg Model Fuel Tank Size (Gal) AgeEstimated
Service LifeMiddle School Comp#1 Chiller Room Pneumatics Air Compressor 1 Furnas 8DH60 Electric 80 N/A 20
Middle School N/A Chiller Room BuildingBack Up
Generator1 Generac 2569660 Natural Gas N/A N/A N/A
Bldg EQUIPMENTMANUFACTURE
RMODEL # QUANTITY
Middle School Walk in Freezer N/A N/A 2
Middle SchoolSingle Door Beverage
RefrigeratorBeverage Air MT23 1
Middle School Reach-in Ice Cream Freezer Caravell 327-935 1
Middle School Soda Vending Machine N/A N/A 1
Middle School Walk in Refrigerator N/A N/A 1
Middle School Delux Double Door Freezer Turbo Air TSF-49SD 1
Middle School Ice Machine Hoshizaki N/A 1
Middle School Deep Fryer Dean N/A 1
Middle School 4 Burner Stove/Oven N/A N/A 1
Middle School Stacked Oven/Warmer Blodgett N/A 2
Middle School Hot Water Booster Heater Hatco C-15 1
Middle School Dishwasher ADC-Forty-Four N/A 1
Middle School Heated CabinetMetro Flavor
ViewC175 1
Middle School Hot Hold Cabinet CresCor N/A 1
Middle School Electric Food WarmerThermotainer
Franklin2454 1
Middle School Double Door Refrigerator McCall 7-7045T 1
Middle SchoolOpen Front Beverage
RefrigeratorFederal N/A 1
Kitchen Equipment Inventory List
Air Handling Units - AHUs
Pumps
Other Mechanical Equipment
Domestic Hot Water Heaters
Chillers
Cooling Tower
![Page 91: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/91.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
HIGH SCHOOL
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg Tag# Location Area Serving Equipment Mfg Model QuantityCooling
Technology
Supply Air
CFMFan HP
Cooling
Capacity
(Tons)
Heating Technology AgeEstimated
Service LifeNotes
High School N/ACeiling of Gym
1A&1BGym 1A&1B
Heating and
Ventilating UnitsN/A N/A 4 N/A N/A N/A N/A Hot Water ~30 15
Pneumatics do
not work
High School N/ACeiling of Gym
2A&2BGym 2A & 2B
Heating and
Ventilating UnitsN/A N/A 2 N/A N/A N/A N/A Hot Water ~30 15
Pneumatics do
not work
High School N/A Ceiling of Gym C Gym CHeating and
Ventilating UnitsN/A N/A 2 N/A N/A N/A N/A Hot Water ~30 15
Pneumatics do
not work
High School AHU-2 Roof Cafeteria Air Handler Unit McQuay RDS708BY 2 Chilled Water N/A N/A N/A Hot Water ~30 15
High School BCU-1 Roof Food CourtHeating and
Ventilating UnitsN/A N/A 1 N/A N/A N/A N/A Hot Water 15
High School RTU-5 Roof Room 800 Roof Top Unit N/A N/A 1 Chilled Water N/A N/A N/A Hot Water 15
High School RTU-3 RoofLibrary and Health
OfficeRoof Top Unit McQuay RDS800CYW 1 Chilled Water N/A N/A N/A Hot Water ~10 15
High School RTU-4 Roof Nurse/Child Care Roof Top Unit McQuay RDS708BY 1 Chilled Water N/A N/A N/A Hot Water ~10 15
High School AHU-1Ceiling of Main
OfficeMain Office Air Handler Unit N/A N/A 1 Chilled Water N/A N/A N/A Hot Water 15
High School RTU-1 RoofFitness Center
Room 110Roof Top Unit McQuay RDS708BY 1 Chilled Water N/A N/A N/A Hot Water ~10 15
High School RTU-2 RoofBoys and Girls
Locker RoomsRoof Top Unit N/A N/A 1 N/A N/A N/A N/A Hot Water >15 15
High School MAU-1 Roof
Science Exhaust
Hoods by Room
307
Make Up Air Unit N/A N/A 1 N/A N/A N/A N/A Hot Water >15 15
High School BCU-3 RoofBetween 500&600
WingMake Up Air Unit N/A N/A 1 N/A N/A N/A N/A Hot Water >15 15
No longer in
operation
High School BCU-4 RoofBetween 500&600
WingMake Up Air Unit N/A N/A 1 N/A N/A N/A N/A Hot Water >15 15
No longer in
operation
High School UVs Classrooms Classrooms Unit Ventilators N/A N/A ~63 Chilled Water N/A N/A N/A Hot Water >15 15
High School Lobby Unit Roof PAC Lobby Roof Top Unit Mammoth N/A 1 DX N/A N/A N/A Hot Water >15 15
High School StageUnit Roof PAC Stage Unit Roof Top Unit Mammoth RC-252-58 1 DX N/A N/A N/A Natural Gas >15 15
High School HouseUnit Roof PAC House Area Roof Top Unit Mammoth RC-1153-78 1 DX N/A N/A N/A Natural Gas >15 15
High School Basement Roof PAC Basement Roof Top Unit Mammoth N/A 1 DX N/A N/A N/A Hot Water >15 15 Not working
High School ChoirRoomCeiling of PAC
Choir RoomPAC Choir Room Air Handler Unit N/A N/A 1 Dx N/A N/A N/A Hot Water >15 15
High School ACCU - 1 Roof Room PA-1Air Cooled
Condensing UnitRheem RAHE-036CAS 1 DX N/A N/A 3 N/A >15 15
High School ACCU - 2 Roof Room PA-2Air Cooled
Condensing UnitRheem RAHE-036CAS 1 DX N/A N/A 3 N/A >15 15
High School ACCU - 3 Roof Room PA-3Air Cooled
Condensing UnitRheem RAHE-036CAS 1 DX N/A N/A 3 N/A >15 15
High School ACCU - 4 Roof Room PA-4Air Cooled
Condensing UnitRheem RAHE-036CAS 1 DX N/A N/A 3 N/A >15 15
High School N/A Roof Various Exhaust Fans Various Various 48 N/A N/A N/A N/A N/A Various 15
High School N/A Roof N/ASplit System
ACCUCarrier 38AE 1 DX N/A N/A N/A N/A >15 15
High School N/A Roof N/A Roof Top Unit Carrier 48TCED 1 DX N/A N/A 4 Natural Gas 15
High School N/A Roof N/ASplit System
ACCUCarrier 38AE 1 DX N/A N/A N/A N/A >15 15
High School N/A Roof N/A Roof Top Unit McQuay RDS708BY 1 Chilled Water N/A N/A N/A Hot Water ~10 15
Bldg Tag# Location Area Serving Equipment Type Mfg Quantity Model Tons Efficiency Refrigerant Heating Capacity Heating GPM Cooling GPM Age Service Life
High School N/A Chiller RoomBuilding Heating
and CoolingChiller/Boiler Absorption Broad 2 BZ50N(k) CH4 165 N/A Lithium Bromide 2754 MBH 275 395 10 20-25
Bldg Tag# Location Area Serving Equipment Quantity Mfg Age Qty of Fans Fan HP VFD?Estimated
Service Life
High School CT-1 RoofCondenser Water
LoopCooling Tower 1 Reymsa 10 2 N/A Yes 20-25
Bldg Tag# Location Area Serving Equipment Motor Mfg Motor Model Quantity GPMHead
ftHP Efficiency VFD? Age
Estimated
Service Life
High School P#3 - P#4 Chiller Room Condenser Water Condenser Pumps
A.O. Smith
Century E
Plus
7-850072 2 1500 63 30 93.6% No ~10 20
High School P#5 - P#6 Chiller Room Chilled WaterChilled Water
Pumps
A.O. Smith
Century E
Plus
7-850016 2 790 100 25 93.6% No ~10 20
High School P#1 - P#2 Chiller Room Hot Water Hot Water Pumps
A.O. Smith
Century E
Plus
7-850023 2 552 105 20 93.6% No ~10 20
High School N/A Chiller Room Domestic HW Inline DHW Pump N/A N/A 2 N/A N/A 1/2 N/A No ~10 20
Bldg Tag# Location Area Serving Equipment Quantity Mfg Type Input Power Capacity (Gal) AgeEstimated
Service Life
High School N/A Chiller Room Domestic WaterDomestic Hot
Water Heater1 N/A
Hot Water
Heat
Exchanger
N/A N/A N/A N/A
Air Handling Units - AHUs
Pumps
Domestic Hot Water Heaters
Chillers
Cooling Tower
1 of 2
![Page 92: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/92.jpg)
MIDDLE TOWNSHIP SCHOOL DISTRICT
HIGH SCHOOL
EQUIPMENT LIST
Prepared by Dome-Tech, Inc.
Bldg EQUIPMENTMANUFACTURE
RMODEL # QUANTITY
High School Soda Vending Machine N/A N/A 7
High School Snack Vending Machine N/A N/A 1
High School Ice Machine Manitowoc N/A 1
High School 4 Door RefrigeratorDelfield
SupremecyN/A 2
High School 4 Door Refrigerator - HeaterDelfield
SupremecySRRZ-SH 1
High School Stacked Ovens Garland Master 200 2
High School Stacked Ovens Blodgett N/A 2
High School 6 Burner Stove/Oven Imperial N/A 1
High School 2 Door Range ClevelandSteam Craft Ultra
10 Model 24CG101
High School Hood Vent Master N/A 2
High School 4 Door HeatedDelfield
SupremecyN/A 2
High School Humidified Heat SystemFood Warming
Equip (FEW)N/A 1
High School Double Glass Door Refrigerator TRUE GDM-32ML 1
High School 2 Door RefrigeratorDelfield
SupremecyN/A 1
High School Food Cooler Alto Shaam N/A 1
High School Double Glass Door Refrigerator Beverage Air MT38 1
High School Single Glass Door Refrigerator TRUE GDM-26 1
High School Open Display Refrigerator N/A N/A 1
High School Deep Fryer Dean N/A 2
High School Fry Machine Delfield N/A 1
High School Deep Fryer Imperial 2
High School Single Glass Door Refrigerator Beverage Air MT27 1
High School Double Glass Door Refrigerator TRUE GDM-37 1
High SchoolElectric Hot Water Booster
HeaterHatco C-36 1
High School Dishwasher Hobart N/A 1
High SchoolSingle Door Freezer (Energy
Star)Beverage Air N/A 1
High School Walk-in Freezer Bally N/A 1
High School Walk-in Cooler Bally N/A 1
Kitchen Equipment Inventory List
2 of 2
![Page 93: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/93.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM LIST
![Page 94: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/94.jpg)
(Page left blank intentionally)
![Page 95: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/95.jpg)
MIDDLE TOWNSHIP BOARD OF EDUCATION Sorted by Payback
Energy Conservation
Measures (ECM) Buildings
Gross
Installation
Costs*
Rebates/
Incentive
Avoided
Cost
Net
Implementation
Costs
Annual
Energy
Cost
Savings
Annual
Oper.
Cost
Savings
Total
Annual
Cost
Savings
Measure
Life
Pay Back
(Gross)
Internal
Rate of
Return (IRR)
(Gross)
Lifecycle
Savings
(NPV)
(Gross)
Pay
Back
(Net)
Internal
Rate of
Return
(IRR)
(Net)
Lifecycle
Savings
(NPV)
(Net)
CO2
Savings
kWh kW Therms Yrs Yrs Yrs Tons
1
Computer Time of Day
Optimization Elementary School #1 3,990 0 0 $210 $0 $0 $210 $520 $0 $520 10 0.4 248% $4,226 0.4 248% $4,226 1.3
1
Computer Time of Day
Optimization Elementary School #2 4,950 0 0 $80 $0 $0 $80 $530 $0 $530 10 0.2 662% $4,441 0.2 662% $4,441 1.6
2
HVAC Time of Day
Optimization Elementary School #1 151,000 0 9,190 $15,100 $0 $0 $15,100 $22,900 $0 $22,900 10 0.7 152% $180,242 0.7 152% $180,242 104
2
HVAC Time of Day
Optimization Middle School 12,700 0 0 $2,450 $0 $0 $2,450 $1,450 $0 $1,450 10 1.7 59% $9,919 1.7 59% $9,919 4
2
HVAC Time of Day
Optimization High School 210 0 160 $280 $0 $0 $280 $180 $0 $180 10 1.6 64% $1,255 1.6 64% $1,255 1
3
Exterior Door Weather
Stripping
Administration
Building 490 0 100 $280 $0 $0 $280 $160 $0 $160 10 1.8 56% $1,085 1.8 56% $1,085 1
3
Exterior Door Weather
Stripping Elementary School #1 60 0 70 $90 $0 $0 $90 $80 $0 $80 10 1.1 89% $592 1.1 89% $592 0
3
Exterior Door Weather
Stripping Elementary School #2 63 0 70 $90 $0 $0 $90 $80 $0 $80 10 1.1 89% $592 1.1 89% $592 0
3
Exterior Door Weather
Stripping Middle School 0 0 140 $280 $0 $0 $280 $130 $0 $130 10 2.2 45% $829 2.2 45% $829 1
4 Day Lighting Elementary School #1 2,440 0 0 $400 $0 $0 $400 $320 $0 $320 10 1.3 80% $2,330 1.3 80% $2,330 1
4 Day Lighting High School 870 0 0 $400 $0 $0 $400 $110 $0 $110 10 3.6 24% $538 3.6 24% $538 0
5
Vending Machine Power
Management
Administration
Building 1,230 0 0 $460 $0 $0 $460 $170 $0 $170 10 2.7 35% $990 2.7 35% $990 0
5
Vending Machine Power
Management Elementary School #1 1,540 0 0 $460 $0 $0 $460 $250 $0 $250 15 1.8 54% $2,524 1.8 54% $2,524 1
5
Vending Machine Power
Management Elementary School #2 1,542 0 0 $459 $0 $0 $460 $211 $0 $210 10 2.2 45% $1,332 2.2 45% $1,331 1
5
Vending Machine Power
Management Middle School 3,080 0 0 $920 $0 $0 $920 $450 $0 $450 10 2.0 48% $2,919 2.0 48% $2,919 1
5
Vending Machine Power
Management High School 10,800 0 0 $3,650 $0 $0 $3,650 $1,840 $0 $1,840 30 2.0 50% $32,415 2.0 50% $32,415 4
6
Demand Controlled
Ventilation Elementary School #1 980 0 320 $3,970 $0 $0 $3,970 $450 $0 $450 10 8.8 2% -$131 8.8 2% -$131 2
6
Demand Controlled
Ventilation Elementary School #2 1,320 0 430 $3,150 $0 $0 $3,150 $600 $0 $600 10 5.3 14% $1,968 5.3 14% $1,968 3
6
Demand Controlled
Ventilation Middle School 2,090 0 680 $3,970 $0 $0 $3,970 $950 $0 $950 10 4.2 20% $4,134 4.2 20% $4,134 5
6
Demand Controlled
Ventilation High School 1,390 0 450 $7,750 $0 $0 $7,750 $640 $0 $640 10 12.1 -3% -$2,291 12.1 -3% -$2,291 3
7 Lighting Upgrade
Administration
Building 7,240 0 0 $9,560 $1,360 $0 $8,200 $800 $0 $800 15 12.0 3% -$10 10.3 5% $1,350 2
7 Lighting Upgrade Elementary School #1 35,600 0 0 $51,900 $4,550 $0 $47,400 $4,620 $0 $4,620 15 11.2 4% $3,253 10.3 5% $7,753 12
7 Lighting Upgrade Elementary School #2 52,600 0 0 $79,100 $14,100 $0 $65,000 $5,650 $0 $5,650 15 14.0 1% -$11,651 11.5 4% $2,449 17
7 Lighting Upgrade Middle School 68,900 0 0 $83,700 $15,800 $0 $67,900 $8,970 $0 $8,970 15 9.3 7% $23,383 7.6 10% $39,183 23
7 Lighting Upgrade High School 119,000 0 0 $113,400 $22,500 $0 $90,800 $13,600 $0 $13,600 15 8.3 8% $48,956 6.7 12% $71,556 39
8
Walk-in Cooler Evaporator
Fan Controls Elementary School #1 810 0 0 $1,450 $150 $0 $1,300 $100 $0 $100 30 14.5 6% $510 13.0 7% $660 0
8
Walk-in Cooler Evaporator
Fan Controls Elementary School #2 1,070 0 0 $1,450 $150 $0 $1,300 $120 $0 $120 30 12.1 7% $902 10.8 8% $1,052 0
8
Walk-in Cooler Evaporator
Fan Controls Middle School 1,070 0 0 $1,450 $150 $0 $1,300 $120 $0 $120 30 12.1 7% $902 10.8 8% $1,052 0
8
Walk-in Cooler Evaporator
Fan Controls High School 1,610 0 0 $1,450 $150 $0 $1,300 $210 $0 $210 30 6.9 14% $2,666 6.2 16% $2,816 1
9 Window Replacement
Administration
Building 1,120 0 100 $16,700 $0 $0 $16,700 $570 $0 $570 30 29.3 0% -$5,528 29.3 0% -$5,528 1
9 Window Replacement Middle School 2,480 0 430 $109,000 $0 $0 $109,000 $700 $0 $700 30 155.7 -8% -$95,280 155.7 -8% -$95,280 3
492,245 0 12,140 513,609 $58,910 $0 $454,650 $67,481 $0 $67,480 15 7.6 0.1 $312,465 6.7 13% $371,424 234
Notes:
1. KW - Where Zero (0) values are shown in the table there is no demand reduction for this measure.
2. Rebates- Where Zero (0) values are shown in the table we could not find any rebates of other financial incentives that are currently available for this measure.
3. Gross Installation Cost is the cost of installing equipment recommended by the ECM.
4. Avoided Cost is the cost of replacing equipment at end of service life with like and kind equipment.
Gross Implementation Costs Net Implementation Costs
Energy Savings
TOTALS
Page 1 of 1
![Page 96: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/96.jpg)
(Page left blank intentionally)
![Page 97: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/97.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM COSTS & CALCULATION
![Page 98: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/98.jpg)
(Page left blank intentionally)
![Page 99: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/99.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #1:
COMPUTER POWER MANAGEMENT OPTIMIZATION
![Page 100: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/100.jpg)
![Page 101: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/101.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #1
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1In house computer set point
adjustmentea 25 - 8.33 208 208
-
TOTAL 210$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1In house computer set point
adjustmentea 9 - 8.33 75 75
-
TOTAL 80$
TOTAL
Computer Time of Day Optimization - Elementary School #2
Other Estimated Implementation Costs
Other Estimated Implementation Costs
Computer Time of Day Optimization - Elementary School #1
N/N UNIT QTYMATERIAL LABOR
TOTAL
N/N UNIT QTYMATERIAL LABOR
Prepared by Dome-Tech, Inc. 1 of 3
![Page 102: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/102.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #1
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Computer Time of Day Optimization - Elementary School #1
Existing
Condition
Proposed
ConditionSavings
Number of PCs 9 9 0
Annual Electric Consumption (kWh/yr) 9,720 5,731 3,989
Annual Cost and Savings ($/yr) 1,262$ 744$ 518$
1. Assuming 9 computer in the library based on a computer count performed in the field.
2. Savings assumes all library computers go into standby/sleep mode during unoccupied hours and after 5 minutes of no use.
