EMERGENCY RESPONSE & DISASTER MANAGEMENT PLAN For IOCL LPG BOTTLING PLANT BUDGE BUDGE, WEST BENGAL JULY 2014 Prepared by CHILWORTH TECHNOLOGY (PVT.) LTD. (ISO: 9001 CERTIFIED) Web: - www.chilworth.co.in Email: [email protected]

Upload: phamhuong

Post on 28-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

EMERGENCY RESPONSE

& DISASTER MANAGEMENT PLAN

For

IOCL LPG BOTTLING PLANT

BUDGE BUDGE, WEST BENGAL

JULY 2014

Prepared by

CHILWORTH TECHNOLOGY (PVT.) LTD.

(ISO: 9001 CERTIFIED)

Web: - www.chilworth.co.in Email: [email protected]

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

DISCLAIMER

This document is confidential and has been produced for the purpose of the above

mentioned study and is only suitable for use in connection therewith.

Any liability arising out of use of this document by the above mentioned client or third

party, for purposes either directly or indirectly (not wholly) connected with the above

mentioned study, shall be the responsibility of the above mentioned client who shall

indemnify Chilworth against all claims, damages and losses arising out of such use.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

DOCUMENT CERTIFICATION

This document is prepared by Chilworth Technology Private Limited, New Delhi for

IOCL IBP Budge Budge in compliance with the Petroleum and Natural Gas

Regulatory Board (Codes of Practices for Emergency Response and Disaster

Management Plan (ERDMP) Regulation, 2010.

It contains data regarding foreseeable emergencies anticipated in the operation and

maintenance of IOCL IBP Budge Budge and the efficient management of these

emergencies. This document is hereby certified by M/s T Q Services (A division of

Tata Projects Limited) and issued to all the concerned for effective implementation.

Prepared by Reviewed by Certified by

Yashpal J Bose Sampat Suri Consulting Engineer Occupier Head –QA Chilworth Tech. Pvt. Ltd. IOCL, IBP Budge Budge. TQ Services.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

FOREWORD

With reference to Communication No. M (I)/DMP/1/2008 dated 28th July 2010, from

Secretary, PNGRB, addressed to CMD/CEO of the downstream organizations

regarding implementation of Emergency Response and Disaster Management Plan

(ERDMP).

“The Emergency Response and Disaster Management Plan is prepared as per the

guidelines from Petroleum and Natural Gas Regulatory Board (PNGRB), New Delhi

and as per Codes of Practices for Emergency Response and Disaster Management

Plan (ERDMP) Regulations, 2010 notified via Gazette of India notification No. G.S.R.

39(E) dated 18th January 2010.

It has been designed with following objectives:

to prevent casualties both on-site & off-site and to reduce damage to public,

property and environment;

to develop high order state of preparedness for prompt and orderly response of

any emergency;

to provide incident management organogram with clear cut roles & responsibilities

& action plans for various emergencies;

to ensure orderly and timely decision making and response processes; etc.

The ultimate goal is the effective containment of the situation by proper mitigating

action at the place of occurrence, cautioning people in adjoining affected localities,

prompt rescue and medical aid to affected persons and communication to civil

authorities for assisting from outside.

Schedule of Implementation for ERDMP is stated along with present status.

As per PNGRB guidelines, ERDMP is applicable to LPG marketing locations.

Accordingly an ERDMP for IOCL LPG Bottling Plant Budge Budge is prepared in

conformity with regulations. These may be altered, if felt necessary, during the actual

emergency based on unforeseen circumstances prevailing at that time. All concerned

are hereby requested to carefully study and thoroughly familiarize themselves with it,

in order to ensure its effectiveness at the time of emergency. This regulation is

prepared based on the requirement of the PNGRB regulation by modifying the

already existing DMP of the location prepared on the basis of OISD & Department of

factories rules & regulations.

Location In-Charge

Date: 23.07.2014 Place: Budge Budge

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

Our Ref: J0541/IOCL Budge Budge/ERDMP/L-01

Date: July 23rd, 2014

M/s. Indian Oil Corporation Limited

Marketing Division

LPG Bottling Plant, Budge Budge

Post:-Buita, Kolkata (WB)-700137

Attn.: Mr. Jyotirmaya Panda, Manger(LPG-Safety)

Dear Sir,

PROJECT: INDANE BOTTLING PLANT BUDGE BUDGE

SUBJECT: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN

We are pleased to submit one softcopy of the ERDMP Report for the above

captioned project. If you have any questions or comments, please contact the

undersigned. If the report is to your complete satisfaction, please sign and return a

copy of the enclosed Report Approval Form.

We thank you for allowing us the opportunity to perform this study and if we can be of

any further assistance to you, please contact us.

Yours faithfully,

CHILWORTH TECHNOLOGY (PVT.) LTD.

Jitendra Kumar

Director

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge i

CONTENTS

ABBREVIATION I

EXECUTIVE SUMMARY III

1 INTRODUCTION 1

1.1 LOCATION 1

1.2 TOPOGRAPHY 2

1.3 METEOROLOGICAL DATA 2

1.4 CLIMATE 2

1.5 SYSTEM DESCRIPTION 3

2 TERMS AND DEFINITIONS 5

2.1 DEFINITIONS 5

3 APPLICABILITY 9

4 SCOPE AND INTENT 10

4.1 SCOPE 10

4.2 INTENT 10

5 CONTENTS OF ERDMP 12

6 CLASSIFICATION OF EMERGENCIES 13

7 ERDMP IMPLEMENTATION SCHEDULE 16

7.1 SCHEDULE 1 (AS PER OF PNGRB REGULATIONS G.S.R. 39(E)) 16

8 CONSEQUENCES OF DEFAULT OR NON COMPLIANCE 17

9 REQUIREMENTS UNDER OTHER STATUTES 20

10 PRE EMERGENCY PLANNING 30

10.1 HAZARD IDENTIFICATION 30

10.2 RISK ANALYSIS 34

10.3 ESTIMATION OF RISK 40

10.4 HAZOP/HAZID STUDY 44

11 EMERGENCY MITIGATION MEASURES 44

11.1 BASIC REQUIREMENTS OF ERDMP 44

11.2 RESOURCE MOBILIZATION 45

11.3 INCIDENT PREVENTING MEASURES AND PROCEDURES 48

12 EMERGENCY PREPAREDNESS MEASURES 52

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge ii

12.1 EMERGENCY DRILLS & MOCK EXERCISES 52

12.2 TRAINING 52

12.3 MUTUAL AID 53

13 RESPONSE PROCEDURES AND MEASURES 55

13.1 ACTION PLAN FOR LPG LEAKAGE AND FIRE 55

13.2 EMERGENCY SHUTDOWN PROCEDURES IN THE PLANT 59

13.3 RESPONSE PROCEDURES FOR SPILLED MATERIAL 60

14 EMERGENCY ORGANISATION AND RESPONSIBILITY 61

14.1 EMERGENCY ORGANIZATION CHART 61

14.2 ROLES & RESPONSIBILITIES 65

15 INFRASTRUCTURE 73

15.1 EMERGENCY CONTROL CENTRE (ECC) (AS PER CLAUSE NO. 15.1) 73

15.2 ASSEMBLY POINT (AS PER CLAUSE NO. 15.2) 74

16 DECLARATION OF ON-SITE & OFF-SITE EMERGENCIES 76

17 RESOURCES FOR CONTROLLING EMERGENCY 79

18 DEMOGRAPHIC INFORMATION 85

19 MEDICAL FACILITIES 87

20 EVACUATION 95

21 INFORMATION TO PUBLIC 99

22 ROLES AND RESPONSIBILITIES OF STAKEHOLDERS INCLUDING

EXTERNAL AGENCIES 101

23 REPORTING OF THE INCIDENT 105

24 ACTION AFTER REPORTING OF INCIDENT BY THE ENTITY 110

25 TERMINATION OF EMERGENCY 111

26 EMERGENCY RECOVERY PROCEDURES 112

26.1 ACCIDENT INVESTIGATION 112

27 ERDMP FOR PIPELINE CARRYING PETROLEUM PRODUCTS 117

28 ERDMP FOR ROAD TRANSPORTATION 118

28.1 RESOURCE MOBILIZATION FOR ROAD TRANSPORT EMERGENCY 118

28.2 TREM CARD (SPECIFIC TO ROAD TRANSPORTATION) 123

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge iii

28.3 TRUCK / VEHICLE DISPERSAL PLAN 125

29 INTEGRATION OF ERDMP WITH NDMP 126

29.1 NATIONAL DISASTER MANAGEMENT PLAN (NDMP) 126

29.2 INTEGRATION OF ERDMP WITH NDMP 131

29.3 SECURITY THREAT PLAN 136

30 MISCELLANEOUS 140

ANNEXURE-I: EMERGENCY CONTACT NUMBERS I-1

ANNEXURE-II: OFF SHIFT FIRE ORGANOGRAM II-1

ANNEXURE-III: ON SHIFT FIRE ORGANOGRAM/NATURAL EMERGENCY

ORGANOGRAM III-1

ANNEXURE-IV: LOCATION MAP (5 KM RADIUS) IV-1

ANNEXURE-V: SITE LAYOUT V-1

ANNEXURE-VI: PROCESS FLOW DIAGRAM VI-1

ANNEXURE-VII: MATERIAL SAFETY DATA SHEET VII-1

ANNEXURE-VIII: FIRE MOCK DRILL REPORT VIII-1

ANNEXURE-IX: MUTUAL AID IX-1

ANNEXURE-X: CLIMATOLOGICAL OBSERVATIONS X-1

ANNEXURE-XI: OFF SITE EMERGENCY PLAN XI-1

ANNEXURE XII- HSE POLICY XII-1

ANNEXURE XIII- SAFETY COMMITTEE MEETING XIII-1

ANNEXURE XIV SAFETY AUDIT REPORT XIV-1

ANNEXURE XV- WORK PERMIT SYSTEM XV-1

ANNEXURE-XVI: CONTOUR MAPPING (MAJOR RISK CONTRIBUTORS) XVI-1

ANNEXURE-XVII: IOCL IBP BUDGE BUDGE TREM (TRANSPORT EMERGENCY)

CARD XVII-1

ANNEXURE-XVIII: CHECKLIST XVIII-1

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge iv

LIST OF TABLES

Table 1-1: Neighbouring facilities from IOCL IBP Budge Budge ................................ 2

Table 6-1: Levels of Emergency Details .................................................................. 14

Table 6-2: Emergency Classification at Plant as per OISD-144 ............................... 15

Table 7-1: Schedule of implementation of Code of Practice for ERDMP .................. 16

Table 8-1: DO'S AND DON'TS in Emergency .......................................................... 17

Table 9-1: Current compliance status of Installation/Plant with various rules ........... 20

Table 10-1: Action plan for natural/man made perils ................................................ 30

Table 10-2: Stability Classes used for QRA study ................................................... 36

Table 10-3: Damages to Human Life Due to Heat Radiation ................................... 36

Table 10-4: Effects Due To Incident Radiation Intensity .......................................... 36

Table 10-5: Damage Due To Overpressures ........................................................... 37

Table 10-6: List of Hazardous Scenarios ................................................................. 38

Table 10-7: Summary of Consequence Calculations ............................................... 39

Table 10-8: Conclusion for IR/SR ............................................................................ 43

Table 10-9: Guidewords/Deviations Used for HAZOP ............................................. 44

Table 10-10: Guidewords Used for the HAZID Study ............................................... 46

Table 11-1: Resource Mobilizations (Men and Equipment) ...................................... 45

Table 12-1 : Number of Persons Undergone Safety Training ................................... 53

Table 15-1: Telephone Numbers of Emergency Control Centre............................... 74

Table 15-2: Assembly Point ..................................................................................... 74

Table 17-1: Details of Fire Fighting Facilities Available at Site: ................................ 79

Table 17-2: List PPEs Available at Site: ................................................................... 80

Table 17-3: Classification of Fires ............................................................................ 81

Table 17-4: Suitability of Fire Extinguishers ............................................................. 81

Table 17-5: Fire Alarm Systems available at site ..................................................... 82

Table 17-6: Details of Fire Extinguishers ................................................................. 83

Table 17-7: Details of Fire Hydrants, Monitors & Hose Boxes ................................. 83

Table 17-8: Fire Water Details ................................................................................. 84

Table 18-1: Population Details around IOCL............................................................ 85

Table 18-2: OTHER DEMOGRAPHIC INFORMATION ........................................... 85

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge v

Table 19-1 : Details of Trained Persons in First Aid ................................................. 87

Table 19-2: First Aid Details .................................................................................... 90

Table 19-3: Telephone Numbers of Hospitals/ Ambulance ...................................... 92

Table 19-4: Resources and Man Power available with Major Hospitals ................... 92

Table 19-5: List of Specialist doctors in Budge Budge ............................................. 93

Table 23-1: Incident Reporting Format .................................................................. 105

Table 28-1: In Plant Resources for Road Transport Emergencies ......................... 118

Table 28-2: External Resources for Road Transport Emergencies ........................ 120

Table 28-3: Identification of Communication Resources: ....................................... 122

Table 29-1: Nearby Battalion Details ..................................................................... 132

Table 29-2: Contact Details of NDRF .................................................................... 134

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge vi

LIST OF FIGURES

Figure 10-1: LSIR FOR IOCL BP Budge Budge Facility ............................................... 42

Figure 10-2: FN Curve for IOCL BP Budge Budge Facility............................................ 43

Figure 14-1: Emergency Organisation Chart................................................................. 62

Figure 14-2: Communication Flow Chart ...................................................................... 71

Figure 29-1: National Disaster management Structure ................................................131

Figure 29-2: National Disaster response Battalions and Training Centres ...................133

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge i

ABBREVIATION

ALARP As Low As Reasonably Practicable

BLEVE Boiling Liquid Expanding Vapour Explosion

BPCL Bharat Petroleum Corporation Limited

CDM Chemical Disaster Management

CIC Chief Incident Controller

CR Control Room

CTPL Chilworth Technology Pvt. Ltd.

ECC Emergency Control Centre

ERDMP Emergency Response and Disaster Management Plan

ERV Emergency Response Vehicle

ESD Emergency Shutdown

HAZCHEM Hazardous Chemicals

HAZID Hazard Identification

HAZOP Hazard & Operability

HPCL Hindustan Petroleum Corporation Limited

HSE Health, Safety and Environment

IBP Indane Bottling Plant

IEC International Electro-technical Commission

IOCL Indian Oil Corporation Limited

IR Individual Risk

LIC Location In-Charge

LPG Liquefied Petroleum Gas

MAE Major Accident Events

MAH Major Accident Hazard

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge ii

MIS Management Information System

MSDS Material Safety Data Sheet

MSIHC Manufacture Storage and Import of Hazardous Chemicals

NDMA National Disaster Management Authority

NDRF National Disaster Response Force

OIC Officer In-Charge

OISD Oil Industry Safety Directorate

P&ID Piping and Instrumentation Diagram

PFD Process Flow Diagram

PNGRB Petroleum and Natural Gas Regulatory Board

PPE Personnel Protective Equipment

QRA Quantitative Risk Assessment

REV Revision

SDRF State Disaster Response Force

S & D Supply & Distribution

SIC Site Incident Controller

SOP Standard Operating Procedure

SR Societal Risk

TLD Tank Lorry Decanting

TREM Transport Emergency

WB West Bengal

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge iii

EXECUTIVE SUMMARY

The planning and response strategies for meeting the emergencies caused by major

accidents are termed as Emergency Response & Disaster Management Plan

(ERDMP). Generally, the following phases are involved in ERDMP:

Hazard identification and Risk analysis: An event with an imminent threat of

turning into an accident must first be identified and risk associated with it must

be observed.

Preventive measures: Based on the evaluation of available information, a rapid

analysis of the severity of the likely accident is done and the best course of

action could be identified which would help in eliminating the causes which may

lead to the spread of accident.

Preparedness measures: Preparedness includes all activities necessary to

ensure a high degree of readiness so that response to an incident would be swift

and effective.

Response Procedures: Action plan along with roles and responsibilities of

employees and external authorities is incorporated in response procedures.

Recovery: It contains those short and long-term activities, which return all

systems to normal operation.

Cleanup and Disposal: After the accident is effectively contained and controlled,

the cleanup of the site of the accident and safe disposal of waste generated due

to the accident are undertaken.

Documentation: All aspects of accidents, including the way it started and

progressed as well as the steps taken to contain and the extent of the damage

and injury, must be documented for subsequent analysis of accident for

prevention in future, damage estimation, insurance recovery and compensation

payment. It may be noted that some aspects of documentation, such as,

photographs of the site of accident and main objects involved in the accident,

survey for damage estimation, etc. may have to be carried out before the

cleanup and disposal phase. However, the effort in all cases is to recommence

the operation as soon as possible.

ERDMP acts as a substitute for maintaining good safety standards in the facility. The

best way to protect against occurrence of major accidents is by maintaining very high

levels of safety standards.

The Present report is based on Petroleum and Natural Gas Regulatory Board

PNGRB Notification Dated 18th January 2010.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-1

INTRODUCTION

(As per Clause No 1.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 1

1 INTRODUCTION

Indian Oil Corporation Limited, Indane Bottling Plant is a marketing Division of LPG

Bottling in Budge Budge, West Bengal with storage capacity of 1850 MT stored in

Horton spheres & Bullets. The plant receives bulk LPG through LPG tankers (5, 18

MT capacity) from Haldia refinery. The received LPG is stored in 1 Horton sphere of

1400 MT capacity & Bullets (3 X 150 MT) capacity and then it is filled into cylinders.

These cylinders are supplied and distributed to different consumers.

Chilworth Technology Pvt. Ltd. (CTPL) has been engaged by IOCL IBP, Budge

Budge for carrying out preparation of ERDMP study for storage and transportation of

petroleum product (LPG). The present report is the ERDMP report for the IBP based

on the design information and suitable conservative assumptions.

