emergency evac point...emergency evac point site sheds 50m road work ahead end road work 50m th...
TRANSCRIPT
Walker Street
The A
venue
Kendall Avenue
Elliot S
treet
Poplar R
oad
Poplar Road
Old Poplar Road
Site Fence
Tree Protection Zone
Emergency Evac Point
Site Sheds
50m
RO
AD
WO
RK
AHEAD
END
RO
AD
WO
RK
50m
FOOTPATH
CLOSEDUSE
OTHER
FOOTPATH
FOOTPATH
CLOSED
USE
OTHER
FOOTPATH
FOOTPATHCLOSED
USEOTHERFOOTPATH
FOO
TPAT
HC
LOSE
DA
HEA
D
USE
OTHE
RFO
OTPA
TH
FOO
TPAT
H
CLO
SED
AHEA
DUS
E
OTHE
R
FOOT
PATH
FOO
TPATHC
LOSED
AH
EAD
USEOTHER
FOOTPATH
LEGEND
Peds Path
Work Area
Bollards & Tape
FOOTPATHCLOSED
USEOTHER
FOOTPATH
Municipality
Date of Works
Time
Poplar Rd, Parkville
Melbourne
AS PER APPLICATION
AS PER APPLICATION
Melways29 F12
Drawn
Designed
Checked
Authorised
ANNA M
ANNA M
Project
Status
Title
Bike Path Reconstruction & Landscaping
Issued For Implementation
ClientDate Drawn
Scale
Client Contact:
NTSThis Traffic Management Plan is not to scale and isintended for use as a guide only. Sign positions are
indicative only and may need to be adjusted due to trafficconditions during works. M1 Traffic Control Pty Ltd
accepts no responsibility for incorrectinstallation if implemented by others. Work site to be
fully compliant with Australian Standards1742.32009 and The Road Management Act 2004.REV Date Description Drawn Appr
19/06/2020 Location
2Construct Poplar Rd, Parkville (Bike Path Reconstruction & Landscaping) TGS 13755 v1.0
1.0 19/06/2020 Issued for implementation. AM LN
12 Richards Court, Keilor Park VIC 3042 Phone: 9310 4066
Email: [email protected]: 49 139 453 268 LAUREN N
LAUREN NArrow Boards :
0MMS :
1Utes :
9
Michael 0403 719 925
TRAFFIC CONTROLLER INSTRUCTIONS:
1. Contact TMC 1300 107 757 to activate MOA (If Applicable)
2. Always remain vigilant to your surroundings when
implementing and dismantling all traffic control devices.
3. Note any changes to TGS in use on the plan, give reasons on
SWMS, all traffic staff on site must sign onto the SWMS
4. Drive through site and check signage is visual from drivers
perspective.5. Use radios to communicate, traffic flow may be stopped for work
site movements.6. Monitor signage regularly, weigh down signs in windy weather.
7. Stay safe and remember your escape zone.
8. Implement and dismantle devices according to Code Of Practice.
9. Contact 1300 107 757 to deactivate MOA at conclusion of shift.
10. Priorty must be given by Traffic controllers and workers to all
Emergency Vehicles.
Emergency Services: Vic Roads TMC: Public Transport Victoria: Work Safe:
0001300 107 7571800 800 007 13 23 60
Contact Numbers: