energy and water efficiency solutions€¦ · the atcs system was commissioned in february of 2005...

53
Energy and Water Efficiency Solutions Aashish Sharma DGM– Sales & Business Development Cell. No. 9826079408 Email: [email protected]

Upload: others

Post on 14-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Energy and Water Efficiency Solutions

Aashish SharmaDGM– Sales & Business Development

Cell. No. 9826079408Email: [email protected]

Page 2: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

C.Q.M. – Cooling Quality Management Ltd. founded in 1994, is a company headquartered in Israelheadquartered in Israel.

C.Q.M. is a global provider of on-line mechanical anti-fouling solutions. We fit in “Make in India” programme of Govt. Of India with our office and works in Pune, I diIndia.

CQM products are developed through in house R & D and patented worldwide, delivers increased productivity and energy efficiency to facilities such as p y gy yThermal Power Plants, Oil Refineries, Petro Chemical Complexes, Fertiliser plants, Pharmaceutical Industries, Shopping Malls, Hotels, and Institutions etc.

CQM systems are highly acclaimed and well accepted in over 22 countries with CQM systems are highly acclaimed and well accepted in over 22 countries with more than 10000 units in the field spread over America, Europe, and Asia.

All the CQM systems and services are fully compliant with CE Directives, ISO 9001: 2000 and having Green Label Certification Standards.

CQM is a member of NAESCO, the US National Association for Energy Services Companies (ESCO).

CQM systems result in energy saving, elimination of costly downtime, extension of capital equipment life cycle and optimization of heat transfer performance.

Page 3: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Solutions Energy, Water and Ecology Efficienciese gy, ate a d co ogy c e c es

• Up to 4% on power stations• Significant energy savings in industrial

processes using heat exchangers• Up to 30% energy savings in HVAC• Up to 30% energy savings in HVAC

• More than 50% savings in bleed water of CTsg• 100% savings of refuse water when replacing

RO water treatment for CTs

• 100% chemical free100% f h i l f t• 100% re-use of chemical-free water

Page 4: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Solution Overview

SRSR--CTCTATCSATCS

Improve EfficiencyImprove Efficiency

Two Pronged Approach

1. Keep Condenser Tubes CleanAutomatic Tube Cleaning System (ATCS)

2. Manage Water ChemistryScale Removal System (SRS)

Page 5: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Automatic Tube Cleaning System

• Condenser Ball cleaning technology has existed for 50 years and is a well accepted principle.

• However, CQM has intensified ATCS technology (Patented) to level where it meets fullest potential in(Patented) to level where it meets fullest potential in energy savings contribution.

Page 6: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRS-CT - How it Works

CQM SR-CTCQM SR-CT

Electrochemical Process

Creates High Ph instead ofchemical

Free Chlorine Generation

Self Flushing

Redundant Sand Filtration

Scale/Bio/Corrosion Control

Low Cost of Operation

Page 7: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes
Page 8: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

The ProblemMUD, ALGAE, HARD SCALE, BIO-FILM, ZEBRA MUSSELS, CLAMS, SEA SHELLS

With out CQM

Page 9: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

N0 Problem of:MUD, ALGAE, HARD SCALE, BIO-FILM, ZEBRA MUSSELS, CLAMS, SEA SHELLS

With CQM

Page 10: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

AUTOMATIC TUBE CLEANING SYSTEM (ATCS)

All balls are injected at once

Balls reach the tube sheet at the a s eac t e tube s eet at t esame timeBalls randomly disperse cleaning central and peripheral tubes

Ball travel does not interfere with condenser water flow

Ball trap with very big open area to ll t th b ll

No moving parts in ball trap with absolutely zero loss of sponge balls

collect the balls

Screen with round holes, balls can not escape

No need to count the balls

Balls do not pass through the pump

Simple PLC operation from the control room

Page 11: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM - Power Plant Installations – Last 5 years