The present document provides the basic intent on Emergency Response and

Disaster management Plan covering detailed organizational responsibilities, actions,

reporting requirements and support resources available to ensure effective and

timely management of emergencies at, or affecting IOCL operations associated to

bulk storage & distribution of LPG.

The ERDMP has been prepared based on workshop of HAZOP / HAZID and

Quantitative Risk Analysis study.

In ERDMP report, worst possible scenarios for major failure/emergency have been

identified, evaluation of their consequences have been done and devised a

systematic plan for handling such emergency.

CTPL has carried out this Study based on inputs received from the plant. CTPL

would like to take this opportunity to thank the IOCL management and the plant

personnel who co-operated in supplying large amounts of data and information

required, thus maximizing the effectiveness of the study.

1.1 LOCATION

Budge Budge is located in the south-western suburbs of Kolkata, on the eastern

bank of the River Ganges. Budge Budge is a town and a municipality in South 24

Parganas district, which is located between 22°30’45” to 20°29’ North latitude and

between 89°4’56” and 88°3’45’’ East longitudes in the state of West Bengal, India. It

is a part of the area covered by Kolkata Metropolitan Development Authority. IOCL

plant is located 4 km away from Budge Budge railway station.

Total population of Budge Budge is 75,465.

Location map with neighbouring details is given in Annexure-IV.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 2

The longitude and latitude coordinates of IOCL IBP Budge Budge are 88°10'23” E

and 22°27'28” N, respectively.

Table 1-1: Neighbouring facilities from IOCL IBP Budge Budge

S.

No. Direction Location

Approximate Distance

from IOCL Plant (meter)

1. North Nischchintapur 121 m

2. East Agricultural Land 50 m

3. South Road 50 m

4. West BBIT 100 m

1.2 TOPOGRAPHY

Budge Budge is located in the southwestern suburbs of Kolkata; on the eastern bank

of the River Ganges. There are numbers of cross-connected canals in the North

/Western block of main land with the ongoing project of construction of 4-lane road

the economic progress is expected to accelerate.

1.3 METEOROLOGICAL DATA

Annual mean air temperature : 30.4OC

Annual mean wind Velocity 1.30 m/s

Wind direction : From North west to North East

Humidity : 69%

Rainfall/year : 1820 mm

1.4 CLIMATE

Climate in Budge Budge is moderate throughout the year. Rainfall is during June to

October. During June-August, the rainfall is heavy. Annual mean air temperature is

taken as 30.4oC and annual mean humidity is taken as 69% based on weather

conditions Details of the IBP Budge Budge.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 3

Name of the Installation : Indian Oil Corporation Limited (Marketing

Division)

Address : Indane LPG Bottling Plant,

LPG Bottling Plant, Budge Budge

Post:-Buita, Kolkata (WB)-700137.

Nature of Process : Non Continuous– Product receipt through Truck

Non continuous – Product storage and dispatch

Timing of Shifts : (Shift ‘A’) 06.00 AM to 02.00 PM

(Shift ‘B’) 02.00 PM to 10.00 PM

1.5 SYSTEM DESCRIPTION

Indian Oil Corporation Limited, Indane Bottling Plant is a marketing Division of LPG

Bottling in Budge Budge, West Bengal with storage capacity of 1850.438 MT stored

in Horton sphere & Bullets. The plant receives bulk LPG through LPG tankers (18 MT

capacity) from Haldia refineries & IPPL. The received LPG is stored in 1 Horton

sphere of 1400 MT capacity & Bullets (3 X 150 MT) capacity. This LPG from storage

tanks is then transferred through a pipeline to filling shed having Manifold of carousel

with the help of centrifugal pumps. Besides the above this shed also have weighing

machine, weigh counter check, leak detection & capping. After quality checking of

filled cylinders, they are loaded in truck and supplied & distributed.

The plant has three LPG storage bullets of 150 MT capacity each & one Horton

sphere of 1400 MT capacity. The plant fills LPG into cylinders. There are no

intermediate products and no chemical reactions involved at any stage of operation

in the plant.

Following facilities are present in the plant

No. of Bullets : 3 X 150 MT

No. of Horton Sphere : 1 X 1400 MT

No. of Tank Lorry Decantation bays : 6

No. of Bore Wells/Open wells : 1

LPG pumps : 3 Nos. (Capacity 85 m3/hr. each,

Discharge Pressure: 17 kg/Cm2).

LPG Vapour Compressor : 3 Nos. (Cap: 48 m3/hr. each).

No. of Fire Pumps : 7 (Diesel pump 410 m3/hr)

No. of Jockey Pumps : 2 (10m3/hr, 20m3/hr)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-2

TERMS AND DEFINITIONS

(As per Clause No 2.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 5

2 TERMS AND DEFINITIONS

(As per Clause No 2.0 of PNGRB Notification Dated 18th January 2010)

Terms & Definitions in this ERDMP document are same as given in PNGRB Act &

Regulations G.S.R. 39(E). Definitions are reproduced below as per (Clause No 2.0)

2.1 DEFINITIONS

(1) In this ERDMP document, unless the context otherwise requires

(a) “Act” means the Petroleum and Natural Gas Regulatory Board Act, 2006;

(b) ‘‘Board” means the Petroleum and Natural Gas Regulatory Board

established under sub-section (1) of section 3 of the Act;

(c) “Boiling Liquid Expanding Vapour Explosion (BLEVE)” means the violent

rupture of a pressure vessel containing saturated liquid or vapour at a temperature

well above its atmospheric boiling point and the resulting flash evaporation of a

large fraction of the superheated liquid which produces a large vapour cloud which

burns in the form of a large rising fireball due to ignition;

(d) “Chief Incident Controller” means the person who assumes absolute

control of the unit and determines action necessary to control the emergency;

(e) “Codes of Practice” means the codes of practice for emergency response

and disaster management plan notified by the Board;

(f) “Disaster” means an occurrence of such magnitude as to create a situation

in which the normal patterns of life within an industrial complex are suddenly

disrupted and in certain cases affecting the neighbourhood seriously with the result

that the people are plunged into helplessness and suffering and may need food,

shelter, clothing, medical attention protection and other life sustaining

requirements;

(g) “Disaster Management Plan“ means a well-coordinated, comprehensive

response plan to contain loss of life, property, environment and provide speedy

and effective recovery by making the most effective use of available resources in

case of a disaster;

(h) “Emergency” means a situation or scenario which has the potential to cause

serious danger to persons, environment or damage to property and which tends to

cause disruption inside or outside the premises and may require the help of outside

resources;

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 6

(i) “Emergency Response Vehicle (ERV)” means a vehicle for handling

emergencies having necessary equipment meant for rescue and relief operations

and ERV can be put to use within installation, outside of installation including road

incident;

(j) “Hazard” means an event related to the property of substance or chemicals

with a potential for human injury, damage to property, damage to the environment,

or some combination thereof;

(k) “Incident” means an unplanned or unintended or intended event having

potential to cause damage to life, property and environment;

(l) “Incident Record Register” means a register containing complete

information pertaining to all incidents covering near miss, and all other incidents

leading to Level-I, Level-II and Level-III emergencies;

(m) “Installation” means facilities, namely, gaseous product pipeline, liquid

Product pipeline, hydrocarbons processing installation, oil and natural gas

installations and commercial storage and transportation, hydrocarbons gas bottling

Installations including CNG (Compressed Natural Gas), city gas distribution

facilities and retail outlets;

(n) “Leak” means release or discharge of a dangerous chemicals or substances

or material into the environment;

(o) “Level-I Emergency” means an emergency as defined under Chapter 6;

(p) “Level-II Emergency” means an emergency as defined under Chapter 6;

(q) “Level-III Emergency” means an emergency as defined under Chapter 6;

(r) “Mutual Aid Association” means an industrial mutual aid association in

which participating industries as a community shall assist each other in case of

emergency. Mutual aid associations supplement a site’s emergency control plan.

Services of member industries shall be requested only when the emergency

threatens to exceed the capability of otherwise available resources;

(s) "Occupier” of an installation means the person who has ultimate control

over the affairs of the installation;

(t) “Off-site Emergency” means an emergency that takes place in an

installation and the effects of emergency extends beyond the premises or the

emergency created due to an incident, catastrophic incidents, natural calamities,

etc. It no longer remains the concern of the installation management alone but also

becomes a concern for the general public living outside and to deal with such

eventualities shall be the responsibilities of district administration;

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 7

(u) “Off-site Emergency Plan” means a response plan to control and mitigate

the effects of catastrophic incidents in above ground installation (AGI) or

underground installations (UGI) or road transportation. This plan shall be prepared

by the district administration based on the data provided by the installation(s), to

make the most effective use of combined resources, i.e. internal as well as external

to minimize loss of life, property, environment and to restore facilities at the

earliest;

(v) “On-site Emergency” means an emergency that takes place in an

installation and the effects are confined to the Installation premise’s involving only

the people working inside the Plant and to deal with such eventualities is the

responsibility of the occupier and is mandatory. It may also require help of outside

resources;

(w) “On-site Emergency Plan” means a response plan to contain and minimize

the effects due to emergencies within the installations which have a potential to

cause damage to people and facilities within the installation premises;

(x) “Risk” means the chance of a specific undesired event occurring within a

specified period or in specified circumstances and it may be either a frequency or a

probability of a specific undesired event taking place;

(y) “Risk Analysis” means the identification of undesired events that lead to the

materialization of a hazard, the analysis of the mechanisms by which these

undesired events could occur and, usually, the estimation of the extent, magnitude,

and likelihood of any harmful effects;

(z) “Risk Assessment” means the quantitative evaluation of the likelihood of

undesired events and the likelihood of harm or damage being caused by them,

together with the value judgments made concerning the significance of the results;

(aa) “Risk Management” means the program that embraces all administrative

and operational programs that are designed to reduce the risk of emergencies

involving acutely hazardous materials. Such programs include, but are not limited

to, ensuring the design safety of new and existing equipment, standard operating

procedures, preventive maintenance, operator training, incident investigation

procedures, risk assessment for unit operations, emergency planning, and internal

and external procedures to ensure that these programs are being executed as

planned;

(ab) “Site Incident Controller” means the person who goes to the scene of the

emergency and supervises the actions necessary to overcome the emergency at

the site of the incident;

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 8

(ac) ‘Spill” means an unintended release or discharge of hydrocarbon or any

other dangerous liquid into the environment;

(ad) “Transport Emergency (TREM) card” means a card containing details

about the nature of hazards, protective devices, telephone numbers and actions

related to spillage, fire, first aid and other details of national and international (UN)

numbers or signage which is common in India and abroad;

(ae) “Unconfined Vapour Cloud Explosion (UVCE)” means the formation of

vapour cloud due to release of significant quantity of liquefied hydrocarbons into

the atmosphere and its explosion due to ignition which may cause high over

pressure and low pressure that cause very heavy damage.

(2) Words and expressions used and not defined in these regulations, but defined

in the Act or rules or regulations made there under, shall have the meanings

respectively assigned to them in this Act or in the rules or regulation, as the case

may be.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-3

APPLICABILTY

(As per Clause No 3.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 9

3 APPLICABILITY

(As per Clause No 3.0 of PNGRB Notification Dated 18th January 2010)

This ERDMP is prepared based upon PNGRB regulations G.S.R. 39(E) titled

‘Petroleum and Natural Gas Regulatory Board (Codes of Practices for Emergency

Response and Disaster Management Plan (ERDMP) Regulations, 2010’.

Clause No. 3 (e) & (h) of PNGRB regulations GSR 39 (E) are applicable for ERDMP

of IOCL IBP, Budge Budge. Emergency Response and Disaster Management Plan

(ERDMP) describes the organizational structure, facilities, equipment, services and

infrastructure necessary to respond to the emergency situation which could have on-

site as well as off-site implications at Receipt, Storage & Dispatch points. Emergency

Response Plan covers all emergencies relating to Transportation, explosion, fire and

bomb threat etc.

This plan also applies to those Governmental Agencies that are responsible for

emergency response within the immediate area surrounding the facilities and those

agencies, organizations, contractors, and facilities providing assistance to IBP Budge

Budge in the event of an emergency. IOCL IBP Budge Budge shall maintain liaison

with concerned governmental agencies to ensure proper understanding and

interfaces regarding aspects of notification, responsibilities of personnel and

resources of state and local agencies to be deployed in case of actual emergency

situation.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-4

SCOPE AND INTENT

(As per Clause No 4.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 10

4 SCOPE AND INTENT

(As per Clause No 4.0 of PNGRB Notification Dated 18th January 2010)

4.1 SCOPE

The Scope covers-

(i) the identification of emergencies;

(ii) the mitigation measures to reduce and eliminate the risk or disaster;

(iii) the preparedness plans and actions when disaster or emergencies occur;

(iv) the responses that mobilize the necessary emergency services including

responders like fire service, police service, medical service, ambulance,

government as well as non-governmental agencies;

(v) the post disaster recovery with aim to restore the affected area to its original

conditions;

4.2 INTENT

(a) Intent of this Emergency Response and Disaster Management Plan (ERDMP)

document is to formulate action plan for all necessary functions that are required to

be carried out towards preparedness, response & management of emergencies. It

describes the emergency response organization, the resources available (internal as

well as external) and specific response actions required for various types of

emergencies that could occur in IOCL IBP Budge Budge jurisdiction.

(b) ERDMP is not just to use as reference material for training.

(c) Objectives of Emergency Response and Disaster Management Plan (ERDMP)

are:

to prevent causalities- both on-site and off-site;

to reduce damage to property, machinery, public and environment;

to develop a state of readiness for a prompt and orderly response to an

emergency and to establish a high order of preparedness (equipment,

personnel) commensurate with the risk;

to provide an incident management organogram with clear missions and lines of

authority;

to ensure an orderly and timely decision-making and response process

(notification, standard operating procedures);

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 11

to maintain good public relations;

In order to achieve the objectives of emergency planning, the critical elements that

form the backbone of the Emergency Response and Disaster Management Plan

(ERDMP) are:

(i) Reliable and early detection of an emergency and careful planning.

(ii) The command, co-ordination and response organization structure along with

efficient trained personnel.

(iii) Availability of resources for handling emergencies.

(iv) Appropriate emergency response actions.

(v) Effective notification and communication facilities.

(vi) Regular review and updating of the Disaster Management Plan.

(vii) Proper training of the concerned personnel.

(viii) Liaison with civil Administration.

Imperatives of such a plan are to minimize the adverse effects of an accident and

restoration of normalcy at the earliest by providing measures to contain the incident

and limit the consequences.

Above objectives are sought to be achieved through following measures:

(i) Providing information to all concerned authorities regarding consequences of

likely emergencies.

(ii) Warning and advising plant personnel & people likely to be affected.

(iii) Mobilizing on-site and off-site resources.

(iv) Calling up assistance from outside agencies.

(v) Initiating and organizing evacuation of affected people.

(vi) Providing necessary First aid and other medical services as required

(vii) Coordinating action taken by various agencies.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-5

CONTENTS OF ERDMP

(As per Clause No 5.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 12

5 CONTENTS OF ERDMP

(As per Clause No 5.0 of PNGRB Notification Dated 18th January 2010)

Contents of this ERDMP documents have been listed under Table of Contents. For

better correlation, same Clause No’s have been retained in the Contents as in

PNGRB regulations G.S.R. 39(E).

(a) Classification of emergencies;

(b) Implementation schedule;

(c) Consequences of defaults or non-compliance;

(d) Statutory requirements;

(e) Pre-emergency planning;

(f) Emergency mitigation measures;

(g) Emergency preparedness measures;

(h) Emergency response procedures and measures;

(i) Emergency organisation and responsibilities;

(j) Infrastructure requirements;

(k) Declaration of on-site and off-site emergency;

(l) Resources for controlling emergency;

(m) Demographic information;

(n) Medical facilities;

(o) Evacuation;

(p) Public relations and information to public;

(q) Reporting of the incident;

(r) Emergency recovery procedures;

(s) ERDMP for tank trucks carrying petroleum products

(t) Integration of the ERDMP with National Disaster Management Authority (NDMA)

guidelines and action plan on Chemical Disasters (Industrial);

(u) Security threat plan and action plan to meet the eventualities.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-6

CLASSIFICATION OF EMERGENCIES

(As per Clause No 6.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 13

6 CLASSIFICATION OF EMERGENCIES

(As per Clause No 6.0 of PNGRB Notification Dated 18th January 2010)

ERDMP has been developed to deal with emergency incidents which occur within

the premises of IOCL IBP area. Emergency incidents will be classified by the level

of response that will be required. The actual classification will be made by the

Location-In -charge (LIC) or his nominee as information first becomes available on

an incident. The level of response may change as more information becomes

available or conditions change. Where information is lacking the worst case

scenario will dictate the level of response.

In IOCL IBP premises, probable emergencies can be categorized into three broad

levels on the basis of seriousness and response requirements, which are given as

under:-

Level - 1 Emergency: This is an emergency or an incident which can be effectively

and safely managed, and contained within the site, location or installation by the

available resources. It has no impact outside the site, location or installation.

Level- 2 Emergency: This is an emergency or an incident which cannot be

effectively and safely managed or contained at the site, location or installation by

available resource and additional support is required. It is having, or has the

potential to have an effect beyond the site, location or installation and where

external support of mutual aid partner may be involved. It is likely to be danger to

life, to the environment, to company assets or reputation.

Level- 3 Emergency: This is an emergency or an incident which could be

catastrophic and is likely to affect the population, property and environment inside

and outside the installation, and management and control is done by District

Administration.

Based on the nature of emergency & severity, the levels of type of emergency to be

declared will be decided by the location in charges. Various possible types of

emergencies are tabulated as below:

Note: Level-I has been considered for fire drill followed with onsite emergency.

However Level-II shall normally be considered as onsite emergency and Level-III as

off-site emergency.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 14

Table 6-1: Levels of Emergency Details

S. No. Type of

Emergency

Applicable

EAP

Description of

Emergency

Reference

from QRA

1 Level-1 On site

Product from the

flanges/Piping/Gate

Valves.