3. Computer and monitor power consumption values based on Dell data for a typical computer.
Computer Power Analysis
Number of Public Computer 9
Existing Computer Annual Operating Hours - Mode: ON 3,600
Proposed Computer Annual Operating Hours - Mode: ON 2,100
Proposed Computer Annual Operating Hours - Mode: Standby 1,500
Computer Power Consumption - Mode: On (Watts) 225
Monitor Power Consumption - Mode: On (Watts) 75
Total Power Consumption - Mode: On (Watts) 300
Computer Power Consumption - Mode: Standby (Watts) 3
Monitor Power Consumption - Mode: Off (Watts) 1.5
Total Power Consumption - Mode: Standby (Watts) 4.5
Current Power Consumption (kWh/yr) 9,720
Proposed Power Consumption (kWh/yr) 5,731
Saved Power Consumption (kWh/yr) 3,989
Current Cost ($/yr) $1,262
Proposed Cost ($/yr) $744
Saved Cost ($/yr) $518
Prepared by Dome-Tech, Inc. 2 of 3
![Page 103: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/103.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #1
SUITABLE AREAS: Computers
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Computer Time of Day Optimization - Elementary School #2
Existing
Condition
Proposed
ConditionSavings
Number of PCs 25 25 0
Annual Electric Consumption (kWh/yr) 20,700 15,750 4,950
Annual Cost and Savings ($/yr) 2,222$ 1,691$ 531$
1. Assuming 25 computer in the computer room (Room: E-10) based on a computer count performed in the field.
2. Savings assumes all computers go into standby/sleep mode during unoccupied hours and after 5 minutes of no use.
3. Computer and monitor power consumption values based on Dell data for a typical computer.
Computer Power Analysis
Number of Public Computer 25
Existing Computer Annual Operating Hours - Mode: ON 2,760
Proposed Computer Annual Operating Hours - Mode: ON 2,090
Proposed Computer Annual Operating Hours - Mode: Standby 670
Computer Power Consumption - Mode: On (Watts) 225
Monitor Power Consumption - Mode: On (Watts) 75
Total Power Consumption - Mode: On (Watts) 300
Computer Power Consumption - Mode: Standby (Watts) 3
Monitor Power Consumption - Mode: Off (Watts) 1.5
Total Power Consumption - Mode: Standby (Watts) 4.5
Current Power Consumption (kWh/yr) 20,700
Proposed Power Consumption (kWh/yr) 15,750
Saved Power Consumption (kWh/yr) 4,950
Current Cost ($/yr) $2,222
Proposed Cost ($/yr) $1,691
Saved Cost ($/yr) $531
SAVINGS DESCRIPTION: Shutting down or putting computers into standby/sleep mode instead of keeping it
continuously running or in screensaver mode.
CALCULATION INSTRUCTIONS: Provide the inputs for all items listed in blue. Clarification is noted in comment
section of input cells.
Prepared by Dome-Tech, Inc. 3 of 3
![Page 104: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/104.jpg)
![Page 105: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/105.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #2:
HVAC TIME OF DAY OPTIMIZATION
![Page 106: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/106.jpg)
![Page 107: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/107.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #2
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Smart Breaker ea 6 125.00 750 320.00 1,920 2,670
2Install field control panel
and BMS programmingea 1 2500.00 2,500 5280.00 5,280 7,780
3 Control Wiring ls 1 250 - 250
47 day programmable digital
time clock - Modsea 5 150.00 750 224.00 1,120 1,870
2,514
TOTAL 15,080$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Smart Breaker ea 1 100.00 100 320.00 320 420
2 BMS programming ea 1 - 1320.00 1,320 1,320
3 Control Wiring ls 1 300 - 300
408
TOTAL 2,450$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1Schedule change by in
house staffea 1 - 280.00 280 280
-
TOTAL 280$
Other Estimated Implementation Costs
Other Estimated Implementation Costs
High School - Time of Day Optimization
N/N UNIT QTYMATERIAL LABOR
TOTAL
Middle School - Time of Day Optimization
N/N UNIT QTYMATERIAL LABOR
TOTAL
Other Estimated Implementation Costs
N/N UNIT QTYMATERIAL LABOR
TOTAL
Elementary School #1 - Time of Day Optimization
Prepared by Dome-Tech, Inc. 1 of 4
![Page 108: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/108.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #2
Summary
Electricity Savings (kWh/yr) 151,128
Natural Gas Savings (therms/yr) 9,187
Estimated Cost Savings ($/yr) $22,915
Estimated Implementation Cost ($) $15,080
0.7
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
Motor kWCurrent
Motor kWh
Proposed
Motor kWh
Motor kWh
SavingsMotor $ Savings
Total $
Savings
Current
kWh / Year
Proposed
kWh / Year
kWh
Savings /
Year
Current
Therms / Year
Proposed
Therms /
Year
Therms
Savings /
Year
TOD Savings
Double Check
Kinder Court 1,500 $ 1.03 $ 0.37 $ 1,539 989$ 0.6 4,900 1,750 3,150 $ 409 $ 1,398 9,929 3,546 6,383 246 88 158 989$
Library 3,000 $ 1.03 $ 0.37 $ 3,077 1,978$ 2.1 18,667 6,667 12,000 $ 1,559 $ 3,537 19,857 7,092 12,765 492 176 316 1,978$
Gym 2,500 $ 1.03 $ 0.37 $ 2,564 1,648$ 1.5 12,748 4,553 8,195 $ 1,064 $ 2,713 16,548 5,910 10,638 410 147 264 1,648$
Main Office/Admin 3,000 $ 1.03 $ 0.37 $ 3,077 1,978$ 2.1 18,667 6,667 12,000 $ 1,559 $ 3,537 19,857 7,092 12,765 492 176 316 1,978$
Main Office/Admin 1,500 $ 1.03 $ 0.37 $ 1,539 989$ 0.6 4,900 1,750 3,150 $ 409 $ 1,398 9,929 3,546 6,383 246 88 158 989$
Unit Ventilators 11,000 $ 1.03 $ 0.37 $ 11,283 7,253$ 0.2 1,742 622 1,120 $ 145 $ 7,399 72,811 26,004 46,807 1,805 645 1,160 7,253$
5 Heat Pumps - Mods 6,250 $ 0.95 $ 0.57 $ 5,947 2,407$ 1.6 10,004 5,955 4,049 $ 526 $ 2,933 28,959 17,237 11,721 16,832 10,019 6,813 2,407$
Supply Totals 28,750 29,026$ 17,244$ 71,629 27,964 43,665 5,671$ 22,915$ 177,889 70,427 107,463 20,524 11,338 9,187 17,244$
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning Savings Conditioning Savings Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Elementary School #1 - Time of Day Optimization
Prepared by Dome-Tech, Inc. 2 of 4
![Page 109: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/109.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #2
SummaryElectricity Savings (kWh/yr) 12,692
Natural Gas Savings (therms/yr) 0
Estimated Cost Savings ($/yr) $1,451
Estimated Implementation Cost ($) $2,450
1.7
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
Motor
kW
Current
Motor kWh
Proposed
Motor kWh
Motor kWh
Savings
Motor $
Savings
Total $
Savings
Current
kWh / Year
Proposed
kWh / Year
kWh Savings
/ Year
Current
Therms / Year
Proposed
Therms /
Year
Therms
Savings /
Year
TOD Savings
Double Check
Library 3,000 $ 0.79 $ 0.39 $ 2,358 1,179$ 0.9 4,756 2,378 2,378 $ 272 $ 1,451 20,629 10,314 10,314 0 0 0 1,340$
Supply Totals 3,000 2,358$ 1,179$ 4,756 2,378 2,378 272$ 1,451$ 20,629 10,314 10,314 0 0 0 1,340$
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning Savings Conditioning Savings Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Middle School - Time of Day Optimization
Prepared by Dome-Tech, Inc. 3 of 4
![Page 110: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/110.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #2
Summary
Electricity Savings (kWh/yr) 207
Natural Gas Savings (therms/yr) 163
Estimated Cost Savings ($/yr) $178
Estimated Implementation Cost ($) $280
1.6
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
Motor
kW
Current
Motor
kWh
Proposed
Motor
kWh
Motor
kWh
Savings
Motor $
Savings
Total $
Savings
Current
kWh / Year
Proposed
kWh / Year
kWh Savings
/ Year
Current
Therms / Year
Proposed
Therms /
Year
Therms
Savings /
Year
TOD Savings
Double Check
Kitchen Make
Up Hood1,750 $ 0.43 $ 0.35 $ 758 $ 152 0.4 1,033 826 207 $ 27 $ 178 0 0 0 815 652 163 165$
Supply Totals 1,750 758$ 152$ 1,033 826 207 27$ 178$ 0 0 0 815 652 163 165$
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning Savings Conditioning Savings Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
High School - Time of Day Optimization
Prepared by Dome-Tech, Inc. 4 of 4
![Page 111: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/111.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #3:
UPGRADE DOOR WEATHER STRIPPING
![Page 112: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/112.jpg)
![Page 113: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/113.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #3
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Door Bottom Sweep installed in house ea 3 13 38 17 50 88
2 Door Vertical Weather Stripping ea 3 47 141 17 50 191
-
TOTAL 280$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Door Bottom Sweep installed in house ea 2 13 26 17 33 59
29
TOTAL 90$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Door Bottom Sweep installed in house ea 2 13 26 17 33 59
29
TOTAL 90$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 Door Bottom Sweep installed in house ea 2 13 26 17 33 59
2 Door Vertical Weather Stripping ea 2 47 94 17 33 127
93
TOTAL 280$
Other Estimated Implementation Costs
Other Estimated Implementation Costs
Weather Stripping - Middle School
N/N UNIT QTYMATERIAL LABOR
TOTAL
Weather Stripping - Elementary School #2
N/N UNIT QTYMATERIAL LABOR
TOTAL
TOTAL
Weather Stripping - Administration Building
Other Estimated Implementation Costs
Other Estimated Implementation Costs
Weather Stripping - Elementary School #1
N/N UNIT QTYMATERIAL LABOR
TOTAL
N/N UNIT QTYMATERIAL LABOR
Prepared by Dome-Tech, Inc. 1 of 5
![Page 114: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/114.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #3
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Weather Stripping - Administration Building
1. Price of #2 Fuel Oil, $/gal
2. Price of City Water, $/1000 gallons
3. Price of Electricity, $/kWh (blended rate) $0.11
4. Price of the Demand of Electricity, $/kW/month
5. Price of Natural Gas, $/therm $1.14
Existing
Condition
Proposed
System Savings
Number of Exterior Doors 3 3
Estimated Infiltration Rate per Door, CFM 88 22
Annual Cooling Infiltration Hours, OAT > 80F 590 590
Annual Heating Infiltration Hours, OAT < 55F 4,422 4,422
Annual Cooling Load, kBTU 1,665 365
Annual Cooling Electrical Consumption, kWh 153 33 119
Annual Heating Load, kBTU 18,214 4,553
Annual Heating Electrical Consumption, kWh 501 125 376
Annual Heating Natural Gas Consumption, therms 127 32 96
Annual Cost and Savings, $ 217$ 54$ 163$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all hours below 55°F.
3. A 40% load factor was used when calculating the existing leakage rate.
4. Assuming the average outside air temperature below 55°F was 38.4°F based on BIN data.
5. Assuming the average outside air temperature above 80°F was 84.6°F based on BIN data.
6. Assume the boiler system has an efficiency of 80%.
7. Assuming an 80% reduction by installing weather stripping.
Prepared by Dome-Tech, Inc. 2 of 5
![Page 115: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/115.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #3
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Weather Stripping - Elementary School #1
1. Price of #2 Fuel Oil, $/gal
2. Price of City Water, $/1000 gallons
3. Price of Electricity, $/kWh (blended rate) $0.13
4. Price of the Demand of Electricity, $/kW/month
5. Price of Natural Gas, $/therm $1.01
Existing
Condition
Proposed
System Savings
Number of Exterior Doors 2 2
Estimated Infiltration Rate per Door, CFM 44 9
Annual Cooling Infiltration Hours, OAT > 80F 590 590
Annual Heating Infiltration Hours, OAT < 55F 4,422 4,422
Annual Cooling Load, kBTU 833 146
Annual Cooling Electrical Consumption, kWh 76 13 63
Annual Heating Load, kBTU 9,107 1,821
Annual Heating Natural Gas Consumption, therms 91 18 73
Annual Cost and Savings, $ 102$ 20$ 82$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all hours below 55°F.
3. A 40% load factor was used when calculating the existing leakage rate.
4. Assuming the average outside air temperature below 55°F was 38.4°F based on BIN data.
5. Assuming the average outside air temperature above 80°F was 84.6°F based on BIN data.
6. Assume the boiler system has an efficiency of 80%.
7. Assuming an 80% reduction by installing weather stripping.
Prepared by Dome-Tech, Inc. 3 of 5
![Page 116: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/116.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #3
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Weather Stripping - Elementary School #2
1. Price of #2 Fuel Oil, $/gal
2. Price of City Water, $/1000 gallons
3. Price of Electricity, $/kWh (blended rate) $0.11
4. Price of the Demand of Electricity, $/kW/month
5. Price of Natural Gas, $/therm $1.00
Existing
Condition
Proposed
System Savings
Number of Exterior Doors 2 2
Estimated Infiltration Rate per Door, CFM 44 9
Annual Cooling Infiltration Hours, OAT > 80F 590 590
Annual Heating Infiltration Hours, OAT < 55F 4,422 4,422
Annual Cooling Load, kBTU 833 146
Annual Cooling Electrical Consumption, kWh 76 13 63
Annual Heating Load, kBTU 9,107 1,821
Annual Heating Natural Gas Consumption, therms 91 18 73
Annual Cost and Savings, $ 99$ 20$ 79$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all hours below 55°F.
3. A 40% load factor was used when calculating the existing leakage rate.
4. Assuming the average outside air temperature below 55°F was 38.4°F based on BIN data.
5. Assuming the average outside air temperature above 80°F was 84.6°F based on BIN data.
6. Assume the boiler system has an efficiency of 80%.
7. Assuming an 80% reduction by installing weather stripping.
Prepared by Dome-Tech, Inc. 4 of 5
![Page 117: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/117.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #3
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Weather Stripping - Middle School
1. Price of #2 Fuel Oil, $/gal
2. Price of City Water, $/1000 gallons
3. Price of Electricity, $/kWh (blended rate) $0.11
4. Price of the Demand of Electricity, $/kW/month
5. Price of Natural Gas, $/therm $0.98
Existing
Condition
Proposed
System Savings
Number of Exterior Doors 2 2
Estimated Infiltration Rate per Door, CFM 80 20
Annual Cooling Infiltration Hours, OAT > 80F 590 590
Annual Heating Infiltration Hours, OAT < 55F 4,422 4,422
Annual Cooling Load, kBTU 1,510 331
Annual Cooling Electrical Consumption, Therms 15 3 12
Annual Heating Load, kBTU 16,514 4,128
Annual Heating Natural Gas Consumption, therms 165 41 124
Annual Cost and Savings, $ 176$ 44$ 133$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all hours below 55°F.
3. A 40% load factor was used when calculating the existing leakage rate.
4. Assuming the average outside air temperature below 55°F was 38.4°F based on BIN data.
5. Assuming the average outside air temperature above 80°F was 84.6°F based on BIN data.
6. Assume the boiler system has an efficiency of 80%.
7. Assuming an 80% reduction by installing weather stripping.
Prepared by Dome-Tech, Inc. 5 of 5
![Page 118: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/118.jpg)
![Page 119: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/119.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #4:
DAY LIGHTING
![Page 120: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/120.jpg)
![Page 121: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/121.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #4
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1Photocell with time of day
controls - install in houseea 1 125.00 125 120.00 120 245
2 Low voltage control wiring ft 25 0.69 17 - 17
3 Line voltage control wiring ft 75 1.39 104 - 104
37
TOTAL 400$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1Photocell with time of day
controls - install in houseea 1 125.00 125 120.00 120 245
2 Low voltage control wiring ft 25 0.69 17 - 17
3 Line voltage control wiring ft 75 1.39 104 - 104
37
TOTAL 400$
TOTAL
High School - Day Lighting
Other Estimated Implementation Costs
Other Estimated Implementation Costs
Elementary School #1 - Day Lighting
N/N UNIT QTYMATERIAL LABOR
TOTAL
N/N UNIT QTYMATERIAL LABOR
Prepared by Dome-Tech, Inc. 1 of 3
![Page 122: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/122.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #4
Summary
2,439
0
$317
Elementary School #1 - Day Lighting $400
1.3
Annual Energy Consumption
(kWh)
Estimated Annual
Operating Cost ($)
Annual Energy
Consumption (kWh)
Estimated Annual
Operating Cost ($)
Annual Energy
Savings (kWh)
Estimated Annual
Cost Savings
5,808 $754 3,369 $438 2,439 $317
Electrical Cost ($/kWh): 0.130$
Number of Fixtures: 8
Fixture Wattage 242
Total Wattage: 1936 Watts
Normal Daylighting Normal Daylighting
Hour (Percentage) (Percentage) (Watts) (Watts)
12:00 AM 0% 0% 0 0
1:00 AM 0% 0% 0 0
2:00 AM 0% 0% 0 0
3:00 AM 0% 0% 0 0
4:00 AM 0% 0% 0 0
5:00 AM 0% 0% 0 0
6:00 AM 0% 0% 0 0
7:00 AM 100% 100% 1,936 1,936
8:00 AM 100% 82% 1,936 1,588
9:00 AM 100% 64% 1,936 1,239
10:00 AM 100% 46% 1,936 891
11:00 AM 100% 28% 1,936 542
12:00 PM 100% 10% 1,936 194
1:00 PM 100% 10% 1,936 194
2:00 PM 100% 10% 1,936 194
3:00 PM 100% 28% 1,936 542
4:00 PM 100% 46% 1,936 891
5:00 PM 100% 64% 1,936 1,239
6:00 PM 100% 82% 1,936 1,588
7:00 PM 100% 100% 1,936 1,936
8:00 PM 100% 100% 1,936 1,936
9:00 PM 100% 100% 1,936 1,936
10:00 PM 0% 0% 0 0
11:00 PM 0% 0% 0 0
29,040 16,843
Notes:
Measure based on 200 occupied days per year.