No. Name Unit No. Capacity Size Cooling BT Type1 Leqing 4 600MW 88" Sea Water T1 Leqing 4 600MW 88 Sea Water T2 Taizhou 10 300MW 72" Sea Water A3 Lanxi 2 600MW 88" CT T4 Changxing 3 300MW 72" CT T5 Guangan 32 300MW 72" CT T6 i 1 300 2 C6 Wangting 14 300MW 72" CT T7 Qingdao 1 300MW 72" Sea Water T8 Xingjiang 4 200MW 56" CT T9 Fengtai 1 600MW 88" CT T

11 Changxing 4 300MW 72" CT T12 Taizhou 9 300MW 72" Sea Water A13 Leqing 2 600MW 88" Sea Water T14 Lanxi 4 600MW 88" CT T15 Guangan 33 300MW 72" CT T17 Xingjiang 3 200MW 56" CT T17 Xingjiang 3 200MW 56 CT T18 Changxing 1 300MW 72" CT T19 Zouxian 34 300MW 72" CT T20 Qingdao 1 300MW 72" Sea Water T21 Gongxian 1 600MW 88" CT T22 F t i 2 600MW 88" CT T22 Fengtai 2 600MW 88" CT T24 Lanxi 3 600MW 88" CT T25 Guangan 34 300MW 72" CT T26 Xingjiang 3 200MW 56" CT T

Page 12: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Power Plant Installations

Changxing Unit 2 start 11-2010Unit 1 start 10-2012Unit 3 start 09-2013Unit 4 start 02-2014

Page 13: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Changxing Power Plant3rd party Energy saving report on unit-2

China Zhejiang Provincial Power Research Institution (Oct 2011)

Page 14: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Power Plant Installations

Guangan Unit 32 start 10-2012Unit 33 start 11-2013Unit 34 will start 07-2014

Page 15: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Power Plant Installations

L i U it 2 t t 06 2012Lanxi Unit 2 start 06-2012Unit 4 start 11-2013Unit 3 start 05-2014

Commissioning Handing Over Report for 24# Lanxi600MW unit-3 2 x 88 T CT 1

Unit 3 start 05-2014

Page 16: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CQM Power Plant InstallationsCQM Power Plant InstallationsPower Plant Country MW Application Ball Traps Start UpBosen Turkey 136 CC Condenser 1x36" &  1x28" 2/28/2000

Zorlu Turkey 120 Condenser 2x24" 1/2/2005

Modern Enerji Turkey 60 CC Condenser 2x16" 6/23/1997

IKPP I d i 300 C d 1 46" & 1 42" 11/18/2003IKPP Indonesia 300 Condenser 1x46"  &  1x42" 11/18/2003

Haifa Israel (unit stop) Condenser 2x40" 6/15/2006

Energetika KG&TK‐2 Czech Condenser 2x20" & 2x10" 2/1/2007

Energetika TG 12&14 Czech Condenser 2x24" & 2x24" 6/1/2008Energetika TG 12&14 Czech Condenser 2x24  & 2x24 6/1/2008

Energetika TG 32 Czech Condenser 2x20"  7/1/2009

AEM Torino Italy 400 CC Condenser 1x72" 3/12/2004

Hwaseong Korea 529 CC Condenser 1x60" 8/16/2006

Chanqxin #3 China 400 coal Condenser 2x72" 10/31/2010

Bis Enerji Turkey 150 CC Absorption unit 10" 4/18/2007

Soda Sanayii A.S. Turkey 150 Oil cooler 2x3" & 4x4" 6/21/1998

Serang Mill Indonesia Oil cooler 3x6" 6/22/2002

Rotenberg Israel Vacuum pump 1x6" 2/1/2005

Page 17: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Why we are most suitable for India• Most of old power plant may not have ATCS and if

i ll d b ki ffi i linstalled may not be working efficiently. If used CQM ATCS, increase in efficiency and saving in terms of revenueterms of revenue.

• We can customize our system to fit in your existing system.system.

• We fit in Make in India programme of Govt. of India –Have full fledged manufacturing unit in Pune, India.g g ,

• Backed by efficient R&D team in Israel and excellent service team in India.