Pinhole leakage from

Piping

Failure of gasket

resulting in leakage

Various

appropriate

locations for

leakages in

Process

Equipment,

Piping and

Cylinders

have been

identified and

analysed in

Section 3.5 of

QRA Report

2 Level-2 On site

Spillages from storage

vessel during receipt.

Leakage from piping due

to damage by external

sources, sabotage,

pilferage.

Failures caused by

corrosion defects,

Failures caused by

miscellaneous factors

such as pipe material

defects.

3 Level-3 Off Site

Failure of Road Tankers

Full bore rupture of

piping

Vapour cloud explosion.

BLEVE (Fireball)

Agitation / forced entry

by external group of

people.

Natural Perils –

Catastrophic

failures of

Road Tanker

has been

considered

and analysed

for Flash

Fires/ Vapor

Cloud

Explosion and

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 15

Earthquake, flood,

tsunami

Sabotage, Bomb

explosion / Threat

BLEVE

(Fireball) in

Section 3.5 of

QRA Report.

Important Note: - The earlier emergency classification at IBP as per OISD-144 has

been renamed as per PNGRB Regulation- 2010 as follows.

Table 6-2: Emergency Classification at Plant as per OISD-144

OISD-144 classification ERDMP Regulation-2010 classification

Small Fire Level-1 Emergency

Major Fire Level-2 Emergency

Disaster Level-3 Emergency

Henceforth in the report, terminology used for emergency is Level 1, Level 2 & Level

3 and words like Small fire, Major fire and Disaster as per OISD-144 have been

dropped.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-7

ERDMP IMPLEMENTATION SCHEDULE

(As per Clause No 7.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 16

7 ERDMP IMPLEMENTATION SCHEDULE

(As per Clause No 7.0 of PNGRB Notification Dated 18th January 2010)

7.1 SCHEDULE 1 (AS PER OF PNGRB REGULATIONS G.S.R. 39(E))

Table 7-1: Schedule of implementation of Code of Practice for ERDMP

S.No. Activity

Implementation Time

(from the notification

date)

Compliance status

1. On-Site Emergency

Plan 3 months Yes

2.

Off-Site Emergency

Plan (Submission of

Information to District

Authority)

3 months Yes

3. Resources in Position 6 months Yes

4.

Accredited Third Party

Certification of

ERDMP.

1 Year Under Preparation

5. Testing and Mock Drills

(On-Site) 3 months Yes.Quarterly

6. Testing and Mock Drills

(Off-Site) ** 12 months Yes. Once in a Year

Fire drill / emergency handling drill – Monthly.

** To be coordinated with District Authority.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-8

CONSEQUENCES OF DEFAULT OR NON COMPLIANCE

(As per Clause No 8.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 17

8 CONSEQUENCES OF DEFAULT OR NON COMPLIANCE

(As per Clause No 8.0 of PNGRB Notification Dated 18th January)

In conformity for complying provision of PNGRB regulations, ERDMP document has

made considering laid down procedures. This document needs to be reviewed on

time to time basis for which following procedures has been evolved-

Regular practicing of Onsite/Offsite Mock drills and noting down any deficiencies

and noting them for implementation/ change in procedures.

Conducting Safety Audit as per check list of OISD-145 to assess the situation and

point out any deficiency/ changes in the system.

Location has developed a well-defined system to explain to the visitors/contract

personnel for do’s and dont’s regarding safety as under-

- Boards have been displayed at conspicuous places and at main gate for

visitors entering the Installation.

- Separate ID cards are issued to visitors for entering in different zones of the

installation and do’s and don’ts are written on them for these places. Visitors

entering the license premises are issued ID cards and always accompanied

by a company staff.

- During emergency or fire drill, security staff is trained for briefing people about

the place of incidents and do’s and don’ts.

- Safety Briefing is compulsory for contract personnel in the Plant once every

fortnight. For visitors, Safety Information sheet is given while issuing gate

pass.

Table 8-1: DO'S AND DON'TS in Emergency

S.No. Action DO'S DON'TS

1.

Any One

Noticing

An

Emergency

Situation

Actuate nearest fire alarm

manual call point and /or inform

CR/Fire Station on telephone or

inform the supervisor. Try to

extinguish or contain fire with

help of nearest available fire

extinguisher, water hydrant,

Water Cum Foam Monitors

DO NOT panic and

avoid running all over

the place, prevent other

from doing so.

DO NOT enter the site

unless instructed or all

clear siren/message is

heard.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 18

S.No. Action DO'S DON'TS

without endangering himself.

Call Emergency Team and

direct them to the site of

emergency. Then report to the

assembly point.

2. Contractor

Personnel

Stop work on hearing alarm.

Assemble at the nearest /

designated ASSEMBLY POINT

and be ready to evacuate.

DO NOT enter the site,

till it is cleared for the

normal work by site

incident controller.

3. Security

Keep the gate manned; Keep

the road clear for movement of

Emergency Vehicles/ Fire

Tenders/Ambulance. Control

traffic at gates.

DO NOT allow

unauthorized visitors

free to enter.

4. Visitors

Leave the place and assemble

at assembly point.

DO NOT enter the site if

emergency alarm is

heard.

5.

All other

Employees

On Site

On hearing FIRE alarm, go to

assembly point and wait for

further instruction.

DO NOT panic

DO NOT go to the site of

emergency unless

specifically instructed by

site main/ incident

controller.

The Board will monitor the compliance of ERDMP, Technical Standards and

Specifications including Safety Standards either directly or indirectly by

accredited third party through separate regulations on third party conformity

assessment.

In case of any deviation or shortfall, in achieving the recommended

standards the entities are liable to penal provisions under the provisions of the

technical standards, specifications including safety standards

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 19

Mutual Aid Association not responding as per memorandum of Understanding

(MOU) or written agreement on request of assistance shall attract penalty as per

mutual Aid agreement are as under. However details are elaborate in clause no-

12.3 and check list -3:

i In the event of any dispute or differences between the parties, such dispute or

differences will be resolved amicably by mutual consultation or through the

good offices of empowered agencies of the government. If such resolution is

not possible then the unresolved dispute or difference will be referred to the

arbitration or an arbitrator to be nominated by the Department of legal affairs

(Law Secretary) in terms of the Office memorandum No. 55/3/1/78-CF dated

19-12-1975 issued by the Cabinet Secretariat Department of cabinetry affairs)

as modified from time to time. The arbitration and conciliation Act 1996 (26 of

1996) shall not be applicable to the arbitration under this clause. The award of

the arbitrator will be binding upon parties to the dispute. However, any party

aggrieved by such award may make further reference for setting aside or

revision of the award to Law Secretary whose decision shall bind the parties

finally and conclusively.

ii The authorities mentioned in Mutual Aid Agreement both the parties shall

meet once in every six months to discuss the arrangement of drills etc. and

take necessary steps to overcome the short comings. It will be the

responsibility of all the two members’ establishments to train their own

personnel in fire fighting.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-9

REQUIREMENTS UNDER OTHER STATUTES

(As per Clause No 9.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 20

9 REQUIREMENTS UNDER OTHER STATUTES

(As per Clause No 9.0 of PNGRB Notification Dated 18th January)

Implementation of ERDMP is primarily governed & ensured its compliance with

following regulations as per Schedule – II of PNGRB regulations G.S.R. 39(E);

Current compliance status with various rules / permissions is stated in the

table below.

IOCL IBP Budge Budge as per PNRGB Schedule – II

Table 9-1: Current compliance status of Installation/Plant with various rules

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

The Environment (Protection) Act, 1986 (amended 1991) and the following Rules

there under:

The

Environment

(Protection)

Rules, 1986

Yes 1182/30/NPB/-

R(94)/2000-

26-04-

2013

31-03-

2016 -

MSIHC Yes - - - -

The

Hazardous

wastes

(Management

and Handling)

Rules, 1989

(amended

2000 and

2003)

Yes

1182/30/WPB-

R(94)/2000 dt.

26.04.2013

18.02.2010 31.01.2015

The

Environment Yes - - - -

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 21

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

Prior

Clearance

Notification,

2006

The Chemical

Accidents

(emergency

Planning,

Preparedness

and

Response)

Rules, 1996

Yes - - - -

Bio-medical

Wastes

(Management

and Handling)

Rules. 1989

Yes - - - -

The Factories Act, 1948 (amended 1987)

West Bengal

Factory Rules Yes

No. 14041,

Regd. No. I-

TP/X/99

13.02.2012 31.12.2013

Directorate

of factories

vide

Licence

No.

1404/Regn

No.1-

TP/X/99

The

Inflammable

Substances

Act, 1952

- - - - -

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 22

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

The Motor Vehicles Act, 1988 (amended 2001)

Public

Liability

Insurance

(PLI) Rules,

1991

(amended

1993)

- - - - -

The central

Motor

Vehicles

Rules, 1989

(amended

2005)

- - - - -

The Petroleum Act, 1934

The

Petroleum

Rules, 2002

- - - - -

The Insecticide Rules, 1968 (amended 2000)

The

Insecticide

Rules, 1971

(amended

1999)

- - - - -

National

Environment

Tribunal Act

- - - - -

The Explosives Act, 1984 (amended till 1983)

The Gas Yes G/HO/WB/06/88 28.10.2010 Ensure

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 23

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

Cylinder

Rules, 2004

(G 1687)

30.09.2013

Updation

of

license.

The Static

and Mobile

Pressure

Vessel

(Unfired)

Rules, 1981

(amended

2002)

1. Horizontal

Type Air

receiver.-5

Nos.

2. Vertical

type

evacuation

vessels-2 Nos.

3. Vertical

type knocks

out drum-4

Nos.

4. Horizontal

type knocks

out drum-2

Nos.

-

28.04.2013

28.04.2013

28.04.2013

28.04.2013

27.04.2014

27.04.2014

27.04.2014

27.04.2014

-

The

explosives

Rules, 1983

(amended

2002)

- - - - -

Prohibited

Area Yes - - - -

VHF License

For Main

Station Hand

Sets

- - - - -

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 24

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

Pollution

Control Board

( Water &

Air)

West Bengal

Pollution

Control Board,

Consent to

Operate

certificate

- 26.04.2013

31.03.2016

Contract

Labor

Registration

Yes

Certificate no.

46/R (3))/94-E.3

dated

09.11.1994

amended on

15.01.2002

09.11.1994 - -

Calibration Of

Instruments

1. Insulation

tester

2. Pressure

gauges

3.Temperature

gauge

Make- Waco,

Sl. No.949816

CERT NO.

SIW/CC/046/12-

13

CERT NO.

SIW/CC/046/12-

13

-

13.02.2013

03.02.2013

-

2.02.2014

02.08.2014

-

Calibration Of

Weigh Bridge

1. Standard

Weights:

2. Electronic

Weigh Bridge

& Avery

weighing

scale

Cert. No.

1305502

Cert.No.

419206

28.12.2012

27.12.2013

Ensure

Updation

of license

Calibration of

Explosive 02 nos – TLD

Cert. no.

1619701

28.12.2012

27.12.2013

Ensure

Updation

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 25

Regulation Applicability

(Yes/No) License No.

Renewed /

Applied

On

Valid Upto Remarks

Meter of license

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-10

PRE EMERGENCY PLANNING

(As per Clause No 10.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 30

10 PRE EMERGENCY PLANNING

(As per Clause No 10.0 of PNGRB Notification Dated 18th January 2010)

10.1 HAZARD IDENTIFICATION

The first step towards ERDMP is to identify potential hazards such as leaks, spills,

fire, explosion, transportation incident, pipeline ruptures, equipment failure, natural

calamities, etc. and the types of damage caused by them.

a. LPG is highly inflammable in its basic character. It is dangerous because of its

intrinsic properties i.e. flash point, ignition energy required, heat of combustion,

flammability limits, etc. In addition to such intrinsic properties, extrinsic factors like

storage & operating conditions and large storage quantity are also considered for

hazard identification. Material safety Data Sheet for LPG is attached as

ANNEXURE-VII

b. The identification of potential impact on downwind air quality or downstream water

quality from an incidental release complies with State Pollution Control Board

rules. The predominant wind direction in the area is from west to east.

(ANNEXURE X)

The annual mean wind velocity is taken as around 1.0 m/s. Usually, during

January to May and October to December (8 months) the wind velocity generally

lies between 0.53-1.36 m/s. During the four monsoon months June to September,

the average velocity is about 1.14 m/s. (ANNEXURE X)

c. Hazards to installation can be in the form of natural calamities such as flood,

earthquake/high wind etc or in the form of terrorist attack, bomb threat etc. Action

plan for these natural/man made perils are given below;

Table 10-1: Action plan for natural/man made perils

Natural/

Man Made

Perils

Cause Effect Mitigation Measures/Action Plan

Flood Excessive

rain

Water

Lodging, loss

of life,

Main flood management programmes

includes various aspects such as

construction of embankments,

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 31

Natural/

Man Made

Perils

Cause Effect Mitigation Measures/Action Plan

Physical

Damage to

structures,

road etc

drainage improvements etc.

When warning of impending flood

conditions are recovered via weather

broadcasts or the police / fire

department, the following steps needs

to be taken.

All the movable equipment and

supplies are to be moved to other

elevated areas

Outside areas are to be checked for

equipment and materials that could be

damaged by floodwaters

If time allows, sandbagged dykes are

to be constructed to augment existing

dykes and to protect high-risk items

Storage tanks/vessels are checked

and secured.

Earthquake Seismic

waves

(Moderate

risk zone-3)

Loss of life,

Physical

Damage to

structures,

road, fires,

spill of

chemicals,

flooding. etc

During earthquake, all personnel

should evacuate buildings and

proceed to areas away from walls and

windows.

If evacuation is not possible,

employees are to seek shelter under a

desk, table etc., or in doorways that

offer protection from falling objects.

After the initial earthquake,

aftershocks should be expected.

The shift officer should contact

operators for a report on employee

safety and a condition of plant facilities

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 32

Natural/

Man Made

Perils

Cause Effect Mitigation Measures/Action Plan

and equipment. The emergency

brigade should begin rescue, first aid

and damage control activities

Emergency shutdown: As soon as

possible, emergency shutdown

procedures should be implemented,

Operate ROV’s, isolate valves.

After earth quake subsides, the

personnel should inspect all the

facilities for rescue, first aid and

damage control activities, damage

assessment, clean-up, restoration and

recovery.

High Wind Difference in

atmospheric

pressure

Loss of life,

Physical

Damage to

structures etc

If the All India Radio / Doordarshan

issues a “high wind caution’’,

personnel should be assigned to

monitor weather conditions, listen for

broadcast warnings and report on the

threatening conditions.

If a warning is issued by the All India

Radio / Doordarshan (meaning that a

high wind has actually been shifted in

the area) or if a funnel cloud is seen

by plant personnel. The following

steps are to be taken:

Personnel will be notified by the alarm

The emergency brigade is placed on

alert

Plant personnel are to seek shelter in

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 33

Natural/

Man Made

Perils

Cause Effect Mitigation Measures/Action Plan

the administrative building, ground

level interior rooms or rest rooms

All non-essential utilities should be

shut-off

After the passing of a high wind,

personnel should inspect their areas

for damage, if the plant was stuck,

emergency brigade personnel will

begin rescue, first aid and damage

control activities. Damage

assessment, clean up and restoration

and other recovery activities should

follow.

Tsunami NA NA NA

Terrorist/

Sabotage/

Bomb

Threat

- Loss of life,

fire, possible

damage to

structures.

In any of such situation, city police/

administration should be informed

immediately and their help should be

sought.

Emergency Action in case of Bomb

Threat/Terrorist/Sabotage:

a) The persons inside the Terminal

should be evacuated as soon as

possible.

b) All the vehicles in the Terminal

premises should be evacuated to safer

Places.

c) Terminal personnel should contact

district authorities immediately.

d) Any new or doubtful thing should not

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 34

Natural/

Man Made

Perils

Cause Effect Mitigation Measures/Action Plan

be touched.

e) All pipeline and storage tank valves

should be closed and all operations

inside are carried out with due

vigilance.

f) In case of firefighting equipment shall

be operated and city fire brigade

should be called immediately during

emergency.

d. Check points for hazard identification are given in Check list-1 in ANNEXURE-

XVIII.

The extent of the consequences arising from the IBP plant would depend on quantity

of the LPG present, mode of containment, and external factors like location, density

of population etc. In many cases, realization of hazard and its potential also depend

on prevailing meteorological conditions and availability of ignition source. Thus, most

serious consequences would arise from a large inventory of LPG surrounded by a

densely populated area. LPG require interaction with air or oxygen for its hazard to

be realized. Under certain circumstances vapors of the LPG when mixed with air may

be explosive specially in confined spaces.

Following methods of hazard identification have been employed in this study:

1. HAZOP

2. Preliminary Hazard Analysis for risk ranking using risk matrix.

10.2 RISK ANALYSIS

The second step of the ERDMP process is to determine the risk of an incident

associated with each hazard. The basic procedure in a risk analysis are as follows:

a. Identify potential failures or incidents (including frequency) ;

b. Accidental release of hazardous chemical can result in severe consequences, the

rupture or leak in tank or any equipment containing hazardous chemical can have

potential impacts on public, property or environment.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 35

c. Calculate the quantity of material that may be released in each failure, estimate

the probability of such occurrences;

d. Evaluate the consequences of such occurrences based on scenarios such as

most probable and worst case events;

e. The combination of consequences and probability will allow the hazards to be

ranked in a logical fashion to indicate the zones of important risk. Criteria should

then be established by which the quantified level of risk may be considered

acceptable to all parties concerned;

f. After assessing the risk, the "maximum tolerable criterion" must be defined and

above which the risk will be regarded as intolerable. Whatever be the benefit

level must be reduced below this level;

g. The risk should also be made "as low as reasonably practicable" (ALARP) and

least impacting the neighbourhood. While conducting the risk analysis, a

quantitative determination of risk involves three major steps:-intolerable, the

ALARP or tolerable region (the region is tolerated only) and broadly acceptable

region.