Savings accounts for replacing the existing fixtures with the recommended fixtures in the lighting upgrade ECM.
Lighting Levels Lighting Consumption
Compiled by Dome-Tech, Inc.
Estimated Implementation Cost ($)
Simple Payback (Years)
Existing Condition Proposed Savings
October 2012
Estimated Cost Savings ($/yr)
Project InformationMiddle Township BOE
Electricity Savings (kWh/yr)Energy Audit
Natural Gas Savings (therm/yr)
Prepared by Dome-Tech, Inc. 2 of 3
![Page 123: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/123.jpg)
MIDDLE TOWNSHIP
CALCULATION
ECM #4
Summary
873
0
$114
$400
3.5
Annual Energy Consumption
(kWh)
Estimated Annual
Operating Cost ($)
Annual Energy
Consumption (kWh)
Estimated Annual
Operating Cost ($)
Annual Energy
Savings (kWh)
Estimated Annual
Cost Savings
2,079 $271 1,206 $157 873 $114
Electrical Cost ($/kWh): 0.130$
Number of Fixtures: 21
Fixture Wattage 22
Total Wattage: 462 Watts
Normal Daylighting Normal Daylighting
Hour (Percentage) (Percentage) (Watts) (Watts)
12:00 AM 0% 0% 0 0
1:00 AM 0% 0% 0 0
2:00 AM 0% 0% 0 0
3:00 AM 0% 0% 0 0
4:00 AM 0% 0% 0 0
5:00 AM 0% 0% 0 0
6:00 AM 0% 0% 0 0
7:00 AM 100% 100% 462 462
8:00 AM 100% 82% 462 379
9:00 AM 100% 64% 462 296
10:00 AM 100% 46% 462 213
11:00 AM 100% 28% 462 129
12:00 PM 100% 10% 462 46
1:00 PM 100% 10% 462 46
2:00 PM 100% 10% 462 46
3:00 PM 100% 28% 462 129
4:00 PM 100% 46% 462 213
5:00 PM 100% 64% 462 296
6:00 PM 100% 82% 462 379
7:00 PM 100% 100% 462 462
8:00 PM 100% 100% 462 462
9:00 PM 100% 100% 462 462
10:00 PM 0% 0% 0 0
11:00 PM 0% 0% 0 0
6,930 4,019
Notes:
Measure based on 300 occupied days per year.
Savings accounts for replacing the existing fixtures with the recommended fixtures in the lighting upgrade ECM.
Lighting Levels Lighting Consumption
Compiled by Dome-Tech, Inc. Estimated Implementation Cost ($)
High School - Day Lighting Simple Payback (Years)
Existing Condition Proposed Savings
October 2012 Estimated Cost Savings ($/yr)
Project InformationMiddle Township BOE Electricity Savings (kWh/yr)
Energy Audit Natural Gas Savings (therm/yr)
Prepared by Dome-Tech, Inc. 3 of 3
![Page 124: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/124.jpg)
![Page 125: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/125.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #5:
VENDING MACHINE POWER MANAGEMENT
![Page 126: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/126.jpg)
![Page 127: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/127.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #5
Middle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Vending Machine Power Management - Admin Bldg
Existing
Condition
Proposed
SystemSavings
Soda Machine Power Consumption 100% 44% 56%
309$ 136$ 173
7,008 7,008
2,803 1,570 1,233
Snack Machine Power Consumption 100% 54% 46%
-$ -$ 0
7,008 7,008
- - -
309$ 136$ 173$
1. Savings based on existing 24/7 operation and typical savings from VendingMiser data.
Utility Unit Costs
Electrical Unit Cost, $/kwh $0.110
Soda Machine Count 1
Snack Machine Count 0
Load Factor 80%
VendMiser Installation Savings
Soda Machine Power Consumption, kw 0.40
Annual Savings % 56%
Electrical Unit Cost, $ per kilowatt-hour $0.110
Annual Energy Savings $173
Economics Summary
kWh Savings 1,233
Estimated Annual Savings $173
$179
$155
Total Installation Cost $280
Total Cost (ECM) $459
Simple Payback, Years 2.7
Project Information
Snackmiser Unit Cost (Snack Machine)
Annual Op Cost
Run Hours
Annual Energy Consumption (kWh)
Annual Cost and Savings, $
Vendmiser Unit Cost (Soda Machine)
Soda Machine Annual Op Cost
Run Hours
Soda Annual Energy Consumption (kWh)
Prepared by Dome-Tech, Inc. 1 of 5
![Page 128: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/128.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #5
Middle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Vending Machine Power Management - Elem. School #1
Existing
Condition
Proposed
SystemSavings
Soda Machine Power Consumption 100% 44% 56%
455$ 200$ 255
8,760 8,760
3,504 1,962 1,542
455$ 200$ 255$
1. Savings based on existing 24/7 operation and typical savings from VendingMiser data.
Utility Unit Costs
Electrical Unit Cost, $/kwh $0.130
Soda Machine Count 1
Snack Machine Count 0
Load Factor 100%
VendMiser Installation Savings
Soda Machine Power Consumption, kw 0.40
Annual Savings % 56%
Electrical Unit Cost, $ per kilowatt-hour $0.130
Annual Energy Savings $255
Economics Summary
kWh Savings 1,542
Estimated Annual Savings $255
$179
$155
Total Installation Cost $280
Total Cost (ECM) $459
Simple Payback, Years 1.8
Project Information
Soda Machine Annual Op Cost
Run Hours
Soda Annual Energy Consumption (kWh)
Annual Cost and Savings, $
Vendmiser Unit Cost (Soda Machine)
Snackmiser Unit Cost (Snack Machine)
Prepared by Dome-Tech, Inc. 2 of 5
![Page 129: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/129.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #5
Middle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Vending Machine Power Management - Elem. School #2
Existing
Condition
Proposed
SystemSavings
Soda Machine Power Consumption 100% 44% 56%
376$ 165$ 211
8,760 8,760
3,504 1,962 1,542
376$ 165$ 211$
1. Savings based on existing 24/7 operation and typical savings from VendingMiser data.
Utility Unit Costs
Electrical Unit Cost, $/kwh $0.107
Soda Machine Count 1
Snack Machine Count 0
Load Factor 100%
VendMiser Installation Savings
Soda Machine Power Consumption, kw 0.40
Annual Savings % 56%
Electrical Unit Cost, $ per kilowatt-hour $0.107
Annual Energy Savings $211
Economics Summary
kWh Savings 1,542
Estimated Annual Savings $211
$179
$155
Total Installation Cost $280
Total Cost (ECM) $459
Simple Payback, Years 2.2
Project Information
Soda Machine Annual Op Cost
Run Hours
Soda Annual Energy Consumption (kWh)
Annual Cost and Savings, $
Vendmiser Unit Cost (Soda Machine)
Snackmiser Unit Cost (Snack Machine)
Prepared by Dome-Tech, Inc. 3 of 5
![Page 130: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/130.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #5
Middle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Vending Machine Power Management - Middle School
Existing
Condition
Proposed
SystemSavings
Soda Machine Power Consumption 100% 44% 56%
801$ 352$ 449
8,760 8,760
7,008 3,924 3,084
801$ 352$ 449$
1. Savings based on existing 24/7 operation and typical savings from VendingMiser data.
Utility Unit Costs
Electrical Unit Cost, $/kwh $0.114
Soda Machine Count 2
Snack Machine Count 0
Load Factor 100%
VendMiser Installation Savings
Soda Machine Power Consumption, kw 0.40
Annual Savings % 56%
Electrical Unit Cost, $ per kilowatt-hour $0.114
Annual Energy Savings $449
Economics Summary
kWh Savings 3,084
Estimated Annual Savings $449
$179
$155
Total Installation Cost $560
Total Cost (ECM) $918
Simple Payback, Years 2.0
Project Information
Soda Machine Annual Op Cost
Run Hours
Soda Annual Energy Consumption (kWh)
Annual Cost and Savings, $
Vendmiser Unit Cost (Soda Machine)
Snackmiser Unit Cost (Snack Machine)
Prepared by Dome-Tech, Inc. 4 of 5
![Page 131: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/131.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #5
Middle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Vending Machine Power Management - High School
Existing
Condition
Proposed
SystemSavings
Soda Machine Power Consumption 100% 54% 46%
3,194$ 1,405$ 1,788
8,760 8,760
24,528 13,736 10,792
3,285$ 1,445$ 1,840$
1. Savings based on existing 24/7 operation and typical savings from VendingMiser data.
Utility Unit Costs
Electrical Unit Cost, $/kwh $0.130
Soda Machine Count 7
Snack Machine Count 1
Load Factor 100%
VendMiser Installation Savings
Soda Machine Power Consumption, kw 0.40
Annual Savings % 56%
Electrical Unit Cost, $ per kilowatt-hour $0.130
Annual Energy Savings $1,788
Economics Summary
kWh Savings 11,101
Estimated Annual Savings $1,840
$179
$155
Total Installation Cost $2,240
Total Cost (ECM) $3,648
Simple Payback, Years 2.0
Project Information
Soda Machine Annual Op Cost
Run Hours
Soda Annual Energy Consumption (kWh)
Annual Cost and Savings, $
Vendmiser Unit Cost (Soda Machine)
Snackmiser Unit Cost (Snack Machine)
Prepared by Dome-Tech, Inc. 5 of 5
![Page 132: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/132.jpg)
![Page 133: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/133.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #6:
DEMAND CONTROLLED VENTILATION
![Page 134: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/134.jpg)
![Page 135: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/135.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #6
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 CO2 sensor ea 3 500.00 1,500 210.00 630 2,130
2 BMS programming ls 1 0.00 - 1320.00 1,320 1,320
518
TOTAL 3,970$
SUB-TOTAL 3,450
O&P 0% -
ASBESTOS ABATEMENT -
DIRECT COST 3,450
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 3,450
CONTINGENCY 15% 518
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 3,968
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 3,968
INTEREST DURING CONSTRUCTION 0% -
TOTAL 3,968$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 CO2 sensor ea 2 500.00 1,000 210.00 420 1,420
2 BMS programming ls 1 0.00 - 1320.00 1,320 1,320
411
TOTAL 3,150$
SUB-TOTAL 2,740
O&P 0% -
ASBESTOS ABATEMENT -
DIRECT COST 2,740
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 2,740
CONTINGENCY 15% 411
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 3,151
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 3,151
INTEREST DURING CONSTRUCTION 0% -
TOTAL 3,151$
Other Estimated Implementation Costs
N/N UNIT QTYMATERIAL LABOR
TOTAL
Elementary School #1 - Demand Controlled Ventilation
Elementary School #2 - Demand Controlled Ventilation
N/N UNIT QTYMATERIAL LABOR
TOTAL
Other Estimated Implementation Costs
Prepared by Dome-Tech, Inc. 1 of 6
![Page 136: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/136.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #6
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 CO2 sensor ea 3 500.00 1,500 210.00 630 2,130
2 BMS programming ls 1 0.00 - 1320.00 1,320 1,320
518
TOTAL 3,970$
SUB-TOTAL 3,450
O&P 0% -
ASBESTOS ABATEMENT -
DIRECT COST 3,450
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 3,450
CONTINGENCY 15% 518
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 3,968
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 3,968
INTEREST DURING CONSTRUCTION 0% -
TOTAL 3,968$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 CO2 sensor ea 2 500.00 1,000 210.00 420 1,420
2 BMS programming ls 1 0.00 - 1320.00 1,320 1,320
3 RA / OA Modulating Damper ActuatorsEA (avg) 2 1,250 2,500 750 1,500 4,000
1,011
TOTAL 7,750$
SUB-TOTAL 6,740
O&P 0% -
ASBESTOS ABATEMENT -
DIRECT COST 6,740
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 6,740
CONTINGENCY 15% 1,011
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 7,751
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 7,751
INTEREST DURING CONSTRUCTION 0% -
TOTAL 7,751$
MATERIAL LABORTOTAL
Middle School - Demand Controlled Ventilation
N/N UNIT QTYMATERIAL LABOR
TOTAL
Other Estimated Implementation Costs
Other Estimated Implementation Costs
High School - Demand Controlled Ventilation
N/N UNIT QTY
Prepared by Dome-Tech, Inc. 2 of 6
![Page 137: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/137.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #6
Summary
Electricity Savings (kWh/yr) 976
Natural Gas Savings (therms/yr) 315
Estimated Cost Savings ($/yr) $445
Estimated Implementation Cost ($) $3,970
8.9
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
kWh Savings /
Year
Therms
Savings /
Year
Kinder Court 1,500 $ 0.37 $ 0.30 $ 549 95$ 209 68
Library 3,000 $ 0.37 $ 0.30 $ 1,099 191$ 418 135
Gym 2,500 $ 0.37 $ 0.30 $ 916 159$ 348 113
Supply Totals 7,000 2,564$ 445$ 976 315
Note:
Savings for the Kindergarten Court unit assumes replacement of the existing unit with an economizer unit (which is currently in progress).
Savings for the Library unit assumes replacement of the existing unit with an economizer unit due to functionality issues.
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning SavingsConditioning Savings
Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Elementary School #1 - Demand Controlled Ventilation
Prepared by Dome-Tech, Inc. 3 of 6
![Page 138: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/138.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #6
Summary
Electricity Savings (kWh/yr) 1,324
Natural Gas Savings (therms/yr) 428
Estimated Cost Savings ($/yr) $605
Estimated Implementation Cost ($) $3,150
5.2
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
kWh Savings
/ Year
Therms
Savings /
Year
Cafeteria 5,500 $ 0.37 $ 0.30 $ 2,015 350$ 767 248
Library 4,000 $ 0.37 $ 0.30 $ 1,465 255$ 558 180
Supply Totals 9,500 3,480$ 605$ 1,324 428
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning SavingsConditioning Savings
Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Elementary School #2 - Demand Controlled Ventilation
Prepared by Dome-Tech, Inc. 4 of 6
![Page 139: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/139.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #6
Summary
Electricity Savings (kWh/yr) 2,091
Natural Gas Savings (therms/yr) 675
Estimated Cost Savings ($/yr) $955
Estimated Implementation Cost ($) $3,970
4.2
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
kWh Savings
/ Year
Therms
Savings /
Year
Café Unit Left 5,000 $ 0.37 $ 0.30 $ 1,832 318$ 697 225
Café Unit Right 5,000 $ 0.37 $ 0.30 $ 1,832 318$ 697 225
Gym 3&4 5,000 $ 0.37 $ 0.30 $ 1,832 318$ 697 225
Supply Totals 15,000 5,495$ 955$ 2,091 675
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning SavingsConditioning Savings
Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Middle School - Demand Controlled Ventilation
Prepared by Dome-Tech, Inc. 5 of 6
![Page 140: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/140.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #6
Summary
Electricity Savings (kWh/yr) 1,394
Natural Gas Savings (therms/yr) 450
Estimated Cost Savings ($/yr) $636
Estimated Implementation Cost ($) $7,750
12.2
Implementation Cost
Unit Tag CFMCurrent
$/CFM
Proposed
$/CFM
Current
Conditioning
Cost / Year
TOD
Conditioning
Savings /
Year
kWh Savings
/ Year
Therms
Savings /
Year
Cafeteria Unit 5,000 $ 0.37 $ 0.30 $ 1,832 318$ 697 225
Cafeteria Unit 5,000 $ 0.37 $ 0.30 $ 1,832 318$ 697 225
Supply Totals 10,000 3,663$ 636$ 1,394 450
Note:
Unit CFM approximated based on supply fan HP size (no air flow values were available).
Simple Payback (Years)
Conditioning SavingsConditioning Savings
Breakdown
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
High School - Demand Controlled Ventilation
Prepared by Dome-Tech, Inc. 6 of 6
![Page 141: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/141.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #7:
LIGHTING UPGRADE
![Page 142: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/142.jpg)
![Page 143: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/143.jpg)
BUILDING
PRE
TOTAL
FIXT.
QTY
PRE
TOTAL
FIXT.
WATTS
PRE
ANNUAL
KWH
CONSUMPTION
POST
TOTAL
FIXT.
QTY
POST
TOTAL
FIXT.
WATTS
POST
ANNUAL
KWH
CONSUMPTION
WATTS
SAVED
ANNUAL
KWH
SAVED
ANNUAL
KWH
SAVED
WITH
SENSORS
ANNUAL
SAVINGS
$
FIXT.
