ems implementation drivers
DESCRIPTION
EMS Implementation Drivers. Minimize Waste and Prevent Pollution Increased Operational $ Cost Savings Greater Process Efficiencies Improved Environmental Compliance Reduced Future EH&S Liability Risk Improved Competitiveness in Supply Chains More Attractive to New Customers/Investors - PowerPoint PPT PresentationTRANSCRIPT
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
EMS Implementation Drivers
•Minimize Waste and Prevent Pollution
•Increased Operational $ Cost Savings
•Greater Process Efficiencies
•Improved Environmental Compliance
•Reduced Future EH&S Liability Risk
•Improved Competitiveness in Supply Chains
•More Attractive to New Customers/Investors
•Improved Community Relations
•More Efficient Use of Company Resources
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
EMS Implementation Drivers
EMS Mentoring
Eaton Corporation, Supercharger Division
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Eaton Supercharger
• Located in Athens
• 325 Employees
• 100,000 sq. ft.
• Aluminum and steel machining
• Epoxy Powder Coating
• UF/RO WWT
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
• Use the EMS to drive improvements in the bottom line;
• Design the EMS to act as a tool to improve operating efficiencies;
• Use the EMS as a function of your organizations overall marketing strategy.
• Design the EMS to act as a compliance assurance tool;
• Use the EMS as a tool to reduce legal liability risks; and
• Design the EMS as a public relations tool.
Reasons to Implement an EMS
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Improve Bottom Line
0
20
40
60
80
J F M A M J J A S O N D
kw/UNIT
Goal
Energy
YTD = 52 KW/SC GOAL = 58 KW/SC 2000 = 61 KW/SC
14.75% Reduction
14.75% Reduction
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Improve Operating Efficiency
Used Oil
YTD = 0.73 lb/SC GOAL = 0.9 lb/SC 2000 = 1.1 lb/SC
05
101520253035
J F M A M J J A S O N D
0
1
2
3
4
5
6
total tons
per unit
Goal
33.6% REDUCTION
33.6% REDUCTION
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Market/Customers
• FORD Motor Company Announces ….• 150 facilities to be Certified by 1998• They Will Encourage Suppliers to Follow Suit
• Others Include: GM, Chrysler, Toyota
– International Paper– US Steel– EXXON– Procter & Gamble– Kodak– United Technologies
– Xerox– Honda of America– Lucent Technologies– British Airways– Dupont– Akzo Nobel– and more …...
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Regulatory Compliance
Solid Wastes
YTD = 1.67 lb/SC GOAL = 1.3 lb/SC 2000 = 1.6 lb/SC
0
10
20
30
40
J F M A M J J A S O N D
0
0.5
1
1.5
2
2.5
3
total tons
per unit
Goal
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Public Relations
• Athens-Clarke County Industrial Recycler of the Year
• Industry of the Year• ISO 14001 Certified• QS 9000 Certified
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Driver
Eaton Corporation mandated that every manufacturing plant be ISO 14001 certified by the
end of 2000!
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
EMS Mentoring
Eaton Corporation, Supercharger Division
Getting Started With Your EMS
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
ISO 14001 Implementation Trail
AppointManagement
Representative
EstablishImplementation
Team
Provide Implementation
Training andDefine Roles
ConductReview& Gap
Analysis DevelopImplementation
Plan andAssign
ResponsibilitiesEstablishManagement
Programs
SetObjectives& Targets
DefineOrganizational
Structure & Assign
Responsibilities
DevelopDocumentation
ProvideJob
RelatedTraining
ConductInternalAudit
Review
InitiateCorrective
Action
Pursue Certification
Identify Aspects
Identify Legal & OtherRequirements
Environmental Policy
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Getting Started
• Assign Responsibility/Champion
• Perform a Gap analysis– Must be knowledgeable of environmental
regulations and ISO 14001 requirements
• Identify Resource needs– Establish Steering Team– Select a registrar
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Gap Analysis
Section 4.4.3 Requirement
With regard to its environmental aspects and EMS, the
organization shall establish and maintain procedures for:
a) internal communications between the various levels and functions of the organization;
b) receiving, documenting and responding to relevant communication from external interested parties.
The organization shall consider processes for external
communication on its significant environmental aspects and
record its decision.
Existing Communications Program
A procedure does exist to communicate information on the facilities
environmental aspects to relevant functions and levels of the organization.
Review of the procedure does not include a process for responding to
external communications from external interested parties.
The organization has not recorded a decision on external communication of its
significant environmental aspects.
GAP?
NO
YES
YES
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Resource Needs
• Steering Team– Environmental– Quality– Production/Manufacturing– Engineering– Purchasing/Materials
• Consultant• Reference Materials
– Consensus/Industry Standards– Regulations
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Questions?
Eaton Corporation, Supercharger Division
Getting Started With Your EMS
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
EMS Implementation Drivers
EMS Mentoring
Yamaha Motor Manufacturing Corporation of America
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
YMMC Total Headcount
0 200 400 600 800
F & A
MFG
ENG
person
Salary
Hourly
Temp
Total 864 person
Yamaha Motor Manufacturing Corp.