10.2.1 List of Chemicals handled

In the facility, there is receipt, storage & distribution of LPG is carried out. Flash

Point, Fire point, Specific gravity, vapour density, static electricity, Bonding and

grounding are the characteristics of chemicals responsible for fire hazard.

10.2.2 Consequence Analysis

Risk is a combination of two factors, frequency of occurrence of the accident and the

magnitude of the consequence of the accident. An accident with low consequence

magnitude can be of high risk if its frequency of occurrence is high. Similarly high

consequence magnitude accidents can pose little risk if their probability of

occurrence is very rare. Thus during enumeration and selection of incidents both

these factors shall be carefully monitored and considered. Incidents with high

consequence magnitude shall not be neglected unless their possibility of occurrence

is not credible. Similarly, incidents with very low consequence magnitude shall be

considered if the probability of their occurrence is not low.

In the study, calculations are performed for following weather conditions:

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 36

Table 10-2: Stability Classes used for QRA study

S. No. Stability Class Wind Velocity (m/s)

1. D 3

2. F 1.5

10.2.3 Damage Criteria

The damage criteria gives the relation between extent of the physical effects

(exposure) and the percentage of the people that will be killed or injured due to those

effects. The knowledge about these relations depends strongly on the nature of the

exposure. In Consequence Analysis studies, in principle two types of exposure (heat

radiation and explosion) to flammable materials are distinguished as follows:

1. Heat radiation, from a jet, flash fire.

Table 10-3: Damages to Human Life Due to Heat Radiation

Exposure

Duration

Radiation energy

1% lethality,

kW/m2

Radiation energy

for 2nd degree

burns, kW/m2

Radiation energy

for first degree

burns, kW/m2

10 Sec 21.2 16 12.5

30 Sec 9.3 7.0 4.0

Since in practical situations, only the employees will be exposed to heat radiation in

case of a fire, it is reasonable to assume the protection by clothing. It can be assumed

that people would be able to find a cover or a shield against thermal radiation in 10-

sec. time. Furthermore, 100% lethality may be assumed for all people suffering from

direct contact with flames, such as a flash fire or a jet flame. The effects due to

relatively lesser incident radiation intensity are given below.

Table 10-4: Effects Due To Incident Radiation Intensity

INCIDENT RADIATION (kw/m2) TYPE OF DAMAGE

0.7 Equivalent to Solar Radiation

1.6 No discomfort for long exposure

4.0 Sufficient to cause pain within 20 sec. Blistering of

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 37

skin (first degree burns are likely)

9.5 Pain threshold reached after 8 sec. second

degree burns after 20 sec.

12.5 Minimum energy required for piloted ignition of

wood, melting plastic tubing etc.

18.47 50% lethality.

36.56 99% lethality.

2. Explosion

In case of vapor cloud explosion, two physical effects may occur:

a. A flash fire over the whole length of the explosive gas cloud;

b. A blast wave, with typical peak overpressures circular around ignition source.

Table 10-5: Damage Due To Overpressures

Peak Overpressure,

bar Damage Type

0.83 Total destruction

0.30 Heavy damage, nearly complete destruction of houses

0.27 Cladding of light industrial building ruptures

0.2 Steel frame buildings distorted and pulled from foundations

0.16 Lower limit of serious structural damage

0.14 Partial collapse of walls and roofs of houses

0.027 Limited minor structural damage

0.01 Typical pressure of glass breakage

The set of appropriate scenarios was generated to carry out Risk analysis

calculations, as listed below:

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 38

Table 10-6: List of Hazardous Scenarios

S. No. Major Accident Events (MAEs)

1. LPG Tanker Failure-Flash Fire/ VCE

2. LPG Tanker Failure- BLEVE

3. Small Leak from LPG Tanker Outlet Line- Jet Fire

4. Small Leak from LPG Tanker Outlet Line- Flash Fire/ VCE

5. LPG Bullet Rupture- Flash Fire/VCE

6. LPG Bullet Rupture- BLEVE

7. Small Leak from LPG Bullet Outlet Line- Jet Fire

8. Small Leak from LPG Bullet Outlet Line- Flash Fire/VCE

9. Horton Sphere Rupture- Flash Fire/ VCE

10. Horton Sphere Rupture- BLEVE

11. Small Leak from Horton Sphere Outlet Line- Jet Fire

12. Small Leak from Horton Sphere Outlet Line-Flash Fire/ VCE

13. Small Leak from LPG Compressor/ Discharge Line-Jet Fire

14. Small Leak from LPG Compressor/ Discharge Line-Flash Fire/ VCE

15. LPG Compressor/Discharge Line Rupture-Flash Fire/ VCE

16. Small Leak from Pump/Discharge Line- Flash Fire/ VCE

17. Pump/Discharge Line Rupture- Flash Fire/ VCE

18. Small Leak from Carousal -Flash Fire/ VCE

19. Carousal Failure-Flash Fire/ VCE

20. LPG Cylinder Failure (14.2 kg)

21. LPG Cylinder Failure (19 kg)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 39

Table 10-7: Summary of Consequence Calculations

Sc# Scenario Description

Damage Distance (m)

50% Fatality 1% Fatality

1. LPG Tanker Failure-Flash Fire/ VCE - 358.94

2. LPG Tanker Failure- BLEVE 136.34 231.79

3. Small Leak from LPG Tanker Outlet Line- Jet Fire 22.45 25.19

4. Small Leak from LPG Tanker Outlet Line- Flash

Fire/ VCE - 44.25

5. LPG Bullet Rupture- Flash Fire/VCE - 787.88

6. LPG Bullet Rupture- BLEVE

293.84 482.82

7. Small Leak from LPG Bullet Outlet Line- Jet Fire

24.16 27.11

8. Small Leak from LPG Bullet Outlet Line- Flash

Fire/VCE - 44.69

9. Horton Sphere Rupture- Flash Fire/ VCE - 1672.92

10. Horton Sphere Rupture- BLEVE 641.23 1025.76

11. Small Leak from Horton Sphere Outlet Line- Jet

Fire 24.50 27.49

12. Small Leak from Horton Sphere Outlet Line-Flash

Fire/ VCE - 44.78

13. Small Leak from LPG Compressor/ Discharge

Line-Jet Fire 26.18 29.38

14. Small Leak from LPG Compressor/ Discharge

Line-Flash Fire/ VCE - 55.17

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 40

Sc# Scenario Description

Damage Distance (m)

50% Fatality 1% Fatality

15. LPG Compressor/Discharge Line Rupture-Flash

Fire/ VCE - 93.86

16. Small Leak from Pump/Discharge Line- Flash

Fire/ VCE - 55.66

17. Pump/Discharge Line Rupture- Flash Fire/ VCE - 116.98

18. Small Leak from Carousal -Flash Fire/ VCE - 55.66

19. Carousal Failure-Flash Fire/ VCE - 116.98

20. LPG Cylinder Failure (14.2 kg) - 24.94

21. LPG Cylinder Failure (19 kg) - 22.66

10.3 ESTIMATION OF RISK

Risk is a combination of two factors, frequency of occurrence of the accident and the

magnitude of the consequence of the accident.

The consequence and risk analysis have been referred from QRA report done by

CTPL. The risk levels associated with the facilities are presented in the following

standard forms:

1. Individual risk contours which show the geographical distribution of risk to an

individual.

2. Societal risk (FN) curves which show the cumulative frequency (F) distribution

of accidents causing different numbers (N) of fatalities. The FN curve therefore

indicates whether the societal risk to the facility is dominated by relatively

frequent accidents causing small numbers of fatalities or low frequency accidents

causing many fatalities.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 41

10.3.1 Location Specific Individual Risk

Based on the above, the major risk contributors to Individual risk are:

1. LPG Tanker Failure-Flash Fire/ VCE

2. LPG Tanker Failure- BLEVE

3. LPG Bullet Rupture-Flash Fire/ VCE

4. LPG Bullet Rupture- BLEVE

5. Horton Sphere Rupture - Flash Fire/ VCE

6. Horton Sphere Rupture-BLEVE

The IR value for the facility comes out to be 7.40E-7 per year which falls in ALARP

region of risk acceptance criteria. The IR acceptance criteria are those adapted by

UK HSE.

ERDMP for IBP Budge Budge

J0541 ERDMP IOCL IBP Budge Budge 42

Figure 10-1: LSIR FOR IOCL BP Budge Budge Facility

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 43

10.3.2 Societal Risk

Based on the above, the major risk contributors to societal risk are:

1. LPG Tanker Failure-Flash Fire/ VCE

2. LPG Tanker Failure- BLEVE

3. LPG Bullet Rupture-Flash Fire/ VCE

4. LPG Bullet Rupture- BLEVE

5. Horton Sphere Rupture - Flash Fire/ VCE

6. Horton Sphere Rupture-BLEVE

Figure 10-2: FN Curve for IOCL BP Budge Budge Facility

Table 10-8: Conclusion for IR/SR

1.

Individual Risk (IR)

The IR value for the facility is calculated to be 7.40E-07 per year, which is

in ALARP region.

2.

Societal Risk (F-N Curve)

The F-N curves show that societal risk for the overall population considered

falls in the ALARP region.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 44

10.4 HAZOP/HAZID STUDY

10.4.1 HAZOP METHODOLOGY

The HAZOP study was conducted through a node by node review, i.e. the system

was divided into discrete nodes and each node was numbered accordingly.

The method involved several repetitive steps:

i) Identify a node of the process on the P&IDs.

ii) Define the design intent and normal operating conditions of the node.

iii) Identify a deviation from the intent or operating condition by applying

guidewords based on the BS - IEC 61882 lists of guidewords.

iv) Identify possible causes and consequences of the deviation. A deviation can

be considered "meaningful" if it has a credible cause and can result in harmful

consequences.

v) Identify safeguards, if any.

vi) Identify recommendations and action parties if no safeguard is provided or

safeguards are insufficient.

In practice the guidewords/deviations are set down in a standard list of questions

relevant to the systems under review. The following guidewords/deviations were

used in this study:

Table 10-9: Guidewords/Deviations Used for HAZOP

Guide-word Code No.

More Flow

Less / No Flow

Reverse Flow

Other Than Flow

High Pressure

Low Pressure

High Temperature

Low Temperature

High Level

Low Level

Composition

01

02

03

04

05

06

07

08

09

10

11

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 45

Guide-word Code No.

Start-up / Shut-down

Maintenance

Corrosion / Erosion

Drawing Error

12

13

14

15

(Refer HAZOP/HAZID Report for more details)

10.4.2 HAZID METHODOLOGY

The HAZID was performed by a multidisciplinary team from IOCL Plant & CTPL to

ensure that the HAZID review was comprehensive. The agreed action items were

recorded on the HAZID worksheets.

The drawings and support documents were referred to as appropriate. The study

progressed through the following steps:

The design intent and normal operating conditions of the area;

Identify possible causes and consequences of the hazard. A hazard can be

considered "meaningful" if it has a credible cause and can result in harmful

consequences;

Identify any existing safeguards, mitigations and control measures included in

the design;

Carry out a ranking of the hazards based on its safety or environmental impacts;

and

Identify recommendations and action parties if further mitigation is required.

In keeping with the purpose of the study, CTPL developed a number of guidewords

that were used in the HAZID workshop to initiate discussion within the HAZID team.

Following Guidewords were used:

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 46

Table 10-10: Guidewords Used for the HAZID Study

S. No Guideword

1. Unignited Hydrocarbon Release

2. Ignited Hydrocarbon Release – Fire

3. Toxic Release

4. High/ Low Pressure

5. High / Low Temperature

6. Dropped Object

7. Maintenance

8. Confined Spaces

9. Access / Egress / Escape / Evacuation

10. Extreme Weather

11. Radioactivity

12. Explosives

13. Sabotage / Piracy / Acts of Terrorism / Theft

14. HAC

15. Electrostatic

16. Electrical Fire

(Refer HAZOP/HAZID Report for more details)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-11

EMERGENCY MITIGATION MEASURES

(As per Clause No 11.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 44

11 EMERGENCY MITIGATION MEASURES

11.1 BASIC REQUIREMENTS OF ERDMP

Basic Requirements of ERDMP as per Schedule–III of PNGRB regulations G.S.R. 39 (E):

1. Location Plan of the Installation indicating siting of the installation at

neighbouring details up to a distance of 2 kms from the installation in each

direction. (ANNEXURE-IV)

2. Site plan of the installation showing a complete layout of the installation

indicating boundary walls, exit and entry gates and location of various facilities.

(ANNEXURE-V)

3. Layout of fire fighting system (ANNEXURE V)

4. Line block diagram of manufacturing process and Process Flow Diagram (PFD)

of each unit. (ANNEXURE-VI)

5. Material Safety Data Sheet (MSDS) for all hazardous chemicals stored, handled,

produced and transported in the installation. (ANNEXURE-VII)

6. Internal and External Emergency contact numbers of police, fire station,

hospitals, mutual aid industry, factory inspectors, Board, State Pollution Control

Board, Petroleum and Explosive Safety Organization (PESO), etc. (ANNEXURE

I)

7. Contact details of suppliers of Fire Safety Equipment are as follows:

Name/Designation Contact number

CIP Tikrikalan 011-28351247 / 28351257

Fire Safety Devices Pvt. Ltd. Faridabad 0129-2288196

Integrated Fire Protection Pvt Ltd Kolkata 033-24541062, 9903973902

Firechem, Faridabad 0129-2288197

HD Fire Protects Pvt. Ltd, Mumbai 022-25826958, 25826793,

09619578444

8. Security Threat Plan (Refer Chapter 29 )

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 45

11.2 RESOURCE MOBILIZATION

Resource Mobilisation as per Schedule IV of PNGRB regulations G.S.R. 39 (E):

Table 11-1: Resource Mobilizations (Men and Equipment)

Total Requirement Available with

Installation

Civil

Authorities (Nearest Fire

Station & Hospital)

Regular employees BCW-37

WCW-06

62

Security staff 21 54

Personnel Trained in first

aid 12

20

Others

(Technicians/Helpers) 100

125

Fire Tenders/ Fire fighting

engines 7 Nos.

10

Water storage capacity 3X3700 kL -

Fire Hoses 80 50

Jet/Fog/Spray Nozzles

34/4

40

Foam Branch No Yes

Jumbo Jet Nozzles No Yes

Foam Compound (kL) No Yes

PVC Suit 1 3

Compressed air B.A. Set 1 2

Refill Cylinders for B.A. Set 1 2

Cascade B.A Set No Yes

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 46

Total Requirement Available with

Installation

Civil

Authorities (Nearest Fire

Station & Hospital)

Fire Proximity Suit 1 2

Water Jel 2 10

Low Temperature Hand

Glove 4 pair

10 Pair

Walkie –Talkie 12 set 20 set

Public Address Pager

System/ security

announcement

11+1 set

5

Megaphone 1 2

Jeeps No 2

Cars 1 1

Ambulance 1 2

Trucks No No

Buses No No

Tractors No No

Boats No No

Mobile cranes No No

Ropes (Meters) 3 (4 set) 40

Empty drums 10 15

Buckets 10 20

Sand bags 100 Yes

Dewatering pump No Yes

Pneumatic pump No Yes

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 47

Total Requirement Available with

Installation

Civil

Authorities (Nearest Fire

Station & Hospital)

Photo Camera 1 1

Video Camera No 1

Light Metal Stretchers 2 5

Tarpauline 12’ X 12’’ No Yes

Rope Fibre 3/8’’ No Yes

Bucket 5 10

Rubber Gloves 2 pairs 5 pairs

Oxygen Cylinder No Yes

Sterlite Bandages 5 20

Cotton Sterilised 5 20

Antibiotics No Yes

Analgesties 5 10

Sedatives No Yes

Tetanus Toxoid 2 10

Dressing Instruments 1 5

Sterilisers No Yes

Autoclave for sterlising

Instruments, dressing No

Yes

B.P. Apparatus 1 2

Suction Apparatus No Yes

I.V.Set 2 25

Antishock drugs No Yes

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 48

Total Requirement Available with

Installation

Civil

Authorities (Nearest Fire

Station & Hospital)

Gluco Saline Set 2 20

Gluco Saline Bottle No Yes

11.3 INCIDENT PREVENTING MEASURES AND PROCEDURES

The incident prevention measures and procedures at the installation includes

following prevention measures:-

I. Health safety and environment (HSE) policy is available with the plant. (Refer

ANNEXURE- XII );

II. Proper layout and inter facility distances (the layout should not have any criss-

cross movement of men and materials);

III. As per factory rules Safety committees with fair participation from staff and

management to be done on quarterly basis but as per IOCL internal guidelines

safety committee meeting is being done monthly. The purpose of the plant safety

committee is to encourage teamwork in safety concerns. (Refer ANNEXURE-

XIII);

IV. Safety audits has been carried out yearly by outside agency and internal routine

safety audit at the plant as per OISD-144 is carried out daily by the safety

officer/Manager (Plant) & department staff while monthly audits is carried out by

a multidisciplinary team. Reports of audits should be reviewed by the In-charge

on daily basis & corrective actions undertaken on priority, whenever required.

IOCL Regional Office & Head Office also carries out periodical safety audit of the

plant. OISD also carries out safety audit of the IOCL plant. In these audits, apart

from what is covered by the daily & monthly plant level audits, the following are

also covered:

Safety Organization

Security System

Fire Prevention / Protection System.

Preparedness to handle emergencies & Mock Drills.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 49

Skill level & training needs for HRD.

Operating manual/ Instructions, displays of Do’s & Don’ts etc.

(Refer ANNEXURE- XIV);

V. Work permit system (including entry of confined space, hot & cold work permit

system) is being followed as per OISD-105. In addition Electrical

isolation/Energisation permit is also available with plant for electrical safety.