ANNUAL
SAVINGS
$
SENSORS
ANNUAL
SAVINGS
$
TOTAL
CO2
REDUCTION
(TONS)
NJ Smart
Start
REBATE $
FIXTURES
TOTAL
(INSTALLED)
COST $
SENSORS
TOTAL
(INSTALLED)
COST $
MATERIAL
TOTAL
(INSTALLED)
COST $
SIMPLE
PAYBACK
NET OF REBATE
(YEARS)
ADMINISTRATION
BUILDING107 6,167 18,501 107 4,387 12,212 1,780 6,289 949 $692 $104 $797 2.1 $1,360 $6,039 $3,520 $9,558 10.3
14%
66%
27%
18%
SAVINGSBUILDING EXISTING FIXTURES PROPOSED FIXTURES
LIGHTING RETROFIT SUMMARY FOR:
ADMINISTRATION BUILDING
PERCENTAGE OF REBATES IN TOTAL INSTALLED COST
PERCENTAGE OF CONSUMPTION COMPARE TO EXISTING STATE
FINANCIAL
EXISTING PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
PROPOSED PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
![Page 144: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/144.jpg)
(Page left blank intentionally)
![Page 145: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/145.jpg)
3000 3000 $0.110
1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 N/A FRONT LOBBY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
2 N/A FRONT PRINTER AREA 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
3 N/A RECEPTIONIST 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
4 N/A SUPERINTENDANT OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 3,000 1,044 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 6 42 252 3,000 756 756 16 96 0 288 0 $32 $341 $0 $281
5 N/A 1ST FLOOR HALLWAY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 9 58 522 3,000 1,566 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 9 42 378 3,000 1,134 1,134 16 144 0 432 0 $48 $512 $0 $422
6 N/A DR DAVID SALVO OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 3 42 126 3,000 378 378 16 48 0 144 0 $16 $171 $0 $141
7 N/A FILE CABINET OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 4 42 168 3,000 504 504 16 64 0 192 0 $21 $228 $0 $188
8 N/A MS LYN LANGFORD OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
9 N/A ANGELA GRASSI OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
10 N/A BARBARA HALL OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
11 N/A BOARD OFFICE-CHRISTINE RITENE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
12 N/A BOARD OFFICE-DIANE FOX 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
13 N/A BOARD OFFICE-OPEN OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 8 58 464 3,000 1,392 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 8 42 336 3,000 1,008 1,008 16 128 0 384 0 $42 $455 $0 $375
14 N/A BOARD OFFICE-CLOSET 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
15 N/A BACK CORNER OFFICE BY MENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
16 N/A MENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
17 N/A CUSTODIAN CLOSET 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
18 N/A WOMANS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
19 N/A ROOM ACROSS FROM WOMENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
20 N/A COPY ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
21 N/A JUDI HAMILTON 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
22 N/A STAIRWELL 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 3 42 126 3,000 378 378 16 48 0 144 0 $16 $171 $0 $141
23 N/A BASEMENT HALLWAY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 3,000 1,044 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 6 42 252 3,000 756 756 16 96 0 288 0 $32 $341 $0 $281
24 N/A BASEMENT STORAGE AREA 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 3,000 3,654 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 21 42 900 Ceiling 8 882 2,100 2,646 1,852 16 336 900 1,008 794 $198 $1,194 $2,816 $3,520
25 N/A BASEMENT STORAGE AREA 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 4 32 128 3,000 384 Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE Ballast 4 22 900 Ceiling 1 88 2,100 264 185 10 40 900 120 79 $22 $172 $352 $484
26 N/A BASEMENT STORAGE AREA 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 3,000 672Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2'x4'
Silver Reflector Kit2 42 900 Ceiling 1 84 2,100 252 176 70 140 900 420 76 $55 $179 $352 $491
27 N/A BASEMENT MENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
28 N/A BASEMENT WOMENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 1 42 42 3,000 126 126 16 16 0 48 0 $5 $57 $0 $47
29 N/A BASEMENT STORAGE CLOSET New Downlight Fixture w/ (1) 13w CFL & Ballast 1 15 15 3,000 45 None 1 15 15 3,000 45 45 0 0 0 0 0 $0 $0 $0 $0
30 N/A WORK ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 4 42 168 3,000 504 504 16 64 0 192 0 $21 $228 $0 $188
31 N/A BOILER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 2 42 84 3,000 252 252 16 32 0 96 0 $11 $114 $0 $94
32 N/A BOILER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696 Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE Ballast 4 42 168 3,000 504 504 16 64 0 192 0 $21 $228 $0 $188
107 6,167 18,501 107 10 4,387 13,161 12,212 1,780 2,700 5,340 949 $692 $6,039 $3,520 $8,198
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ADMINISTRATION BUILDING
REPLACEMENT FIXTURES
FACILITY SQ. FT.
5,950
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 2 of 2
![Page 146: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/146.jpg)
(Page left blank intentionally)
![Page 147: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/147.jpg)
BUILDING
PRE
TOTAL
FIXT.
QTY
PRE
TOTAL
FIXT.
WATTS
PRE
ANNUAL
KWH
CONSUMPTION
POST
TOTAL
FIXT.
QTY
POST
TOTAL
FIXT.
WATTS
POST
ANNUAL
KWH
CONSUMPTION
WATTS
SAVED
ANNUAL
KWH
SAVED
ANNUAL
KWH
SAVED
WITH
SENSORS
ANNUAL
SAVINGS
$
FIXT.
ANNUAL
SAVINGS
$
SENSORS
ANNUAL
SAVINGS
$
TOTAL
CO2
REDUCTION
(TONS)
NJ Smart
Start
REBATE $
FIXTURES
TOTAL
(INSTALLED)
COST $
SENSORS
TOTAL
(INSTALLED)
COST $
MATERIAL
TOTAL
(INSTALLED)
COST $
SIMPLE
PAYBACK
NET OF REBATE
(YEARS)
ELEMENTARY #1 665 64,761 130,546 664 48,681 97,075 16,080 33,471 2,118 $4,347 $275 $4,622 11.1 $4,550 $47,597 $3,931 $51,920 10.2
9%
74%
17%
13%
SAVINGSBUILDING EXISTING FIXTURES PROPOSED FIXTURES
LIGHTING RETROFIT SUMMARY FOR:
ELEMENTARY #1
PERCENTAGE OF REBATES IN TOTAL INSTALLED COST
PERCENTAGE OF CONSUMPTION COMPARE TO EXISTING STATE
EXISTING PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
PROPOSED PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
FINANCIAL
![Page 148: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/148.jpg)
(Page left blank intentionally)
![Page 149: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/149.jpg)
3875 3875 $0.130 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 N/A KITCHEN STORAGE ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 600 209Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 600 151 151 16 96 0 58 0 $7 $341 $0 $281
2 N/A KITCHEN BATHROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 600 19Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 90 Wall 1 22 510 13 11 10 10 90 6 2 $1 $43 $207 $240
3 N/A BOILER ROOM 2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $32 $228 $0 $188
4 N/A KITCHEN OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 1,700 99Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 1,700 71 71 16 16 0 27 0 $4 $57 $0 $47
5 N/A KITCHEN STORAGE ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 600 70Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 600 50 50 16 32 0 19 0 $2 $114 $0 $94
6 N/A KITCHEN 2'x2' Troffer w/ (2) FB32T8 6"-U Lamps & (1) Electronic Ballast 3 58 174 1,750 305Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit3 28 84 1,750 147 147 30 90 0 158 0 $20 $192 $0 $162
7 N/A KITCHEN 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,750 1,960Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,750 1,470 1,470 28 280 0 490 0 $64 $725 $0 $725
8 N/A ALL PURPOSE ROOMCompact Fluorescent High Bay Fixture w/ (6) 32w CFL & Electronic
Ballast12 186 2,232 3,875 8,649 None 12 186 2,232 3,875 8,649 8,649 0 0 0 0 0 $0 $0 $0 $0
9 N/A STORAGE ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 600 67Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp1 84 84 600 50 50 28 28 0 17 0 $2 $72 $0 $72
10 N/A RESTROOM ACROSS FROM MPR 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 3,000 336Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp1 84 900 Wall 1 84 2,100 252 176 28 28 900 84 76 $21 $72 $207 $279
11 N/A SUPPLY ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 600 67Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp1 84 84 600 50 50 28 28 0 17 0 $2 $72 $0 $72
12 N/A ALL PURPOSE ROOM STORAGE 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 5 112 560 600 336Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp5 84 420 600 252 252 28 140 0 84 0 $11 $362 $0 $362
13 N/A ENTRANCE BY STAGE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 1,700 99Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 1,700 71 71 16 16 0 27 0 $4 $57 $0 $47
14 N/A F-2 JOHNSON 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 1,700 381Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 1,700 286 286 28 56 0 95 0 $12 $145 $0 $145
15 N/A FACULTY ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 5 112 560 2,860 1,602Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp5 84 715 Wall 1 420 2,145 1,201 901 28 140 715 400 300 $91 $362 $207 $549
16 N/A ROOM 25 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 15 58 870 1,700 1,479Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast15 42 630 1,700 1,071 1,071 16 240 0 408 0 $53 $853 $0 $703
17 N/A ROOM 24 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 1,700 381Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 1,700 286 286 28 56 0 95 0 $12 $145 $0 $145
18 N/A WORK ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 1,700 571Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 252 1,700 428 428 28 84 0 143 0 $19 $217 $0 $217
19 N/A WORK ROOM BATHROOM 2'x2' Troffer w/ (2) FB32T8 6"-U Lamps & (1) Electronic Ballast 1 58 58 1,400 81Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit1 28 280 Wall 1 28 1,120 39 31 30 30 280 42 8 $6 $64 $207 $261
20 N/A ROOM 23 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 1,700 381Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 1,700 286 286 28 56 0 95 0 $12 $145 $0 $145
21 N/A ROOM 21 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 1,700 1,142Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 1,700 857 857 28 168 0 286 0 $37 $435 $0 $435
22 N/A ROOM 22 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 1,700 381Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 1,700 286 286 28 56 0 95 0 $12 $145 $0 $145
23 N/A ROOM 20 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 1,700 1,142Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 1,700 857 857 28 168 0 286 0 $37 $435 $0 $435
24 N/A ROOM 19 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 1,700 1,142Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 1,700 857 857 28 168 0 286 0 $37 $435 $0 $435
25 N/A ROOM 18 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $7 $114 $0 $94
26 N/A ROOM 17 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 1,700 1,142Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 1,700 857 857 28 168 0 286 0 $37 $435 $0 $435
27 N/A ROOM 16 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 8 112 896 1,700 1,523Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp8 84 672 1,700 1,142 1,142 28 224 0 381 0 $49 $580 $0 $580
28 N/A CUSTODIAN CLOSET 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
29 N/A MENS ROOM BY BOILER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $33 $171 $207 $348
30 N/A BOILER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,875 225Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 3,875 163 163 16 16 0 62 0 $8 $57 $0 $47
31 N/A WOMENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $33 $171 $207 $348
32 N/A ROOM 15 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
33 N/A ROOM 13 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
34 N/A ROOM 14 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #1
REPLACEMENT FIXTURES
FACILITY SQ. FT.
84,220
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 2 of 4
![Page 150: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/150.jpg)
3875 3875 $0.130
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #1
REPLACEMENT FIXTURES
FACILITY SQ. FT.
84,220
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
35 N/A ROOM 11 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
36 N/A ROOM 12 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
37 N/A ROOM 10 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
38 N/A ROOM 9 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
39 N/A ROOM 9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 1,700 99Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 1,700 71 71 16 16 0 27 0 $4 $57 $0 $47
40 N/A BATHROOM 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 2 75 150 3,000 450Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit2 28 900 Wall 1 56 2,100 168 118 47 94 900 282 50 $43 $128 $207 $315
41 N/A STORAGE ROOM 1 New Downlight Fixture w/ (1) 13w CFL & Ballast 1 15 15 600 9 None 1 15 15 600 9 9 0 0 0 0 0 $0 $0 $0 $0
42 N/A STORAGE ROOM 2 New Downlight Fixture w/ (1) 13w CFL & Ballast 1 15 15 600 9 None 1 15 15 600 9 9 0 0 0 0 0 $0 $0 $0 $0
43 N/A ROOM 8 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
44 N/A BACKROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 1 15 15 600 9 None 1 15 15 600 9 9 0 0 0 0 0 $0 $0 $0 $0
45 N/A BATHROOM 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 1 75 75 1,400 105Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit1 28 280 Wall 1 28 1,120 39 31 47 47 280 66 8 $10 $64 $207 $261
46 N/A STORAGE ROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 1 15 15 600 9 None 1 15 15 600 9 9 0 0 0 0 0 $0 $0 $0 $0
47 N/A BOYS ROOM 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 3 75 225 3,000 675Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit3 28 900 Wall 1 84 2,100 252 176 47 141 900 423 76 $65 $192 $207 $369
48 N/A GIRLS ROOM 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 3 75 225 3,000 675Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit3 28 900 Wall 1 84 2,100 252 176 47 141 900 423 76 $65 $192 $207 $369
49 N/A ROOM 6 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
50 N/A ROOM 7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $21 $341 $0 $281
51 N/A ROOM 5 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 1,700 1,142Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 1,700 857 857 28 168 0 286 0 $37 $435 $0 $435
52 N/A ROOM 4 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
53 N/A ROOM 2 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
54 N/A ROOM 3 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
55 N/A ROOM 1 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 12 112 1,344 1,700 2,285Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp12 84 1,008 1,700 1,714 1,714 28 336 0 571 0 $74 $870 $0 $870
56 N/A ROOM 26 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 18 112 2,016 1,700 3,427Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp18 84 1,512 1,700 2,570 2,570 28 504 0 857 0 $111 $1,305 $0 $1,305
57 N/A SUPPLY ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 600 67Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp1 84 84 600 50 50 28 28 0 17 0 $2 $72 $0 $72
58 N/A GIRLS ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 900 Wall 1 252 2,100 756 529 28 84 900 252 227 $62 $217 $207 $404
59 N/A BOYS ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 900 Wall 1 252 2,100 756 529 28 84 900 252 227 $62 $217 $207 $404
60 N/A CUSTODIAN 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
61 N/A ROOM 27 - COMPUTER LAB 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
62 N/A ROOM 29 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
63 N/A ROOM 28 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
64 N/A ROOM 30 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
65 N/A ROOM 31 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
66 N/A ROOM 32 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
67 N/A ROOM 33 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
68 N/A ROOM 34 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
69 N/A ROOM 35 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 3 of 4
![Page 151: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/151.jpg)
3875 3875 $0.130
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #1
REPLACEMENT FIXTURES
FACILITY SQ. FT.
84,220
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
70 N/A FACULTY ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 2,860 1,258Relamp & Reballast w/ (3) F28T8 Lamps & (1) 3/32 Elec. LP HE
Ballast Lamps5 63 715 Wall 1 315 2,145 901 676 25 125 715 358 225 $76 $323 $207 $410
71 N/A FACULTY ROOM RESTROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,400 162Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 280 Wall 1 84 1,120 118 94 16 32 280 45 24 $9 $114 $207 $301
72 N/A WORK ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 1,700 299Relamp & Reballast w/ (3) F28T8 Lamps & (1) 3/32 Elec. LP HE
Ballast Lamps2 63 126 1,700 214 214 25 50 0 85 0 $11 $129 $0 $89
73 N/A MAIN OFFICE 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 6 112 672 2,125 1,428Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp6 84 504 2,125 1,071 1,071 28 168 0 357 0 $46 $435 $0 $435
74 N/A CONFERENCE ROOM IN MAIN LOBBY 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 2,860 641Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 715 Wall 1 168 2,145 480 360 28 56 715 160 120 $36 $145 $207 $352
75 N/A MAIN OFFICE LOBBY 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 2,125 714Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 252 2,125 536 536 28 84 0 179 0 $23 $217 $0 $217
76 N/A NURSES OFFICE LOBBY 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (3) F28T8 Lamps & (1) 3/32 Elec. LP HE
Ballast Lamps3 63 189 2,125 402 402 25 75 0 159 0 $21 $194 $0 $134
77 N/A NURSES OFFICE BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 1,400 81Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 280 Wall 1 42 1,120 59 47 16 16 280 22 12 $4 $57 $207 $254
78 N/A EXAM ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 1,700 190Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp1 84 84 1,700 143 143 28 28 0 48 0 $6 $72 $0 $72
79 N/A BACK OF NURSES OFFICE 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 4 112 448 2,125 952Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp4 84 336 2,125 714 714 28 112 0 238 0 $31 $290 $0 $290
80 N/A PRINCIPAL 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 2,125 476Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 2,125 357 357 28 56 0 119 0 $15 $145 $0 $145
81 N/A ASSIST. PRINCIPAL 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 2,125 476Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 2,125 357 357 28 56 0 119 0 $15 $145 $0 $145
82 N/A BETTER CHOICE ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 2,125 187Relamp & Reballast w/ (3) F28T8 Lamps & (1) 3/32 Elec. LP HE
Ballast Lamps1 63 63 2,125 134 134 25 25 0 53 0 $7 $65 $0 $45
83 N/A LIBRARY MEDIA CENTER 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 3,875 5,844Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 3,875 4,232 4,232 16 416 0 1,612 0 $209 $1,479 $0 $1,219
84 N/A LIBRARY OFFICE 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 2,125 714Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 252 2,125 536 536 28 84 0 179 0 $23 $217 $0 $217
85 N/A ROOM 36 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 9 112 1,008 1,700 1,714Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp9 84 756 1,700 1,285 1,285 28 252 0 428 0 $56 $652 $0 $652
86 N/A ROOM 37 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 9 112 1,008 1,700 1,714Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp9 84 756 1,700 1,285 1,285 28 252 0 428 0 $56 $652 $0 $652
87 N/A BOYS ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 900 Wall 1 252 2,100 756 529 28 84 900 252 227 $62 $217 $207 $404
88 N/A GIRLS ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp3 84 900 Wall 1 252 2,100 756 529 28 84 900 252 227 $62 $217 $207 $404
89 N/A ROOM 44 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 9 112 1,008 1,700 1,714Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp9 84 756 1,700 1,285 1,285 28 252 0 428 0 $56 $652 $0 $652
90 N/A ROOM 43 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 11 112 1,232 1,700 2,094Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp11 84 924 1,700 1,571 1,571 28 308 0 524 0 $68 $797 $0 $797
91 N/A PHYSICAL ACTIVITY ROOM HID High Bay Fixture w/ (1) 350w Metal Halide Lamp & Ballast 9 398 3,582 3,875 13,880New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor8 351 2,808 3,875 10,881 10,881 47 423 0 2,999 0 $390 $3,130 $0 $2,721
92 N/A PA ROOM OFFICE 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 1,700 381Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp2 84 168 1,700 286 286 28 56 0 95 0 $12 $145 $0 $145
93 N/A ROOM 42 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,700 1,904Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,700 1,428 1,428 28 280 0 476 0 $62 $725 $0 $725
94 N/A ROOM 42 STORAGE ROOM 2'x2' Troffer w/ (2) FB32T8 6"-U Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit1 28 28 600 17 17 30 30 0 18 0 $2 $64 $0 $54
95 N/A ROOM 42 BATHROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 600 19Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 22 600 13 13 10 10 0 6 0 $1 $43 $0 $33
96 N/A FACULTY RESTROOM 2'x2' Troffer w/ (2) FB32T8 6"-U Lamps & (1) Electronic Ballast 1 58 58 1,400 81Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit1 28 280 Wall 1 28 1,120 39 31 30 30 280 42 8 $6 $64 $207 $261
97 N/A KINDERGARTEN COURT HID Fixture w/ (1) 250w Metal Halide Lamp & Ballast 8 295 2,360 1,750 4,130New 2'x4' Troffer w/ (4) F54T5HO Lamps & (2) 2/54 T5 Elec. HO
Ballasts8 242 1,936 1,750 3,388 3,388 53 424 0 742 0 $96 $2,743 $0 $1,943
98 N/A ROOM 38 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,700 1,904Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,700 1,428 1,428 28 280 0 476 0 $62 $725 $0 $725
99 N/A ROOM 39 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,700 1,904Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,700 1,428 1,428 28 280 0 476 0 $62 $725 $0 $725
100 N/A ROOM 40 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,700 1,904Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,700 1,428 1,428 28 280 0 476 0 $62 $725 $0 $725
101 N/A ROOM 41 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 10 112 1,120 1,700 1,904Relamp & Reballast w/ (4) F28T8 Lamps & (1) 4/32 Elec. LP HE
Ballast 5000K Temp Lamp10 84 840 1,700 1,428 1,428 28 280 0 476 0 $62 $725 $0 $725
102 N/A KINDERGARTEN KITCHEN 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $7 $114 $0 $94
665 64,761 130,546 664 19 48,681 99,192 97,075 15,729 12,635 31,354 2,118 $4,347 $47,597 $3,931 $47,370
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 4 of 4
![Page 152: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/152.jpg)
(Page left blank intentionally)
![Page 153: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/153.jpg)
BUILDING
PRE
TOTAL
FIXT.