Page 18: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

ATCS is suitable for -

All types of power plants.Heat exchangers in refineries.Heat exchangers/ condensers in anyHeat exchangers/ condensers in anyprocess industry.Heat e change s/ condense s in fe tiliseHeat exchangers/ condensers in fertiliserplants.HVAC / Chillers.

19

Page 19: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical HVAC System1 mm of fouling accumulation in the condenser tubes

increases energy consumption by 30%% change in energy consumption (Kwh) per cubic ton at 4°C

140%

+ 30%130%

140%

120%

100%

110%

Fuente: Philip Kotz, Air Conditioning Heating, 

100%-1.33E-15 0.3 0.6 0.9 1.2

Grosor del deposito - mmthickness of fouling (mm)

Piping and Air Conditioning Journal

Page 20: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

No. Name System�Size Building�type Completion�Date1 Gl k G i Ltd G j t 8” Ph I d t 2011

CQM – HVAC Installation in India1 Glenmark Generics�Ltd.,�Gujarat 8” Pharma�Industry 20112 Fourrts Laboratories Ltd.,�Chennai 8” Pharma�Industry 20123 IPCA�Laboratories�Ltd.,�Ratlam 10” Pharma�Industry 20124 S.K.�Oil�Industries�Ltd.,�Jalgaon 4” Food�Industry 20135 Maharashtra�Solvent�Extraction�P�Ltd., Dhulia 4” Food Industry 20136 ITC�Sonar,�Kolkatta 8” Hotel 20137 Infosys,�Bangalore 4” Office 20138 The Medicity�Hospital 14” Hospital 20149 IHDP,�New�Delhi 8” Office 2014

10 ITC�Biscuit�Factory,�Haridwar 8” Food�Industry 201411 Cipla�Ltd.,�Pune 3” Pharma�Industry 201412 Ester�Industries�Ltd., Khatima,�Bihar 10” Process�Industry 201413 ITC�Welcome�Sheraton,�New�Delhi 8” Hotel 201514 Taj Palace,�Delhi 10” Hotel 201515 Hindalco�Industries�Ltd.,�Renukoot,�U.P. 6”&�10” Aluminum�Industry 201516 Dinanath Mangeskar Hospital,�Pune 8” Hospital 201517 Hotel�Renaissance,�Mumbai 10” Hotel 201518 Hotel�JW�Marriott,�Mumbai 10” Hotel 201519 Hotel�ITC�Grand�Maratha, Mumbai 10” Hotel 201520 Dr.�Reddy�Laboratories,�Hyderabad 10” Pharma�Industry 201521 Titan�Company�Ltd.,�Hosur Bangalore 6” Watch�Industry 201622 Jindal Polyfilms Ltd.,�Nashik 10” Plastic�Industry 201623 Godrej�Industries�Ltd.,�Ankaleswar 4” Industry 201624 IMFA, Bhubaneswar�(2�x�60�MW) 36” Captive�Power�plant 2013( ) p p

Page 21: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical installationsTypical installations

ATCS in combine cycle power plantATCS in combine cycle power plant

Page 22: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical installation - 400MW CC Power Plant M li i (T i ) It lMoncalieri (Torino) Italy

The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes under the most severe river water characteristics fine silt and l Wh th d d f i ti ll t b f d f tl lalgae. When the condenser was opened for inspection all tubes were found perfectly clean.

Marco Pattacini Plant Engineering

Page 23: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

75 + 65 MW CC Power Plant Bosen Turkey

We have been using the CQM Ball Cleaning System since May 2000 on the condensers of our 75of our 75MW and 65 MW Combined Cycle power plants. second quality water supply. Bose Electric Power Generation

Page 24: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical installation - CRYOGENIC PLANT

Pag. 27

Page 25: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Tube and Shell Heat Exchanger:Two or more PassesTwo or more Passes

Fixed or removable

fluxesfluxes

29

Page 26: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

ATCS Features

• C.Q.M have developed patented solution suitable for temp. upto300 OC, especially for refinery crude oil service

• Fluids with specific gravity: 0.9 to 1.8

b i 12 32• Tube size : 12 to 32 mm

• Crude oil pipe size : 6” to 24”

• Vertical or horizontal pipe alignment.