(Refer ANNEXURE- XV );

VI. Early warning alarm system in the installation (Gas monitoring system with

alarms at 20 % LEL and 40 % LEL is present to automatically sense the leakage

of LPG, heat detection, high level alarms, low pressure/high pressure alarms

etc.) especially in the vicinity of storage tanks, filling station, delivery points and

along with periphery with the indication in the central control room; in-built safety

interlocks system in design such as safety relief valves (SRVs), thermal safety

valves (TSVs), non-returning valves (NRVs), remote operated valves (ROVs)

and Interlocking of sprinkler system with ROV’s and electrical siren, other

various emergency trip systems in Installations;

VII. Fire protection (preferably automatic) and HSE Management system;

VIII. Drill for visitors including assembly procedure and escape route, do’s and don’ts

written instructions before entry, etc.;

IX. MIS System is available in the plant. In MIS System, reports such as RSC

meeting, DSO conference etc. are distributed quarterly.

X. All standby equipment’s are operated periodically and checked as per specified

schedule. Warning system, first aid & definitive treatment methods, evacuation

procedures are tested periodically.

XI. Instruments are checked periodically and observations shall be recorded;

XII. Regulation towards prevention of Fire

Ban on carrying of a potential source of ignition.

Use of only flameproof and intrinsically safe electrical equipment inside the

licensed area.

Fire or naked light, matches, petrol or other lighters or any apparatus, which is

capable of causing ignition, is not permitted to be taken within the battery area

by any person.

Persons entering the installation battery limit shall deposit match boxes,

lighters etc. with the Security Department at the main entrance gate of the

Installation. The same can be collected on return.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 50

Ban On Smoking.

Smoking is prohibited in all parts of the battery area.

Ban On Carrying Lamps.

Ordinary torches will not be used within the battery area. Home proof

torches/lamps or approved manufactures, as supplied by the installation shall

only be used.

Use Of Flame Arrestors.

All vehicles transporting petroleum products from the installation must be

fitted only with those types of spark/flame arrestors, which are duly approved

by the Chief Controller of Explosives.

XIII. General Precautions to be followed to prevent the accident in the plant.

Maintain good housekeeping. Waste materials such as soaked rags, papers

and other scrap are potential source of fire. Spillage of hydrocarbons in

operating areas can be dangerous.

Be vigilant for the abnormal presence of hydrocarbons in operating

environment.

Follow the laid down procedure strictly specially w.r.t. Safety provisions (e.g.

earthing of wagons/trucks etc.) A short cut may prove to be a fatal.

Loose wiring, temporary and non-standard fittings are not permitted inside the

battery area.

Regular checks on equipment health (vibration, fabrication etc.) must be

maintained faithfully.

Do not operate an equipment un-authorized and without clarity.

Anticipate the hazards (e.g. presence of pyrophoric iron) during vessel

cleaning and take preventive steps in advance.

Use only approved type of tools. This will prevent spark due to hammering,

cutting, rubbing actions.

XIV. Check points for incident prevention measures are given at Check list -2 (Refer

ANNEXURE- XVIII).

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-12

EMERGENCY PREPAREDNESS MEASURES

(As per Clause No 12.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 52

12 EMERGENCY PREPAREDNESS MEASURES

(As per Clause No 12.0 of PNGRB Notification Dated 18th January 2010)

12.1 EMERGENCY DRILLS & MOCK EXERCISES

(As per clause No. 12.1)

In emergency management, time is very important, the initial few minutes are critical

and timely action may contain the emergency. For persons to perform quickly their

assigned roles, it is essential that each individual should be made aware of

emergency rehearsals which will impart procedures and their individual roles through

proper training.

Testing & Mock fire drills are carried out monthly in the plant.

A mock drill of the on-site emergency plan is conducted every quarter and records of

such drills with actions on any deficiency observed are kept for reference.

These mock drills cover various probable emergency scenarios e.g. a fire, explosion,

gas leak etc. Mock drill results are reviewed by OIC and reports communicated to

Factory Inspector.

Off Site Emergency Plan is conducted quarterly in the plant considering different

scenarios to improve awareness and to build up the confidence among the

employees for quick and correct action as per their role and responsibilities to

mitigate the Emergency.

On completion of the mock drill rehearsal, the debriefing meeting chaired by Officer

In-charge of the unit is conducted to ensure the efficacy of the rehearsal and to

discuss the observations. Recommendations/observations received from the

observers in this regards are complied with time bound schedule. Moreover the

rehearsal on “Off-site emergency action” has been conducted with the consent of and

under the guidelines of District Collector for surrounding MAH industries.

Last on site emergency response drill rehearsal was conducted on 16-05-2014.

(Refer Annexure-VIII)

12.2 TRAINING

(As per clause 12.2)

1. An ERDMP is easier to use if training material and general philosophy on

emergency prevention and control are kept separate from the working plan.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 53

2. Training is imparted to all the personnel likely to be involved directly or indirectly

to the emergencies including employees, contract workers, transport crew and

security personnel.

3. Contract personnel and contract labourer are allowed to start work only after

clearance of attending and passing safety training.

4. Refresher training are conducted at regular intervals.

5. Critical Safety Campaigns are being conducted periodically on various safety

topics circulating by CO-HSE by involving all Employees, Contract Employees

and Security Personnel.

Moreover Training is being imparted to all IOCL regular employees, security

personnel, contract employees on schedules as per approved Training Calendar as

per OISD Std. 154 for HSE training. Training modules are prepared by Fire & Safety

specialists and external expert faculty also invited.

Table 12-1 : Number of Persons Undergone Safety Training

S.NO. Department No. of Persons No. of Persons Trained

1. Company Employee

BCW

37 Training is given at the time

of recruitment.

2. WCW 06 Training is given at the time

of recruitment.

3. Security 21 21

4. Contract Labours 100 100

12.3 MUTUAL AID

(As per clause 12.3)

Indane Bottling Plant has Mutual Aid agreement with HPCL, BPCL, IOCL Lube Plant

& IOCL Terminal. Various activities to promote Health Safety and Environment

awareness amongst each other, regular lectures / visits / exhibitions are conducted

for knowledge sharing of the expertise of individual organisational related activities to

adopt the best suitable measures in each other.

The plant is handling LPG, which fall under the category of highly hazardous

material. Containing the consequence of emergency requires, well-planned and

documented procedures to ensure prompt response and coordinating among various

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 54

task groups. Combating major emergencies/disaster might be beyond the capability

of individual unit and it is essential to have mutual aid arrangements between similar

units. Mutual aid arrangement are made to facilitate additional help in the event of

firefighting or in rescue operation by the way of rendering manpower medical aid or

firefighting to enhance preparedness in meeting an emergency. The lead time for

response of Mutual Aid members including District Fire Service is within 30 minutes

A copy of Mutual Aid Agreement attached as ANNEXURE-IX.

To make the emergency plan a success, the following exchange of information

amongst the member organizations of mutual aid association is considered essential:

(i) The types of hazards in each installation and firefighting measures.

(ii) List of all the installations or entities falling along the routes of transport vehicles

carrying petroleum or petroleum products.

(iii) The on-site disaster management plans available at the locations detailing the

response procedures/measures prevalent in the locations.

(iv) The fire organization charts drawn by appointing key personnel and defining their

specific duties for handling emergencies.

(v) List consisting of different firefighting equipment available with mutual aid

members, which are compatible for connecting at users place and procedure for

making the replenishment.

(vi) Written procedures which spell out the communication system for help and

response. This is also required to get acquainted with operation of different

firefighting equipment available at mutual aid members and compatibility for

connecting at users place.

(vii) Familiarization of topography and drills for access and exit details carried out by

mutual aid members.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-13

RESPONSE PROCEDURES AND MEASURES

(As per Clause No 13.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 55

13 RESPONSE PROCEDURES AND MEASURES

(As per Clause No 13.0 of PNGRB Notification Dated 18th January 2010)

Containing the consequences of an emergency requires well-planned and

documented procedures to ensure prompt response and coordination among various

task groups. The following response procedures as prevalent in the location is

carried out during emergency.

(a) Zoning and maps

Different zones as per the risk scenarios based on the risk analysis are already

mentioned in chapter 10 (For Contour mapping refer Annexure-XVI) and also

refer Quantitative Risk Analysis Report. Location of assembly point is mentioned

in chapter 15.

Nearby areas and living population is detailed in chapter-01 and demographic

information is detailed in chapter-18.

(b) Detailed layout and flow diagram for different activities/process is attached

as Annexure-V & Annexure-VI.

(c) Manpower- Data are provided in the Chapter 1

Check points on ERDMP response measures are given at Check list- 4 in Annexure

XVIII

13.1 ACTION PLAN FOR LPG LEAKAGE AND FIRE

13.1.1 Leakage from the cylinder valve with fire

a) Immediately try to put out the fire with fire extinguishers available in the vicinity.

b) Cool other cylinders with water sprinkler if they are adjacent to it.

c) Make arrangements for reaching the area with Hydrant Hose to achieve directed

spray in the area.

d) It is important to use all possible methods to cool the surrounding area and

specially the Filled LPG cylinders to avoid spread of fire. The MCP should also

be operated to stop all conveyors and the Electrical system.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 56

13.1.2 Leakage from the Pressure Relief Valve with Fire

a) Allow the fire to continue.

b) Cool the vessel to reduce evaporation.

c) Attempt to cool the vessel extensively so as to reduce the internal pressure.

d) Pressure relief valve will close automatically.

e) Extinguish the fire.

f) Cool adjoining vessel(s) and structure.

13.1.3 Leakage from Pipeline / Vessel without Fire

a) Cordon off the area around 30m radius so that no automobile or sources of

ignition approaches the area.

b) Attempt to close the isolating valve.

c) Attempt to transfer LPG into another vessel if possible.

d) Avoid entrapping into the vapour cloud.

e) Use water spray to disperse the vapour cloud.

13.1.4 Leakage from Pipeline / Vessel with Fire

a) Isolate the storage completely from other storage vessel by closing ROVs of all

the storage and stop other operations.

b) Cool the vessel exposed to flames continuously to reduce the LPG evaporation.

Avoid the possibility of BLEVE (Boiling Liquid Expanding Vapour Explosion).

c) Continue filling the firewater storage tanks by starting bore wells.

d) Provide water curtain between the bullet under fire and the next one.

e) Allow the fire to continue under controlled conditions.

f) Attempt to put-off fire only after control valve is closed. Keep persons away from

dished end.

g) Withdraw the persons to safe zone in case of rising sound coming from safety

valves or discolouration or bulging of vessel.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 57

13.1.5 Leakage in Road Tanker

a) Disperse the vapour with water spray.

b) Close the control valves and then tighten the flange joints / valve glands to arrest

the leakage.

c) Decant the Road Tanker into a storage vessel having low pressure and avoid

pressurizing the road tanker.

d) If the leak cannot be arrested continue dispersal of vapour by water spray.

13.1.6 Leakage in truck decanting area leading to Fire

a) If the leak is small it can be arrested. Close the valves on both sides of the leak

and tighten the loose fittings to stop the leakage.

b) If the leakage is a major one and cannot be stopped instantly, disperse the

leaking LPG by water spray in fine particles. Operate sprinkler system if

necessary.

c) Operate the remote control valves and block the pipeline.

d) Avoid sources of ignition. If it catches fire, allow the fire to burn under controlled

conditions until pipeline quantity gets exhausted.

13.1.7 Action plan for Cylinder Fire

a) When filled cylinder containing LPG is involved in fire and if internal pressure is

not relieved, it shall build up above 70 Kg/ Sq. Cm and ultimately rupture the

container. Rupture may also occur at low pressure if the body becomes weak by

direct flame impingement.

b) If container’s pressure is raised up to 70 Kg/ Sq. Cm, leakage from screwed

valve joint can occur due to different coefficient of expansion of steel and brass.

c) Ignition of the escaping gas would aggravate the fire but release of fire reduces

the possibility of rupture

d) No attempt should made to extinguish the burning gas but the container under

fire and other containers in the vicinity should be kept cool by water spray.

e) If the gas leakage does not ignite, the container should be approached from

upwind and removed to the place of safety away from the source of ignition.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 58

13.1.8 Action plan for Electric Fire

a) Disconnect the affected areas electrical supply.

b) Use Sand Buckets, CO2 Type Fire Extinguishers available in the vicinity to

extinguish the Fire. Even DCP type Fire Extinguishers can be used if CO2 type

Fire Extinguishers is not available immediately.

c) If fire is not extinguished, extinguish by spraying water with FOG nozzle only

after ensuring complete isolation of electric current.

13.1.9 Action plan for Office Fire

a) Disconnect the electric supply of the affected area

b) Attempt to extinguish the fire with the help of CO2, DCP fire extinguishers.

c) For a large fire use hydrant system.

d) Attempt to save the records.

e) Attempt to extinguish the PC fire with the help of Halon or CO2 fire extinguisher.

13.1.10 Action plan for Medical Aid for LPG Freezes

a) Do cover the frost-bitten area with warm hands or light woollen material

b) Bring victim inside to warm area as soon as possible

c) Immerse frostbitten area in cool water.

d) Gently cover the affected parts with light dampened or wet woollen material or

medically fit water gel blanket if affected area cannot be immersed in cool water.

e) Give victim a warm non alcoholic drink

f) Take victim to a physician

g) Do not use hot water or hot water bags

h) Do not turn water pressure or pour water on the burn

i) Do not rub with ice or snow as this increases the chance of infection

j) Tell the physician that a freeze or frostbite from LPG is similar to a burn received

from a heated object or flame.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 59

13.1.11 Action Plan for Electric Shock Casualties

a) Do first aid quickly and without panic

b) Switch off the supply if this can be done at once

c) If not possible use a dry stick, dry cloth or other non conductor to separate the

victim from electrical contact.

d) The rescuer must avoid receiving shock himself by wearing gloves or using a

jacket to pull the victim.

e) Always keep in mind that delay in rescue and resuscitation may be fatal, every

second counts a lot.

13.1.12 Leakage from Pump/Compressor without Fire

a) The pump/compressor should be stopped immediately.

b) The pump/compressor should be isolated by closing the pump suction and

discharge valves.

c) Casing vent line to be opened to vent out LPG from the equipment casing.

d) If the leak continues due to hold up volume in the isolated line, water spraying to

be continued until the leak stops.

13.1.13 Leakage from Pump/Compressor with Fire

a) Isolate the Pump/Compressor completely from the system by closing ROVs.

b) Cool the Pump/Compressor exposed to flames continuously to reduce the LPG

evaporation.

c) Continue filling the firewater storage tanks by starting bore wells or by external

source.

d) Allow the fire to continue under controlled conditions.

e) Attempt to put-off fire only after control valve is closed.

13.2 EMERGENCY SHUTDOWN PROCEDURES IN THE PLANT

Total 2 Nos. Emergency push buttons are installed at critical areas to shutdown all

the moving equipment (and hence all the operations) by stopping the control power

(except lighting) and to activate the siren. Emergency shutdown Logic as per OISD

144 is practiced at Plant.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 60

13.3 RESPONSE PROCEDURES FOR SPILLED MATERIAL

The material collected in the bunded enclosure in the event of a major tank

leak shall be skimmed off and re-pumped into the respective product tank. In

case of spillage outside the bunded area, no waste material would be allowed

to travel away with the storm water as drain gates would be shut off.

Accumulated material in any sewers would be pumped through portable

pumps into the tanks. In addition, since the plant does not store any acidic or

alkaline material, there is no need of neutralization or similar clean up. It is not

expected that any of the materials each out into the ground water system and

thereby causes the need for extensive spill clean up procedures.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-14

EMERGENCY ORGANIZATION AND RESPONSIBILITY

(As per Clause No 14.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 61

14 EMERGENCY ORGANISATION AND RESPONSIBILITY

(As per Clause No 14.0 of PNGRB Notification Dated 18th January 2010)

Detailed information on roles and responsibilities of various coordinators and other

employees and action to be taken in case of emergency in IOCL IBP Budge Budge is

provided in this chapter. The success of control of an emergency situation depends

upon the timely action by the key personnel of the organization.

Emergency Response Organization:

Overall objectives of an emergency response organization are:

a) Promptly control problems as they develop at the scene.

b) Prevent or limit the impact on other areas and off-site.

c) Provide emergency personnel, selecting them for duties compatible with their

normal work functions wherever feasible.

d) Follow Standard Operating Procedures (SOP’s) laid down for all types of

emergencies.

e) Employees must assume additional responsibilities as per laid down procedure

of ERDMP whenever an emergency alarm sounds.

f) In setting up the organization, the need for round-the-clock coverage is essential.

Shift personnel must be prepared to take charge of the emergency control

functions or emergency shutdown of system, if need be, until responsible

personnel arrive at the site of emergency. The organization should have an

alternate arrangement for each function.

14.1 EMERGENCY ORGANIZATION CHART

Role of key personnel is clearly defined to avoid confusion and to meet the

emergency effectively. The Chief Incident Controller (Ch. Plant Manager) and the

Site Incident Controller (Sr. Manager (Plant)) are two main positions for effective

control of an emergency at site. They will be supported by Emergency Management

Team comprising of technical resources from Operations & Maintenance,

mechanical, electrical, instrumentation, civil, communications, technical services etc.

Fire & Safety, Security, HR (Personnel & Administration), Finance & Accounts, C&P

personnel shall also take due roles & responsibilities.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 62

Figure 14-1: Emergency Organisation Chart

Correspondence between various positions as per Emergency organogram and

IOCL organogram are depicted in Annexure-II & Annexure-III.

Also following coordination functions are not nominated separately but assigned to

members of Support & auxiliary services.

i. Human resources and Welfare Services

ii. Transport and Logistic Services

iii. Media and Public relations

iv. Operation and technical Coordination

Medical Services

and Ambulance

Fire Brigade

Services

Police Services

Off-Site Incident

Commander

(District

Magistrate)

CHIEF INCIDENT

CONTROLLER (CH.