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
3.4 million lbs of Waste Reduced/year!Landfilled Solid Waste
253 258230
339 321
160198 189 207
161135
176136 132 131 119 135
87
169140 157 145
101
0
50
100
150
200
250
300
350
400
Feb-0
0
Mar-
00
Apr-
00
May-0
0
Jun-0
0
Jul-00
Aug-0
0
Sep-0
0
Oct-
00
Nov-0
0
Dec-0
0
Jan-0
1
Feb-0
1
Mar-
01
Apr-
01
May-0
1
Jun-0
1
Jul-01
Aug-0
1
Sep-0
1
Oct-
01
Nov-0
1
Dec-0
1
To
ns
Historically 280 tons/month went to the landfill
ReduceReduce
ReuseReuse
RecycleRecycle
EMS Results
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Monthly VOC Emissions
8.0
7.0
6.3
7.6 7.7
8.3
9.6
6.87.2
8.68.2
7.9 8.0
5.3
2.2
3.4
5.6
6.8 6.7
6.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
May
-00
Jun-
00
Jul-0
0
Aug
-00
Sep
-00
Oct
-00
Nov
-00
Dec
-00
Jan-
01
Feb
-01
Mar
-01
Apr
-01
May
-01
Jun-
01
Jul-0
1
Aug
-01
Sep
-01
Oct
-01
Nov
-01
Dec
-01
Jan-
02
Feb
-02
Mar
-02
Apr
-02
To
ns
/ VO
C
VOC Emissions (tons/month) VOC Emission Limit 12 Month Average Goal
EMS Results
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Activity AnnualSavings
Annual Sales
Waste Management $200,000
Cardboard Recycling $75,000
Paper Break Even
Aluminum Cans Break Even
Plastics $10,000
Metals $ 5,000
Pallets $ 4,000
Unnecessary Item Sales $ 6,000
Metal and Plastic Drums $2,000
MEK Distillation $126,000
TOTAL $326,000 $102,000
$428,000 savings through environmental program implementation this year.
Additional cost savings through regulation compliance - no fines
EMS Results
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Back to YMMC33.3%
YMMC Employee Programs
33.3%
Community Improvements
CCS33.3%
Recyclable Sales =
YMMC 33% Program
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Funding for local classroom environmental projects
Grant cycle is 2 times per year
Grants awarded to 12 local schools
Environmental programs will benefit over
3,000 Coweta County School Children
Funding - Community Involvement
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
• Community Improvement and Beautification
• Community Recycling Programs
• Public Education and Scholarships
Keep America Beautiful - nonprofit federal environmental program
Funding - Community Involvement
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
January 2002
Sponsored Christmas Tree Recycling
Coweta County Adopt-A-Stream equipment funded by
YMMC 33% Recycling Program
Funding - Community Involvement
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Through YMMC’s EHS programs we are able to make positive impacts on our company, our employees, our community and our customers.
• Improves Business / Cost• Improves Environment• Creates “Kando”
EMS Results
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Getting Started With Your EMS
EMS Mentoring
Yamaha Motor Manufacturing Corporation of America
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
ISO 14001 Certification
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Why Quality Why Quality andand Environmental?? Environmental??Both Strive for ZERO:Both Strive for ZERO:
QualityQuality EnvironmentalEnvironmental
Zero ScrapZero Scrap Zero Waste Zero Waste
Zero DefectsZero Defects Zero Pollution Zero Pollution
““EveryEvery use of a resource represents an opportunity to conserve. use of a resource represents an opportunity to conserve.
Every loss of a resource represents an opportunity “ Every loss of a resource represents an opportunity “
Pojaseck, Harvard.eduPojaseck, Harvard.edu
Implementing an Integrated System
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
ISO 9001ISO 9001UniqueUnique
ISO 14001ISO 14001UniqueUniqueSharedShared
Customer FocusCustomer FocusProduct RealizationProduct RealizationDesign and DevelopmentDesign and DevelopmentProduction and ServiceProduction and ServiceCustomer SatisfactionCustomer SatisfactionControl of NCMControl of NCM
Aspects and ImpactsAspects and ImpactsEmergency ResponseEmergency ResponseInterested PartiesInterested PartiesRegulatory auditsRegulatory audits
Policy Manual and StatementPolicy Manual and StatementDocument ControlDocument ControlObjectives and TargetsObjectives and TargetsTrainingTrainingInternal AuditingInternal AuditingMeasuring and MonitoringMeasuring and MonitoringCalibrationCalibrationCAR/PAR SystemsCAR/PAR SystemsManagement ReviewManagement Review
Implementing an Integrated System
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
• Designate Management Representative
• Perform GAP Analysis
• Designate Implementation Team
Management Commitment
You Must Have Management Commitment!
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Quality EngineerManuf. EngineerProduction Lead
Supervisor
Plastics
Quality EngineerManuf. EngineerProduction Lead
Supervisor
Welding
Quality EngineerManuf. EngineerProduction Lead
Supervisor
Paint
Quality EngineerManuf. EngineerProduction Lead
Supervisor
W/V Assembly
Quality EngineerManuf. EngineerProduction Lead
Supervisor
T/V Assembly
Standardization Team
One elected repfrom each dept.
team.
Use representatives from each area:
Form Implementation Team
PP22AD GA MFI - 34303 Rev.1AD GA MFI - 34303 Rev.1
Questions?
Yamaha Motor Manufacturing Corporation of America
Getting Started With Your EMS