ENBE FINAL PROJECT Imagine a Better
Urban Transportation Hubs
and Connectivity
25% GROUP WORK
PRESENTATION: 8TH December 2016
(8AM @ CODA)
![Page 4: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/4.jpg)
TASK: As a group you are required to propose a new improved
transportation hub and connectivity links at the
given site. You are required to propose the idea based on your
SWOT analysis to make it a better urban transportation hub and
connectivity linkages.
Determine what are the factors or issues to be improved or elements to be included. Determine what to link from and to the
transportation hub. How would you improve it? You are required
to justify your suggestions, supported by case studies or
references from books or other resources.
The proposal should focus on improving the urban planning, public spaces, about people, jobs and activities, basic public
facilities, transportation, connectivity, sense of place and green
sustainable initiatives.
![Page 5: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/5.jpg)
TASK: The new proposal should also consider; the atmosphere, the
tangible and intangible factors, culture and community, views &
vistas, layouts, arrangements, zoning, walkability, infrastructures,
shapes and form, nodes, green areas, edges, pathways, visuals,
squares, promenade, shades, public furniture's, signage's,
waterfront, walkways, amphitheater, interesting spaces and
activities, urban intervention etc.
By improving the connectivity you could determine the type of
new urban public spaces to propose. Propose it on plan with
supporting visuals and illustrations. (drawing plan) – PLUS
PROVIIDE REFERENCES BOOKS AND OTHER EXISTING PROJECTS
THAT IS SIMILAR – especially during tutorials
For the final students are required to prepare presentation boards and 2 models.
![Page 6: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/6.jpg)
requirements: Students are required to prepare the followings;
1. Maximum 4 and min 1 - A1 Presentation boards (hand drawn or
printed) – introduction about the site and proposal, explain what is
the 5 new thing that you have improved, explain the aim of the
proposal of the site, connectivity and transportation, public spaces
and facilities, and must focus on ONE public space area that is the
starting point of the connection path (to provide a zoom in plan and
details preferably near the station), 3 green and sustainable
initiatives or ideas, supporting images and information, master plan
of the site. + to provide a clear schedule of what was the issues and
solutions to improve the transportation hub and connectivity links on
A3 size paper or board.
2. An A3 size base model of the OVAL SITE - scale 1:750/1000/1250 +
An A3 size base model of the focused transportation hub area -
scale 1:250/500 (using recycle box board. Laser cutting is NOT allowed)
3. A 2 minute video compilation explaining about the project. (to be
placed in the E-Portfolio – to submit the YouTube link during the
exam week) - INDIVIDUAL
![Page 7: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/7.jpg)
assessment 1. 40% CONTENT & IDEAS - Depth of thoughtful research, suggestions,
sensitivity, aim of the proposal and consideration to plan and
propose the improves transportation hub and connectivity.
Implementing the content and elements taught in class and using
correct urban planning and architectural terminology. (this must be
shown and evidence in the presentation boards and model)
2. 30% Models Outcome – The clarity of the elements on the model, the
use of suitable materials, colors and workmanship
3. 30% Presentation Boards-Readability – Layout, structure of contents,
arrangements of text & content, graphics & colors, techniques,
visuals, clear and proper illustrations & drawings.
TOTAL: 100% (25% for the final marks)
*Video will be mark as 5% under the E-portfolio marks.
![Page 8: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/8.jpg)
+ A Video Compilation
1-4 A1 presentation boards
A3 size based model at 1:1000
A3 size board to present the schedule explaining about the
issues and the solutions
A3 size based model at 1:500
![Page 9: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/9.jpg)
The models
![Page 10: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/10.jpg)
![Page 11: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/11.jpg)
![Page 12: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/12.jpg)
![Page 13: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/13.jpg)
![Page 14: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/14.jpg)
![Page 15: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/15.jpg)
![Page 16: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/16.jpg)
![Page 17: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/17.jpg)
![Page 18: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/18.jpg)
![Page 19: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/19.jpg)
![Page 20: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/20.jpg)
![Page 21: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/21.jpg)
![Page 22: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/22.jpg)
![Page 23: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/23.jpg)
![Page 24: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/24.jpg)
![Page 25: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/25.jpg)
![Page 26: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/26.jpg)
The presentation boards
![Page 27: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/27.jpg)
![Page 28: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/28.jpg)
![Page 29: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/29.jpg)
![Page 30: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/30.jpg)
![Page 31: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/31.jpg)
![Page 32: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/32.jpg)
![Page 33: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/33.jpg)
![Page 34: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/34.jpg)
![Page 35: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/35.jpg)
![Page 36: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/36.jpg)
![Page 37: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/37.jpg)
![Page 38: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/38.jpg)
![Page 39: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/39.jpg)
![Page 40: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/40.jpg)
![Page 41: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/41.jpg)
![Page 42: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/42.jpg)
![Page 43: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/43.jpg)
![Page 44: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/44.jpg)
![Page 45: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/45.jpg)
![Page 46: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/46.jpg)
![Page 47: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/47.jpg)
![Page 48: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/48.jpg)
![Page 49: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/49.jpg)
![Page 50: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/50.jpg)
![Page 51: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/51.jpg)
![Page 52: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/52.jpg)
![Page 53: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/53.jpg)
![Page 54: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/54.jpg)
![Page 55: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/55.jpg)
![Page 56: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/56.jpg)
![Page 57: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/57.jpg)
![Page 58: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/58.jpg)
![Page 59: Enbe final project brief (1)](https://reader033.vdocuments.us/reader033/viewer/2022042907/586fb1921a28abe57d8b6579/html5/thumbnails/59.jpg)
+ A Video Compilation
1-4 A1 presentation boards
A3 size based model at 1:750/1000/1250
A3 size board to present the schedule explaining about the
issues and the solutions
A3 size based model at 1:250/500