emergency management plan - · pdf file2.4 emergency risk management 29 ... standard operating...
TRANSCRIPT
Emergency Management Plan - December 2013 Page 1 of 60
Emergency Management Plan
Emergency Management Curtin University December 2013
Emergency Management Plan - December 2013 Page 2 of 60
This Plan has been produced in compliance with the Australian Standard AS 3745-2010 – Planning for Emergencies in Facilities, together with reference to the Emergency Management Act 2005, endorsed by the Curtin University Emergency Planning Committee and approved by the Vice President of Corporate Services.
20 December 2013 ……………………………………………………………… ………………………………………………….
Endorsed by Chairperson Date Emergency Planning Committee
Emergency Management Plan - December 2013 Page 6 of 60
GLOSSARY OF TERMS 9
PART 1 - INTRODUCTION 15
1.1 INTRODUCTION 16
1.2 AIM 16
1.3 DEFINITION OF AN EMERGENCY 16
1.4 SCOPE 16
1.5 RELATED DOCUMENTS & ARRANGEMENTS 17
1.6 SPECIAL CONSIDERATIONS 17
1.7 RESOURCES 18
1.8 FINANCIAL ARRANGEMENTS 18
1.9 INDEMNITY 18
1.10 REVIEW OF DOCUMENTATION 18
PART 2 - PLANNING 19
2.2 WESTERN AUSTRALIAN HAZARD MANAGEMENT STRUCTURE 25
2.3 EXERCISING AND REVIEWING 27
2.4 EMERGENCY RISK MANAGEMENT 29
PART 3 -RESPONSE 31
3.1 AUSTRALASIAN INTERSERVICE INCIDENT MANAGEMENT SYSTEM (AIIMS) 32
3.2 CURTIN’S EMERGENCY RESPONSE STRUCTURE 33
3.4 EVACUATION, EVACUATION DIAGRAMS AND EQUIPMENT 37
3.5 EMERGENCY EQUIPMENT 38
3.6 COMMUNICATION EQUIPMENT 39
PART 4 -RECOVERY 41
4.1 RECOVERY 42
4.4 WELFARE / EVACUATION CENTRES 42
PART 5 - APPENDICES 43
APPENDIX 1: RISK REGISTER SCHEDULE (SUBJECT TO DEVELOPMENT) 45
APPENDIX 2: STANDARD OPERATING PROCEDURE (SOP) - EVACUATION 47
APPENDIX 3: RESOURCES REGISTER 49
APPENDIX 4: EVACUATION / WELFARE CENTRE INFORMATION 52
APPENDIX 5: PERSONAL EMERGENCY EVACUATION PLAN (PEEP) TEMPLATE 53
APPENDIX 6 – CRITICAL INCIDENT MANAGEMENT TEAM (CIMT) INCIDENT ALERT MATRIX 56
APPENDIX 7 – EMERGENCY CONTACTS DIRECTORY 60
Emergency Management Plan - December 2013 Page 7 of 60
DISTRIBUTION LIST
Organisation Type of Copy E = Electronic D = Document
Critical Incident Management Team (CIMT) E
Emergency Planning Committee (EPC) E
Health & Safety E
Security D
Faculty Managers E
Executive Deans of Faculty E
Curtin Library D
WA Police E
Department of Fire & Emergency Services E
St John Ambulance E
South East District Emergency Management Committee E
Canning/South Perth Local Emergency Management Committee E
Victoria Park/Belmont Local Emergency Management Committee E
Emergency Management Plan - December 2013 Page 8 of 60
AMENDMENT RECORD
No. Date Amendment Details By
1
2
3
4
5
6
7
8
9
10
DOCUMENT CONTROL
RESPONSIBILITIES (All Sections Required)
Policy Manager Vice President, Corporate Services
Contact Emergency Management & Planning Manager Tel: 9266 2653 Fax: 9266 3381
Review Date Annually from date of endorsement.
Emergency Management Plan - December 2013 Page 9 of 60
GLOSSARY OF TERMS
The following terms apply throughout this Plan: AUSTRALASIAN INTERSERVICE INCIDENT MANAGEMENT SYSTEM (AIIMS) – a nationally adopted structure to formalise a coordinated approach to emergency incident management. AIIMS STRUCTURE – the combination of facilities, equipment, personnel, procedures and communications operating within a common organizational structure with responsibility for the management of allocated resources to effectively accomplish stated objectives relating to an incident (AIIMS). AS – Australian Standard (AS3745-2010 Planning for emergencies in facilities) BIOHAZARD - infectious agents that present a risk or potential risk to the health of humans or other animals, either directly through infection or indirectly through damage to the environment. BUSINESS CONTINUITY PLAN - a plan to assist with post-incident co-ordination and recovery issues. CHIEF WARDEN – a trained person responsible for the overall coordination of building evacuations. COMPREHENSIVE APPROACH – the development of emergency and disaster plans to embrace the aspects of prevention, preparedness, response, and recovery (PPRR). PPRR are aspects of emergency management, not sequential phases. CRITICAL INCIDENT – any event which causes disruption to an organization, creates significant danger or risk and which creates a situation where staff and students feel unsafe, vulnerable and under stress. CRITICAL INCIDENT MANAGEMENT TEAM (CIMT) –a team of University executives and senior directors who are accountable to the Vice Chancellor and Council, who together, provide stewardship in times of crisis. DEPARTMENT OF FIRE AND EMERGENCY SERVICES (DFES) – the Department of Fire and Emergency Services in Western Australia. EMERGENCY – the occurrence or imminent occurrence of a hazard which is of such a nature or magnitude that it requires a significant and coordinated response. EMERGENCY MANAGEMENT – the management of the adverse effects of an emergency. Involves the development and maintenance of plans to mitigate, prepare for, respond to and recover from emergencies.
Emergency Management Plan - December 2013 Page 10 of 60
EMERGENCY MANAGEMENT AGENCY – a hazard management agency (HMA), a combat agency or a support organisation as prescribed under the provisions of the Emergency Management Act 2005. EMERGENCY MANAGEMENT TEAM (formerly the Emergency Control Organisation) – a team of people who together manage an emergency or potential emergency on Campus grounds. EMERGENCY RISK MANAGEMENT – a systematic process that produces a range of measures which contribute to the well-being of the Curtin University community and environment. EMERGENCY OPERATIONS CENTRE (EOC) - a room allocated as the Emergency Operations Centre where the Critical Incident Management Team and/or Emergency Management Team members meet to coordinate the response to the incident or critical incident. EMERGENCY PLANNING COMMITTEE - persons responsible for the development and implementation of this Emergency Management Plan. EVACUATION – the planned relocation of persons from dangerous or potentially dangerous areas to safer areas and eventual return. FORWARD COMMAND POST (FCP) – the point where responding agencies assemble to receive and disseminate information to make decisions on response actions. HAZARD – a situation with the potential for loss or harm to the University, its people and the environment.
a) A cyclone, earthquake, flood, storm, tsunami or other natural event b) A fire c) A road or air crash d) A plague or an epidemic e) A terrorist act as defined in The Criminal Code section 100.1 set out in the Schedule to the Criminal Code Act 1995 of the Commonwealth f) Any other event, situation or condition that is capable of causing or resulting in;
(i) Loss of life, prejudice to the safety or harm to the health of persons or (ii) Destruction of or damage to property or any part of the environment and is prescribed by the regulations.