31

Page 27: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical installation – Fertiliser plantTypical installation Fertiliser plant

32

Page 28: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

C.Q.MC.Q.M

SRCT-LS - Large scale (NCT) Non Chemical Treatment system for cooling towers water

treatment in Power Plants

Energy and Water Efficiency Solutions

Page 29: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

In all Thermal po er plants ater is sed for steam generation as• In all Thermal power plants water is used for steam generation as well as cooling media for different circuits.

• Maintaining clean and desired quality of water is very important inMaintaining clean and desired quality of water is very important in the power plants as the source of water is river, underground or sea.

• The desired quality of water is achieved in power plants traditionally by treating the water with various types of chemicals, which are hazardous and causes environmental issues.

• SRCT is online treatment of cooling tower water absolutely without• SRCT is online treatment of cooling tower water absolutely without use of any chemicals and the results achieved by this method are better than the chemicals used traditionally.

• Best part of this technology is that it is green technology, we are not using any chemicals for the treatment of water. SRCT maintains 100% t di i f ti b t i d t th f l i100% water disinfection, no bacteria and prevents growth of algae in power plant water circuits.

Page 30: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

New Technology from CQM

• For the past 10 years CQM have installed more then 800 SRCT (non chemical electrolysis system) for small to ( y y )medium size cooling towers.

• The technology replace any use of chemicals in the treatment of cooling tower water.

• The New SRCT - LS (large Scale) is a new concept and design based on the above proven product design to meet the challenges of very large scale cooling towers in power stations and refinerystations and refinery.

• First mid size (4500m3h / 20,000GPM) was successfully run over past two years in Auxiliary cooling tower in a power station belong to ZEG Group in China.station belong to ZEG Group in China.

• Based on successful results over two year period ZEG Group has purchased from CQM in 2014 an SRCT - LS for the treatment of 2 X 600MW cooling tower project 

$ l f hg p j

estimate at $4M, two cooling towers of 70,000 m3h/ 320,000GPM each.

Page 31: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Deposits of salts, corrosion, dirt and micro-organisms reduce the efficiency of coolingorganisms reduce the efficiency of cooling

towers and water circuits

Page 32: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

And increase electricity and water consumption and accelerate the deterioration of theand accelerate the deterioration of the

equipment and tubes

Page 33: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Chemicals used for water treatment require to maintain the water conductivity level atthe water conductivity level at

max 2500 µs, which implies a high level of bleed-off

Water consumption of p~ 20 m3/day*to compensate bleed offto compensate bleed-off(500TR cooling tower operating 18 hrs/day)p g y)

* asumming fresh water conductivity of 300 µs

Page 34: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Solution:

SRCT -LSCh i l f W T S fChemical-free Water Treatment System for Automatic Scale Removal and Cleaning of

Cooling Towers and Water CircuitsWater Circuits

Page 35: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRS allows the operation of the cooling towers at 4500-5000 µs conductivity4500-5000 µs conductivity,

saving up to 50% of drained water

Water consumption of ~ 10 m3/dayto compensate bleed-off(500TR cooling tower ( goperating 18 hrs/day)

Water consumption of ~ 20 m3/dayto compensate bleed offto compensate bleed-off(500TR cooling tower operating 18 hrs/day)

Page 36: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

By eliminating the use of chemicals, SRS allows the saving of 100% of bleed off that can bethe saving of 100% of bleed-off that can be

applied for watering or other uses

Page 37: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRS maintains water circuits free of deposits, the most efficient and technological technology

• Automatic operation 100% productivity

• Active oxidation removes corrosion

• Electrolytic technology zero chemicals

• Removes susp, solids zero dirt

• Strong Oxidation zero microorganis.