PLANT MANAGER)

Affected Stake Holders and Government Authorities

SITE INCIDENT

CONTROLLER

(SR. MANAGER

(PLANT))

Mutual Aid

Municipal transport rescue and rehabilitation team

Support Service like Communication, Engg sevices, media etc

Administration and Communication Coordinator

Fire Safety & Emergency Handlers /Fire Fighting Teams

Operation Team, technical team,

etc.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 63

14.1.1 On site Emergency:

Following Actions to be carried out for Onsite Level -01 & Level-02 emergencies

during General shift as well as off shift hours:

Fire / Vapour Cloud Explosion / Emergency:

1. First responder is an operator or maintenance worker who on discovering fire /

explosion / product leak shall inform to local CR.

2. Try to extinguish or contain fire with help of nearest available fire extinguisher,

water hydrant, Water Cum Foam Monitors without endangering himself.

3. He should attract the attention of others by using hand siren.

4. He can also display the red flag available at the nearest spot and shout “ FIRE”

FIRE “

5. Immediately notify control room, confirm location, type & extent of emergency,

numbers of injured personnel, nature of injuries, name of reporter etc.

6. Control room section operator shall inform to Location In-charge who shall take

charge to deal with emergency and also inform to Sr.Manager (P)

7. Fire coordinator shall take immediate action to control emergency.

8. Security coordinator shall carry out rescue operations at site and control of

personnel to those required for emergency control.

9. Shift in-charge security shall contact Ch. Plant Manager (CIC), Sr. Manager

(Plant) (SIC) and apprise them about nature & extent of emergency.

10. Shift-In-charge –Security ( Main Gate) shall

Communicate emergency message to All HOD’s

Organize arrangement for transportation of officials to site.

Inform all duty/ off duty drivers to turn up for duty.

11. Officer In-charge, all HOD’s shall rush to site with members of Emergency

Management team and take action to mitigate / contain emergency.

12. All coordinators will be at respective duty stations and obey instructions from

Ch. Plant Manager (CIC) will assume full responsibility of emergency action

plan. He shall take decision regarding level of emergency, start of Emergency

Control Centre (ECC).

13. Ch. Plant Manager (CIC) shall take necessary emergency control measures till

situation is brought under control. He shall initiate actions & decisions

regarding:

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 64

Operation & maintenance

Shut-down of Plant & equipment

Evacuation of personnel

Medical assistance to injured

Assistance from mutual aid members and external agencies.

Escalation of emergency & reporting incident to district authorities

Communication & assistance to affected public

Refer Annexure-III for On Shift - Emergency Organogram & IOCL Organogram

Correspondence for Level I ad Level II Emergencies and Roles of Fire Fighting

Team, Auxillary Team and Rescue Team.

Note:

1. Ch. Plant Manager will be Chief Incident Controller (CIC) for over all coordination.

2. Sr. Manager (Plant) (SIC) will be Site Incident Controller at Site.

3. All Coordinators will report to the Sr. Manager (Plant) (SIC) at site.

4. All IOCL Employees working inside shall assemble at ASSEMBLY POINT in Near

Canteen

(Here all IOCL Employees means the persons whose role is not defined in action

plan)

Emergency Action Plan for Emergency during Off- Shift Hours (Including

Holidays):

1. During other than office hours (including holidays) the Security In-charge shall

perform the duties of Site Incident Controller. Security at Visitor Gate shall also

perform duties of Communication, Welfare & Medical, and Material Coordinator

in addition to his normal duties until the arrival of the concerned coordinator.

2. The Security in-charge in consultation with the Sr. Manager (Plant) shall act

upon depending on the situation till arrival of the concerned coordinators for

effective handling of emergency. They shall take care of the safety of personnel,

plant, property etc. Safe operating procedures which are already in practice will

be followed.

3. All other non-essential personnel whose role is not defined in the action plan

shall assemble at assembly points and wait for further instruction from CIC

Control Room.

Refer Annexure-II For Off Shift Emergency Organogram. (Data to be

Updated)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 65

14.1.2 Off-site Emergency

IOCL IBP Budge Budge is notified as a ‘Major Accident Hazard’ installation under

Manufacture Storage and Import of Hazardous Chemicals MSIHC rules, 1989 of

EPA. Therefore, it is required to formulate an Off-site Emergency Plan. Off-site

emergency Plan is attached in Annexure-XI.

During Off-site emergency chief incident controller will coordinate with district

authorities for effective coordination of District crisis management group as per the

District disaster Management plan circulated.

14.2 ROLES & RESPONSIBILITIES

During an emergency situation, Roles & Responsibilities (duties) of IOCL

personnel’s are defined below:-

14.2.1 Chief Incident Controller (Location-In-Charge)

1. Preparation, review & updating of ERDMP Document as per Check list-5

attached in Annexure-XVIII.

2. Assessment of Situation, declaration of emergency and activation of the action

plan.

3. Mobilization of main coordinators & key personnel at respective locations

4. Activation of Emergency Control Centre (ECC).

5. Depending on seriousness of the emergency, seek assistance mutual aid

members & external agencies like Police, Fire Brigade, Hospitals etc.

6. Exercise control of the unaffected areas.

7. Continuously review and monitor the emergency situation.

8. Direct shutdown of Plant and evacuation of personnel as and when necessary.

9. Ensure that injured are receiving prompt medical treatment, take stock of

casualties, if any and that relatives are properly informed / advised.

10. Ensure correct accounting and position of personnel.

11. Taking decision in consultation with district authorities, when the Off-Site

Emergency is to be declared.

12. Regulate vehicular movement in the factory.

13. Arrange for chronological records of the incident / emergency.

14. If emergency is prolonged, arrange for replacement of emergency handling

personnel.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 66

15. Authorize statements to external agencies, media.

16. In case of escalation of situation which may lead to damage to nearby population

inform district authorities to warn nearby population.

17. Ensure that incidents are investigated and recommendations are implemented.

14.2.2 Site Incident Controller (Sr. Manager (Plant))

The Site Incident Controller (SIC) will be identified by the Chief Incident Controller

and will report directly to him. Responsibilities of the Chief Incident Controller shall

include the following:-

1. He shall put in action workable emergency control plan, establish emergency

control centre, organize and equip the organization with ERDMP and train the

personnel.

2. Immediately on knowing about the emergency, he shall proceed to the site.

3. Assess the level of emergency and apprise CIC / ECC about situation

4. Activate the emergency procedure / control plan as required.

5. Direct all operations within the affected area as per priority.

6. Ensure affected area is cordoned off and all non-essential workers in the affected

area are evacuated to the assembly point.

7. Ensure search, rescue and firefighting operations are started.

8. Minimize damage to Plant, property & environment.

9. Alert medical centre and any specialist support as required.

14.2.3 Administration and Communication Coordinator (Location-In-Charge)

Communications Coordinator shall ensure that:

1. ECC communication equipment and systems are maintained to a high standard

and functional throughout the emergency.

2. Back-up communication system is available in the event of the ECC Room.

3. Providing quality and diverse communication systems for use in routine and

emergency situations.

14.2.4 Fire Safety Coordinator (Manager- LPG Safety)

1. Activate local Siren(s).

2. Rush to the site and take charge of fire and rescue operations.

3. Work in close association with site incident controller / chief incident controller.

4. Render technical guidance and logistics to fire personnel.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 67

5. Establish danger zone and arrange barricading if necessary.

6. Ensure sufficient firefighting chemicals and rescue equipment are available at

site.

7. Ensure that firewater pump house is manned and sufficient hydrant pressure in

fire water mains and monitor water level in reservoir.

8. Arrange for additional fighting resources help from mutual aid partners & other

fire services if necessary, in consultation with site incident controller.

9. Coordinate with outside fire brigades and agencies for firefighting / rescue

operations.

10. Ensure that casualties are promptly sent to first aid Centre / hospital.

14.2.5 Support & Auxiliary Services Coordinator (Sr. Manager (Plant))

1. Rush to his office and take charge of medical, welfare and media.

2. Activate medical Centre and render first aid to the injured by assigning first-aid

personnel to specific duties.

3. Arrange additional medical supplies, drugs and equipment spares for firefighting,

as required.

4. Arrange ambulance for transporting casualties and coordinate with hospitals for

prompt medical attention to casualties.

5. Keep all the vehicles and drivers in readiness and send vehicles as per

requirement of different coordinators and officials to mobilize transport to various

teams for facilitating the response measures;

6. To monitor entry and exit of authorized personnel into and out of premises;

7. Head Counts at assembly points.

8. Take care of public relation, inform relatives of injured.

9. Arrange canteen facilities and proper food / refreshment.

10. Arrange to meet emergency clothing requirement.

11. Arrange to contact the families of the injured.

12. Maintaining public relation and arrange media briefing wherever necessary

13. To control the mob outside, if any, with the assistance of the police and to provide

administrative and logistics assistance to various teams;

14. Issue press statement with the approval of Competent Authority / OIC.

15. Take help of welfare bodies, social organizations, NGO’s, local administrations,

blood bank, blood donors, hospitals, doctors, ambulance services, water supply

department, transport hire service, catering services as per requirement.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 68

16. Inform police, civil authorities, statutory authorities etc. with the approval of OIC, if

necessary.

14.2.5.1. Haulage & House Keeping Team (Mechanical)

1. Rush to the site.

2. Work in close association with site incident controller.

3. Assist site incident controller in assessing scale of emergency and take corrective

action to minimize damage to equipment/Plant in consultation with other

coordinators.

4. Ensure that key mechanical personnel are present at site with proper tools.

5. Render technical guidance and logistics to mechanical personnel.

14.2.5.2. Electrical contractor/RSE Automation (Instrumentation/ Electrical)

1. Rush to the site.

2. Work in close association with site incident controller.

3. Assist site incident controller in assessing scale of emergency and take corrective

action to minimize damage to equipment/Plant in consultation with other

coordinators.

4. Ensure that key instrument personnel are present at site with proper tools.

5. Render technical guidance and logistics to instrument personnel.

6. Provide assistance to control room engineer for Plant shut down/instrument

control requirement.

7. Ensure that key electrical personnel are present at site with proper tools.

8. Render technical guidance and logistics to electrical personnel.

9. Ensure electric supply of affected equipment/area isolated if required.

10. Ensure proper lighting is provided during handling of emergency if required.

14.2.5.3. Public Relations In charge (Sr. Manager (Plant))

A competent and well equipped Public Relations / Information officer well trained in

media relations is assigned responsibility of interacting with media, government

agencies, local organizations and the general public.

Initial releases will be restricted to statements of facts such as the name of the

installation involved, type and quantity of spill, time of spill, and countermeasure

actions being taken. All facts must be stated clearly and consistently to everyone.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 69

Plans shall also be developed to utilize local media and television stations for

periodic announcements during an emergency. This shall also assist in reducing

rumours and speculation.

LIST OF COORDINATORS AND THEIR CONTACT NUMBERS (Refer

ANNEXURE-I)

14.2.5.4. Operations Coordinator (TLD Section)

1. He shall proceed to control room immediately.

2. Assess the situation and apprise chief incident controller, site incident controller

and other key persons about the emergency situation.

3. He shall handle plant operations under directions of CIC.

4. He shall direct Emergency management team for appropriate action.

5. He shall monitor all critical process parameters, alarms and ensure safety of plant

& equipment.

6. Warn all the employees in the affected section/plant area and evacuate them to

assembly point if need arises.

7. Assign Time recorder to start Log of emergency as well as time recording.

8. Initiate rescue activities; and first aid need to be given to injured persons pending

arrival of ambulance.

9. Notify the adjacent areas.

10. Ensure that only persons having authorized duties enter their area.

14.2.5.5. ECC /Control Room In Charge

1. Inform to respective sections/coordinators about the emergency.

2. Inform Chief incident controller, site incident controller, TLD operations.

3. Take suitable action to protect the plant in consultation with site incident

controller, Section Operations.

4. Communicate message (telephone) to person(s) working in area/plant.

5. Clearly note down type of emergency and the location.

6. Inform State Emergency coordinators as per emergency telephone list.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 70

14.2.5.6. Security Coordinator

Security Coordinator reports to CIC / SIC and is responsible for security of installation

during emergency. He shall ensure that systematic efforts are launched and no

confusion or panic is created. He shall carry out following actions:

1. Assist F&S department in evacuation and escorting workers & visitors to

assembly areas.

2. Maintain security of premises in the event of evacuation.

3. Maintain the law and order; assist authorities in case of public unrest.

4. Close all gates, control traffic and allow only authorized persons to enter in

consultation with site incident controller / shift coordinator.

5. Cordon off the area of accident and coordinate with external security personnel if

necessary.

6. Direct the external help / authorities to respective coordinators.

14.2.5.7.a Maintenance of ERDMP Records

S&D Section maintains records for all kind of emergencies covering near Miss, Level-

I (if any), Level-II (if any) and Level-III (if any). DSOs will maintain separate registers

for Incident Record, Near Miss, Preliminary Accident report file, Mock Drill Records

etc. at their respective Base Stations. Table top exercises are performed before all

ERD (emergency response drill) and off site mock drill at Location-In-Charge

chamber.

Post–disaster documentation like resources deployed, relief, rehabilitation measures

and lesson learned to avoid re-occurrence of any such emergency will be prepared

by DSO.

14.2.5.7.b Time Recorder

An officer will be assigned the responsibility to maintain an accurate time record of

key information received from the incident or emergency location and to record the

actions initiated by the site incident controller and for implementing the emergency

response actions below:

1. To record key incident events / actions on incident status board / display

manually or electronically;

2. To maintain essential equipment checklist status;

3. To ensure all status and information is up to date and correctly displayed;

4. To take all necessary recorded material to the alternate ECC room in the event of

emergency in main ECC room; and

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 71

5. To maintain a logbook.

14.2.5.8. Communications Services (Location- In-Charge)

A. The Communications Coordinator shall ensure the following actions below:

a. Ensure the ECC equipment and systems are maintained to a high standard

and remain functional throughout the emergency.

b. Ensure a back-up communication system is available in the event of the ECC

Room.

c. Provide quality and diverse communication systems for use in routine and

emergency situations.

Figure 14-2: Communication Flow Chart

Note:

1. The Communication flow chart shown above is a typical communication flow

chart for notification of emergency.

2. Wherever communication exists for any level of emergency, it automatically

implies that the communication exists for all higher levels of emergencies.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 72

B. Flow of Information

a. Control Centre shall receive the information from field either in person or from the

various systems available in the installation.

b. On receipt of information, the control room/TLD In-charge will actuate the

ERDMP and notify the emergency to site incident controller.

c. Control room shift in-charge will act as site incident controller till arrival of

designated person.

d. SIC or CIC depending upon the level of emergency will activate the ERDMP and

inform the concerned authorities as depicted above in the chart.

14.2.5.9. Siren codes

1. The Emergency siren/s should be located suitably to cover the whole area with

the operational control within the installation. These should be tested at least

once in a week to keep them in working condition.

2. Emergency siren code should be as follows, namely: -

(a) Emergency Level-I: A wailing siren for two minutes.

(b) Emergency Level-II and III: Same type of siren as in case of Level – I but it

will be sounded for three times at the interval of 1 minute i.e (wailing siren

2min + gap 1 min+ wailing siren 2min +gap 1 min+ wailing siren 2min)

(c) ALL CLEAR: Straight run siren for two minutes.

(d) TEST: Straight run siren for two minutes at frequency of at least once a

Week.

(e) Public address system should be provided with message

The above siren codes are displayed at prominent places of the Plant.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-15

INFRASTRUCTURE

(As per Clause No 15.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 73

15 INFRASTRUCTURE

(As per Clause No 15.0 of PNGRB Notification Dated 18th January 2010)

15.1 EMERGENCY CONTROL CENTRE (ECC) (AS PER CLAUSE NO. 15.1)

S&D Room has been nominated as the Emergency Control Centre/Control Room. At

the time of the emergency On-site Chief Controller assisted by other designated

coordinators shall take position to perform their duties. The Emergency Control

Centre will be the focal point in case of an emergency from where the overall

operations which handle the emergency are directed and coordinated. Its location

outside the area of potential hazards and easily approachable.

Following supplies and dedicated equipment are made available at the ECC.

1) Copies of the On-site Emergency Plan

2) Layout Plan of the complex

3) Information regarding Safety Equipment, Fire Fighting material

4) Map showing entrance / exit gates.

5) A list of telephones of key and essential staff of the company along with their

residential numbers.

6) Copies of the local Telephone Directories.

7) A list of important telephones like neighbouring industries, local Fire Brigade,

Hospitals, Chief Inspector of Factories.

8) Personal Protective Equipment.

9) First – Aid Kit.

10) Communication equipment – Internal and External telephones and other

communication equipment.

11) Requisite stationary items.

12) Personnel to act as messengers.

13) Updated lists of names, addresses, and telephone numbers of off-site groups

and organizations are made available that might have to be contacted during

emergency.

14) ECC has emergency lights and back up UPS power so that operations can

continue in the event of power failure.

15) Logbooks for recording the sequence of events have been provided to assist in

investigating causes, evaluating performance and preparing reports.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 74

16) ECC also has dedicated computer with the latest and updated soft copies of all

standard operating practices (SOP) etc.

Table 15-1: Telephone Numbers of Emergency Control Centre

Emergency Control Centre Contact Number

S&D Room 033-2482-7727

15.2 ASSEMBLY POINT (AS PER CLAUSE NO. 15.2)

(1) Emergency Assembly Point near Canteen is pre-designated area in safe zone

as per quantitative risk analysis, where the personnel like workers, staff,

contractor workers etc. not involved in emergency operations (as per ERDMP)

shall assemble in case of an emergency.

Table 15-2: Assembly Point

S.No Potential Hazard Zone Assembly point Location

1. Cylinder Shed Near Canteen

(2) Designated assembly point is clearly marked with directional display board

along the route. Routes are well lighted with florescent marking.

(3) During an emergency, pre-designated persons would take charge of this point

and take the roll call of the people reporting. Provisions are made for assembly

points, communication and headcount facilities at assembly point, and

personnel to control the movement of assembled employees.

(4) The assembly point coordinator should rush to their designated assembly

point.

(5) The assembly point coordinators will

Keep in touch with Chief Incident Controller for further instruction.

Ensure the assembling of residents at their nearest Assembly point.