QTY
PRE
TOTAL
FIXT.
WATTS
PRE
ANNUAL
KWH
CONSUMPTION
POST
TOTAL
FIXT.
QTY
POST
TOTAL
FIXT.
WATTS
POST
ANNUAL
KWH
CONSUMPTION
WATTS
SAVED
ANNUAL
KWH
SAVED
ANNUAL
KWH
SAVED
WITH
SENSORS
ANNUAL
SAVINGS
$
FIXT.
ANNUAL
SAVINGS
$
SENSORS
ANNUAL
SAVINGS
$
TOTAL
CO2
REDUCTION
(TONS)
NJ Smart
Start
REBATE $
FIXTURES
TOTAL
(INSTALLED)
COST $
SENSORS
TOTAL
(INSTALLED)
COST $
MATERIAL
TOTAL
(INSTALLED)
COST $
SIMPLE
PAYBACK
NET OF REBATE
(YEARS)
ELEMENTARY #2 1212 79,404 166,224 1,210 55,080 114,626 24,324 51,598 1,025 $5,539 $110 $5,649 17.1 $14,120 $75,614 $2,690 $79,086 11.5
18%
69%
13%
9%
LIGHTING RETROFIT SUMMARY FOR:
ELEMENTARY #2
PERCENTAGE OF REBATES IN TOTAL INSTALLED COST
PERCENTAGE OF CONSUMPTION COMPARE TO EXISTING STATE
EXISTING PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
PROPOSED PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
FINANCIALSAVINGSBUILDING EXISTING FIXTURES PROPOSED FIXTURES
![Page 154: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/154.jpg)
(Page left blank intentionally)
![Page 155: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/155.jpg)
3875 3875 $0.107 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 N/A HALLWAY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,875 674Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 3,875 488 488 16 48 0 186 0 $20 $171 $0 $141
2 N/A EXIT SIGNS Exit Sign w/ (2) 2W LED Lamps 18 4 72 8,760 631 None 18 4 72 8,760 631 631 0 0 0 0 0 $0 $0 $0 $0
3 N/A CAFETERIA 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 20 112 2,240 3,875 8,680Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit20 42 840 3,875 3,255 3,255 70 1,400 0 5,425 0 $582 $1,788 $0 $1,388
4 N/A A-142 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 15 112 1,680 1,700 2,856Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 70 1,050 0 1,785 0 $192 $1,341 $0 $1,041
5 N/A A-140 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 15 112 1,680 1,700 2,856Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 70 1,050 0 1,785 0 $192 $1,341 $0 $1,041
6 N/A A-143 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
7 N/A A-144 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
8 N/A A-141 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
9 N/A A-146 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $18 $341 $0 $281
10 N/A KITCHEN 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 14 58 812 1,700 1,380Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast14 42 588 1,700 1,000 1,000 16 224 0 381 0 $41 $796 $0 $656
11 N/A KITCHEN BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,400 162Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 280 Wall 1 84 1,120 118 94 16 32 280 45 24 $7 $114 $207 $301
12 N/A KITCHEN OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
13 N/A MER WITH DHW 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 600 209Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 600 151 151 16 96 0 58 0 $6 $341 $0 $281
14 N/A MAINTENANCE ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 27 58 1,566 3,875 6,068Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast27 42 1,134 3,875 4,394 4,394 16 432 0 1,674 0 $180 $1,536 $0 $1,266
15 N/A GYM LOBBY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 3,875 1,349Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 3,875 977 977 16 96 0 372 0 $40 $341 $0 $281
16 N/A MENS LOCKER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $27 $228 $0 $188
17 N/A WOMENS LOCKER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $27 $228 $0 $188
18 N/A FACULTY ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 2,860 1,991Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 2,860 1,441 1,441 16 192 0 549 0 $59 $683 $0 $563
19 N/A GUIDANCE OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 5 58 290 2,125 616Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast5 42 210 2,125 446 446 16 80 0 170 0 $18 $284 $0 $234
20 N/A A-117 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
21 N/A A-118 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
22 N/A A-119 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 1,700 296Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 1,700 214 214 16 48 0 82 0 $9 $171 $0 $141
23 N/A A-120 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
24 N/A A-107 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 5 58 290 1,700 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast5 42 210 1,700 357 357 16 80 0 136 0 $15 $284 $0 $234
25 N/A A-102 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $35 $683 $0 $563
26 N/A A-106 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 5 58 290 1,700 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast5 42 210 1,700 357 357 16 80 0 136 0 $15 $284 $0 $234
27 N/A A-108 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
28 N/A A-104 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
29 N/A A-103 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 5 58 290 1,700 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast5 42 210 1,700 357 357 16 80 0 136 0 $15 $284 $0 $234
30 N/A GYM HID High Bay Fixture w/ (1) 350w Metal Halide Lamp & Ballast 18 398 7,164 3,875 27,761New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor16 351 5,616 3,875 21,762 21,762 47 846 0 5,999 0 $644 $6,259 $0 $5,441
31 N/A MENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
32 N/A CLOSET IN MENS ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
33 N/A WOMENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
34 N/A CLOSET IN WOMENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #2
REPLACEMENT FIXTURES
FACILITY SQ. FT.
87,674
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 2 of 5
![Page 156: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/156.jpg)
3875 3875 $0.107
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #2
REPLACEMENT FIXTURES
FACILITY SQ. FT.
87,674
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
35 N/A A-122 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
36 N/A A-111 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
37 N/A A-110 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $18 $341 $0 $281
38 N/A A-126 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 1,700 296Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 1,700 214 214 16 48 0 82 0 $9 $171 $0 $141
39 N/A A-129 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 1,700 449Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 1,700 214 214 46 138 0 235 0 $25 $268 $0 $208
40 N/A B-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
41 N/A B-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $58 $1,138 $0 $938
42 N/A B-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $58 $1,138 $0 $938
43 N/A B-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $58 $1,138 $0 $938
44 N/A B-4 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $58 $1,138 $0 $938
45 N/A D-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $53 $1,024 $0 $844
46 N/A D-4 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 4 112 448 1,700 762Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 70 280 0 476 0 $51 $358 $0 $278
47 N/A D-5 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 33 58 1,914 1,700 3,254Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast33 42 1,386 1,700 2,356 2,356 16 528 0 898 0 $96 $1,877 $0 $1,547
48 N/A D-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
49 N/A D-12 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
50 N/A D-WING SUPPLIES 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 600 202Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 600 76 76 70 210 0 126 0 $14 $268 $0 $208
51 N/A ROOM IN SUPPLIES ROOM 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 600 67Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 600 25 25 70 70 0 42 0 $5 $89 $0 $69
52 N/A D-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
53 N/A D-8 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 4 112 448 1,700 762Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 70 280 0 476 0 $51 $358 $0 $278
54 N/A D-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
55 N/A D-10 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
56 N/A D-11 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 16 58 928 1,700 1,578Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast16 42 672 1,700 1,142 1,142 16 256 0 435 0 $47 $910 $0 $750
57 N/A D-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 1,700 2,071Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 1,700 1,499 1,499 16 336 0 571 0 $61 $1,194 $0 $984
58 N/A D-WING BOYS 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 900 Wall 1 126 2,100 378 265 70 210 900 630 113 $80 $268 $207 $415
59 N/A D-WING GIRLS 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 3 112 336 3,000 1,008Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 900 Wall 1 126 2,100 378 265 70 210 900 630 113 $80 $268 $207 $415
60 N/A D-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
61 N/A D-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
62 N/A D-13 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
63 N/A D-14 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
64 N/A E-10 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $35 $683 $0 $563
65 N/A E-11 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 14 58 812 1,700 1,380Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast14 42 588 1,700 1,000 1,000 16 224 0 381 0 $41 $796 $0 $656
66 N/A E-WING SUPPLIES 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 2 112 224 600 134Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 600 50 50 70 140 0 84 0 $9 $179 $0 $139
67 N/A FACULTY ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 2,860 332Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 715 Wall 1 84 2,145 240 180 16 32 715 92 60 $16 $114 $207 $301
68 N/A FACULTY ROOM BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 1,400 81Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 280 Wall 1 42 1,120 59 47 16 16 280 22 12 $4 $57 $207 $254
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 3 of 5
![Page 157: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/157.jpg)
3875 3875 $0.107
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #2
REPLACEMENT FIXTURES
FACILITY SQ. FT.
87,674
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
69 N/A FACULTY ROOM STORAGE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
70 N/A E-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
71 N/A E-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
72 N/A E-8 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
73 N/A E-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
74 N/A E-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 16 58 928 1,700 1,578Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast16 42 672 1,700 1,142 1,142 16 256 0 435 0 $47 $910 $0 $750
75 N/A E-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
76 N/A E-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
77 N/A E-5 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
78 N/A E-4 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
79 N/A C-14 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
80 N/A C-13 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
81 N/A C-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
82 N/A C-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
83 N/A C-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 1,700 2,071Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 1,700 1,499 1,499 16 336 0 571 0 $61 $1,194 $0 $984
84 N/A C-4 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
85 N/A C-5 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 35 58 2,030 1,700 3,451Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast35 42 1,470 1,700 2,499 2,499 16 560 0 952 0 $102 $1,991 $0 $1,641
86 N/A C-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
87 N/A C-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
88 N/A C-12 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $70 $1,365 $0 $1,125
89 N/A C-WING SUPPLIES 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 600 104Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 600 76 76 16 48 0 29 0 $3 $171 $0 $141
90 N/A C-8 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $12 $228 $0 $188
91 N/A C-11 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $35 $683 $0 $563
92 N/A C-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
93 N/A C-10 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $76 $1,479 $0 $1,219
94 N/A C-WING BOYS 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
95 N/A C-WING GIRLS 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
96 N/A LIBRARY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 29 58 1,682 3,875 6,518Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast29 42 1,218 3,875 4,720 4,720 16 464 0 1,798 0 $193 $1,649 $0 $1,359
97 N/A B-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $18 $341 $0 $281
98 N/A B-6 STORAGE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 600 104Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 600 76 76 16 48 0 29 0 $3 $171 $0 $141
99 N/A B-8 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 1,700 296Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 1,700 214 214 16 48 0 82 0 $9 $171 $0 $141
100 N/A BOYS BATHROOM NEAR LIBRARY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
101 N/A GIRLS BATHROOM NEAR LIBRARY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $28 $171 $207 $348
102 N/A A-125 BATHROOM WOMEN 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 600 104Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 90 Wall 1 126 510 76 64 16 48 90 29 11 $4 $171 $207 $348
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 4 of 5
![Page 158: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/158.jpg)
3875 3875 $0.107
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012ELEMENTARY #2
REPLACEMENT FIXTURES
FACILITY SQ. FT.
87,674
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
103 N/A A-129 BATHROOM MEN 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 600 158Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 90 Wall 1 126 510 76 64 46 138 90 83 11 $10 $268 $207 $415
104 N/A B-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
105 N/A GYM OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 1,700 296Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 1,700 214 214 16 48 0 82 0 $9 $171 $0 $141
1,212 79,404 166,224 1,210 13 55,080 115,651 114,626 23,622 8,655 50,572 1,025 $5,539 $75,614 $2,690 $64,966
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 5 of 5
![Page 159: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/159.jpg)
BUILDING
PRE
TOTAL
FIXT.
QTY
PRE
TOTAL
FIXT.
WATTS
PRE
ANNUAL
KWH
CONSUMPTION
POST
TOTAL
FIXT.
QTY
POST
TOTAL
FIXT.
WATTS
POST
ANNUAL
KWH
CONSUMPTION
WATTS
SAVED
ANNUAL
KWH
SAVED
ANNUAL
KWH
SAVED
WITH
SENSORS
ANNUAL
SAVINGS
$
FIXT.
ANNUAL
SAVINGS
$
SENSORS
ANNUAL
SAVINGS
$
TOTAL
CO2
REDUCTION
(TONS)
NJ Smart
Start
REBATE $
FIXTURES
TOTAL
(INSTALLED)
COST $
SENSORS
TOTAL
(INSTALLED)
COST $
MATERIAL
TOTAL
(INSTALLED)
COST $
SIMPLE
PAYBACK
NET OF
REBATE
(YEARS)
Middle School 1150 84,738 203,037 1,150 55,746 135,570 28,992 67,468 1,400 $8,784 $182 $8,967 22.3 $15,755 $80,153 $3,539 $83,692 7.6
19%
67%
41%
28%
SAVINGSBUILDING EXISTING FIXTURES PROPOSED FIXTURES
LIGHTING RETROFIT SUMMARY FOR:
Middle School
PERCENTAGE OF REBATES IN TOTAL INSTALLED COST
PERCENTAGE OF CONSUMPTION COMPARE TO EXISTING STATE
EXISTING PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
PROPOSED PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
FINANCIAL
![Page 160: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/160.jpg)
(Page left blank intentionally)
![Page 161: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/161.jpg)
3875 3875 $0.130
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 N/A CONF. ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 2,860 1,510Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 715 Ceiling 1 252 2,145 721 541 46 276 715 789 180 $126 $536 $352 $733
2 N/A FACULTY ROOM (A-1) 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 2,860 1,659Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 715 Ceiling 1 420 2,145 1,201 901 16 160 715 458 300 $99 $569 $352 $786
3 N/A FW-1 FACULTY WOMENS BATHROOM 2'x2' Troffer w/ (2) F17T8 Lamps & (1) Electronic Ballast 1 34 34 1,400 48Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast1 28 280 Wall 1 28 1,120 39 31 6 6 280 8 8 $2 $43 $207 $240
4 N/A FM-1 FACULTY MENS BATHROOM 2'x2' Troffer w/ (2) F17T8 Lamps & (1) Electronic Ballast 1 34 34 1,400 48Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast1 28 280 Wall 1 28 1,120 39 31 6 6 280 8 8 $2 $43 $207 $240
5 N/A GYM HID Fixture w/ (1) 400w Metal Halide Lamp & Ballast 18 455 8,190 3,875 31,736New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor18 351 6,318 3,875 24,482 24,482 104 1,872 0 7,254 0 $944 $7,041 $0 $5,241
6 N/A CORRIDOR 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 94 58 5,452 3,875 21,127Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast94 42 3,948 3,875 15,299 15,299 16 1,504 0 5,828 0 $759 $5,346 $0 $4,406
7 N/A MEDIA CENTER 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 30 88 2,640 3,875 10,230Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit30 42 1,260 3,875 4,883 4,883 46 1,380 0 5,348 0 $696 $2,681 $0 $2,081
8 N/A MEDIA CENTER COMP. ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 1,700 449Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 1,700 214 214 46 138 0 235 0 $31 $268 $0 $208
9 N/A MEDIA CENTER BACKROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
10 N/A MEDIA CENTER CONF. ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $21 $341 $0 $281
11 N/A C-13 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
12 N/A C-11 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
13 N/A C-14 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
14 N/A C-12 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
15 N/A C-16 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
16 N/A C-18 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
17 N/A C-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
18 N/A C-10 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
19 N/A C-8 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
20 N/A C-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
21 N/A C-6 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
22 N/A C-4 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
23 N/A C-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
24 N/A C-5 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
25 N/A C-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
26 N/A C-1 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
27 N/A CMB - C WING MENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 900 Wall 1 168 2,100 504 353 16 64 900 192 151 $45 $228 $207 $394
28 N/A BMB - B WING MENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 900 Wall 1 168 2,100 504 353 16 64 900 192 151 $45 $228 $207 $394
29 N/A CAFETERIA 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 48 58 2,784 3,875 10,788Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast48 42 2,016 3,875 7,812 7,812 16 768 0 2,976 0 $387 $2,730 $0 $2,250
30 N/A D-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 13 58 754 1,700 1,282Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast13 42 546 1,700 928 928 16 208 0 354 0 $46 $739 $0 $609
31 N/A D-1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
32 N/A D-1 OFFICE 1 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 1,700 598Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 46 184 0 313 0 $41 $358 $0 $278
33 N/A D-1 OFFICE 2 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 1,700 598Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 46 184 0 313 0 $41 $358 $0 $278
34 N/A D-2 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
35 N/A D-3 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 20 88 1,760 1,700 2,992Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit20 42 840 1,700 1,428 1,428 46 920 0 1,564 0 $204 $1,788 $0 $1,388
36 N/A D-WING SIDE TRANSFER BOYS 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,000 528Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 900 Wall 1 84 2,100 252 176 46 92 900 276 76 $46 $179 $207 $346
37 N/A D-WING SIDE TRANSFER GIRLS 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,000 528Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 900 Wall 1 84 2,100 252 176 46 92 900 276 76 $46 $179 $207 $346
38 N/A FACULTY ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 2,860 1,258Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 715 Ceiling 1 210 2,145 601 450 46 230 715 658 150 $105 $447 $352 $664
39 N/A FACULTY ROOM BATHROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 1,400 123Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 280 Wall 1 42 1,120 59 47 46 46 280 64 12 $10 $89 $207 $276
40 N/A D-6 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