HAZARD MANAGEMENT AGENCY (HMA) – A public authority or other person, prescribed by regulations because of that agency’s functions under any written law or because of its specialised knowledge, expertise and resources, to be responsible for the emergency management or an aspect of emergency management of a hazard for a part or the whole of the State. INCIDENT – an unplanned event resulting in, or having the potential for, death, injury, ill health, loss of or damage to property including environmental impact, disruption or other events.
Emergency Management Plan - December 2013 Page 11 of 60
INCIDENT CONTROLLER – the person appointed by the Hazard Management Agency or Controlling Agency for the overall management of an incident within a designated incident area. INCIDENT MANAGEMENT TEAM (IMT) – a group of incident management personnel comprising the Incident Controller and the person that he/she appoints to be responsible for the functions of operations, planning, logistics and public information The team headed by the Incident Manager which is responsible for the overall control of the incident. INCIDENT SUPPORT GROUP (ISG) – a group of agency/organisation liaison officers convened and chaired by the Incident Controller to provide agency specific expert advice and support in relation to operational response to the incident. H&S – Health and Safety. LOCAL GOVERNMENT (LG) – meaning the City, Town or Shire and the City, Town or Shire Council. LOCAL EMERGENCY MANAGEMENT COMMITTEE (LEMC) – based on either local government boundaries or emergency management sub-districts. Chaired by the Shire President/Mayor (or a delegated person) with the Local Emergency Coordinator, whose jurisdiction covers the local government area concerned, as the Deputy Chair. PREVENTION – regulatory and physical measures to ensure that emergencies are prevented, or their effects mitigated. Measures to eliminate or reduce the incidence or severity of emergencies.
PREPAREDNESS – arrangements to ensure that, should an emergency occur, all those resources and services which are needed to cope with the effects can be efficiently mobilised and deployed. RESPONSE – actions taken in anticipation of, during, and immediately after an emergency to ensure that its effects are minimised and that people affected are given immediate relief and support. RECOVERY – the coordinated process of supporting emergency-affected communities in reconstruction of the physical infrastructure and restoration of emotional, social, economic and physical well-being. RISK – a concept used to describe the likelihood of harmful consequences arising from the interaction of hazards, communities and the environment. - The chance of something happening that will have an impact upon objectives. It is
measured in terms of consequences and likelihood. - A measure of harm, taking into account the consequences of an event and its likelihood. For
example, it may be expressed as the likelihood of death to an exposed individual over a given period.
Emergency Management Plan - December 2013 Page 12 of 60
- Expected losses (of lives, persons injured, property damaged, and economic activity disrupted) due to a particular hazard for a given area and reference period. Based on mathematical calculations, risk is the product of hazard and vulnerability.
RISK MANAGEMENT – the systematic application of management policies, procedures and practices to the tasks of identifying, analysing, evaluating, treating and monitoring risk. STANDARD OPERATING PROCEDURES - formal written guidelines that denote day to day operational procedures assist in long-range planning and provide instructions for incident responses. TREATMENT OPTIONS – a range of options identified through risk management, to select appropriate strategies which minimize the potential harm to the community. WARDEN - a trained person responsible for evacuating given areas of a building and reporting back to the Chief Warden.
Emergency Management Plan - December 2013 Page 13 of 60
GENERAL ACRONYMS USED IN THESE ARRANGEMENTS
CW Chief Warden
ECC Emergency Coordination Centre
EMP Emergency Management Plan
EMT Emergency Management Team
EOC Emergency Operations Committee
EPC Emergency Planning Committee
DEMC District Emergency Management Committee
DFES Department of Fire & Emergency Services
DoH Department of Health
FM (Curtin University) Facilities Management
HMA Hazard Management Agency
H&S Health & Safety
IMT Incident Management Team
ISG Incident Support Group
LEMC Local Emergency Management Committee
PEEP Personal Emergency Evacuation Plan
SOP Standard Operating Procedure
Emergency Management Plan - December 2013 Page 16 of 60
1.1 Introduction The development and implementation of this Emergency Management Plan (EMP) is part of Curtin University’s commitment to enhance the safety and well-being of people in its facilities and to protect the facilities. The Standard (AS 3745-2010 Planning for Emergencies in Facilities) together with the Emergency Management Act 2005 and the Western Australian State Emergency Management framework for emergency prevention, preparedness, response and recovery from incidents have been referenced and utilised to identify the following principles and best practice:
preventative measures are identified, assessed and implemented
personnel are prepared for emergencies through training, skills and knowledge
appropriate response measures are initiated to address the scale and size of the emergency
the University is able to continue operations within a reasonable timeframe. 1.2 Aim The aim of the EMP is to outline the management structure, responsibilities, procedures and guiding policies to assist Curtin University when responding to an emergency event. The EMP directs the response efforts and works in conjunction with standard operating procedures (SOPs) and department specific plans which complement and coordinate overall efforts and provides more depth and specific knowledge and expertise. 1.3 Definition of an emergency An emergency, for the purposes of this document is defined by the Emergency Management Act 2005 as: “the occurrence or imminent occurrence of a hazard which is of such a nature or magnitude that it requires a significant and coordinated response” For Curtin University incidents/emergencies the Emergency Response Diagram (refer Part 3 – Response) should be adhered to. 1.4 Scope The EMP is a campus-level plan covering property owned and/or operated by Curtin University and the faculty, staff, students and visitors associated with the University campus. The EMP is designed to address a comprehensive range of natural and manmade hazards that could affect the University. This EMP covers the Curtin University Bentley campus, Technology Park, Shenton Park and Curtin Graduate Business School. Other campuses or property owned or leased by Curtin will have separate plans.
Emergency Management Plan - December 2013 Page 17 of 60
1.5 Related Documents & Arrangements
1.6 Special Considerations
1.6.1 After Hours, Weekends and Public Holidays It should be noted that the business hours of Curtin University, are from Monday to Friday however, Security operates on a twenty four hour, seven days a week basis. In order to access the Curtin University services and resources after hours, on weekends and public holidays, the utilisation of relevant emergency contact phone numbers will be required. These numbers are located at Appendix 7 – Emergency Contacts Directory.
