end of session 2 presentation 11-29-16 corey harpe external
TRANSCRIPT
![Page 1: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/1.jpg)
Corey HarpeFossil Hydro OperationsCo-op Development ProgramNovember 29th 2016
![Page 2: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/2.jpg)
About Me
■ University of Florida
– Senior: Mechanical Engineering
– Graduation: May 2018■ How many rotations with Duke Energy?
– Session 1 & 2: High Energy Piping (FL Region) at Crystal River Steam Plant
■ Central Engineering – Boilers and Fuel Prep
– Mentor: Chris Barbee
– Manager: Randy Kaupang
![Page 3: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/3.jpg)
Today’s Discussion
• My Safety MomentI• Responsibilities this RotationII• HRSG and Boiler InspectionsIII• Bartow AutoPIPE AnalysisIV• ASME Branch Reinforcement CalculatorV• Looking AheadVI
![Page 4: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/4.jpg)
My Safety Moment
Dropped Objects
During steam drum inspections at Hines a coworker bent over and a paint pen fell off the top story and down to the ground. The pen exploded and we all took a moment to revisit the danger of dropped objects and the importance of tethers.
![Page 5: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/5.jpg)
Responsibilities this Rotation■ Analyzed
– AutoPIPE Stress Analysis of Bartow HRH Drain Modification
■ Attended– 2016 FHO TechX Conference
– Tour of the University of Florida Co-generation Plant
■ Created– Material Spec. Database for Osprey’s HP and HRH Piping Systems
– ASME B31.1 Branch Connection Reinforcement Area Calculator
■ Inspected– Osprey Plant baseline inspections with Structural Integrity
– Boilers at Crystal River Unit 2, Unit 5, and Anclote Unit 2
– HRSGs at Hines PB4A and PB4B
![Page 6: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/6.jpg)
HRSG Inspections – Hines PB4A
![Page 7: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/7.jpg)
Boiler Inspections – Crystal River Unit 2
![Page 8: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/8.jpg)
Boiler Inspections – Anclote Unit 2
![Page 9: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/9.jpg)
Bartow AutoPIPE Analysis - Intro
![Page 10: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/10.jpg)
Bartow AutoPIPE Analysis – Benefits
■ Training
– Learned the fundamentals of AutoPIPE
■ Testing– Analyzed code stresses
and thermal displacement
■ Collaborated– Compared to Steve Grace’s
Caepipe Analysis
![Page 11: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/11.jpg)
ASME Branch Reinforcement Calculator - Intro
![Page 12: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/12.jpg)
ASME Branch Reinforcement Calculator - Benefits■ Learned valuable information
– ASME Codes
■ Man hours saved– Piping engineers can use this tool
instead of reading the code book
■ Safety– Ensure that existing designs or
repairs meet code
■ Teamwork– Received feedback from Boilers
and Fuel Prep Team and revised accordingly
![Page 13: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/13.jpg)
Looking Ahead■ Returning May 22nd to join the Nuclear Generation Engineering
Summer Internship Program at the Brunswick Plant
▲Available from: Duke Energy Brand Toolkit & iCreate
![Page 14: End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL](https://reader036.vdocuments.us/reader036/viewer/2022062902/58edcc451a28abe77a8b4641/html5/thumbnails/14.jpg)
Questions?
Available from: suncoastnews.com