Request the assemble persons, not to panic and be ready for evacuation

(if required).

Keep in touch with Welfare and Media Coordinator for arrangement of

transport facility for evacuation (if required)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 75

Carryout the head count of the assembled persons at the respective

assembly point and report the same to the CIC.

Refer Annexure I for Contact Details of internal and External Authorities.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-16

DECLARATION OF ON-SITE AND OFF-SITE EMERGENCIES

(As per Clause No 16.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 76

16 DECLARATION OF ON-SITE & OFF-SITE EMERGENCIES

(As per Clause No 16.0 of PNGRB Notification Dated 18th January 2010)

Declaration of On-Site & Off-Site Emergencies (Clause No 16.0)

1. An emergency starts as a small incident, which may become a major incident with

passage of time. At the initial stages, the emergency organization chart will be put

into action. If the incident goes beyond control, the chief incident controller will

actuate the on-site emergency plan at the appropriate stage as considered

necessary.

2. During idle shift or holidays, the security personnel will combat the incident as per

the ERDMP organization chart.

3. When emergency becomes catastrophic and evacuation beyond the plant

premises is considered necessary by the chief incident controller, the situation will

be handed over to district authority for implementing the off-site emergency plan.

4. The management of emergency henceforth has to be controlled by the district

crisis management group under the supervision of the District Collector/DDMA

(District Disaster Management Authority).

5. In addition to preparation of on-site emergency plan, furnishing relevant

information to the district authorities for the preparation of off-site emergency plan

is a statutory responsibility of the occupier of every industry handling hazardous

substance.

WHO SHOULD REPORT THE FIRE DISASTER AND HOW:

Any person in the plant who sees a fire or unsafe conditions anywhere in the

premises of plant should report it at once to the Control Room. Person reporting the

fire / emergency should state the location at a prominent place to guide fire-fighting

crew arriving on the scene. The man should try to attempt to mitigate the emergency,

extinguish the fire with the equipment available nearby till arrival of fire fighting crew.

He should draw the attention of nearby people by shouting ‘FIRE, FIRE, and FIRE’.

DECLARATION OF THE DISASTER

Level 1 & 2 disaster- The disaster is declared by the Chief Incident controller.

Level 3 disaster- The disaster is declared by District Authority

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 77

Initial Announcement of an Emergency

Any untoward incident/emergency has to be reported either by person or through PA

System/Walkie-Talkie/Megaphone or by any other means to the Location In-

Charge/Security Gate. The Location In-Charge shall act as per Roles &

Responsibility defined in clause No.14.2.

Incident Controller shall decide the nature of emergency [Minor/Major/Disaster] and

take appropriate action.

In the event of Emergency, the same will be communicated to all Coordinators. All

employees will report to Assembly point as specified, on hearing the siren or getting

the message over PA system/Walkie-Talkie/Megaphone. Maintenance

personnel/Contract workmen working with machines also proceed for Assembly point

after leaving the machine in safe condition.

Note: The announcement regarding Major Emergency will be made by the Location-

In-Charge [Chief incident Coordinator] or his nominee as information first becomes

available on an incident.

This plan has been developed to deal with emergency incidents which occur totally

within the IOCL IBP, Budge Budge premises and which do not endanger the outside

community. Emergency incidents will be classified by the level of response that will

be required. The actual classification will be made by the Location-In-Charge or his

nominee as information first becomes available on an incident. The level of response

may change as more information becomes available or conditions change. Where

information is missing, the worst case scenario will dictate the level of response.

Level 1: Minor Emergency

Incidents with minor release or leak of products or other emergency, which amounts

to minimum spill or minimum release of volume, could pose a minor threat to the

safety of employees, residents, the environment or property and can be safely

contained On-Site, which doesn’t produce any off site impact and doesn’t seek any

outside involvement.

Level 2: Major Emergency

Incidents with moderate release or leak of petroleum products handled or other

emergency, which amounts to moderate spill or moderate releases, could pose a

moderate threat to the safety of employees, the environment or property which could

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 78

have been safely contained on-site, could produce off site impact and could seek any

outside involvement and could require outside resources.

Level 3: Disaster

Incidents with major releases or leak of hydrocarbon products or other emergency,

which amounts to large spill or large release of volume involved, could pose a total

threat to the safety of employees, residents, the environment or property which

produces off site impact and require large outside involvement & district outside

resources.

Termination of emergency period and restoration of normalcy period, which follows

all clear sirens, shall also be declared by the “Site Coordinator” or the higher

management who replaces him.

Refer Annexure I for Contact Details of internal and External Authorities.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-17

RESOURCES FOR CONTROLLING EMERGENCY

(As per Clause No 17.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 79

17 RESOURCES FOR CONTROLLING EMERGENCY

(As per Clause No 17.0 of PNGRB Notification Dated 18th January 2010)

In order to meet all possible emergencies, adequate number of resources and

systems have been provided as per identified Risk level and also in compliance with

statutory requirements under Factories Act, 1948 and other OISD regulations.

The available emergency control systems and facilities within the installation are as

follows:-

Table 17-1: Details of Fire Fighting Facilities Available at Site:

Sr.

No.

Safety Equipment Total Number

1 Fire Water Tanks (3154 KL each) 03

2 Fire Engines (410 Cum/hr.) 07

3 Jockey Pumps (25 Cum/hr.) 02

4 Security Air Compressors 02

5 10 kg DCP Fire Extinguishers 96

6 75 kg DCP Fire Extinguishers 6

7 4.5 kg CO2 Fire Extinguishers 07

8 Hand Sirens 10

10 Double Hydrants 31

12 Water Monitors 30

13 Electrical Sirens 02

14 Deluge Valves 27

15 Gas Sensors 0

16 Emergency Trip Button 02

18 Manual Call Point 12

19 Deluge Valves 27

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 80

20 Jet Nozzles 34

21 Universal Nozzles 02

22 Triple Purpose Nozzles 02

23 Curtain Nozzles 02

24 Emergency Kit 01

25 Non Sparking tools Kit 01

26 Sand Scoops 0

27 Fire Beaters 0

28 Fire Trolley 01

29 Fire Proximity Suit 01

30 Water Jet Blankets 02

31 Sand Buckets 16

32 125 kg Halon Spray 0

Table 17-2: List PPEs Available at Site:

S.No. Item Total Number

1. Protective Clothing 0

2. Breathing Apparatus 01

3. Safety Helmets 100

4. First Aid Box 03

5. Stretchers 02

6. Safety torches 02

7. Resuscitator 02

8. Fire Helmets 04

9. Hand Gloves (Asbestos) No

10. Hand Gloves (Cotton) 10 pair

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 81

Classification of Fire:

Fire is classified basically on the basis of the combustible material involved:

Table 17-3: Classification of Fires

Type of Fire Materials Involved

Class ‘A’ Fire

(Combustible Solid)

Ordinary combustibles as Wood, Cloth,

Rubbish, Plastic, Paper.

Class ‘B’ Fire

(Combustible Liquid)

Inflammable substances as Oil, Mob,

Benzoyl, Solvent etc. And also all the fires,

which occur in fast and vapour.

Class ‘C’ Fire

(Combustible Gases)

Fire involving gases i.e. LPG, CNG,

Synthetic gas, Hydrocarbon Gases etc.

Class ‘D’ Fire

(Combustible Metal)

All Combustible metallic fire, Potassium,

Magnesium, Sodium etc.

Note:

1. For fires of Electric type, use only CO2 or dry chemical fire extinguishers to

extinguish fire on or around electrical equipment. Do not use water or foam.

2. Do not extinguish a gas fire until the source of fuel has been cut off to avoid an

explosive mixture being formed.

Table 17-4: Suitability of Fire Extinguishers

Types of

Extinguishers Class ‘A’ Class ‘B’ Class ‘C’ Class ‘D’

Water Type

Fire Extinguishers Suitable Unsuitable Unsuitable Unsuitable

Foam Type

Fire Extinguishers

Unsuitable but

will control small

fires

Suitable Unsuitable Unsuitable

CO2

Unsuitable but

will control small

Unsuitable

but will Suitable Unsuitable

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 82

Types of

Extinguishers Class ‘A’ Class ‘B’ Class ‘C’ Class ‘D’

Fire Extinguishers fires control small

fires

Dry Powder

Fire Extinguishers

Unsuitable but

will control small

fires

Suitable Suitable Suitable*

*Special type of DCP for specific materials.

Fire Alarm System:

Fire Alarm System

Type Frequency

Distance Quantity, Nos.

Electrical 3 KM 2

Manual 1 KM 10

Table 17-5: Fire Alarm Systems available at site

Electrical siren No.1 is Three Km Range

Manual siren Nos 10 are 1 Km Range

Hand sirens will be audible only within the facility

Wind Socks:

Wind socks are installed for knowing wind direction during emergency. Adequate

number of Wind Socks has been installed in at strategic locations.

Portable Fire fighting Extinguishers:

All the strategic location/areas of the Plant are covered with portable fire

extinguishers for tackling fires at their incipient stage. DCP & CO2 type extinguishers

of different capacities provided at hazardous area for instant use as given in below

Table 17-6

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 83

Table 17-6: Details of Fire Extinguishers

Description Quantity, Nos.

10 kg DCP Fire Extinguishers 96

75 kg DCP Fire Extinguishers 06

6 kg CO2 Fire Extinguishers 0

4.5 kg CO2 Fire Extinguishers 07

Hydrants, Monitors & Hose Boxes:

Entire Plant is covered with hydrant points, water Monitors & Water Cum Foam

Monitor System. The details are mentioned in the table below:

Table 17-7: Details of Fire Hydrants, Monitors & Hose Boxes

Description Quantity (Nos.)

Water Cum Foam Monitor 750 gpm No

Foam Compound Trolley 200/210 No

Hose Boxes 32

First aid fire trolley 1

Water cum foam monitor No

Water monitor 30

Double headed hydrant point 31

AFFF (kL) No

ATCFOAM (kL) No

Portable MEFG No

Fixed MEFG No

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 84

Fire Water Network:

Entire plant premise is covered with fire water Network to meet the emergency along

with Monitors, High Range Monitors, Fire Hydrant points and water cum Foam

Monitors at strategic points as per OISD-144 requirements.

Table 17-8: Fire Water Details

S. No. Item Quantity, Nos.

1. Water Tanks 03 no’s of above ground Tank each of

capacity 3154 kL

2. Fire Engines 07

Telephones:

Following communication equipment are used for internal and external

communication at IOCL IBP Budge Budge.

Walkie-Talkie

PA Pager system

Megaphone

Transport Facilities:

One Tata Indica is always available at Plant & IOCL shall take help from outside

transport agencies for mass evacuation of plant persons, if required. Also officers are

provided with vehicle which can be made available during emergency.

Check list - 6 for available resources (internal and external) as per regulation

17 is attached in ANNEXURE-XVIII.

Mutual Aid Help:

The following company in the IOCL IBP Budge Budge area form a part of mutual aid

scheme:

HPCL, Budge Budge

BPCL, Budge Budge

IOCL Lube Plant, Budge Budge

IOCL Terminal, Budge Budge

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 85

The commitment in writing to render assistance in emergency is available. The

details of facilities are exchanged among industries. The mutual aid scheme

applicable not only for safety but also for security and sharing of common facility.

For the roles of mutual aid partners during emergency situations Refer ANNEXURE-

IX.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-18

DEMOGRAPHIC INFORMATION

(As per Clause No 18.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 85

18 DEMOGRAPHIC INFORMATION

(As per Clause No 18.0 of PNGRB Notification Dated 18th January 2010)

The basis of the population assigned to the facility will be based on the data

available according to the latest population Census near Plant area. The

population covered in a distance 5,000 m perpendicular to the Plant premises on

either side is considered. Based on the census report and area of consideration, the

following table is proposed for population density.

Table 18-1: Population Details around IOCL

Population of South 24 Parganas district is 8,153,176

Table 18-2: OTHER DEMOGRAPHIC INFORMATION

S. No. Details Regarding

(with 5 Km Range)

Remarks

1. Flora Fauna Flora

Sandle trees, mangrove tree, sugarcane,

timber, and betel nuts

Fauna

Garole breed of sheep, Chinae hans, Booroola

merino sheep, Bengal Tiger, crocodiles

2. Cattle and Livestock Cows, buffaloes, hens etc

3. Religious Places Dargah/Temple within 2 Km

4. Orphanages Not Available

5. Old aged homes Available

Name of Place Approx. Distance

from Plant

Population

Jamalpur 1.24 km 243,474

Buita 1.25 km 10,000

Chandipur 1.76 km 20,000

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 86

List of Schools come under 5 km radius of IBP Plant.

1. P K Girls High School Budge Budge, West Bengal, India. 3.7 km from Bottling

Plant

2. St. Thomas Memorial School Budge Budge, West Bengal, India. 3.6 km from

Bottling Plant

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-19

MEDICAL FACILITIES

(As per Clause No 19.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 87

19 MEDICAL FACILITIES

(As per Clause No 19.0 of PNGRB Notification Dated 18th January 2010)

First Aid Details

Three first aid boxes are available in the Plant. In case of emergency, one

Emergency vehicle Tata Indica is always available at IBP Budge Budge.

First aid is the provision of initial care for an illness or injury. It is usually performed

by trained personnel to a sick or injured person until definitive medical Treatment can

be accessed. Total 12 No. of employees underwent First aid training program.

Table 19-1 : Details of Trained Persons in First Aid

S. No. Name Designation

1. Priya Ranjan Kar Ops. Officer Ii

2. Asit Naskar Jr. Chargeman (F)

3. Shamim Hossain Jr. Chargeman (F)

4. Sirajul Islam Sanfui Jr. Chargeman (F)

5. Sk Monirul Islam Jr. Chargeman (F)

6. Pijush Kanti Sardar Jr. Chargeman (F)

7. Kamalesh Mondal Jr. Chargeman (F)

8. Sukanta Mondal Jr. Chargeman (F)

9. R A Modi Jr. Chargeman (F)

10. Sk. Niamot Ali Jr. Chargeman (F)

11. Shyamal Naskar Jr. Chargeman (F)

12. Hiralal Adhikary Jr. Chargeman (F)

INSTRUCTIONS TO FIRST AID PROVIDER

a) Gather information as to how the accident or illness came about.

b) Look out for signs such as swelling, bleeding, immobility etc.

c) Look out whether the victim feels thirst, nausea, cold, pain, numbness etc.

d) Pay special attention to severe bleeding, failure of breathing and shock.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 88

e) Arrange for speedy removal of the victim to proper medical care.

DO’S AND DON’TS OF FIRST AID

a) Do the first thing first quickly, quietly and calmly.

b) Stop severe bleeding, if any.

c) Administer artificial respiration if required and continue it till the doctor arrives.

d) Treat for shock.

e) Boost up the morale of the victim to lesson his anxiety.

f) Unless required don’t remove clothes.

g) Don’t try to achieve too much

h) Don’t soak a victim to wake him up.

i) Unless victim complains of cold, don’t wrap with blanket or coat.

FIRST AID FOR SPECIFIC ACCIDENT OR ILLNESS

Treatment for Shock

Keep patient warm.

Keep head lower than feet

Cover with blankets or coats

Give hot coffee or hot tea

Heat Exhaustion

Signs to look for: fatigue, irritability, headache, feeling of faintness, cold, clammy

skin and a lot of perspiration

What to do:

Person should be made to lie down in a cool, shaded area or an air conditioned

room. Raise feet.

Massage legs towards heart.

Give cold salt water, (1/2 teaspoon to ½ glass of water), or cool sweetened

drinks, especially iced tea and coffee, every 15 minutes until person recovers.

Do not let person sit up, even after feeling recovered. Person should rest for a

little while longer.

Treatment for Fainting

Place victim in lying down position with head lower than the rest of the body.

Loosen clothing around neck

Ensure plenty of cold air

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 89

Sprinkle face and chest with cold water

Put smelling salt or ammonia to nose

Rub limbs towards body

Give stimulates which victim can swallow.

Treatment for Sprains

Ensure absolute rest for victim till the arrival of doctor.

The affected joint should not be used.

If possible elevate the affected joint.

Apply clothes wrung in cold water or shower the joint with very cold water.

Treatment for Ordinary Wounds

Prevent touching of the wound

Don’t apply ordinary water since it may contain infectious germs.

Don’t use strong antiseptics like dichloride or mercury or carbolic acid.

Cover the wound with several layers of sterile gauze and bandage firmly but not

tightly.

Call the doctor as early as possible.

Treatment for Burns and Scalds

Place several layers of sterile gauze over the burn; saturate with 5 per cent

tannic acid solution if available and apply bandage.

For serious burns on the body remove all clothing carefully and treat as per first

treatment.

If there are signs of collapse keep the victim warm and give sips of warm coffee

or warm tea if not unconsciousness.

Treatment for Gas Poisoning

In all cases of gas poisoning, call the doctor at once.

Remove the victim to fresh air if possible.

Put the victim on a bed in a comfortable position and ensure that he is quiet and

composed.

In case of unconscious victim and difficulty in breathing, administer artificial

respiration at once.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 90

Table 19-2: First Aid Details

S. No. Item Quantity,

Nos.

1. Small Sterilised Dressings 10

2. Medium Sterilised Dressings 5

3. Large Sterilised Dressings 5

4. Large Sterilised Burn Dressings 2

5. Sterilised Cotton Wool (15 Gms) 5

6. Antiseptic/Centrimide (1%) Solution 2 ml

7. Mercurochrome (2%) Solution 2 ml

8. Sal-Volatile (Dose Mode Of Administration) 2 ml

9. Scissors 2

10. Adhessive Plaster (6cms X 1 M) 5 roll

11. Adhessive Plaster (2cms X 1 M) 5 rolls

12. Sterilised Eye Pads 3

13. Aspirin/Any Analgesic 5 leaf

14. Polythene Wash Bottle(For Washing Eyes) 2

15. Roller Bandages(10cms Wide) 2

16. Roller Bandages(5cms Wide) 2

17. Triangular Bandages 5

18. Tourniquet 2

19. Splints 2

20. Safety Pins 2 Packets

21. Kidney Tray Not Required

22. Snake Bite Lance Not Required

23. Potasium Permanganate Ate Crystals 30 ml

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 91

List of Antidotes and Emergency Medicines

Petroleum products are not acutely toxic, hence antidotes are not necessary.