41 N/A D-8 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
42 N/A D-10 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
43 N/A D-9 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
44 N/A D-7 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
45 N/A D-5 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
46 N/A D-4 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $122 $1,073 $0 $833
47 N/A STAGE IN CAFÉ 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $71 $1,138 $0 $938
48 N/A HALLWAY BY STAGE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,875 682Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 3,875 326 326 46 92 0 357 0 $46 $179 $0 $139
49 N/A GYM OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $7 $114 $0 $94
50 N/A GYM OFFICE BATHROOM 2'x2' Troffer w/ (2) F17T8 Lamps & (1) Electronic Ballast 2 34 68 600 41Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast2 28 56 600 34 34 6 12 0 7 0 $1 $86 $0 $66
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012Middle School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
88,639
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 2 of 4
![Page 162: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/162.jpg)
3875 3875 $0.130
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012Middle School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
88,639
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
51 N/A BOYS LOCKER ROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 4 32 128 2,520 323Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast4 22 88 2,520 222 222 10 40 0 101 0 $13 $172 $0 $132
52 N/A BOYS LOCKER ROOM Incandescent Fixture w/ (1) 150w Incandescent Lamp 3 150 450 2,520 1,134New 1'X4' Enclosed Fixture w/ (2) F24T5HO Lamps and (1) 2/24
Elec. HO Ballast3 54 162 2,520 408 408 96 288 0 726 0 $94 $614 $0 $614
53 N/A BOYS LOCKER ROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 8 15 120 2,520 302 None 8 15 120 2,520 302 302 0 0 0 0 0 $0 $0 $0 $0
54 N/A GIRLS LOCKER ROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 4 32 128 2,520 323Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast4 22 88 2,520 222 222 10 40 0 101 0 $13 $172 $0 $132
55 N/A GIRLS LOCKER ROOM Incandescent Fixture w/ (1) 150w Incandescent Lamp 3 150 450 2,520 1,134New 1'X4' Enclosed Fixture w/ (2) F24T5HO Lamps and (1) 2/24
Elec. HO Ballast3 54 162 2,520 408 408 96 288 0 726 0 $94 $614 $0 $614
56 N/A GIRLS LOCKER ROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 8 15 120 2,520 302 None 8 15 120 2,520 302 302 0 0 0 0 0 $0 $0 $0 $0
57 N/A GYM 3 & 44' Industrial Fixture w/ (4) F54T5HO Lamps & (2) 2/54 T5 Elec. NP
Ballasts14 234 3,276 3,875 12,695 None 14 234 3,276 3,875 12,695 12,695 0 0 0 0 0 $0 $0 $0 $0
58 N/A GYM 3 & 4 STORAGE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 600 211Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 600 101 101 46 184 0 110 0 $14 $358 $0 $278
59 N/A S-4 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 5 32 160 1,700 272Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast5 22 110 1,700 187 187 10 50 0 85 0 $11 $216 $0 $166
60 N/A A-6 COMPUTER LAB 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $85 $1,365 $0 $1,125
61 N/A A-5 HOME EC. 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 36 58 2,088 1,700 3,550Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast36 42 1,512 1,700 2,570 2,570 16 576 0 979 0 $127 $2,048 $0 $1,688
62 N/A B-1 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 8 88 704 1,700 1,197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit8 42 336 1,700 571 571 46 368 0 626 0 $81 $715 $0 $555
63 N/A B-2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
64 N/A B-3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
65 N/A B-5 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
66 N/A B-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
67 N/A B-4 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 15 88 1,320 1,700 2,244Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 46 690 0 1,173 0 $153 $1,341 $0 $1,041
68 N/A B-6 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 15 88 1,320 1,700 2,244Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 46 690 0 1,173 0 $153 $1,341 $0 $1,041
69 N/A B-4 PREP ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 1,700 449Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 1,700 214 214 46 138 0 235 0 $31 $268 $0 $208
70 N/A CWB - C WING WOMENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,000 696Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 900 Wall 1 168 2,100 504 353 16 64 900 192 151 $45 $228 $207 $394
71 N/A A-WING FACULTY WOMENS BATHROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 1,400 45Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 280 Wall 1 22 1,120 31 25 10 10 280 14 6 $3 $43 $207 $240
72 N/A A-WING FACULTY MENS BATHROOM 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 1,400 45Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 280 Wall 1 22 1,120 31 25 10 10 280 14 6 $3 $43 $207 $240
73 N/A B-8 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $61 $536 $0 $416
74 N/A A-9 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $64 $1,024 $0 $844
75 N/A A-8 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 30 58 1,740 1,700 2,958Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast30 42 1,260 1,700 2,142 2,142 16 480 0 816 0 $106 $1,706 $0 $1,406
76 N/A A-8 PREP ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $42 $683 $0 $563
77 N/A A-7 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 15 58 870 1,700 1,479Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast15 42 630 1,700 1,071 1,071 16 240 0 408 0 $53 $853 $0 $703
78 N/A A-WING MENS BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 3,000 522Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 900 Wall 1 126 2,100 378 265 16 48 900 144 113 $34 $171 $207 $348
79 N/A A-4 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 9 58 522 1,700 887Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast9 42 378 1,700 643 643 16 144 0 245 0 $32 $512 $0 $422
80 N/A CORRIDOR ADJACENT TO A-4 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,875 682Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 3,875 326 326 46 92 0 357 0 $46 $179 $0 $139
81 N/A HEALTH SUITE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 8 88 704 1,700 1,197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit8 42 336 1,700 571 571 46 368 0 626 0 $81 $715 $0 $555
82 N/A HEALTH SUITE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 8 58 464 1,700 789Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast8 42 336 1,700 571 571 16 128 0 218 0 $28 $455 $0 $375
83 N/A BOILER ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 18 88 1,584 3,875 6,138Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit18 42 756 3,875 2,930 2,930 46 828 0 3,209 0 $418 $1,609 $0 $1,249
84 N/A RECEIVING Incandescent Fixture w/ (1) 150w Incandescent Lamp 2 150 300 3,875 1,163New 1'X4' Enclosed Fixture w/ (2) F24T5HO Lamps and (1) 2/24
Elec. HO Ballast2 54 108 3,875 419 419 96 192 0 744 0 $97 $410 $0 $410
85 N/A RECEIVING 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 3,875 1,349Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 3,875 977 977 16 96 0 372 0 $48 $341 $0 $281
86 N/A MAIN OFFICE LOBBY 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 2,125 2,244Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 2,125 1,071 1,071 46 552 0 1,173 0 $153 $1,073 $0 $833
87 N/A PRINCIPAL SECRETARY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
88 N/A MAIN OFFICE LOBBY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 2,125 740Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 2,125 536 536 16 96 0 204 0 $27 $341 $0 $281
89 N/A FACULTY KITCHEN 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 1,700 449Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 1,700 214 214 46 138 0 235 0 $31 $268 $0 $208
90 N/A PRINCIPAL SECRETARY 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 2,125 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 2,125 357 357 16 64 0 136 0 $18 $228 $0 $188
91 N/A EMPTY OFFICE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 1,700 150Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 1,700 71 71 46 46 0 78 0 $10 $89 $0 $69
92 N/A VICE PRINCIPAL 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 2,125 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 2,125 357 357 16 64 0 136 0 $18 $228 $0 $188
93 N/A GUIDANCE ROOM 1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
94 N/A GUIDANCE ROOM 2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
95 N/A RESTROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 1,400 123Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 280 Wall 1 42 1,120 59 47 46 46 280 64 12 $10 $89 $207 $276
96 N/A ROOM 6 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 1,700 150Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 1,700 71 71 46 46 0 78 0 $10 $89 $0 $69
97 N/A TESTING 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 1,700 150Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 1,700 71 71 46 46 0 78 0 $10 $89 $0 $69
98 N/A CHILD STUDY TEAM 1 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 4 75 300 1,700 510Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit4 28 112 1,700 190 190 47 188 0 320 0 $42 $256 $0 $216
99 N/A CHILD STUDY TEAM 2 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 4 75 300 1,700 510Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit4 28 112 1,700 190 190 47 188 0 320 0 $42 $256 $0 $216
100 N/A A-3 SHOP 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 26 58 1,508 1,700 2,564Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast26 42 1,092 1,700 1,856 1,856 16 416 0 707 0 $92 $1,479 $0 $1,219
101 N/A A-3 SHOP ROOM 1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,700 394Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,700 286 286 16 64 0 109 0 $14 $228 $0 $188
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 3 of 4
![Page 163: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/163.jpg)
3875 3875 $0.130
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012Middle School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
88,639
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
102 N/A A-3 SHOP ROOM 2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $7 $114 $0 $94
103 N/A A-3 SHOP ROOM 3 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $7 $114 $0 $94
104 N/A FIRE SPRINKLER ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $61 $536 $0 $416
1,150 84,738 203,037 1,150 15 55,746 136,970 135,570 28,992 9,225 66,067 1,400 $8,784 $80,153 $3,539 $67,937
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 4 of 4
![Page 164: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/164.jpg)
(Page left blank intentionally)
![Page 165: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/165.jpg)
BUILDING
PRE
TOTAL
FIXT.
QTY
PRE
TOTAL
FIXT.
WATTS
PRE
ANNUAL
KWH
CONSUMPTION
POST
TOTAL
FIXT.
QTY
POST
TOTAL
FIXT.
WATTS
POST
ANNUAL
KWH
CONSUMPTION
WATTS
SAVED
ANNUAL
KWH
SAVED
ANNUAL
KWH
SAVED
WITH
SENSORS
ANNUAL
SAVINGS
$
FIXT.
ANNUAL
SAVINGS
$
SENSORS
ANNUAL
SAVINGS
$
TOTAL
CO2
REDUCTION
(TONS)
NJ Smart
Start
REBATE $
FIXTURES
TOTAL
(INSTALLED)
COST $
SENSORS
TOTAL
(INSTALLED)
COST $
MATERIAL
TOTAL
(INSTALLED)
COST $
SIMPLE
PAYBACK
NET OF REBATE
(YEARS)
High School 1724 175,925 383,739 1,722 119,568 265,659 56,357 118,080 1,081 $13,497 $124 $13,620 39.0 $22,529 $109,469 $3,104 $113,355 6.7
20%
69%
21%
14%
SAVINGSBUILDING EXISTING FIXTURES PROPOSED FIXTURES
LIGHTING RETROFIT SUMMARY FOR:
High School
PERCENTAGE OF REBATES IN TOTAL INSTALLED COST
PERCENTAGE OF CONSUMPTION COMPARE TO EXISTING STATE
EXISTING PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
PROPOSED PERCENTAGE OF LIGHTING ENERGY CONSUMPTION OF THE WHOLE BUILDING
FINANCIAL
![Page 166: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/166.jpg)
(Page left blank intentionally)
![Page 167: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/167.jpg)
3875 3875 $0.114 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 N/A RM 512New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts9 185 1,665 1,700 2,831 None 9 185 1,665 1,700 2,831 2,831 0 0 0 0 0 $0 $0 $0 $0
2 N/A RM 510New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts9 185 1,665 1,700 2,831 None 9 185 1,665 1,700 2,831 2,831 0 0 0 0 0 $0 $0 $0 $0
3 N/A RM 508New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts6 185 1,110 1,700 1,887 None 6 185 1,110 1,700 1,887 1,887 0 0 0 0 0 $0 $0 $0 $0
4 N/A RM 506 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
5 N/A RM 504 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
6 N/A RM 502 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
7 N/A RM 500 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
8 N/A RM 501 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
9 N/A RM 503 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
10 N/A RM 505 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 1,700 2,071Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 1,700 1,499 1,499 16 336 0 571 0 $65 $1,194 $0 $984
11 N/A RM 507New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts10 185 1,850 1,700 3,145 None 10 185 1,850 1,700 3,145 3,145 0 0 0 0 0 $0 $0 $0 $0
12 N/A RM 509 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $54 $536 $0 $416
13 N/A RM 511New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts5 185 925 1,700 1,573 None 5 185 925 1,700 1,573 1,573 0 0 0 0 0 $0 $0 $0 $0
14 N/A RM 416 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $56 $1,024 $0 $844
15 N/A RM 414 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 16 58 928 1,700 1,578Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast16 42 672 1,700 1,142 1,142 16 256 0 435 0 $50 $910 $0 $750
16 N/A RM 412 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 16 58 928 1,700 1,578Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast16 42 672 1,700 1,142 1,142 16 256 0 435 0 $50 $910 $0 $750
17 N/A RM 410 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 15 88 1,320 1,700 2,244Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 46 690 0 1,173 0 $134 $1,341 $0 $1,041
18 N/A RM 408 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 15 88 1,320 1,700 2,244Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit15 42 630 1,700 1,071 1,071 46 690 0 1,173 0 $134 $1,341 $0 $1,041
19 N/A RM 406 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $107 $1,073 $0 $833
20 N/A RM 404 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,700 2,366Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,700 1,714 1,714 16 384 0 653 0 $75 $1,365 $0 $1,125
21 N/A RM 402 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $56 $1,024 $0 $844
22 N/A RM 407 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 6 58 348 1,700 592Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast6 42 252 1,700 428 428 16 96 0 163 0 $19 $341 $0 $281
23 N/A RM 405 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
24 N/A RM 403 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 30 58 1,740 1,700 2,958Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast30 42 1,260 1,700 2,142 2,142 16 480 0 816 0 $93 $1,706 $0 $1,406
25 N/A RM 401 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 1,700 2,071Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 1,700 1,499 1,499 16 336 0 571 0 $65 $1,194 $0 $984
26 N/A RM 308 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $56 $1,024 $0 $844
27 N/A RM 306 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $56 $1,024 $0 $844
28 N/A RM 304 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 1,700 1,775Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 1,700 1,285 1,285 16 288 0 490 0 $56 $1,024 $0 $844
29 N/A RM 302 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
30 N/A RM 309 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 1,700 986Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 1,700 714 714 16 160 0 272 0 $31 $569 $0 $469
31 N/A RM 307 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 22 58 1,276 1,700 2,169Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast22 42 924 1,700 1,571 1,571 16 352 0 598 0 $68 $1,251 $0 $1,031
32 N/A RM 307 STORAGE RM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 600 104Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 600 76 76 16 48 0 29 0 $3 $171 $0 $141
33 N/A RM 305 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 1,700 2,071Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 1,700 1,499 1,499 16 336 0 571 0 $65 $1,194 $0 $984
34 N/A RM 303 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 11 88 968 1,700 1,646Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit11 42 462 1,700 785 785 46 506 0 860 0 $98 $983 $0 $763
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 2 of 7
![Page 168: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/168.jpg)
3875 3875 $0.114
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
35 N/A RM 303 2'x2' Troffer w/ (4) F17T8 Lamps & (1) Electronic Ballast 1 64 64 3,875 248Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit1 28 28 3,875 109 109 36 36 0 140 0 $16 $64 $0 $54
36 N/A RM 301 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 14 88 1,232 1,700 2,094Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit14 42 588 1,700 1,000 1,000 46 644 0 1,095 0 $125 $1,251 $0 $971
37 N/A RM 301 2'x2' Troffer w/ (4) F17T8 Lamps & (1) Electronic Ballast 2 64 128 3,875 496Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit2 28 56 3,875 217 217 36 72 0 279 0 $32 $128 $0 $108
38 N/A RM 206 - FACULTYNew 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts4 185 740 1,400 1,036 None 4 185 280 Wall 1 740 1,120 1,036 829 0 0 280 0 207 $24 $0 $207 $187
39 N/A RM 204New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts10 185 1,850 1,700 3,145 None 10 185 1,850 1,700 3,145 3,145 0 0 0 0 0 $0 $0 $0 $0
40 N/A RM 202 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $54 $536 $0 $416
41 N/A RM 207 - TRAINER 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 10 88 880 1,700 1,496Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit10 42 420 1,700 714 714 46 460 0 782 0 $89 $894 $0 $694
42 N/A RM 205 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 8 88 704 1,700 1,197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit8 42 336 1,700 571 571 46 368 0 626 0 $72 $715 $0 $555
43 N/A RM 203 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $107 $1,073 $0 $833
44 N/A RM 201 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 12 88 1,056 1,700 1,795Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit12 42 504 1,700 857 857 46 552 0 938 0 $107 $1,073 $0 $833
45 N/A BATHROOM NEAR RM 206 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 900 Wall 1 42 2,100 126 88 16 16 900 48 38 $10 $57 $207 $254
46 N/A BATHROOM IN RM 206 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 900 Wall 1 42 2,100 126 88 16 16 900 48 38 $10 $57 $207 $254
47 N/A RM 1A & 1B - A GYMNew 8' Industrial Fixture w/ (8) F54T5HO Lamps & (4) 2/54 T5
Elec. HO Ballasts Wire Guards Multi-Tap Voltage20 468 9,360 1,700 15,912 None 20 468 9,360 1,700 15,912 15,912 0 0 0 0 0 $0 $0 $0 $0
48 N/A RM 1R - A GYM STORAGE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 600 139Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 600 101 101 16 64 0 38 0 $4 $228 $0 $188
49 N/A RM 1T - A GYM STORAGE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 600 139Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 600 101 101 16 64 0 38 0 $4 $228 $0 $188
50 N/A RM 110 - FITNESS 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 25 88 2,200 3,875 8,525Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit25 42 1,050 3,875 4,069 4,069 46 1,150 0 4,456 0 $509 $2,234 $0 $1,734
51 N/A RM 108 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 7 88 616 1,700 1,047Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit7 42 294 1,700 500 500 46 322 0 547 0 $63 $626 $0 $486
52 N/A RM 106 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $54 $536 $0 $416
53 N/A RM 104 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $54 $536 $0 $416
54 N/A RM 102DNew 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts8 185 1,480 1,700 2,516 None 8 185 1,480 1,700 2,516 2,516 0 0 0 0 0 $0 $0 $0 $0
55 N/A RM 107 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,700 898Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 46 276 0 469 0 $54 $536 $0 $416
56 N/A RM 105 - NURSE BEDSNew 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts5 185 925 2,125 1,966 None 5 185 925 2,125 1,966 1,966 0 0 0 0 0 $0 $0 $0 $0
57 N/A RM 105 - NURSE OFFICENew 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts3 185 555 2,125 1,179 None 3 185 555 2,125 1,179 1,179 0 0 0 0 0 $0 $0 $0 $0
58 N/A RM 105 - NURSE WAITINGNew 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts6 185 1,110 2,125 2,359 None 6 185 1,110 2,125 2,359 2,359 0 0 0 0 0 $0 $0 $0 $0