Plan / Arrangements Dated Location / Contact
Emergency Management Plan 2013 Curtin website www.curtin.edu.au
Health & Safety Risk Register Refer to Table of Contents
Local Emergency Management Arrangements: City of Canning/South Perth City of Victoria Park/Belmont
2012
Relevant administration building and website
AS 3745-2010 Planning for Emergencies in Facilities
2010 www.sai.com.au
Emergency Management Act 2005 2005 www.semc.wa.gov.au
State Emergency Management Plans (WESTPLANS):
Fire
Severe Storm
Tropical Cyclone
Flood
Tsunami
Earthquake
HAZMAT
Human Epidemic
Collapse
Recovery Coordination
Heatwave
Public Information
Gas Supply Disruption
Liquid Fuel Supply Disruption
2013
2004
2007
2010
2010
2011
2010
2008
2008
2008
2012
2012
2013
2011
www.semc.wa.gov.au
Emergency Management Plan - December 2013 Page 18 of 60
1.6.2 Linguistically Diverse Curtin University comprises a multi-cultural population with a variety of languages being spoken, including those from Asia, Europe and the Middle East. During an emergency event, where language may become a communication barrier, a Telephone Interpreter Service (24 hours) may be utilised to provide or receive information by contacting the Translating and Interpreting Services (TIS) on 131 450.
1.6.3 Personal Emergency Evacuation Plan (PEEP) The Personal Emergency Evacuation Plans are individually designed plans that apply to individuals with a disability, medical condition or who are mobility impaired who may need assistance during an emergency. Each PEEP is an individual plan for means of escape from fire or emergency situation and is completed by the individual. However, individuals are not obligated to complete the form but it is recommended and promoted at Curtin University. Refer to Appendix 5 for the PEEP template.
1.7 Resources
The Hazard Management Agency (HMA) is responsible for the determination of resources required to combat the hazards for which they have responsibility. Curtin University has conducted a broad analysis of resources available within the University. The Curtin University emergency resource register is located at Appendix 3. The Register will be reviewed and updated on a regular basis.
1.8 Financial Arrangements
The principles of funding for emergencies is to ensure accountability for the expenditure incurred, the organisation with operational control of any resource shall be responsible for payment for all related expenses associated with its operation during emergencies, unless other arrangements are established.
The leader of the Critical Incident Management Team and/or nominee has the authority to authorise and incur expenses associated with an emergency.
1.9 Indemnity
The University will provide staff members with full professional indemnity insurance, except in circumstances of external private consultancy work or other work outside of the scope of a staff member’s employment contract with the University. 1.10 Review of Documentation
This plan will be reviewed by the Emergency Planning Manager annually or where there are significant changes to occupancy or usage of buildings and after an incident. Emergency evacuation diagrams will be reviewed by the individual building health and safety representatives and will be displayed at appropriate locations to enable occupants and visitors easy access and guidance. They shall be in the format described in AS 3745-2010 Emergency Planning for Facilities.
Emergency Management Plan - December 2013 Page 20 of 60
2.1 Curtin’s Emergency Management Structure
2.1.1 Critical Incident Management Team
In the event of a level 2 or 3 emergency, the Critical Incident Management Team (CIMT) may be formed. The composition of the CIMT will depend on the nature, complexity and duration of the emergency.
The role and responsibilities of the CIMT in an emergency situation as outlined in this plan may include, but are not limited to:
undertake a strategic assessment of the situation;
declaring a University wide emergency if the situation warrants;
co-ordinate and approve the release of all official information to the University;
ensure that staff and student safety and wellbeing is prioritised ahead of all other priorities.
approve and prioritise business continuity and business resumption requirements of the University;
approve and prioritise the provision of people, premises, resources and funding to manage the incident.
2.1.2 Emergency Planning Committee (EPC)
The EPC reports via the Chair to the Vice President, Corporate Services.
Terms of Reference
Responsibilities o To develop and plan the University’s emergency preparedness, response and
recovery. o To establish and monitor the University’s emergency management framework.
Membership o The membership of the EPC shall consist of the following personnel or their
nominated delegate:
Director Asset Management (Chair) Emergency Planning Manager Director Health and Safety Facilities Manager Security Manager Director Support Services – Uni Life Director Public and Community Relations Director Strategic Communications Director CITS Business Systems
Emergency Management Plan - December 2013 Page 21 of 60
Subject matter experts may be called upon to provide additional expertise in developing the Emergency Management Plan, procedures and training requirements.
Role and duties o prepare, maintain and implement the Emergency Management Plan o ensure adequate resources for development and implementation of response
to emergencies o ensure adequate training and information awareness o ensure appropriate and adequate testing/exercising of the Emergency
Management Plan o provide a point of liaison for key stakeholders in the emergency management
environment o review the effectiveness of the Emergency Management Plan and where
appropriate arrange for amendments to be made.
Meetings are to be held quarterly with the Agenda to include the following items: o assess the appropriateness of resources including time, finances, equipment
and personnel for the implementation and maintenance of the Emergency Management Plan, procedures and training
o undertake the Emergency Risk Management process and assess and develop appropriate treatment options
o develop a schedule of exercises and scenarios for testing of emergency procedures
o review outcomes from exercises and scenarios to address any deficiencies o determine if the Emergency Management Plan and procedures have been
effectively communicated.
The EPC meetings will be minuted and a running sheet of action items will be compiled.
2.1.3 Emergency Management Team (EMT)
The EMT reports via the “on call” (after hours) emergency response person to the Chair of the EPC.
Terms of Reference
Responsibilities o To provide a 24/7 all hazards, emergency response service.
Membership The membership of the EMT shall consist of the following personnel or their nominated delegate:
o Director Asset Management o Emergency Planning Manager o Director Health and Safety o Director Support Services – Uni Life
Emergency Management Plan - December 2013 Page 22 of 60
o Director Public and Community Relations o Director Strategic Communications o Emergency Response Coordinator o Facilities Manager o Security Manager o Director CITS Business Systems
Role and duties o To direct, implement and coordinate emergency response. o Act as the conduit between Curtin University and the emergency services
personnel. o Provide situation reports to the CIMT.
2.1.4 Chief Wardens
Responsibilities
Chief Wardens have the authority to direct University staff, students, contractors and visitors following the declaration of an incident/emergency or during an exercise.
Locate and to be familiar with evacuation routes and assembly points detailed on each building evacuation diagram.
Establish a method for contacting Wardens.
Ensure a Deputy is trained and available during their absence.
Ensure efficiency in operation of facility communication equipment i.e. EWIS
Provide induction to new staff and new wardens on emergency procedures.
Attend training and exercises, as required.
2.1.5 Wardens
Responsibilities
Wardens have the authority to direct University staff, students, contractors and visitors following the declaration of an incident/emergency or during an exercise.
Locate and to be familiar with evacuation routes and assembly points detailed on each building evacuation diagram.
2.1.6 First Aiders
Responsibilities
Provide first aid as and when required.
Attend and participate in training requirements for the position.
Participate in exercises, scenarios and testing of emergency.