Arrangement for transferring affected persons to hospitals

In the Plant, there is One Tata Indica Emergency vehicle is available always. In case

of emergency, this can be pressed into service for transferring victims. IOCL IBP

Budge Budge has tie up with Budge Budge Hospital at Budge Budge which is near

from plant, also ESI Hospital at Budge Budge which is 6 km from plant In addition,

one ambulance is provided which is available for transferring people in emergency.

Evacuation Routes for the Ambulance Vehicles for transferring affected

persons

The main medical emergency management plan involves rescue of the victim

through a safe route, ascertaining the level of injury/ fatality, deciding on the extent of

medical action required, rushing the patient to nearest first aid centre or hospital as

the case may be. In addition, of course, informing close relatives of the extent of

injury and proposed treatment is very important.

For the facility in question, the incident controller would be In-charge of determining

the presence of any victim requiring immediate evacuation from within the plant. The

actual rescue operation would be carried out by the “Rescue Team Members” as

identified in the Fire Orders. The evacuation route selected would be the shortest one

and the one well away from or shielded from heat radiation and as identified in the

site layout plan. In case additional water shielding is felt necessary, the same may be

done with the help of water sprays/ hydrants etc. along the evacuation path. Victims

would be carried away for treatment in stretchers from the site. Petrol Vehicles and

scooters are not to be used for rescue within the plant. The role of the rescue team

includes (on hearing the siren): rushing to the spot with stretcher and first aid box,

rescuing the victims to safe location, giving first aid (there are trained first aiders) etc.

In addition, they should inform the Incident Controller and company doctor (on panel)

and request his immediate presence. In case any outside assistance from hospitals

etc. is deemed essential, necessary arrangements at the hospital (phoning up and

gearing up the hospital to receive the victims) would be made.

In addition, they would need to arrange for the safe transport of the victim by either a

company car or hospital ambulance, depending upon the severity. The trained first

aiders, during this process should continue giving first aid till such time as necessary.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 92

In addition, monitoring the condition of victim throughout this ordeal is essential- any

signs of deterioration in breathing, infection of open wounds etc., must be brought to

notice immediately.

Details of neighbouring Hospitals:

Table 19-3: Telephone Numbers of Hospitals/ Ambulance

S. No. Name of the

Hospital

Address Contact No

Hospitals At South 24 Parganas

1. Budge Budge

Hospital

- 24801200

2. Budge Budge ESI

Hospital

BBT Rd, Gumar Gala, Budge Budge,

Kolkata, WB 700137 24701396

Ambulance

3. Ambulance - 9231474534

/9674406808

The following facilities are available at the nearby hospital:

Burn Wards

Emergency Drugs (as required)

Number of Beds (More than 10)

Medical Equipment (as required)

Table 19-4: Resources and Man Power available with Major Hospitals

Sr. No. Hospital Doctors Beds Burn Bard

1. Budge Budge ESI Hospital 100 400 6

2. Budge Budge Hospital 40 100 1

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 93

Table 19-5: List of Specialist doctors in Budge Budge

Sr. No. Name Qualification Specialization

1. Dr. P. S Mukherjee

MRCP UK

(London), FCCP

(USA , Critical

care)

Critical care

Specialist

2. Prof.(Dr) .G.K. Prusty MCh, MBBS Neurosurgery

3. Dr. Sudipta Chandra MBBS, MS ENT

4. Dr. Sunip Banerjee MBBS, MD Cardiologist

5. Dr. Kasturi bhowmick MBBS, MRCOG Gynaecologist

6. Dr. Raja Dhar MD, MRCP Pulmonologist

7. Dr. Arun Ratan Dutta MBBS, MD Nephrologist

8. Dr. Shivaji Basu MS, FRCS Urologist

9. Dr. Adhish Basu MBBS, MS Plastic Surgeon

10. Dr. Sanket Chakraberty MDS Maxillofacial

Surgeon

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-20

EVACUATION

(As per Clause No 20.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 95

20 EVACUATION

(As per Clause No 20.0 of PNGRB Notification Dated 18th January 2010)

The Chief Incident controller will intimate regarding evacuation. Evacuation of the

personnel willl be carried out in a planned manner along the escape route to

assembly points. People must be evacuated at right angle to wind or opposite to the

wind direction.

All Team Heads/Security will provide the exact head count details during the

emergency. Accounting for site personnel, visitors and contractors, particularly those

known to have been in the affected area will be done.

Figures of contract labor may vary depending upon day and time, but the exact figure

(inside Plant) will be available at main gate (Security Department keeps record of

contract person/ visitor etc. who have entered inside Plant). Total number of persons

available at site will be calculated from above.

Rescue operation will be carried out by the Rescue/Incident Control personnel who

are attending to the emergency. The above operations will be led by the Incident

Controller at site. The list of casualties etc. will be reported to the Communication

coordinators who in turn will be reporting to the Chief Incident Controller at site.

Casualties will be shifted to hospital, if required, by communication coordinators in

consultation with Chief Incident Controller.

Evacuation of those personnel who are not required to be present will be carried out

in consultation with site incident controller. When required, all personnel shall

proceed to ASSEMBLY POINTS through designated routes.

All Section heads/ Team Coordinators will ensure that the employees nominated by

them from their respective Sections must report at emergency site to extend their

support to Team Coordinators.

Evacuation Plan

When the emergency message is received, all personnel should ensure that

nearby personnel are aware of the emergency, quickly shutdown operating

equipment by pressing ESD buttons (e.g., Valves, Pumps, flow meters etc),

close the doors and exit the building using staircase.

All personnel should know where primary and alternate exits are located, and be

familiar with the various evacuation routes available.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 96

When officially told to evacuate, leave by the nearest exit and alert others to do

the same.

Once outside, move to the assembly point designated for the plant. Stay there

until an accurate head count has been taken.

Keep streets and walkways next to exits clear for emergency vehicles and

personnel. Keep the street side of buildings clear so that emergency equipment

can reach buildings.

Do not return to an evacuated plant/ building until & unless directed to do so by

the Fire & Safety Department personnel.

EVACUATION & REHABILITATION

If a major industrial accident does occur, the public in surrounding areas will have

very little time to react and save themselves. The local population will have to be

warned in a very short period. Time available to population for a safe escape and

threatened by the accident will depend on the nature of accident. A fire, when

compared with explosion will give more time to escape and generally, affected area

will be small. Effects of fire on population will be injuries due to thermal radiation. An

explosion will give little time to warn population and area affected may be much

larger than that in case of a fire. Effects of an explosion on the population will be

injuries caused by shock wave, flying debris collapsing structures as well as

exposure to thermal radiation.

FOR INSIDE BATTERY AREA

The entry of contract personnel working inside the battery area is through Main Gate

only. In case of emergency / major accident / disaster, assembly points have been

identified and marked in the plant area for assembling of people for head counting

and thereafter transportation to a safe place.

FOR OUTSIDE BATTERY AREA

Evacuation of the population in the affected villages / other places outside the battery

area depends on the emergency and provision of temporary shelter and supplies (in

the relief camp) and will be under the control of the District Administration.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 97

ACTIONS FOR GENERAL POPULATION

On being warned of a major industrial accident general public should take the

following actions:

Immediately go outdoors

Extinguish all flames

Keep torches handy. Store water for emergency use

Do not jam emergency phone lines by calling emergency services.

Wait for further instructions from emergency services before moving out.

EVACUATION

In major disaster, it may become necessary to evacuate people from and around

the area likely to be affected by accident. Sometimes, the evacuation may have to

be made to safe places within the complex area itself. At other times, however,

especially in case of catastrophic disaster, it will be necessary to shift the entire

population outside the complex area to certain pre-designated places fixed in

advance. The task may be difficult as there will be no notice or very short notice of

a calamity, there may be failure of electricity, there may be shortage of manpower

resources etc.

REQUISITIONING OF BUSES / TRUCKS

The Local Police station In-charge under the respective station will be the

Commander-in-Charge of evacuation under the direction of respective

Superintendent of Police. He will determine the extent of evacuation necessary in

view of the likely hazards of disaster. Once this is decided upon, the next job would

be to perform necessary evacuation as quickly as possible. Whether evacuation is

internal in the complex area itself or external, transport facilities would be a major

requirement. For this evacuation, Commander will require availability of buses /

trucks. Public Transport such as Bus, Train, Auto and Taxi can be used for

evacuation of personnel residing nearby. A list of such vehicles should be prepared

in advance and kept ready. For this purpose, he may also get requisite buses from

the SRTC (State Road Transport Corporation).

For ordering evacuation, it will be necessary to fix up pick-up points in different areas

in advance so that residents would know where exactly to board the buses. The

buses / trucks will be lined up at these points for shifting people to safe places.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 98

The entire area to be evacuated should be divided into convenient sectors and each

sector should be placed in charge of a senior officer, whose duty would be to ensure

that all persons from this sector are compulsorily shifted. Help of security / police staff

should also be taken in achieving this task, if considered necessary.

Repeated announcements should be made over mobile-vehicles, fitted with mikes,

directing people to evacuate immediately and board buses / trucks at pick – up

points. Staff who would be employed for supervising arrangements at pick – up

points should be earmarked in advance. The routes by which evacuation will be

made from different areas will be fixed in advance. The drivers of buses / trucks will

be informed about their routes and about their destinations where the residents are to

be off-loaded. In the case of shifting to city, the Chairman of Municipality should be

informed for keeping the places of accommodation ready to receive evacuated

persons and to make other arrangements.

Sheltering of shifted people will be taken care of by DC.

EDUCATION

Help of voluntary organizations and local schools are taken to conduct educational

sessions to make people aware of the actions, the public should take in case of any

major emergency. Periodic meetings of people are held with the village heads to

educate them.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-21

INFORMATION TO PUBLIC

(As per Clause No 21.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 99

21 INFORMATION TO PUBLIC

(As per Clause No 21.0 of PNGRB Notification Dated 18th January 2010)

(1) General public who are likely to be affected will be informed about safety

measures to be taken in the event of an emergency.

During On-site emergency Fire Mock Drill, nearby public are informed & their

participation also ensured to have holistic experience of the emergency &

precautionary measures to be adopted during emergencies.

Awareness camp is also being conducted regularly for sensitizing the people

about the emergency nature.

(2) Display boards carrying Do’s and Don’ts during emergency will be located

outside the gate as well as in the neighbouring areas and other habitat areas in

the immediate vicinity. Use of Dos' and Don’ts will be prepared and furnished to

the District Crisis Management Group.

(3) Safety leaflets are printed having the information on Hazards of Petroleum

Product & action in case of emergency is distributed among villages near by the

area which are described in Chapter-18.

Assessing the situation at Site & Making Emergency known to People

Whosoever will notice any situation will immediately inform Plant Control Room /

nearest Control Room / supervisor by means of telephone or nearest alarm point or

personally. Officer of Plant Control room, after seeing the magnitude of the situation,

will blow the siren. Accordingly, a wailing siren for two minutes will be blown and

emergency will be controlled by the teams as per organogram.

If the Fire Fighting crew is not capable of controlling the situation, after assessing the

situation, the Incident controller of the Plant will declare the disaster i.e. level 3

disaster. Plant Control Room operator will blow three wailing sirens of 2 minutes

each with a time lag of 1 minute between each siren to make the disaster known to

the key personnel and employees of the Plant as well. The information about the

disaster to key personnel will also be given on telephone by Station Control Room.

Public Awareness System

For disclosure of information to the public, the plant has developed pamphlets. The

same is being given to villager in the form of a brief write up for further propagation in

their villages. Many programs are conducted in villages through corporate social

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 100

responsibility programs and various development schemes are implemented. To

avoid any panic, it is been considered that the necessary announcement will be

made in nearby villages releasing the information to the tune of requirement only.

The Welfare & Media Co-coordinator of the Plant is the only authorized person for

giving the information to the public & to serve as the Liaison Officer.

The use of Electronic Media

For bringing the awareness among the external public, the use of electronic media

like TV, Air & Press coverage is used. The Welfare & Media co-coordinator of the

plant prepares the Press release to be issued for the local press & other important

dailies.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-22

ROLES AND RESPONSIBILITIES OF STAKEHOLDERS INCLUDING EXTERNAL AGENCIES

(As per Clause No 22.0 of PNGRB Notification Dated 18th January 2010)

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 101

22 ROLES AND RESPONSIBILITIES OF STAKEHOLDERS INCLUDING EXTERNAL

AGENCIES

(As per Clause No 22.0 of PNGRB Notification Dated 18th January 2010)

Roles and responsibilities of stakeholders including external agencies

This section describes the role and responsibilities of stakeholders including external

agencies such as District Authority, police, fire service, revenue department, health

department, pollution control board, National Disaster Response Force (NDRF) and

State Disaster Response Force (SDRF).The district collector acts as Head of

emergency operation and other authorities including external agencies act under him,

as defined in Schedule–V. These roles and responsibilities are generally in line with

National Disaster Management Guidelines on Chemical Disasters, April 2007,

brought out by National Disaster Management Authority.

Schedule – V

The important Roles and Responsibilities of Various Stakeholders

a) Indane Bottling Plant, Budge Budge is the bottling installation having receiving,

storage and handling facilities of Liquefied Petroleum Gas.

During Emergencies, the installation will provide necessary information to Mutual

Aid Association, District Authority, Police and Fire Services about the following:

List of Hazardous Chemical and Systems, which have potential to cause danger

to Human, Environment and Property.

Material Data Sheet is attached as Annexure-VII

Onsite Emergency Plan and Periodic Mock Drill.

The above entities will support plant in mitigation, rescue and rehabilitation, with

resources identified and agreed with the plant in advance. Such areas will be

included in Off-Site Emergency Plans.

b) The district authority is responsible for the Off-Site emergency plan and it will

be equipped with up-to-date Major Accident Hazard units, website, control room

etc., with provisions for monitoring the level of preparedness at all times. Regular

meetings of various stakeholders of Chemical Disaster Management will be

conducted by district administration/District Disaster Management Authority to

review the preparedness of Chemical Disaster Management & IOCL IBP

participation actively in all disaster management review meetings.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 102

c) The police will be an important component of all disaster management plans as

they will be associated with investigation of incidents/disasters. Police take

overall charge of the Off-Site situation until the arrival of the district collector or its

representative at the scene.

d) The fire services are one of the first responders and will be adequately trained

and equipped to handle chemical emergencies. Fire services are to acquire a

thorough knowledge of likely hazards at the incident site and the emergency

control measures required to contain it.

e) In a chemical emergency, the revenue department shall coordinate with other

agencies for evacuation, establishment of shelters and provision of food, etc.

f) When required for evacuation purposes in a chemical emergency, the

Department of transport should made transport promptly available.

g) The role of civil society and private sector in the Off-Site plan will be defined.

h) The health department needs to assure that all victims get immediate medical

attention on the site as well as at the hospitals/health-care facility where they are

shifted. In addition, the department needs to network all the health-care facilities

available in the vicinity for effective management and take effective measures to

prevent the occurrence of any epidemic.

i) Pollution control boards need to ascertain the developing severity of the

emergency in accordance with responsive measures by constant monitoring of

the environment. Whether an area is fit for entry will depend upon the results of

the monitoring. A decontamination operation would be required to be carried out

with the help of other agencies and industries.

j) The NDRF and SDRF are the specialized forces to manage these disasters in a

longer run according to the severity and nature of the disaster. Their specialized

training is an effective measure that needs to be built up and maintained with

time for achieving a higher standard of preparedness. They need to coordinate

with other local agencies such as the Central Industrial Security Force that may

be responsible for security at the industrial site.

k) Role of above External Agencies have been defined in Annexure–XI of National

Disaster Management Guidelines Chemical Disasters, April, 2007

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 103

ASSISTANCE FROM OUTSIDE AGENCIES

Assistance may be required from outside agencies during the course of an

emergency & SICs will be responsible for establishing liaison with these agencies for

effective assistance.

DISTRICT MAGISTRATE, POLICE & FIRE BRIGADE

To inform IOCL about leak / burst on the Mainline when the Public brings to their

notice.

In case of Product Spillage, to ensure security at site & cordoning off the areas

and post guards for preventing the villagers going near the site of the spillage.

In case of fire, mobilization of Foam Tenders and Crew from local Fire Stations.

For deployment & Home Guards , if necessary

Traffic Control and Diversion

Provision of Wireless Communication facilities.

Evacuation of Civilian Population, if necessary

Maintenance of communication with the public

ASSISTANCE REQUIRED FROM PWD AUTHORITIES

For constructing any temporary diversion

For repair of any damage to Roads or Bridges

Assistance for mobilizing equipment labor contractors for de-watering the canal,

exposing the line and digging Bore-wells etc. for carrying out of the repairs.

ASSISTANCE REQUIRED FROM RAILWAYS

In case the need arises, the railway personnel shall help in evacuating persons

stranded at railway station and at neighbouring areas, through passenger trains.

Railway communication facilities to convey important message at the time of

crisis.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge 104

ASSISTANCE REQUIRED FROM NEIGHBOURING INDUSTRY (MUTUAL AID

PARTNERS)

Mutual Aid Members will render the help at the time of emergency. They will mobilize

the Equipment, Manpower, etc. to mitigate the loss due to disaster or accident. They

will provide support to combat the disaster situation in an efficient way and will

provide

Fire Tender and Crew

F/F material, First Aider, their hospital facilities if any.

Technical expertise, communication facilities, vehicles as required.

ERDMP for LPG Bottling Plant

J0541 ERDMP IOCL IBP Budge Budge

CHAPTER-23

REPORTING OF THE INCIDENT

(As per Clause No 23.0 of PNGRB Notification Dated 18th January 2010)