59 N/A RM 105 - NURSE BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 2,125 123Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 2,125 89 89 16 16 0 34 0 $4 $57 $0 $47
60 N/A RM 2A & 2B - B GYM4' Industrial Fixture w/ (4) F54T5HO Lamps & (2) 2/54 T5 Elec. NP
Ballasts24 234 5,616 3,875 21,762 None 24 234 5,616 3,875 21,762 21,762 0 0 0 0 0 $0 $0 $0 $0
61 N/A RM 2P - B GYM MENS LOCKER ROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 12 15 180 3,875 698 None 12 15 180 3,875 698 698 0 0 0 0 0 $0 $0 $0 $0
62 N/A RM 2P - B GYM MENS LOCKER ROOM Incandescent Fixture w/ (1) 100w PAR38 Lamp 3 100 300 3,875 1,163Relamp w/ (1) 23 watt Compact Fluorescent Spring Lamp Screw-In
2 Piece PAR38 Reflector3 23 69 3,875 267 267 77 231 0 895 0 $102 $57 $0 $36
63 N/ARM 2J - B GYM MENS LOCKER TEACHER
ROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $28 $228 $0 $188
64 N/ARM 2K - B GYM MENS LOCKER COACH
ROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,875 225
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 3,875 163 163 16 16 0 62 0 $7 $57 $0 $47
65 N/ARM 2M - B GYM MENS LOCKER
BATHROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,875 450
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 3,875 326 326 16 32 0 124 0 $14 $114 $0 $94
66 N/ARM 2H - B GYM WOMENS LOCKER
ROOMNew Downlight Fixture w/ (1) 13w CFL & Ballast 12 15 180 3,875 698 None 12 15 180 3,875 698 698 0 0 0 0 0 $0 $0 $0 $0
67 N/ARM 2H - B GYM WOMENS LOCKER
ROOMIncandescent Fixture w/ (1) 100w PAR38 Lamp 3 100 300 3,875 1,163
Relamp w/ (1) 23 watt Compact Fluorescent Spring Lamp Screw-In
2 Piece PAR38 Reflector3 23 69 3,875 267 267 77 231 0 895 0 $102 $57 $0 $36
68 N/ARM 2C - B GYM WOMENS LOCKER
TEACHER ROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $28 $228 $0 $188
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 3 of 7
![Page 169: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/169.jpg)
3875 3875 $0.114
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
69 N/ARM 2D - B GYM WOMENS LOCKER
COACH ROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,875 225
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 3,875 163 163 16 16 0 62 0 $7 $57 $0 $47
70 N/ARM 2F - B GYM WOMENS LOCKER
BATHROOM2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,875 450
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 3,875 326 326 16 32 0 124 0 $14 $114 $0 $94
71 N/A RM 102 - PERIODICAL STORAGE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 600 211Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 600 101 101 46 184 0 110 0 $13 $358 $0 $278
72 N/A RM 102 - LIBRARIAN WORKROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 1,700 449Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 1,700 214 214 46 138 0 235 0 $27 $268 $0 $208
73 N/A RM 102 - TECHNOLOGY 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 1,700 299Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 1,700 143 143 46 92 0 156 0 $18 $179 $0 $139
74 N/A RM 102 - RESTROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 600 70Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 90 Wall 1 84 510 50 43 16 32 90 19 8 $3 $114 $207 $301
75 N/A RM 610 - BOILER ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 8 58 464 3,875 1,798Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast8 42 336 3,875 1,302 1,302 16 128 0 496 0 $57 $455 $0 $375
76 N/A RM 608 - ELECT ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 3,875 899Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 3,875 651 651 16 64 0 248 0 $28 $228 $0 $188
77 N/A ROOM ADJACENT TO RM 608 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 1,700 197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 1,700 143 143 16 32 0 54 0 $6 $114 $0 $94
78 N/A RM 3 - C GYM HID High Bay Fixture w/ (1) 350w Metal Halide Lamp & Ballast 12 398 4,776 3,875 18,507New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor12 351 4,212 3,875 16,322 16,322 47 564 0 2,186 0 $250 $4,694 $0 $3,494
79 N/A C GYM MENS LOCKERROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 3,875 341Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 3,875 163 163 46 46 0 178 0 $20 $89 $0 $69
80 N/A C GYM MENS LOCKERROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 6 15 90 3,875 349 None 6 15 90 3,875 349 349 0 0 0 0 0 $0 $0 $0 $0
81 N/A RM 606 - TV STUDIO 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 24 58 1,392 1,400 1,949Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast24 42 1,008 1,400 1,411 1,411 16 384 0 538 0 $61 $1,365 $0 $1,125
82 N/A RM 606 - TV OFFICES 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 11 88 968 1,400 1,355Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit11 42 462 1,400 647 647 46 506 0 708 0 $81 $983 $0 $763
83 N/A C GYM WOMENS LOCKERROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 1 88 88 3,875 341Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 3,875 163 163 46 46 0 178 0 $20 $89 $0 $69
84 N/A C GYM WOMENS LOCKERROOM New Downlight Fixture w/ (1) 13w CFL & Ballast 6 15 90 3,875 349 None 6 15 90 3,875 349 349 0 0 0 0 0 $0 $0 $0 $0
85 N/A A GYM MENS LOCKERROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 9 88 792 3,875 3,069Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit9 42 378 3,875 1,465 1,465 46 414 0 1,604 0 $183 $804 $0 $624
86 N/A A GYM WOMENS LOCKEROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 9 88 792 3,875 3,069Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit9 42 378 3,875 1,465 1,465 46 414 0 1,604 0 $183 $804 $0 $624
87 N/A MENS BATHROOM NEAR RM 407 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 900 Wall 1 42 2,100 126 88 16 16 900 48 38 $10 $57 $207 $254
88 N/A MENS BATHROOM NEAR RM 407 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 3,000 336Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 900 Wall 1 42 2,100 126 88 70 70 900 210 38 $28 $89 $207 $276
89 N/A WOMENS BATHROOM NEAR RM 407 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 3,000 174Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 900 Wall 1 42 2,100 126 88 16 16 900 48 38 $10 $57 $207 $254
90 N/A WOMENS BATHROOM NEAR RM 407 2'x4' Troffer w/ (4) FO32T8 Lamps & (2) Electronic Ballasts 1 112 112 3,000 336Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 900 Wall 1 42 2,100 126 88 70 70 900 210 38 $28 $89 $207 $276
91 N/A MENS BATHROOM NEAR RM 512 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 900 Wall 1 84 2,100 252 176 16 32 900 96 76 $20 $114 $207 $301
92 N/A WOMENS BATHROOM NEAR RM 512 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 3,000 348Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 900 Wall 1 84 2,100 252 176 16 32 900 96 76 $20 $114 $207 $301
93 N/A MENS BATHROOM NEAR RM 301 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 3,000 96Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 900 Wall 1 22 2,100 66 46 10 10 900 30 20 $6 $43 $207 $240
94 N/A WOMENS BATHROOM NEAR RM 301 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 1 32 32 3,000 96Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast1 22 900 Wall 1 22 2,100 66 46 10 10 900 30 20 $6 $43 $207 $240
95 N/A CORRIDOR - P.A. 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 3,875 2,248Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 3,875 1,628 1,628 16 160 0 620 0 $71 $569 $0 $469
96 N/A CORRIDOR - 600 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 18 58 1,044 3,875 4,046Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast18 42 756 3,875 2,930 2,930 16 288 0 1,116 0 $128 $1,024 $0 $844
97 N/A CORRIDOR - 700 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 3,875 2,248Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 3,875 1,628 1,628 16 160 0 620 0 $71 $569 $0 $469
98 N/A CORRIDOR - 500 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 19 58 1,102 3,875 4,270Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast19 42 798 3,875 3,092 3,092 16 304 0 1,178 0 $135 $1,081 $0 $891
99 N/A CORRIDOR - 400 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 3,875 2,697Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 3,875 1,953 1,953 16 192 0 744 0 $85 $683 $0 $563
100 N/A CORRIDOR - 300 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 21 58 1,218 3,875 4,720Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast21 42 882 3,875 3,418 3,418 16 336 0 1,302 0 $149 $1,194 $0 $984
101 N/A CORRIDOR - 200 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 3,875 2,697Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 3,875 1,953 1,953 16 192 0 744 0 $85 $683 $0 $563
102 N/A CORRIDOR - 100 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 17 58 986 3,875 3,821Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast17 42 714 3,875 2,767 2,767 16 272 0 1,054 0 $120 $967 $0 $797
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 4 of 7
![Page 170: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/170.jpg)
3875 3875 $0.114
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
103 N/A CORRIDOR - 100 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 2 75 150 3,875 581Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit2 28 56 3,875 217 217 47 94 0 364 0 $42 $128 $0 $108
104 N/A CORRIDOR - 800 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 13 58 754 3,875 2,922Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast13 42 546 3,875 2,116 2,116 16 208 0 806 0 $92 $739 $0 $609
105 N/ACORRIDOR - 800 (SCHOOL STORE
AREA)2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 3,875 2,248
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 3,875 1,628 1,628 16 160 0 620 0 $71 $569 $0 $469
106 N/A RM 802 A&B - CAFÉ HID High Bay Fixture w/ (1) 350w Metal Halide Lamp & Ballast 20 398 7,960 3,875 30,845New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor20 351 7,020 3,875 27,203 27,203 47 940 0 3,643 0 $416 $7,824 $0 $5,824
107 N/A RM 802 A&B - CAFÉ 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 18 75 1,350 3,875 5,231Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit18 28 504 3,875 1,953 1,953 47 846 0 3,278 0 $375 $1,151 $0 $971
108 N/A RM 802 - KITCHEN AREAS 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 39 88 3,432 3,875 13,299Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit39 42 1,638 3,875 6,347 6,347 46 1,794 0 6,952 0 $795 $3,486 $0 $2,706
109 N/A PTAC - THEATER Incandescent Fixture w/ (1) 500w Incandescent Lamp 25 500 12,500 250 3,125 150W CFL 25 150 3,750 250 938 938 350 8,750 0 2,188 0 $250 $2,099 $0 $1,849
110 N/A PTAC - THEATER Incandescent Fixture w/ (1) 100w PAR38 Lamp 14 100 1,400 250 350Relamp w/ (1) 23 watt Compact Fluorescent Spring Lamp Screw-In
2 Piece PAR38 Reflector14 23 322 250 81 81 77 1,078 0 270 0 $31 $265 $0 $167
111 N/A RM 101 - MAIN OFFICE AREA 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
112 N/A RM 101 - MAIN OFFICE AREA 2'x2' Troffer w/ (2) FT40T5 Lamps & Electronic Ballast 10 75 750 2,125 1,594Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit10 28 280 2,125 595 595 47 470 0 999 0 $114 $639 $0 $539
113 N/A RM 101 - MAIL ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 2,125 935Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 210 2,125 446 446 46 230 0 489 0 $56 $447 $0 $347
114 N/A RM 101 - WAITING AREA 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
115 N/A RM 101 - SPEECH OFFICE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
116 N/A RM 101 - CHILD STUDY TEAM 1 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
117 N/A RM 101 - CHILD STUDY TEAM 2 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
118 N/A RM 101 - CHILD STUDY TEAM 3 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
119 N/A RM 101 - PRINC. CONF RM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 2,125 748Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 2,125 357 357 46 184 0 391 0 $45 $358 $0 $278
120 N/A RM 101 - PRINC. SECRETARY 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
121 N/A RM 101 - PRINCIPAL 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 2,125 935Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 210 2,125 446 446 46 230 0 489 0 $56 $447 $0 $347
122 N/A RM 101 - PRINCIPAL BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 2,125 123Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 2,125 89 89 16 16 0 34 0 $4 $57 $0 $47
123 N/A RM 103 - VICE PRINCIPAL MAIN AREA 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 2,125 935Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 210 2,125 446 446 46 230 0 489 0 $56 $447 $0 $347
124 N/A RM 103 - BATHROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 1 58 58 600 35Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast1 42 42 600 25 25 16 16 0 10 0 $1 $57 $0 $47
125 N/A RM 103 - VICE PRINCIPAL OFFICE 1 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 2,125 247Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 2,125 179 179 16 32 0 68 0 $8 $114 $0 $94
126 N/A RM 103 - VICE PRINCIPAL OFFICE 2 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 3 58 174 2,125 370Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast3 42 126 2,125 268 268 16 48 0 102 0 $12 $171 $0 $141
127 N/A RM 103 - CONFERENCE ROOM 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 2,125 493Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 2,125 357 357 16 64 0 136 0 $16 $228 $0 $188
128 N/A RM 600 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $62 $1,138 $0 $938
129 N/A RM 600A 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 1,700 986Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 1,700 714 714 16 160 0 272 0 $31 $569 $0 $469
130 N/A RM 602New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts19 185 3,515 1,700 5,976 None 19 185 3,515 1,700 5,976 5,976 0 0 0 0 0 $0 $0 $0 $0
131 N/A RM 604New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts19 185 3,515 1,700 5,976 None 19 185 3,515 1,700 5,976 5,976 0 0 0 0 0 $0 $0 $0 $0
132 N/A OFFICE BETWEEN 602&604New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts4 185 740 1,700 1,258 None 4 185 740 1,700 1,258 1,258 0 0 0 0 0 $0 $0 $0 $0
133 N/A RM 602 SIDE OFFICE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 1,700 299Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 1,700 143 143 46 92 0 156 0 $18 $179 $0 $139
134 N/A RM 604 SIDE OFFICE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 1,700 299Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 1,700 143 143 46 92 0 156 0 $18 $179 $0 $139
135 N/A RM 601 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 14 88 1,232 1,700 2,094Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit14 42 588 1,700 1,000 1,000 46 644 0 1,095 0 $125 $1,251 $0 $971
136 N/A RM 601 PREP ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 1,700 598Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 46 184 0 313 0 $36 $358 $0 $278
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 5 of 7
![Page 171: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/171.jpg)
3875 3875 $0.114
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
137 N/A RM 603 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 14 88 1,232 1,700 2,094Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit14 42 588 1,700 1,000 1,000 46 644 0 1,095 0 $125 $1,251 $0 $971
138 N/A RM 603 MUD ROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 1,700 598Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 1,700 286 286 46 184 0 313 0 $36 $358 $0 $278
139 N/A RM 700 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
140 N/A RM 702 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
141 N/A RM 704 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 12 58 696 1,700 1,183Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast12 42 504 1,700 857 857 16 192 0 326 0 $37 $683 $0 $563
142 N/A RM 706New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts4 185 740 1,700 1,258 None 4 185 740 1,700 1,258 1,258 0 0 0 0 0 $0 $0 $0 $0
143 N/A RM 708 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 8 88 704 1,700 1,197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit8 42 336 1,700 571 571 46 368 0 626 0 $72 $715 $0 $555
144 N/A RM 710 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 8 88 704 1,700 1,197Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit8 42 336 1,700 571 571 46 368 0 626 0 $72 $715 $0 $555
145 N/A RM 709 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $62 $1,138 $0 $938
146 N/A RM 707 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 20 58 1,160 1,700 1,972Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast20 42 840 1,700 1,428 1,428 16 320 0 544 0 $62 $1,138 $0 $938
147 N/A RM 705New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts18 185 3,330 1,700 5,661 None 18 185 3,330 1,700 5,661 5,661 0 0 0 0 0 $0 $0 $0 $0
148 N/A RM 703 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 10 58 580 1,700 986Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast10 42 420 1,700 714 714 16 160 0 272 0 $31 $569 $0 $469
149 N/A RM 701 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 54 58 3,132 1,700 5,324Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast54 42 2,268 1,700 3,856 3,856 16 864 0 1,469 0 $168 $3,071 $0 $2,531
150 N/A RM 800New 2'x4' Troffer w/ (3) F54T5HO Lamps & (1) 3/54 T5 Elec. HO
Ballasts22 185 4,070 1,700 6,919 None 22 185 4,070 1,700 6,919 6,919 0 0 0 0 0 $0 $0 $0 $0
151 N/A MAINTENANCE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 2 58 116 600 70Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast2 42 84 600 50 50 16 32 0 19 0 $2 $114 $0 $94
152 N/A 800 WING MENS BATHROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 3,000 1,320Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 900 Wall 1 210 2,100 630 441 46 230 900 690 189 $100 $447 $207 $534
153 N/A 800 WING WOMENS BATHROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 3,000 1,320Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 900 Wall 1 210 2,100 630 441 46 230 900 690 189 $100 $447 $207 $534
154 N/A RM 805 New Downlight Fixture w/ (1) 13w CFL & Ballast 8 15 120 1,700 204 None 8 15 120 1,700 204 204 0 0 0 0 0 $0 $0 $0 $0
155 N/A RM 103 - GUIDANCE AREA 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 7 88 616 2,125 1,309Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit7 42 294 2,125 625 625 46 322 0 684 0 $78 $626 $0 $486
156 N/A RM 103 - GUIDANCE AREA 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 0 88 0 2,125 0Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit0 42 0 2,125 0 0 46 0 0 0 0 $0 $0 $0 $0
157 N/A RM 103 - GUIDANCE / CHILD STUDY 1 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
158 N/A RM 103 - GUIDANCE WORKROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
159 N/A RM 103 - GUIDANCE / CHILD STUDY 2 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
160 N/A RM 103 - GUIDANCE / CHILD STUDY 3 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
161 N/A RM 103 - GUIDANCE / CHILD STUDY 4 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
162 N/A RM 103 - GUIDANCE / CHILD STUDY 5 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 3 88 264 2,125 561Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit3 42 126 2,125 268 268 46 138 0 293 0 $34 $268 $0 $208
163 N/A RM 103 - GUIDANCE CONF. RM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 4 88 352 2,125 748Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit4 42 168 2,125 357 357 46 184 0 391 0 $45 $358 $0 $278
164 N/A RM 103 - GUIDANCE COPY RM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 2,125 374Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 2,125 179 179 46 92 0 196 0 $22 $179 $0 $139
165 N/A 802A FACULTY DINING 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 6 88 528 1,400 739Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 280 Wall 1 252 1,120 353 282 46 276 280 386 71 $52 $536 $207 $603
166 N/A PA-1 2'x4' Troffer w/ (4) F40T12/34w Lamps & (2) Electronic Ballasts 6 120 720 1,700 1,224Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 78 468 0 796 0 $91 $536 $0 $416
167 N/A PA-2 2'x4' Troffer w/ (4) F40T12/34w Lamps & (2) Electronic Ballasts 6 120 720 1,700 1,224Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 78 468 0 796 0 $91 $536 $0 $416
168 N/A PA-3 2'x4' Troffer w/ (4) F40T12/34w Lamps & (2) Electronic Ballasts 6 120 720 1,700 1,224Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 78 468 0 796 0 $91 $536 $0 $416
169 N/A PA-4 2'x4' Troffer w/ (4) F40T12/34w Lamps & (2) Electronic Ballasts 6 120 720 1,700 1,224Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 78 468 0 796 0 $91 $536 $0 $416
170 N/A PA MAINTENANCE CLOSET 2'x4' Troffer w/ (2) F40T12/34w Lamps & (1) Electronic Ballast 1 60 60 600 36Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit1 42 42 600 25 25 18 18 0 11 0 $1 $89 $0 $69
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 6 of 7
![Page 172: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/172.jpg)
3875 3875 $0.114
TOTAL
INSTALLED
COST
AFTER
INCENTIVES
POST
TOTAL
WATTS
/
LINE
EXISTING FIXTURES
PRE
AVERAGE
LIGHT LEVEL
FOOT
CANDLES
PRE
ANNUAL
KWH
WATTS
SAVED
/
FIXT.
ANNUAL
HOURS
SAVED
SPACE DESCRIPTION ENERGY ANALYSIS
MIDDLE TWP. PUBLIC SCHOOLS DATE OF AUDIT:
November 2012High School
REPLACEMENT FIXTURES
FACILITY SQ. FT.