The following table outlines the colour and apparel requirements:
Position Apparel Colour
Chief Warden / Deputy Tabards
White
Wardens Red
First Aid Green
Emergency Management Plan - December 2013 Page 23 of 60
2.1.7 Employees, Visitors and Contractors Responsibilities
Employee Responsibilities
The following outlines the responsibilities of employees within the University.
Responsible Person (the person responsible for contractors)
Ensure that Contractors within their area of responsibility have completed the Contractor Induction and are aware of their responsibilities.
Ensure that they check in with security and carry their identification card at all times.
Ensure they have developed an Emergency Management Plan for their area of activities.
Faculty Heads
Ensure that employees within their area of responsibility have completed the employee induction and are aware of their responsibilities.
Ensure that teaching staff are trained in emergency procedures for classes.
Teaching Staff
Complete the employee induction before undertaking any University activities.
Attend and participate in training associated with emergency procedures.
Direct and escort students to the assembly/muster point during any emergency event.
Non-Teaching Staff and Volunteers
Complete the employee induction before undertaking any University activities.
Ensure awareness of location of emergency equipment including alarm activation methods, firefighting equipment, first aid equipment and emergency exits.
Responsibilities of non-employees Tenants
Ensure awareness of location of emergency equipment including alarm activation methods, firefighting equipment, first aid equipment and emergency exits.
Direct and escort patrons/visitors from the premises to assembly/muster points during an emergency event.
Students
Complete the student induction within the first week of semester
Follow the instructions of University employees during an emergency
Emergency Management Plan - December 2013 Page 24 of 60
Visitors
Follow the instructions of University employees or emergency services personnel during an emergency.
Contractors
Complete the contractor induction before undertaking any activities on site, unless other arrangements are stipulated in the contract safety management plan.
Carry identification card at all times
Follow the emergency procedures set out in the safety management plan for the contract.
Ensure awareness of location of emergency equipment including alarm activation methods, firefighting equipment, first aid equipment and emergency exits.
Follow instructions from University employees or emergency services personnel.
Venue Hirer
Comply with Curtin University’s Health and Safety Management System and H&S Policy as directed by the University.
Direct and escort attendees to the assembly/muster point during an emergency event.
Emergency Management Plan - December 2013 Page 25 of 60
2.2 Western Australian Hazard Management Structure
The hazard management structure consists of “Controlling Agencies”, "Hazard Management Agencies", "Combat Agencies" and "Support Organisations" that are at some level involved with preventing, preparing for, responding to and recovering from the effects of a hazard.
Figure 1 – Hazard Management Structure
2.2.1 Controlling Agency
A Controlling Agency is the agency nominated to control the response activities to an incident.
When an Emergency Situation/State of Emergency is declared the Controlling Agency may also be the prescribed Hazard Management Agency for that hazard.
2.2.2 Hazard Management Agency (HMA)
Pursuant to s.4 (1) Emergency Management Act 2005 a HMA is a public authority, or other person, who may be prescribed by the regulations to be a Hazard Management Agency for emergency management, or an emergency management aspect prescribed by the regulations, of a hazard prescribed by the regulations.
A Hazard Management Agency is prescribed because of that agency’s functions under any written law or specialized knowledge, expertise and resources, is responsible for emergency management, or the prescribed emergency management aspect, in the area prescribed of the hazard for which is prescribed s.4 (3) of the Act.
The prescribed Hazard Management Agencies are detailed in the Emergency Management Regulations, 2006.
When an emergency situation is declared by a Hazard Management Agency, that agency is responsible for the overall management of the response to the incident resulting from that hazard.
Controlling Agency
Combat Agency Support Organisation
Emergency Management Plan - December 2013 Page 26 of 60
2.2.3 Combat Agency
A public authority, or other person, may be prescribed by the regulations to be a Combat Agency who or which, because of the agency’s functions under any written law or specialized knowledge, expertise and resources, is responsible for performing an emergency management activity prescribed by the regulations in relation to that agency s.6 (2) of the Act.
A Combat Agency undertakes response tasks at the request of the Controlling Agency in accordance with their legislative responsibilities or specialised knowledge. 2.2.4 Support Organisation
A Public authority or other person who or which, because of the agency’s functions under any written law or specialised knowledge, expertise and resources is responsible for providing support functions prescribed by the regulations in relation to that organisation s.6(2) of the Act
A Support Organisation undertakes specific activities in support of the Controlling Agency, Combat Agencies and other Support Organisations upon request.
Emergency Management Plan - December 2013 Page 27 of 60
2.3 Exercising and Reviewing
2.3.1 Aim of Exercising Testing and exercising are essential to ensure that the Emergency Management Plan is workable and effective. Testing and exercising is also important to ensure that individuals and departments remain appropriately aware of what is required of them during an emergency. The exercising of a HMA’s response to an incident is a HMA responsibility however; it could be incorporated into one of the University’s exercises. Exercising the plan will allow the EPC to:
test the effectiveness of the Emergency Management Plan
bring together individuals, departments, faculties, members of emergency management agencies and give them knowledge of and confidence in, their roles and responsibilities allow participating agencies an opportunity to test their operational procedures and skills in simulated emergency conditions
test the ability of separate agencies to work together on common tasks and to assess effectiveness of co-ordination between them.
2.3.2 Exercising Exercises shall be undertaken for each procedure documented in this Emergency Management Plan. These exercises can be desktop simulation, partial exercise or full evacuation drill. Exercises shall only be undertaken once the EPC has confirmed that the procedures have been assessed for completeness and those with responsibilities have been trained. The EPC shall develop a schedule of exercises in consultation with the EMT. Each EMT shall then plan, organise and execute these exercises in accordance with the schedule. For each exercise, a risk assessment must be undertaken to determine unplanned events. The objectives and expected outcomes of the exercise must be established, documented and communicated to all participants. Each exercise shall have a nominated observer. Prior to conducting any exercise, those affected by the exercise shall be made aware of the type, scope and inclusion/exclusions of employees, visitors and contractors related to the exercise. Where necessary, signs indicating that the activities are a drill/exercise shall be distributed in the area of the drill/exercise if required. 2.3.3 Frequency of Exercises One full evacuation exercise/drill shall occur every 12 months for each building.
Emergency Management Plan - December 2013 Page 28 of 60
2.3.4 Types of Exercises Some examples of exercises types include:
Desktop/Discussion
A phone tree recall exercise
Operating procedures of an Emergency Operations Centre
Locating and activating resources on the Emergency Resources Register (refer to Appendix 3).
2.3.5 Debriefing A debriefing will be held at the completion of the exercise and involve all exercise participants. Participants should be encouraged to comment on the execution of the exercise and provide recommendations and suggestions for improvement. All comments should be documented and forwarded to the EPC.
Emergency Management Plan - December 2013 Page 29 of 60
2.4 Emergency Risk Management
Risks – hazards likely to occur Curtin University recognizes that the campus’ ability to cope with the impact of potential emergencies largely depends on the preparation of plans and procedures. The following tables illustrate the prioritisation of local hazards, responsible HMAs, relevant Westplans and local procedures pertaining to Curtin University.
