Brussels, 18-20 February 2008 – Dissemination of information workshop 1
EUROCODESBackground and Applications EN 1991 – Eurocode 1: Actions on structures
EN 1991-1-4:2005
Wind actions
Your logo
![Page 2: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/2.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 2
EUROCODESBackground and Applications EN 1991-1-4:2005 Contents
1. General
2. Design situations
3. Modelling of wind actions
4. Wind velocity and velocity pressure
5. Wind actions
6. Structural factor
7. Pressure and force coefficients
8. Wind actions on bridges
![Page 3: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/3.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 3
EUROCODESBackground and Applications EN 1991-1-4:2005 Contents
Annex
A. Terrain effects
B. Procedure 1 for determining the structural factor
C. Procedure 2 for determining the structural factor
D. Structural factors for different types of structures
E. Vortex shedding and aeroelastic instabilities
F. Dynamic characteristics of structures
![Page 4: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/4.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 4
EUROCODESBackground and Applications Section 1 General – 1.1 Scope
(2) This Part is applicable to:
- Buildings and civil engineering works with heights up to 200 m
- Bridges having no span greater than 200 m, provided that they satisfy the criteria for dynamic response
(3) This part is intended to predict characteristic wind actions onland-based structures, their components and appendages
![Page 5: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/5.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 5
EUROCODESBackground and Applications Section 1 General – 1.1 Scope
Draft corrigendum to EN 1991-1-4:200522 January 2008
(11) Guyed masts and lattice towers are treated in EN 1993-3-1 and lighting columns in EN 40
(12) This part does not give guidance on the following aspects:
- torsional vibrations, e.g. tall buildings with a central core
- bridge deck vibrations from transverse wind turbulence
- wind actions on cable supported bridges
- vibrations where more than the fundamental mode needs to beconsidered
![Page 6: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/6.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 6
EUROCODESBackground and Applications Section 2 Design situations
(1)P The relevant wind actions shall be determined for each design situation identified in accordance with EN 1990, 3.2.
(2) Traffic, snow and ice
(3) Execution
(4) Where in design windows and doors are assumed to be shutunder storm conditions, the effect of these being open should betreated as an accidental design situation
![Page 7: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/7.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 7
EUROCODESBackground and Applications Section 3 Modelling of wind actions
3.1 Nature
3.2 Representations of wind actions
3.3 Classification of wind actions
(1) Unless otherwise specified, wind actions should be classified as variable fixed actions
3.4 Characteristic values
(1)
Note: All coefficients or models, to derive wind actions from basicvalues, are chosen so that the probability of the calculated windactions does not exceed the probability of these basic values
3.5 Models
![Page 8: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/8.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 8
EUROCODESBackground and Applications Section 4 Wind vel. and vel. pres. - 4.2 Basic values
0,bseasondirb vccv ⋅⋅=
![Page 9: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/9.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 9
EUROCODESBackground and Applications Section 4 Wind vel. and vel. pres. - 4.2 Basic values
ENV 1991-2-4:1995
![Page 10: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/10.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 10
EUROCODESBackground and Applications Norway: Basic wind velocity. NS 3491-4:2002
![Page 11: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/11.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 11
EUROCODESBackground and Applications UK: Basic wind velocity. BS 6399-2:1997
![Page 12: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/12.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 12
EUROCODESBackground and Applications Faroe Islands – extreme winds
![Page 13: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/13.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 13
EUROCODESBackground and Applications Faroe Islands – extreme winds
Vindklima i Danmark og i udlandet 29
![Page 14: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/14.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 14
EUROCODESBackground and Applications Faroe Islands – measuring stations
![Page 15: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/15.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 15
EUROCODESBackground and Applications Faroe Islands - Glyvursnes
Vindklima i Danmark og i udlandet 37
![Page 16: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/16.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 16
EUROCODESBackground and Applications Faroe Islands – basic wind velocities
![Page 17: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/17.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 17
EUROCODESBackground and Applications Italy - Messina
![Page 18: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/18.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 18
EUROCODESBackground and Applications Southerly winds at Messina – bridge deck height
![Page 19: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/19.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 19
EUROCODESBackground and Applications Basis for updated European wind map?
