ems/hct in denmark - closer...the ems-trial in denmark • introduced as a 3 year trial in 2008 •...
TRANSCRIPT
![Page 1: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/1.jpg)
EMS/HCT in Denmark
HCT-conference in Göteborg
28. august 2019
by Martin Frimann Mortensen and
Kasper Dahlhus Bønnelykke,
Danish Road Directorate
![Page 2: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/2.jpg)
Content
• The EMS-trial in Denmark
2008-2019 (11 years)
• Danish EMS on the roads
• Status of the road net
• The enterprise program
• Homepage (vd.dk)
![Page 3: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/3.jpg)
The EMS-trial in Denmark• Introduced as a 3 year trial in 2008
• In 2014 the trial was extended to 2030
• Four types of EMS in Denmark
• Up to 25,25 meters and up to 60 tonnes
– max 10 ton pr. axle
• The ”Enterprise Program”
• Around 50 applications every year – but
not all projects are finalized
![Page 4: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/4.jpg)
The EMS-map of Denmark by 2008
• 2008:
• Aprox. 1000 km state roads
• Aprox. 10 km local roads
• Connecting a total of 36 areas (e.g.
logistic center)
![Page 5: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/5.jpg)
The EMS-map of Denmark by 2019
• 2008:
• Aprox. 1000 km state roads
• Aprox. 10 km local roads
• Connecting a total of 36 areas (e.g.
logistic center)
• 2019:
• Aprox. 4200 km state roads
• Aprox. 650 km local roads
• Connecting a total of 280 areas (e.g.
logistic center)
![Page 6: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/6.jpg)
Number of EMS in Denmark
![Page 7: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/7.jpg)
Data / knowledge of EMS on the roads Coils in the road…..
![Page 8: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/8.jpg)
The Great Belt bridge 1998-2019
0
50
100
150
200
250
300
350
400
450
6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6 10
2 6
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019(tom)
The Great Belt bridge. Amount af traffic 1998 - 2019 (both ways together). Index 100 = january 2009
Index Store lastbiler Index Lastbiler over 20 meter Index Totalantal
![Page 9: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/9.jpg)
The enterprise program → EMS-roadnet
A typical case – step 1….
• Applicant standard form (from
Vejdirektoratets homepage)
• The local municipality
![Page 10: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/10.jpg)
How a company get access to EMS-roads
A typical case – step 2….
• Vejdirektoratet makes a screening
with the program ”Auto-turn”
• Summary report
![Page 11: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/11.jpg)
How a company get access to EMS-roads
A typical case – step 3….
• Blue print of the road
projects
• Driving curves for EMS
• Consent from the police
• A final consent regarding
road traffic regulations
![Page 12: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/12.jpg)
How a company get access to EMS-roads
Driving
curves –
example..
![Page 13: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/13.jpg)
How a company get access to EMS-roads
Driving
curves –
example 2
![Page 14: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/14.jpg)
How a company get access to EMS-roads
A typical case – step 4….
• Publish the new route
on our website…
• … including a specific
route description
![Page 15: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/15.jpg)
How a company get access to EMS-roads BEFORE
Relevant screening of road crossings…
AFTER
Company access and roads are granted…
![Page 16: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/16.jpg)
Danish homepage for EMS• The new homepage in Danish Road Directorate has just been released in June 2019
• Information regarding the Danish EMS-trial, the road net and other related links can be
found here: https://www.vejdirektoratet.dk/side/erhvervstransport#1
• Page in English
• Rerouting mailing service to hauliers, drivers etc.
• Route descriptions from the prime road net to specific areas, including companies within
“the enterprise program”
• The new legal act for EMS in Denmark from 2019-09-01
![Page 17: EMS/HCT in Denmark - CLOSER...The EMS-trial in Denmark • Introduced as a 3 year trial in 2008 • In 2014 the trial was extended to 2030 • Four types of EMS in Denmark • Up to](https://reader033.vdocuments.us/reader033/viewer/2022050223/5f6881c80f150a56747400a3/html5/thumbnails/17.jpg)