Hazard HMA WA State EM Policy
Westplan Curtin Procedure
Fire DFES Yes Yes
Severe Storm DFES Yes In progress
Tropical Cyclone DFES Yes In progress
Flood DFES Yes In Progress
CBRN (Chemical, Biological, Radiological, Nuclear)
DFES Yes Need Clarification
Hazardous Materials DFES Yes Yes – H&S
Collapse DFES Yes In Progress
Earthquake DFES Yes In Progress
Plane Crash WA Police Yes In Progress
Road Crash WA Police Yes In Progress
Human Epidemic Department of Health Yes In Progress
Terrorist Act WA Police Yes In Progress
Heatwave Department of Health Yes Need clarification
Hazard Responsible authority
WA State EM Policy
Westplan Curtin Procedure
Emergency evacuation Curtin University Yes No Yes
Disruption to essential services
Curtin University No Need Clarification
Personal threat Curtin University No Yes
The Emergency Management Plan for Curtin University is based on the premise that the HMAs prescribed with the responsibility for the above hazards develop, test and review the appropriate State Emergency Management Plans (Westplans). However, Curtin University is committed to providing HMA and combat agencies with assistance and support where possible for emergency events through the implementation of this Plan or any part of.
Emergency Management Plan - December 2013 Page 32 of 60
3.1 Australasian Interservice Incident Management System (AIIMS) Curtin University has adopted the principles of the Australasian Interservice Incident Management System (AIIMS) for its Emergency Management Plan. AIIMS is a nationally recognised system of incident management and provides for an organisational structure able of responding to all levels of emergencies from simple to complex. Its operation relies on the formation of an Incident Management Team for command and control of an incident.
3.1.1 Incident Management Structure
Incident
Controller
Planning
Operations
Logistics
Public
Information
3.1.2 Incident Management Team (IMT)
Based on the principals of management by objectives, AIIMS allows for flexibility to respond to incidents that may escalate in severity and its operation relies on the formation of an Incident Management Team for command and control of an incident.
The Incident Controller may determine that an Incident Management Team (IMT) and an Emergency Operations Centre (EOC) is required, the IMT would assemble at a predetermined campus Emergency Operations Centre (EOC) to take control of the response to the emergency.
3.1.3 Incident Support Group (ISG)
The ISG is convened by the HMA to assist in the overall coordination of services and information during a major incident. Coordination is achieved through clear identification of priorities by agencies sharing information and resources.
The role of the ISG is to provide support to the agency Incident Management Team. The ISG is a group of people represented by the different agencies that may have involvement in the incident and is formed when there is a necessity to coordinate multiple agencies.
Frequency of meetings will be determined by the Incident Controller and will generally depend on the nature and complexity of the incident.
Emergency Management Plan - December 2013 Page 33 of 60
3.1.4 Incident Levels
This Emergency Management Plan refers to three levels of emergency incidents as per AIIMS and State Emergency Management Policy (SEMP) 4.1 – Operational Management.
Level 1 (Low)
A local Level 1 Incident is typically one where the emergency situation presents danger, but there is no immediate threat to areas outside the vicinity of the emergency. Generally does not require a response from a Hazard Management Agency (e.g. Police, Fire or Ambulance).
Level 2 (Serious)
A Level 2 Incident is a situation that could go beyond the abilities of the first responder and require the attendance of the HMA. Activation of an Incident Management Team would be done and the Emergency Operations Centre (EOC) should they be required.
Level 3 (Major)
A Level 3 Incident is a serious situation with the possibility of developing into a critical situation involving inability to provide core business, fatalities or multiple serious injuries and/or serious acts of violence on a large scale. A level 3 incident is likely to lead to Curtin University being externally controlled by emergency services and the formation of the Critical Incident Management Team.
3.2 Curtin’s Emergency Response Structure
3.2.1 Responding to an emergency
For life-threatening emergencies (Fire, Police or Ambulance): Call 0 000 from an internal phone Call 000 from an external or mobile phone.
Only call 000 if you are seeking an emergency response from Police, Fire or Ambulance Services. Text Emergency Call - Dial 106
People who use a TTY (teletypewriter) or computer with modem to access the telephone network can call emergency services via the National Relay Service. This service is not available to people who do not rely on text-based communication
For non-life threatening emergencies including general Security assistance: Call 4444 from an internal phone Call 9266 4444 from an external or mobile phone
Use the SafeZone app (a free app for all students and staff that connects you directly to the University's Security team when you need help or first aid).
N.B. It should be noted that any person providing a “first response” should limit their actions to be commensurate with their level of training and expertise.
Emergency Management Plan - December 2013 Page 34 of 60
3.2.2 Incident Alert Matrix
The Critical Incident Management Team has identified in their Incident Alert Matrix three incident levels. These incident levels pertain to Curtin University only and should not be confused with the incident levels detailed in AIIMS or State Emergency Management Policy (SEMP) 4.1 - Operational Management. For further detailed information regarding these levels refer to Appendix 6. Level 1 Alert (yellow) - usually a situation that presents danger however, there is no immediate risk to areas outside the vicinity of the emergency - managed within the work area with low probability of escalation. Level 2 Alert (orange) - usually a situation that could go beyond the abilities of the first responder and will require the attendance of Security / EMT / emergency services – Curtin has control and needs to work across business areas. Level 3 Alert (red) – usually a serious incident with the possibility of developing into a critical situation involving the inability to provide core business, fatalities or multiple serious injuries and/or serious acts of violence on a large scale. A level 3 incident is likely to lead to Curtin University being externally controlled by emergency services and the formation of the Critical Incident Management Team.
Emergency Management Plan - December 2013 Page 35 of 60
3.2.3 Emergency Response Diagram
EMERGENCY
The occurrence or imminent occurrence of a hazard
which is of such a nature or magnitude that it
requires a significant and coordinated response.
No Yes
Does it fall into one of
the categories below?
Theft/Robbery/Burglary/Fraud
Criminal damage
Motor vehicle theft/accident
Drunk and disorderly conduct
Assault
Indecent assault/ rape
Mental health issues
Fire
Severe storm
Tropical cyclone
Flood
Terrorist Act
CBRN
Collapse
Earthquake
Road crash
Plane crash
Disruption to essential services
Human epidemic
Heatwave
Yes – then it is an incident No, liaise direct with line manager
or refer straight to EMT? Security/First Responder
Security:
deal at scene or report to
Manager/Director using
relevant SOP.
liaise with Police/St John as
appropriate.
complete Incident Report.
