End-to-End Testing-Introduction

Page 2© OMICRON

What is it?• It’s the simultaneous injection of simulated fault quantities

into two or more interconnected devices in order to verify proper protection system operation

End to End Testing-Introduction

Page 3© OMICRON

Why do it?• Setting and communication errors represent nearly half of all

misoperations

End to End Testing-Introduction

Page 4© OMICRON

RelayElements

50G 50P

21P87L

...

Logic

Relay B

System Testing

Element Testing

Why do it?• Traditional functional testing cannot adequately test communication

assisted schemes

End-to-End Testing-Implementation

Page 5© OMICRON

Clock Accuracy Considerations

• Traditional communication-assisted distance protection• Only carries permissive and block signals• 1ms accuracy was acceptable

End-to-End Testing-Implementation

Page 6© OMICRON

Clock Accuracy Considerations

• Line/bus differential • 60hz->50usec/deg, therefore small time errors can introduce substantial

measurement inaccuracies• Newer applications require extraordinary precision (IEEE 1588)

End-to-End Testing-Implementation

Page 7© OMICRON

General Test Hardware Setup

• Positioning a GPS antenna in urban environments or around energized structures can be challenging

• For remote test sets not under remote control, voice communication is required

End-to-End Testing-Implementation

General procedure:1. Develop a list of desired test cases based on circuit design, logic

decisions, and potential scheme weaknesses

Variations in fault loop, fault location, system configuration, secondary faults, SOTF, LOPT, etc. should be tested to verify hardware, software, and settings.

End-to-End Testing-Implementation

General procedure:2. Develop test quantities for each desired test case

• Fault quantities can be obtained from a variety of modeling software

• Fault data format can be IEEE COMTRADE, a variety of proprietary formats, or a simple spreadsheet

End-to-End Testing-Implementation

COMTRADE Advantage:• Universal standard• Waveform includes

realistic DC offset and fault inception angle

• Waveforms easily scaled

C37-111-2013 COMTRADE (Common format for Transient Data Exchange)

End-to-End Testing-Implementation

COMTRADE format:• CFG file contains channel data• DAT file contains waveform data• HDR file optional info

C37-111-2013 COMTRADE (Common format for Transient Data Exchange)

End-to-End Testing-Implementation

General procedure:3. Isolate the equipment under test

• Common practice today is to take the protected object out of service

End-to-End Testing-Implementation

General procedure:4. Perform a metering test

• Carefully check all analog and binary signals5. Verify GPS or IRIG-B time synch

• Mixing test set manufacturers in the test

End-to-End Testing-Implementation

General procedure:6. Execute test cases

While the execution time is controlled by GPS, test cases are usually selected and armed via voice communication between the test locations.

End-to-End Testing-Implementation

General procedure:7. Evaluate results• Verify proper operation• Verify targets/SER

What is new for End to End testing?Testing Automatic Loop Restoration Schemes

Schemes are communication-based and can incorporate advanced recloser controls or traditional relaying.• Complex, but can dramatically affect system availability metrics

What is new for End to End testing?Testing Automatic Loop Restoration Schemes

Schemes require careful commissioning• Design vs. installation reality• Redundant communication channels and operating modes• Complex logic• Multiple test scenarios

Page 18© OMICRON

One PC controlling multiple test sets makes this easier

What is new for End to End testing?Testing Automatic Loop Restoration Schemes

Restoration schemes are difficult to test with conventional E2E methods.

What is new for End to End testing?Testing Automatic Loop Restoration Schemes

What is new for End to End testing?Testing Automatic Loop Restoration Schemes

Page 21© OMICRON

• Simple settings, but complex operation• Bench testing is good, but field installation will introduce variables

What is next for End to End Testing?Testing time Domain and travelling wave schemes

Why test Time Domain relays

Page 22© OMICRON

• 1nsec/ft propagation Time• TW pulses for currents must be simulated for first arrival and first reflected TW on both ends with

different TW polarities (current and voltage) and on different phases• Superimpose traveling wave pulses at 10kHz sampled current and voltage signals point-on-wave for

current and voltage traveling waves• End-to-end test with multiple time-synchronized test devices and high accuracy GPS clocks

What is next for End to End Testing?Testing time Domain and travelling wave schemes

Unique challenges for test hardware and software

Page 23© OMICRON

• Model topology of protected line (incl. non-homogenous segments, successor and predecessor line, parallel line, series capacitors, ...)

• Possibility to simulate faults on any location in the topology with different fault types, inception angles, arc resistances

What is next for End to End Testing?Testing time Domain and travelling wave schemes

Unique challenges for test hardware and software

What is next for End to End Testing?Testing time Domain and travelling wave schemes

• 100 km overhead line• Z1 = 7.8 Ohms @ 84 °• Z0 = 24.8 Ohms @ 81.5 °• Line propagation time:

340us (TWLPT)• Protected by 2 SEL-

T400L with TD21, TD32, TW32, TW87, POTT and DTT, TW (DE and SE) and Z-based (DE and SE) fault locators

What is next for End to End Testing?Testing time Domain and travelling wave schemes

What is next for End to End Testing?Testing time Domain and travelling wave schemes

Fault inceptionTravelling wave hits near endTraveling wave hit far end

Bewley’s Lattice Diagram of a similar fault

Conclusion

As relay systems become more complex, modern End to End testing tools provide the single most effective way to test communication based relay schemes.

Questions?