Page 38: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Typical layout -2 X 600 MW

Page 39: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

Page 40: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

Page 41: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

CQM SRCT-LS 35000CQM SRCT-LS 35000

Electrochemical Process

C t Hi h H I T kCreates High pH In Tank

Free Chlorine Generation

Self Flushingg

Scale/Bio/Corrosion Control

Low Cost of Operation

Page 42: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

Page 43: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

Page 44: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Dimensions and featuresTotal Height 4120

Dimensions and Features

Total Width 2300Total Length 12000Weight TBD

Working Pressure Open flowMaximum Treatment Capacity 35000 m3/h (by side circulation)Anode Type MMO-coated Titanium G7-CQMpH 6-9Treated water conductivity 1000 – 3000 micro siemens

Water Pump Centrifugal, electricity poweredController DeltaPower Supply 380 vPower consumption 75 KW(max), 40 KW (normal)

Page 45: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000

Water control and drainage

Drain water per one container unit is approx. 4 cubic per dayDrain water per one container unit is approx. 4 cubic per day

Accumulated scaling will sink into the bottom of the gtank

The sediments drainage control is automatic by controlThe sediments drainage control is automatic by control valve, operates twice a day.

Page 46: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

CL water concentration

Residual choline level will be up to 0.5ppm

Addition Five (5) oxidation agents that are created inAddition Five (5) oxidation agents that are created in the electrolysis process provide disinfection solution to any un-expected event.any un expected event.

Page 47: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

The processp• During the process, basic pH develops on the cathode surface, and acid

pH on the anode surface As a result of the basic pH conditions on thepH on the anode surface. As a result of the basic pH conditions on the cathode

• surface the following reactions occur:• Mg(HCO3)2+4OH Mg(OH) 2+2H2O+2CO3²• Ca(HCO3)2+2OH CaCO3+2H2O + CO3²

M (HCO3)2 M CO3+2H2O + CO2• Mg(HCO3)2 MgCO3+2H2O + CO2• (SiO2)aq (SiO2)• These sediments (MgCO3, CaCO3, Mg(OH) 2, SiO2) that are theThese sediments (MgCO3, CaCO3, Mg(OH) 2, SiO2) that are the

main ingredients of scale in water systems, are treated.

Page 48: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

The results• On the face of the anodes the following reactions occur:

OH OH R di l OH• OH - e OH Radical OH• OHº H2O + O Radical Oxygen• 2OHº H2O2 Peroxide2OH H2O2 Peroxide• Cl - e Cl Radical chlorine• 2Cl Cl2 Molecular chlorine• The S.R. has an anodic reaction that releases some oxidants to the

water and changes some of the chloride to active chlorine in small portions. If there are bacteria and algae in the system, it will help treatportions. If there are bacteria and algae in the system, it will help treat it, keep the bacteria level low, and helps to prevent algae grow.

Page 49: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 35000•Automatic and reliable turnkey system.•Continuously treat the cooling tower water•Continuously treat the cooling tower water.•Avoids the need of chemical treatment.•Saves up to 50% of the blow-down water.100% of blo do n can be ec cled•100% of blow-down can be recycled.

•Automatic self-cleaning to remove accumulated dirt and scale.•100% water disinfection, no bacteria, prevents growth of algae.•Operation at high µs/cm without forming scale.•Creates an alkaline pH environment that prevents corrosion.•No additives or consumables.No additives or consumables.•Low operating and maintenance costs.•Robust life time of equipment's.•Absolutely green environmentally friendly and safe•Absolutely green environmentally friendly and safe.

Page 50: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

SRCT-LS 4500 m3H significant biological improvement with in 3 month at a power plantimprovement with in 3 month at a power plant

Before SR 3-months After SR

Page 51: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Sea water and SRCT-LS

Sea water is suitable to our application, every site is subject to a water analysis report from the requested site.

Page 52: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

Some of our Customers

Page 53: Energy and Water Efficiency Solutions€¦ · The ATCS system was commissioned in February of 2005 and since that time the ATCS has performed properly ensuring clean condenser tubes

C Q MC.Q.M

THANK YOUTHANK YOUjwww.cqm-raj.com,

Email: [email protected] No. 9826079408