EMT
CIMT Escalate incidents as per matrix
Emergency Management Plan - December 2013 Page 36 of 60
3.2.4 Emergency Operations Centres (EOC)
The following locations have been identified as Emergency Operations Centres:
Incident Management Team: Security Building
Critical Incident Management Team: Building 100
Emergency Management Plan - December 2013 Page 37 of 60
3.3 Media Management and Public Information
People threatened or impacted by emergencies have an urgent and vital need for information and direction. Such person’s require adequate, timely information and instructions in order to be aware of the emergency and to take appropriate actions to safeguard life and property. (refer Westplan Public Information). The provision of this information is the responsibility of the HMA. This is achieved through the Incident Management Team position of ‘Public Information Officer’ as per the AIIMS Structure.
It is likely that Curtin University will want to issue media releases for the students and staff they are responsible for. However, the release times, issues identified and content shall be coordinated through the ISG to avoid conflicting messages being disseminated.
(Please refer to the media procedures policy at http://policies.curtin.edu.au/findapolicy/) 3.4 Evacuation, Evacuation Diagrams and Equipment
3.4.1 Evacuation
Evacuation is a risk management strategy which may need to be implemented, particularly in regards to cyclones, flooding and fire. The decision to evacuate either a building/s or all/part of the campus will be based on an assessment of the nature and extent of the hazard, the anticipated speed of onset, the number and category of people to be evacuated, evacuation priorities and the availability of resources. These considerations should focus on providing all the needs of those being evacuated to ensure their safety and on-going welfare.
Evacuation of site may be a necessity and therefore effective communication with external agencies and in particular surrounding local governments is essential.
3.4.2 Evacuation Diagrams
Properties shall ensure that building evacuation diagrams are prepared, displayed and updated in accordance with AS3745-2010 Planning for Emergencies in Facilities. Building evacuation diagram (example)
Emergency Management Plan - December 2013 Page 38 of 60
3.4.3 Location
Building / Facility Locations
Offices and Teaching space Foyer on each level
Lecture Theatres All doorways inside the lecture theatre
Laboratories Entry point
Library Entry point and each level entrance
Amenities Main entrance
3.4.4 Size and Position
All evacuation diagrams shall be a minimum of A4 (210mm x 297mm), and Positioned at least 1200 mm above the ground but less than 1600 mm.
3.4.5 Elements
The evacuation diagram should contain the following elements as a minimum:
Element Details
Floor layout Minimum of 200mm x 150mm and orientated according to north direction
Title EVACUATION DIAGRAM
Position YOU ARE HERE
Exits Green Running Man symbol +- arrows
Communication Red Phone
Control Panels Black Text CP or FIP (fire indicator panel)
Hose reels Red hose reel
Hydrants Red Hydrant
Fire blanket Red Fire blanket
Refuges If present
Assembly Area Green / White Muster Point
First Aid Kits Green Background White Cross symbol
Spill response kits
Yellow Symbol
Legend Showing and describing these symbols
Direction North Pointer
3.5 Emergency Equipment All buildings shall conform to Building Code of Australia (BCA) or other relevant Standard. Inspections of emergency equipment shall be undertaken as part of the Workplace Inspection Procedure. Facilities Management is responsible for repair and maintenance of university emergency equipment including but not limited to fire panels, EWIS, emergency lighting, and firefighting equipment.
Emergency Management Plan - December 2013 Page 39 of 60
3.6 Communication Equipment Communication methods which may be utilised in an emergency include:
Emergency Warden Intercommunication System (EWIS)
Telephones, fixed, mobile and satellite
2-way radios
Megaphones
Visual and verbal communication
Runners with instructions or written communications
Safezone
SMS alert
Emergency Management Plan - December 2013 Page 42 of 60
4.1 Recovery Recovery management is the coordinated process of supporting “emergency affected communities in the reconstruction and restoration of physical infrastructure, the environment and community, psychosocial and economic wellbeing”. (Emergency Management Act 2005) Recovery is more than simply the replacement of what has been destroyed and the rehabilitation of those affected. It is a complex social and developmental process. Recovery provides an opportunity to improve aspects beyond previous conditions by enhancing social infrastructure, natural and built environments, and economies. The manner in which recovery processes are undertaken is critical to their success. (EMA Community Recovery Handbook 2011) 4.2 Aim The aim of recovery is to restore, as quickly as possible, business continuity to an affected area so that it is able to continue to function as part of the wider campus. The aim of providing recovery services is to assist the affected area towards management of its own recovery. It is recognised that where a structure or individual experiences a significant emergency there may be a need to supplement help via the Critical Incident Management Team. 4.3 Priorities for Recovery The Critical Incident Management Team/Emergency Management Team should consider the following areas when recommending priorities and ensuring work is completed:
Health and safety of individuals
Safeness of buildings
Welfare/social recovery
Economic recovery
Physical recovery
Environmental recovery
Business continuity The Emergency Management Team has responsibility for ensuring the recovery phase is initiated and are accountable for ensuring that all issues are addressed, resolved and completed. Please refer to the Liaison Office checklist at Appendix 8. 4.4 Welfare / Evacuation Centres (In development - liaison required with CIMT / DCPFS)
Emergency Management Plan - December 2013 Page 45 of 60
Appendix 1: Risk Register Schedule (subject to development)
Risk assessments consider possible risk to life, property and the business impact for Curtin University. Each Standard Operating Procedure (SOP) is accompanied by a risk assessment. In assessing the risk the following methodology has been applied. Step A – Consider the consequences Step B – Consider the likelihood
For each hazard, consider the consequence if something happens. Consider what could reasonably have happened, as well as what actually happened (if there was an accident/incident). Look at the description below and choose the most suitable consequences.
How likely is it that something will happen as a result of the hazard? Look at the description below and choose the most suitable likelihood.
Consequence Description Likelihood Description
Fatality May cause death and/or severe
irreversible disability, and/or
permanent ill health
Very Likely Will probably occur
immediately or within a
short period of time
Major Severe injury or illness Likely Will probably occur in
time
Minor Minor (usually reversible) injury or
illness resulting in days off work
Possible Might occur in the next
few months
First Aid First aid level medical treatment Unlikely Could happen, but only
rarely
Negligible No treatment required Highly
Unlikely
Has the potential to
occur, but probably
never will
Step C – Calculate the Risk Level
1. Take the Step A rating and select the correct consequence
2. Take the step B rating and select the correct likelihood
3. Circle the risk level where the two ratings cross in the matrix below
Risk level = …………………………………………
Emergency Management Plan - December 2013 Page 46 of 60
Risk Analysis Matrix
Consequence
Likelihood
Very
Likely
Likely Possible Unlikely Highly
unlikely
Fatality Extreme High High High Medium
Major Injury High High High Medium Medium
Minor Injury High Medium Medium Medium Medium
First Aid Medium Medium Medium Low Low
Negligible Medium Medium Low Low Low
Emergency Management Plan - December 2013 Page 47 of 60
Appendix 2: Standard Operating Procedure (SOP) - Evacuation
Evacuation Procedures
Subject Evacuation procedures Reference AS 3745-2010 - Planning for emergencies in facilities Review Date August 2014 Responsibility Curtin Emergency Planning Committee (EPC) Background For the purposes of evacuating a building for all hazards, do so immediately upon hearing the:
alert or alarm from the Emergency Warden Intercommunication System (EWIS),
fire alarm bell or
via verbal directive from a warden, Security staff or emergency services personnel. Procedure(s) Where it has been identified there is the need to evacuate, the following procedure(s) should be followed: Chief Warden
put on white tabard and ensure the safety of yourself and other personnel;
ascertain the nature of the emergency, o determine the most appropriate action, o assume control of the situation and o initiate a safe evacuation of the area if applicable;
notify the appropriate emergency services / Security and wait for the Warden’s status reports;
if appropriate, brief the emergency services team(s) and standby for their direction;
monitor the evacuation process and assess any potential need to extend the evacuation area;
ensure a log is maintained throughout which can be used during the debrief and secured for future reference;
brief / update either Security / Emergency Management Team (EMT) depending on the incident who will inform or escalate to the Critical Incident Management Team (CIMT);
implement the initial phase of recovery.