205,270
LIGHTING UPGRADE PROJECT
LINE x LINE DETAIL
CUSTOMER:
FACILITY:
SENSOR
TYPE
POST
WATTS
/
FIXT.
QTY
SENSORS
/
LINE
ANNUAL
HOURSPOST
ANNUAL
KWH
POST
ANNUAL
KWH
WITH
OCC
SENSOR
ANNUAL
KWH
SAVED
WITH
OCC
TOTAL
WATTS
SAVED
/
LINE
ANNUAL
KWH
SAVED
FROM
FIXT.
LINE PROPOSED FIXTURE DESCRIPTION
POST
FIXT.
QTY
ANNUAL
HOURS
SAVED
NUMBERSPACE DESCRIPTION
PRE
WATTS
/
FIXT.
PRE
TOTAL
WATTS
/
LINE
PRE FIXTURE DESCRIPTION
PRE
FIXT.
QTY
DEFAULT
ANNUAL
HOURS
TOTAL ANNUAL
$ SAVINGS / LINE
(INCLUDING
SENSORS)
COST ANALYSIS
TOTAL FIXTURE
COST (MATERIAL
PLUS LABOR)
WITH
MARK UPS
TOTAL SENSOR
COST
(MATERIAL
PLUS
LABOR)
WITH
MARK UPS
171 N/A BAND ROOM HID High Bay Fixture w/ (1) 350w Metal Halide Lamp & Ballast 12 398 4,776 1,700 8,119New 2'x4' Singlepoint-Mount High Bay w/ (6) F54T5HO Lamps & (3)
2/54 T5 Elec. HO Ballasts Wire Guard Occupancy Sensor10 351 3,510 1,700 5,967 5,967 47 564 0 2,152 0 $246 $3,912 $0 $3,694
172 N/A BAND ROOMCompact Fluorescent Step Fixture w/ (1) 18w CFL & Electronic
Ballast17 18 306 1,700 520 None 17 18 306 1,700 520 520 0 0 0 0 0 $0 $0 $0 $0
173 N/A PA-5 2'x4' Troffer w/ (4) F40T12/34w Lamps & (2) Electronic Ballasts 6 120 720 1,700 1,224Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit6 42 252 1,700 428 428 78 468 0 796 0 $91 $536 $0 $416
174 N/A PTAC - THEATER OFFICE 2'x4' Troffer w/ (2) FO32T8 Lamps & (1) Electronic Ballast 4 58 232 1,040 241Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast4 42 168 1,040 175 175 16 64 0 67 0 $8 $228 $0 $188
175 N/A PTAC - HALLWAY Incandescent Fixture w/ (1) 100w PAR38 Lamp 37 100 3,700 1,700 6,290Relamp w/ (1) 23 watt Compact Fluorescent Spring Lamp Screw-In
2 Piece PAR38 Reflector37 23 851 1,700 1,447 1,447 77 2,849 0 4,843 0 $554 $701 $0 $442
176 N/A PTAC - VESTIBULECompact Fluorescent Step Fixture w/ (1) 18w CFL & Electronic
Ballast6 18 108 1,700 184 None 6 18 108 1,700 184 184 0 0 0 0 0 $0 $0 $0 $0
177 N/A Main Entrance Lobby 2'x4' Troffer w/ (1) FO32T8 Lamp & (1) Electronic Ballast 21 32 672 1,700 1,142Relamp & Reballast w/ (1) F28T8 Lamp & (1) 1/32 Elec. LP HE
Ballast21 22 462 1,700 785 785 10 210 0 357 0 $41 $905 $0 $695
178 N/A RM 102 - LIBRARY LOBBY 2'x2' Troffer w/ (3) FT40T5 Lamps & (2) Electronic Ballasts 44 117 5,148 3,875 19,949Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit44 28 1,232 3,875 4,774 4,774 89 3,916 0 15,175 0 $1,734 $2,812 $0 $2,372
179 N/A RM 102 - LIBRARY LOBBY 2'x2' Troffer w/ (3) FT40T5 Lamps & (2) Electronic Ballasts 16 117 1,872 3,875 7,254Relamp & Reballast w/ (2) F17T8 Lamps & (1) 2/17 Elec. LP HE
Ballast 2'x2' Silver Reflector Kit16 28 448 3,875 1,736 1,736 89 1,424 0 5,518 0 $631 $1,023 $0 $863
180 N/A RM 1F - MENS LOCKERROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 3,875 1,705Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 210 3,875 814 814 46 230 0 891 0 $102 $447 $0 $347
181 N/A RM 1G - MENS LOCKERROOM OFFICE 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,875 682Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 3,875 326 326 46 92 0 357 0 $41 $179 $0 $139
182 N/A RM 1C - WOMENS LOCKERROOM 2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 5 88 440 3,875 1,705Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit5 42 210 3,875 814 814 46 230 0 891 0 $102 $447 $0 $347
183 N/ARM 1P - WOMENS LOCKERROOM
OFFICE2'x4' Troffer w/ (3) FO32T8 Lamps & (1) Electronic Ballast 2 88 176 3,875 682
Relamp & Reballast w/ (2) F28T8 Lamps & (1) 2/32 Elec. LP HE
Ballast 2'x4' Silver Reflector Kit2 42 84 3,875 326 326 46 92 0 357 0 $41 $179 $0 $139
1,724 175,925 383,739 1,722 15 119,568 266,740 265,659 55,655 11,450 116,999 1,081 $13,497 $109,469 $3,104 $90,826
Dome-Tech, Inc. | “Building Performance - Delivered” | 510 Thornall St., Suite 170, Edison, NJ 08837 www.dome-tech.com 7 of 7
![Page 173: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/173.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #8:
WALK-IN COOLER CONTROLLERS
![Page 174: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/174.jpg)
![Page 175: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/175.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #8
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Walk-in Coolers Evaporator Fan Controls - Elementary School #1
Price of Electricity, $/kWh (blended rate) $0.130
Existing
Condition
Proposed
SystemSavings
Evaporator Fan Savings 100% 70%
Heat Load Savings (during periods when cooler is not actively cooled) 100% 25%
Cost to Remove Evap Fan Heat Load 38$ 9$ 28$
Fan Annual Operating Cost 255$ 178$ 76$
Run Hours 8,760 8,760
Annual Energy Consumption (kWh) 1,960 1,155 806
Annual Cost and Savings, $ 292$ 188$ 105$
1. Run hours based on fan motors being run 8,760 hrs
2. Assuming a compressor efficiency of 1.3 kW/Ton.
3. Assuming each evaporator fan motor is 1/20 HP and 65% efficient.
4. Assuming a 30% savings at the evaporator fans and 20% at the compressors.
Prepared by Dome-Tech, Inc. 1 of 4
![Page 176: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/176.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #8
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Walk-in Coolers Evaporator Fan Controls - Elementary School #2
Price of Electricity, $/kWh (blended rate) $0.107
Existing
Condition
Proposed
SystemSavings
Evaporator Fan Savings 100% 70%
Heat Load Savings (during periods when cooler is not actively cooled) 100% 25%
Cost to Remove Evap Fan Heat Load 41$ 10$ 31$
Fan Annual Operating Cost 281$ 196$ 84$
Run Hours 8,760 8,760
Annual Energy Consumption (kWh) 2,614 1,540 1,074
Annual Cost and Savings, $ 322$ 207$ 115$
1. Run hours based on fan motors being run 8,760 hrs
2. Assuming a compressor efficiency of 1.3 kW/Ton.
3. Assuming each evaporator fan motor is 1/20 HP and 65% efficient.
4. Assuming a 30% savings at the evaporator fans and 20% at the compressors.
Prepared by Dome-Tech, Inc. 2 of 4
![Page 177: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/177.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #8
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Walk-in Coolers Evaporator Fan Controls - Middle School
Price of Electricity, $/kWh (blended rate) $0.114
Existing
Condition
Proposed
SystemSavings
Evaporator Fan Savings 100% 70%
Heat Load Savings (during periods when cooler is not actively cooled) 100% 25%
Cost to Remove Evap Fan Heat Load 44$ 11$ 33$
Fan Annual Operating Cost 299$ 209$ 90$
Run Hours 8,760 8,760
Annual Energy Consumption (kWh) 2,614 1,540 1,074
Annual Cost and Savings, $ 343$ 220$ 123$
1. Run hours based on fan motors being run 8,760 hrs
2. Assuming a compressor efficiency of 1.3 kW/Ton.
3. Assuming each evaporator fan motor is 1/20 HP and 65% efficient.
4. Assuming a 30% savings at the evaporator fans and 20% at the compressors.
Prepared by Dome-Tech, Inc. 3 of 4
![Page 178: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/178.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #8
Project InformationMiddle Township BOE
Energy Audit
October 2012
Compiled by Dome-Tech, Inc.
Walk-in Coolers Evaporator Fan Controls - High School
Price of Electricity, $/kWh (blended rate) $0.130
Existing
Condition
Proposed
SystemSavings
Evaporator Fan Savings 100% 70%
Heat Load Savings (during periods when cooler is not actively cooled) 100% 25%
Cost to Remove Evap Fan Heat Load 75$ 19$ 57$
Fan Annual Operating Cost 511$ 357$ 153$
Run Hours 8,760 8,760
Annual Energy Consumption (kWh) 3,921 2,310 1,611
Annual Cost and Savings, $ 586$ 376$ 210$
1. Run hours based on fan motors being run 8,760 hrs
2. Assuming a compressor efficiency of 1.3 kW/Ton.
3. Assuming each evaporator fan motor is 1/20 HP and 50% efficient.
4. Assuming a 30% savings at the evaporator fans and 75% reduction in heat load during periods when the walk-in is not being actively cooled.
Prepared by Dome-Tech, Inc. 4 of 4
![Page 179: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/179.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
ECM #9:
WINDOW REPLACEMENT
![Page 180: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/180.jpg)
![Page 181: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/181.jpg)
MIDDLE TOWNSHIP
COST ESTIMATE
ECM #9
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 67"x 39.5" windows ea 20 425.00 8,500 145.00 2,900 11,400
2 32"x 32" windows ea 1 300.00 300 110.00 110 410
3 36"x 29.5" windows ea 2 300.00 600 110.00 220 820
4,042
TOTAL 16,672$
SUB-TOTAL 12,630
O&P 20% 2,526
ASBESTOS ABATEMENT -
DIRECT COST 15,156
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 15,156
CONTINGENCY 10% 1,516
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 16,672
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 16,672
INTEREST DURING CONSTRUCTION 0% -
TOTAL 16,672$
DESCRIPTION OF
WORK PER UNIT TOTAL PER UNIT TOTAL
1 84" x 36" windows ea 107 625.00 66,875 145.00 15,515 82,390
26,365
TOTAL 108,755$
SUB-TOTAL 82,390
O&P 20% 16,478
ASBESTOS ABATEMENT -
DIRECT COST 98,868
PAYMENT & PERFORMANCE BOND 0% -
SUB-TOTAL 98,868
CONTINGENCY 10% 9,887
ASBESTOS CONTINGENCY 0% -
SUB-TOTAL 108,755
ASBESTOS DESIGN & AIR MONITORING, TESTING -
IC FEE 0.0% -
SUB-TOTAL 108,755
INTEREST DURING CONSTRUCTION 0% -
TOTAL 108,755$
Administration Building - Window Replacement
N/N UNIT QTYMATERIAL LABOR
TOTAL
Other Estimated Implementation Costs
Other Estimated Implementation Costs
Middle School - Window Replacement
N/N UNIT QTYMATERIAL LABOR
TOTAL
Prepared by Dome-Tech, Inc. 1 of 3
![Page 182: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/182.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #9
$0.110
$1.140
Existing WindowsProposed
Windows
Proposed
Insulated
Panels
Savings
Net Area of Window Glass to Be Replaced, Sq Ft 350 350 0
Window U- Value 1.1 0.4 0.2
Estimated Infiltration Rate, CFM 270.6 27.1 0.0
Annual Cooling Degree Days, Base 65F 1,296 1,296 1,296
Annual Heating Degree Days, Base 55F 1,783 1,783 1,783
Annual Cooling Infiltration Load (kBTU) 9,089 909 -
Annual Cooling Conduction Load (kBTU) 6,189 3,127 -
Annual Cooling Electrical Consumption (kWh) 1,528 404 - 1,124
Annual Heating Infiltration Load (kBTU) 12,504 1,250 -
Annual Heating Conduction Load (kBTU) 8,514 4,302 -
Annual Heating Electrical Consumption (kWh) 3,080 814 - 2,266
Annual Heating Natural Gas Consumption (Therms) 131 35 - 97
Annual Cost and Savings, $ 657$ 84$ -$ 573$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all BIN hours below 55° F.
3 A 80% load factor was used when calculating the existing leakage rate.
4. Assume the cooling system has an efficiency of 1.2 kW/ton.
5. Assume the boiler system has an efficiency of 80%.
Administration Building - Replace Windows
Price of Electricity, $/kWh (blended rate)
Price of Natural Gas, $/therm
Prepared by Dome-Tech, Inc. 2 of 3
![Page 183: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/183.jpg)
MIDDLE TOWNSHIP
CALCULATIONS
ECM #9
$0.114
$0.977
Existing WindowsProposed
WindowsSavings
Net Area of Window Glass to Be Replaced, Sq Ft 2,020 2,020
Window U- Value 1.1 0.4
Estimated Infiltration Rate, CFM 236.0 23.6
Annual Cooling Degree Days, Base 65F 1,296 1,296
Annual Heating Degree Days, Base 55F 1,783 1,783
Annual Cooling Infiltration Load (kBTU) 7,928 793
Annual Cooling Conduction Load (kBTU) 35,717 18,046
Annual Cooling Electrical Consumption (kWh) 4,365 1,884 2,481
Annual Heating Infiltration Load (kBTU) 10,958 1,108
Annual Heating Conduction Load (kBTU) 49,139 24,828
Annual Heating Natural Gas Consumption (Therms) 751 324 427
Annual Cost and Savings, $ 1,233$ 532$ 701$
1. Infiltration rate was calculated according to ASHRAE Fundamentals 2005 Door Leakage Rate Equation F27.12
2. Estimated hours of infiltration was based on all BIN hours below 55° F.
3 An 80% load factor was used when calculating the existing leakage rate.
4. Assume the cooling system has an efficiency of 1.2 kW/ton.
5. Assume the boiler system has an efficiency of 80%.
Middle School - Replace Windows
Price of Electricity, $/kWh (blended rate)
Price of Natural Gas, $/therm
Prepared by Dome-Tech, Inc. 3 of 3
![Page 184: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/184.jpg)
(Page left blank intentionally)
![Page 185: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/185.jpg)
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
RENEWABLES CALCULATIONS
![Page 186: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/186.jpg)
(Page left blank intentionally)
![Page 187: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/187.jpg)
MIDDLE TOWNSHIP
RENEWABLES CALCULATIONS
Solar PV SystemMiddle Township Middle School, NJ
Performed By Dome-Tech, Inc.
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9
N/S N/S N/S N/S N/S N/S N/S N/S N/S
Gross Length, feet 63 63 41 63 138 86 50 14 73
Panel Count (calculated) 18.4 18.4 11.9 18.4 40.2 25.1 14.6 4.1 21.3
Panel Count (actual) 18 18 11 18 40 25 14 4 21
E/W E/W E/W E/W E/W E/W E/W E/W E/W
Gross Length, feet 41 110 34 146 75 54 91 57 95
Panel Count (calculated) 8.0 21.5 6.6 28.5 14.7 10.6 17.8 11.1 18.6
Panel Count (actual) 8 21 6 28 14 10 17 11 18
Gross Panel Qty 144 378 66 504 560 250 238 44 378
Panel Reduction % 80% 80% 100% 40% 40% 60% 70% 90% 80%
Net Panel Qty 115 302 66 202 224 150 167 40 302
System Capacity, kw 26 70 15 46 52 35 38 9 70
Choose Closest City Atlantic City Atlantic City Atlantic City Atlantic City Atlantic City Atlantic City Atlantic City Atlantic City Atlantic City
Capacity Factor (kwh/kw) 1,115 1,115 1,115 1,115 1,115 1,115 1,115 1,115 1,115
First Year Expected Production (kWh) 29,543 77,550 16,926 51,700 57,445 38,468 42,725 10,155 77,550
1 of 1
![Page 188: Energy Audit Prepared For - Amazon S3Township_FIN… · Energy Star Score is calculated to establish a facility-specific energy intensity baseline. Energy Star can be used to compare](https://reader033.vdocuments.us/reader033/viewer/2022042913/5f4b5507ce8348512702f557/html5/thumbnails/188.jpg)
MIDDLE TOWNSHIP
RENEWABLE CALCULATIONS
Wind Analysis - Middle Township Board of EducationPerformed By Dome-Tech Energy Advisors
Average Wind Speed 5.4 5.4 6.9
Annual Electric Use, kwh 4,451,312 4,451,312 4,451,312
Electric Cost $0.122/kWh $0.122/kWh $0.122/kWh
Micro
Traditional
5.2 kw
Traditional 50
kw
Number of Units 50 10 1
kW Capacity, per Unit 1 Kw 5.2 Kw 50.0 Kw
kW Capacity, Total 50 Kw 52 Kw 50 Kw
Annual Production Per Unit 1,182 Kwh 8,121 Kwh 163,858 Kwh
Annual Production Total 59,119 Kwh 81,211 Kwh 163,858 Kwh
Annual Savings $7,213 $9,908 $19,991
Installed Cost per Unit $6,500
Installed Cost per Kw $6,000 $5,000
Gross Installed Cost $325,000 $312,000 $250,000
NJ Incentive 0 0 0
Net Installed Cost $325,000 $312,000 $250,000
Simple PayBack 45.1 31.5 12.5
% Energy Use 1.3% 1.8% 3.7%
Latitude Longitude January February March April May June July August September October November December
39.08 74.8 6.42 5.87 5.45 5.02 4.88 4.76 4.67 4.68 5.02 5.67 6.39 6.35
Latitude Longitude January February March April May June July August September October November December
39.08 74.8 8.13 7.43 6.9 6.36 6.18 6.02 5.91 5.92 6.36 7.18 8.09 8.04
Latitude 39.08
Longitude 74.83
NASA Surface meteorology and Solar Energy: Data Subset
http://eosweb.larc.nasa.gov/cgi-bin/sse/subset.cgi?email=
Monthly Averaged Wind Speed At 10 m Above The Surface Of The Earth For Terrain Similar To Airports (m/s)
Monthly Averaged Wind Speed At 50 m Above The Surface Of The Earth (m/s)
Annual Electric Use, kwh
Name
4,451,312
Electric Cost, kwh $0.122
Middle Township BOE
1 of 1