ENV 1991-2-4:1995
![Page 20: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/20.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 20
EUROCODESBackground and Applications Climatological changes?
![Page 21: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/21.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 21
EUROCODESBackground and Applications Influence of terrain - measured wind velocities
![Page 22: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/22.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 22
EUROCODESBackground and Applications Section 4.3 Mean wind
borm vzczczv ⋅⋅= )()()(
![Page 23: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/23.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 23
EUROCODESBackground and Applications Section 4.3.2 Terrain roughness
mzzzk
zzkzc
IIII
r
rr
05,019,0
)/ln()(
,0
07,0
,0
0
0
=⎟⎟⎠
⎞⎜⎜⎝
⎛⋅=
⋅=
![Page 24: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/24.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 24
EUROCODESBackground and Applications Terrain categories and terrain parameters
![Page 25: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/25.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 25
EUROCODESBackground and Applications Annex A: Terrain category I and II
![Page 26: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/26.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 26
EUROCODESBackground and Applications Annex A: Terrain category III and IV
![Page 27: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/27.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 27
EUROCODESBackground and Applications Annex A: Terrain category 0 – coastal area
![Page 28: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/28.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 28
EUROCODESBackground and Applications Coastal area exposed to the open sea
![Page 29: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/29.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 29
EUROCODESBackground and Applications Figure 4.1 - Assessment of terrain roughness
![Page 30: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/30.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 30
EUROCODESBackground and Applications A.2 Transition between roughness categories
![Page 31: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/31.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 31
EUROCODESBackground and Applications A.2 Transition between roughness categories
Procedure 1
If the structure is situated near a change of terrain roughnessat a distance:
- less than 2 km from the smoother category 0- less than 1 km from the smoother categories I to III
the smoother terrain category in the upwind direction shouldbe used.
Small areas (less than 10% of the area under consideration) with deviating roughness may be ignored.
![Page 32: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/32.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 32
EUROCODESBackground and Applications A.3 Terrain orography. Figure A.1
![Page 33: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/33.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 33
EUROCODESBackground and Applications Section 4.4 Wind turbulence. Turbulence intensity
)/ln(1)(
0zzk
czI I
ov =
![Page 34: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/34.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 34
EUROCODESBackground and Applications Section 4.5 Peak velocity pressure, peak velocity
)()(71)(
)(21))(71()( 2
zvzIzv
zvzIzq
mvp
mvp
⋅⋅+=
⋅⋅⋅⋅+= ρ
![Page 35: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/35.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 35
EUROCODESBackground and Applications Measured wind velocities
![Page 36: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/36.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 36
EUROCODESBackground and Applications Section 5 Wind actions – 5.1 General
![Page 37: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/37.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 37
EUROCODESBackground and Applications Section 5.2 Wind pressure on surfaces
peepe czqw ⋅= )(
piipi czqw ⋅= )(
![Page 38: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/38.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 38
EUROCODESBackground and Applications Figure 5.1 – Pressure on surfaces
![Page 39: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/39.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 39
EUROCODESBackground and Applications Section 7.2 Pressure coeff. for buildings. Figure 7.2
![Page 40: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/40.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 40
EUROCODESBackground and Applications Section 7.2.2 Vertical walls. Figure 7.5
![Page 41: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/41.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 41
EUROCODESBackground and Applications Section 7.2.2 Vertical walls. Table 7.1
![Page 42: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/42.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 42
EUROCODESBackground and Applications Section 7.2.5 Duopitch roofs. Figure 7.8
![Page 43: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/43.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 43
EUROCODESBackground and Applications Section 7.2.5 Duopitch roofs. Table 7.4a
![Page 44: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/44.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 44
EUROCODESBackground and Applications Section 5.3 Wind forces
refepfdsw AzqcccF ⋅⋅⋅= )(
![Page 45: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/45.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 45
EUROCODESBackground and Applications Section 6 Structural factor
6.2 Determination of structural factor