Emergency Management Plan - December 2013 Page 48 of 60
Warden
put on red tabard, remain calm, ascertain type and location of emergency if safe to do so;
if immediate evacuation is required, initiate controlled evacuation, otherwise wait for instructions from the Chief Warden;
operate the intercommunication system if available;
search (perform sweep) of designated area to ensure all persons are accounted for (staff, students, visitors and contractors);
assist mobility impaired persons to designated safe holding area.
ensure orderly flow of persons into protected areas, e.g. stairwells;
ensure that all fire and smoke doors are closed;
on successful evacuation report situation to the Chief Warden;
direct persons to relevant assembly area/muster point;
prevent persons from re-entering the evacuation zone or building;
control and account for personnel at assembly point if directed to do so by the Chief Warden;
compile a report of your actions for the debrief and keep for future reference. First Aid
collect first aid kit if possible;
provide care to injured personnel;
make way to the muster point and report to a Warden;
ensure first aid equipment is restocked;
attend and participate in the debrief, if applicable. Employees, Visitors and Contractors
remain calm;
collect small personal belongings (e.g. wallet/car keys) DO NOT take computers and other large items;
ensure persons in your immediate vicinity are aware they are to evacuate;
assist disabled persons in your immediate area as per their Personal Emergency Evacuation Plan (PEEP);
immediately leave the building by the first available emergency exit and proceed to the designated assembly area/muster point;
DO NOT congregate around the exit doors. Remain at the assembly area/muster point until otherwise directed by a Warden.
DO NOT use the lifts. This is not permitted in an emergency evacuation.
DO NOT carry hot liquids or food when evacuating a building. This will slow your evacuation and could cause a danger to another person i.e. spillage.
DO NOT re-enter the building until the Warden or emergency services personnel have given the all clear.
Emergency Management Plan - December 2013 Page 49 of 60
Appendix 3: Resources Register
Resources Register
Item Description Number of Items Location
Tractors - (one with bucket) 2 B110
Bobcat - (with bucket ) 1 B110
Trucks (with hiabs) - 500kg lifting capacity 2 B110
Utes - (2 x 4x4) 7 B110 and B115
Trailers 2 B110
Chainsaws / Small hand tools / shovels Various B110
Caterpillar – (Schaffer loader) 1 B110
Motorised Pump - (Unleaded Fuel) 3.8L tank, 500L
Pumps/min
1 B110
Elect submersible pump 1 B110
Box tray Utes - (2 aluminum tray backs) 2 B110
Portable Generators
Yamaha 2.4kw – 4 Stroke (unleaded), 6L tank, R 9 hrs
(1/4 load), M op 2.4kva
Yamaha 1.0kw – 4 stroke (unleaded), 3L tank, R 12hrs,
M op 2.4 kva
Honda 11.0ph – 4 stroke (unleaded), 6.5L tank, M op
8.1 kva
3 B110
Generators – (requires truck / hiab)
Perkins P27, 88kwd – 110kva, 153amps
Perkins P27, 88kwd – 27kva, 38amps
2 B110
Dispenser - (Petrol/Diesel) 1 B110
120 litre Fuel and Oil spill kits 3 B115
120 litre Chemical spill kits 2 B115
Parks and Gardens car/truck contains small spill kits– fuel 10 B110
Satellite Phones 2 B115
Emergency Management Plan - December 2013 Page 50 of 60
Two –Way Radios 22 B115
Mobile two-way Radio base station 1 B115
Patrol Vehicles with emergency roof lights 3 B115
Electric / Solar 4 seater transporter vehicle 3 B115
Steel Crowd Barriers 20 B115
First Aid Kits 6 B115
Oxygen Bottles 2 B115
Fire Extinguishers 8 All buildings
Spill Kits 6 - 10 B115
Burn Kits 4 B115
Wheelchair 1 B115
Loud Hailers - Note each patrol Vehicle has a built in loud
hailer
2 B115
Defibrillator 14 Across Campus
Spray Units – (gator spray / tractor spray) 2 B110
Domestic Waste Truck - (Large flatbed used to load Silo
bins)
1 B110
Water Truck - (Ute with water tank 1000L) 1 B110
Mini Excavator 1 B110
High Pressure Cleaner – (mains operated) 1 B110
Compactors – (for sand pavers etc.) 1 B110
Brush Cutters 6 B110
Edger’s 3 B110
Trimmers / Pruners 5 B110
Message boards 3 B110
Emergency Management Plan - December 2013 Page 52 of 60
Appendix 4: Evacuation / Welfare Centre Information
(subject to development)
Emergency Management Plan - December 2013 Page 54 of 60
Appendix 5: Personal Emergency Evacuation Plan (PEEP) Template
PERSONAL EMERGENCY EVACUATION PLAN (PEEP)
Persons Name
Preferred Contact Number
Location (most frequent)
Building Facility
Floor
Room Number
Is an Assistance Animal Involved? Yes [ ] No [ ]
Trained in Evacuation Procedure? Yes [ ] No [ ]
Preferred Method of Communication SMS [ ] PVD [ ] Visual [ ]
Type of Assistance Required
Equipment Required for Evacuation
Egress Procedure
Designated Assistant name/number/email
Are your designated assistants trained in evacuating you including general evacuation procedures
Yes [ ] No [ ]
Diagram of Evacuation Route (attach if necessary)
Issue Date: ..../..../.... Review Date: ..../...../..... Occupant Approved............................................... Date: ...../..../.... Building Warden..................................................... Date: …../..../...
Emergency Management Plan - December 2013 Page 56 of 60
Appendix 6 – Critical Incident Management Team (CIMT) Incident Alert Matrix
Security/Safety & Health Compliance/Conduct Facilities/Environment Information Technology Alert Level and
Notification
Major security threat e.g. explosion – chemicals or other bomb – chemicals or other Civil unrest Armed offender Serial dangerous offender
Potential full evacuation or lockdown of campus
Pandemic at Sustain: virus is established in Australia and spreading in the WA community. Pandemic Plan invoked (revised)
Controlled by external bodies eg Coroner, Police, WorkSafe, Emergency Services
Strong community or stakeholder criticism moving from social media into mainstream media leading to a loss of confidence in Senior Mgt or Council
TEQSA, Parliamentary or Regulator serious investigation into University activities e.g. prosecution of senior management or Council
Emergency powers in force
Senior management succession plan invoked
Widespread disruption, most areas without power or water >1 day
Widespread release of pathogens, radiation, chemicals or gas
Widespread fire internal or external to campus
Prolonged evacuation of campus or neighbourhood
Controlled by external bodies e.g. Work Safe, EPA, DFES, WA Police.
Widespread infrastructure disruption of >1 week
Telecommunications disruption of >1 week
Level 3 Alert (revised) Level of incident likely to lead to Curtin being externally controlled by emergency services, regulators, investigators or third parties. Success of the University;’s Business Continuity Response is critical.
Immediate notification to CIM Team Leader – Ian Callahan or relevant DVC (alternate)
VC/Council involved in managing business impact and media responses
All Members of Critical Incident Response Team in operation
Emergency Management Plan - December 2013 Page 57 of 60
Fatality or permanent disability on campus or on a Curtin activity
Murder, suicide or sexual assault, alleged or otherwise, on campus or on a Curtin activity, involving Curtin staff or students.
Involuntary detainment or kidnapping overseas
Sudden change in country security level requiring Curtin/Federal Govt assistance to evacuate staff or students
Pandemic at Contain: virus has arrived in WA or overseas students have been exposed to the virus. Pandemic Plan invoked (revised)
Infectious disease has spread to more than one person on campus e.g. TB, Legionella.
Working with external bodies eg Coroner, Police, Regulator, and/or Emergency Services.
Escalating adverse community criticism either in social media or mainstream media of >2 weeks
TEQSA, Parliamentary or Regulator investigation into University activities eg major systemic controls failure, or Serious Misconduct matter involving investigation by a Regulator for a prolonged period of time
Regulator enforced course closure/loss of accreditation
Escalating and prolonged class/industrial action
Major disruption, most areas without power or water between 4 hours and <1 day
Local release of pathogens, radiation, chemicals or gas
Local fire – campus evacuation
Natural disasters e.g. flood, earthquake, etc, significantly impacts staff and students on campus or on a Curtin activity
Evacuation of campus or neighbourhood
Working with external bodies e.g. WorkSafe, EPA, DFES, WA Police
Adverse Impact on Curtin community (new)
Major infrastructure disruption between 1 day and <1 week
Telecommunications disruption between 1 day and <1 week
Widespread or Systemic identity or data theft/loss
Level 2 Alert
(revised)
Curtin has control
however level of
incident means that it is
difficult to manage and
Curtin will be working
with external parties.
Effective Business
Continuity Response
required.
Immediate notification to CIM Team Leader – Ian Callahan or relevant DVC (alternate)
Notify Critical Incident Coordinator, Director Risk Management
CIMT Chair to call meeting of relevant CIMT members
VC to brief Chancellor or Council/TEQSA and other regulators as appropriate
Stakeholders to be briefed as appropriate
Emergency Management Plan - December 2013 Page 58 of 60
Security/Safety & Health Compliance/Conduct Facilities/Environment Information Technology Notification
Cumulative minor assaults/security incidents on campus e.g. car parks, playing fields
Individual/s in danger of hurting self or others
Serious injury due to any cause requiring medical attention has occurred on campus or arising out of a workplace incident
Suspicious death off-campus, of staff member or student unrelated to Curtin activities
Lost time injury >10 days
WorkSafe Prohibition or Performance Improvement Notice
Isolated case of infectious disease e.g. tuberculosis, legionella.
Pandemic at Contain: small cluster of human cases occurring in Australia but not WA
Involuntary delay domestic or overseas detainment while travelling for >1 day
Ongoing adverse community criticism either in social media or mainstream media of <2 weeks
Repeated email/verbal/written threats to members of Curtin Community including Council
Misconduct matters for the purposes of CCC where cross-Curtin coordination is required
Unplanned TEQSA/Regulator audit or query where cross-Curtin coordination is required
Litigation or industrial action where cross-Curtin coordination is required
Disruption of power/utilities outage of <4 hours
Chemical spill affecting part of the campus contained in <4 hours
Small electrical/other fire isolated to an area
Evacuation of local area or some buildings
Natural disasters e.g. flood, earthquake, etc, impacting some staff and students on campus or on a Curtin activity
Major disruption for <1 day in business hours, including loss of key systems
Isolated identity or data theft/loss eg cyber security threat
Telecommunications failure for <1 day in business hours
Mass password disclosure with localised/individual losses.
Systems malfunction resulting in Inaccurate data and/or sensitive data loss
Central Administration and Faculties invoke BC Plans
Level 1 Alert
(revised)
Curtin has control and
needs to work across
business areas
Must notify
VP CR & D /or Director Strategic Communications
DVC International if relevant
Director, Risk Management
Relevant DVC, VP and/or PVC
Relevant Compliance Officer
Relevant Curtin Liaison Officer for Regulators as appropriate eg TEQSA, EPA, CCC or Worksafe
Stakeholders to be briefed appropriate
Appoint:
Case Manager. Refer to
Incident Management
Guidelines.
Emergency Management Plan - December 2013 Page 59 of 60
Routine breaches in security
Death off-campus, of staff member or students unrelated to Curtin activities
First-aid required
Lost time injury <10 days
Individual/s displaying delusional or impaired judgement
Infectious disease diagnosed for an individual (e.g. tuberculosis)
Pandemic Phase at Delay: large cluster(s) of cases in only one or two countries overseas.
Threat from disgruntled individual
Breach of policy/legislation
Misconduct matters
Routine TEQSA/Regulator audit
Threat of legal or industrial action
Localised flooding in a work area
Temporary loss of power or ventilation to a work area
Temporary loss of systems
Temporary loss of communications
Localised password disclosure with localised loss.
Routine Incidents
Managed within the
work area low
probability of
escalation
May need to notify:
Relevant DVC, VP or PVC
Relevant Compliance Officer
Relevant Curtin Liaison Officer for Regulators as appropriate eg TEQSA, EPA, CCC or Worksafe
Legal
Counselling/Health Services
Corporate Relations & Dev.
Consult or Inform: - Security: 9266 4444 - Emergency Mgmt (tba), - Health &, Safety 9 266
4900, - Human Resources 9 266
9090,
as appropriate
Consult or Inform: - PSCU: 9 266 9140, - Security: 9 266 4444 - Human Resources
(9090)
as appropriate
Consult or Inform: - CITS : 9266 9090, - Security: 9 266 4444, - Facilities Management: 9
266 2020 - Health & Safety: 9266 4900
as appropriate.
Consult or Inform: - CITS : 9266 9090 - PSCU: 9266 9140
as appropriate