The structural factor may be taken as 1 for
a) buildings with a height less than 15 m
b) facade and roof elements having a natural frequencygreater than 5 Hz
c) framed buildings which have structural walls and which areless than 100 m high and whose height is less than 4 times thein-wind depth
d) chimneys with circular cross-sections whose height is lessthan 60 m and 6,5 times the diameter
![Page 46: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/46.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 46
EUROCODESBackground and Applications Annex D Structural factor
![Page 47: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/47.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 47
EUROCODESBackground and Applications Annex D Structural factor
![Page 48: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/48.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 48
EUROCODESBackground and Applications Annex D Structural factor
![Page 49: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/49.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 49
EUROCODESBackground and Applications Annex D Structural factor
![Page 50: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/50.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 50
EUROCODESBackground and Applications Annex D Structural factor
![Page 51: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/51.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 51
EUROCODESBackground and Applications Section 6 Structural factor. Figure 6.1
![Page 52: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/52.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 52
EUROCODESBackground and Applications Section 6.3 Detailed procedure
2
22
2
22
)(71
)(21
)(71)(71
)(71)(21
BzI
RBzIkc
zIBzIc
zIRBzIk
cc
sv
svpd
sv
svs
sv
svpds
⋅⋅+
+⋅⋅⋅+=
⋅+⋅⋅+
=
⋅+
+⋅⋅⋅+=
![Page 53: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/53.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 53
EUROCODESBackground and Applications Backgrund turbulence and resonance turbulence
![Page 54: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/54.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 54
EUROCODESBackground and Applications Wind vortices versus structural size
![Page 55: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/55.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 55
EUROCODESBackground and Applications Procedure 1 (dotted line) versus theory (solid line)
![Page 56: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/56.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 56
EUROCODESBackground and Applications Procedure 2 (dotted line) versus theory (solid line)
![Page 57: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/57.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 57
EUROCODESBackground and Applications Structural factor. Procedure 1 or 2?
Procedure 2 has a more accurate representation of the theoreticalbackground compared to procedure 1
![Page 58: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/58.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 58
EUROCODESBackground and Applications Annex E Vortex shedding
Chimneys
Bridges
![Page 59: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/59.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 59
EUROCODESBackground and Applications Annex E Vortex shedding. Bending vibrations
![Page 60: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/60.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 60
EUROCODESBackground and Applications Annex E Vortex sheding. Ovalling vibrations
![Page 61: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/61.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 61
EUROCODESBackground and Applications Annex E Vortex shedding. Critical wind velocity
Stnb
v
Stnb
v
oiicrit
yiicrit
⋅⋅
=
⋅=
2,
,
,,
![Page 62: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/62.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 62
EUROCODESBackground and Applications Vortex shedding. Chimneys
![Page 63: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/63.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 63
EUROCODESBackground and Applications Vortex shdding. Chimneys
![Page 64: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/64.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 64
EUROCODESBackground and Applications Approach 1 versus approach 2
Approach 1: Vortex-resonance model
Approach 2: Spectral model
Turbulence is an active parameter only in approach 2
E1.5.1 General(3)
Approach 2 allows for the consideration of different turbulenceintensities, which may differ due to meteorological conditions.
For regions where it is likely that it may become very cold and stratified flow condition may occur (e.g. in coastal areas in NorthernEurope), approach 2 may be used.
![Page 65: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/65.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 65
EUROCODESBackground and Applications Vortex shedding. Bridge cross section
![Page 66: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/66.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 66
EUROCODESBackground and Applications Vortex shedding. Bridge cross section. Approach 1
![Page 67: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/67.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 67
EUROCODESBackground and Applications Vortex shedding. Bridge cross section. Approach 2
![Page 68: EN 1991-1-4:2005 Wind actions](https://reader031.vdocuments.us/reader031/viewer/2022013106/5866a76c1a28ab7d408b89af/html5/thumbnails/68.jpg)
Brussels, 18-20 February 2008 – Dissemination of information workshop 68
EUROCODESBackground and Applications Vortex shedding. Approach 1 or 2?
Approach 2 has a more accurate representation of the physicalphenomenon compared to approach 1